© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 1 of 119
C HAPTER 2
Overview of Business Processes
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 2 of 119
INTRODUCTION
• Questions to be addressed in this chapter include:
 What are the basic business processes in which an
organization engages?
 What decisions must be made to undertake these processes?
 What information is required to make those decisions?
 does data processing cycle play an important role in organizing
business processes and providing information to users?
 What is the role of the information system and enterprise
resource planning in modern organizations?
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 3 of 119
INFORMATION NEEDS AND
BUSINESS PROCESSES
• Businesses engage in a variety of processes,
including:
– Acquiring capital
– Buying buildings and equipment
– Hiring and training employees
– Purchasing inventory
– Doing advertising and marketing
– Selling goods or services
– Collecting payment from customers
– Paying employees
– Paying taxes
– Paying vendors
Each activity
requires
different types
of decisions.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 4 of 119
INFORMATION NEEDS AND
BUSINESS PROCESSES
• Businesses engage in a variety of processes,
including:
– Acquiring capital
– Buying buildings and equipment
– Hiring and training employees
– Purchasing inventory
– Doing advertising and marketing
– Selling goods or services
– Collecting payment from customers
– Paying employees
– Paying taxes
– Paying vendors
Each decision
requires
different types
of information.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 5 of 119
• Types of information needed for decisions:
– Some is financial
– Some is nonfinancial
– Some comes from internal sources
– Some comes from external sources
• An effective AIS needs to be able to
integrate information of different types
and from different sources.
INFORMATION NEEDS AND
BUSINESS PROCESSES
By improving business processes leading to efficient
production, Toyota has become the largest automobile
manufacturer in the world, a title held by General Motors for
almost 100 years.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 6 of 119
INTERACTION WITH EXTERNAL AND
INTERNAL PARTIES
• The AIS interacts with external parties,
such as customers, vendors, creditors,
and governmental agencies.
AIS
External
Parties
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 7 of 119
INTERACTION WITH EXTERNAL AND
INTERNAL PARTIES
• The AIS also interacts with internal parties
such as employees and management.
AIS
Internal
Parties
External
Parties
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 8 of 119
INTERACTION WITH EXTERNAL AND
INTERNAL PARTIES
• The interaction is typically two way, in that
the AIS sends information to and receives
information from these parties.
AIS
Internal
Parties
External
Parties
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 9 of 119
• A transaction is:
– An agreement between two entities to
exchange goods or services; OR
– Any other event that can be measured in
economic terms by an organization.
EXAMPLES:
– Sell goods to customers
– Depreciate equipment
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
10 of
• The business transaction cycle is a process
that:
– Begins with capturing data about a transaction.
– Ends with an information output, such as
financial statements.
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
11 of
• Many business processes are paired in
give-get exchanges.
• Basic exchanges can be grouped into five
major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
12 of
• Many business processes are paired in
give-get exchanges.
• The basic exchanges can be grouped into
five major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
13 of
• The revenue cycle involves interactions
with your customers.
• You sell goods or services and get cash.
REVENUE CYCLE
Give
Goods
Get
Cash
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
14 of
• Many business processes are paired in
give-get exchanges.
• The basic exchanges can be grouped into
five major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
15 of
• The expenditure cycle involves
interactions with your suppliers.
• You buy goods or services and pay cash.
EXPENDITURE CYCLE
Give
Cash
Get
Goods
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
16 of
• Many business processes are paired in
give-get exchanges.
• The basic exchanges can be grouped into
five major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
17 of
• In the production cycle, raw materials and
labor are transformed into finished goods.
PRODUCTION CYCLE
Give Raw
Materials &
Labor
Get
Finished
Goods
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
18 of
• Many business processes are paired in
give-get exchanges.
• The basic exchanges can be grouped into
five major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
19 of
• The human resources cycle involves
interactions with your employees.
• Employees are hired, trained, paid,
evaluated, promoted, and terminated.
HUMAN RESOURCES/
PAYROLL CYCLE
Give
Cash
Get
Labor
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
20 of
• Many business processes are paired in
give-get exchanges.
• The basic exchanges can be grouped into
five major transaction cycles:
– Revenue cycle
– Expenditure cycle
– Production cycle
– Human resources/payroll cycle
– Financing cycle
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
21 of
• The financing cycle involves interactions with
investors and creditors.
• You raise capital (through stock or debt), repay
the capital, and pay a return on it (interest or
dividends).
FINANCING CYCLE
Give
Cash
Get
cash
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
22 of
• Thousands of transactions can occur
within any of these cycles.
• But there are relatively few types of
transactions in a cycle.
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
23 of
EXAMPLE:
• In the revenue cycle, the basic give-get
transaction is:
– Give goods
– Get cash
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
24 of
• Other transactions in the revenue cycle include:
BUSINESS CYCLES
• Handle customer inquiries
• Take customer orders
• Approve credit sales
• Check inventory availability
• Initiate back orders
• Pick and pack orders
• Ship goods
• Bill customers
• Update sales and Accts Rec.
for sales
• Receive customer payments
• Update Accts Rec. for
collections
• Handle sales returns,
discounts, and bad debts
• Prepare management reports
• Send info to other cycles
Note that the last activity in any
cycle is to send information to other
cycles.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
25 of
• Click on the buttons below if you wish to
see the transactions that occur in the other
cycles:
BUSINESS CYCLES
Expenditure
Cycle
Human Res./
Payroll Cycle
Production
Cycle
Financing
Cycle
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
30 of
• Every transaction cycle:
– Relates to other cycles.
– Interfaces with the general ledger and
reporting system, which generates information
for management and external parties.
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
31 of
General Ledger
and Reporting
System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
 The Revenue Cycle
 Gets finished goods
from the production
cycle.
 Provides funds to the
financing cycle.
 Provides data to the
general ledger and
reporting system.
Finished Goods
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
32 of
General Ledger
and Reporting
System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
The Expenditure Cycle
 Gets funds from the
financing cycle.
 Provides raw materials
to the production cycle.
 Provides data to the
general ledger and
reporting system.
Raw
Mats.
Data
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
33 of
General Ledger
and Reporting
System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
 The Production Cycle:
 Gets raw materials from
the expenditure cycle.
 Gets labor from the
HR/payroll cycle.
 Provides finished goods
to the revenue cycle.
 Provides data to the
general ledger and
reporting system.
Raw
Mats.
Finished Goods
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
34 of
General Ledger
and Reporting
System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
 The HR/Payroll Cycle:
 Gets funds from the
financing cycle
 Provides labor to the
production cycle.
 Provides data to the
general ledger and
reporting system.
Funds
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
35 of
General Ledger
and Reporting
System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
 The Financing Cycle:
 Gets funds from the
revenue cycle.
 Provides funds to the
expenditure and
HR/payroll cycles.
 Provides data to the
general ledger and
reporting system.
Funds
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
36 of
General Ledger
and
Reporting System
Revenue
Cycle
Expenditure
Cycle
Production
Cycle
Human Res./
Payroll Cycle
Financing
Cycle
 The General Ledger
and Reporting System:
 Gets data from all of the
cycles.
 Provides information for
internal and external
users.
Information for
Internal & External Users
Data
Data
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
37 of
Many accounting software packages
implement the different transaction cycles
as separate modules.
 Not every module is needed in every
organization,
e.g., retail companies don’t have a
production cycle.
Some companies may need extra modules.
The implementation of each transaction cycle
can differ significantly across companies.
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
38 of
• However the cycles are implemented, it is
critical that the AIS be able to:
– Accommodate the information needs of
managers.
– Integrate financial and nonfinancial data.
BUSINESS CYCLES
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
39 of
Accountants play an important role in data
processing. They answer questions such as:
What data should be entered and stored?
Who should be able to access the data?
How should the data be organized, updated,
stored, accessed, and retrieved?
How can scheduled and unanticipated information
needs be met?
To answer these questions, they must
understand data processing concepts.
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
40 of
An important function of the AIS is to
efficiently and effectively process the data
about a company’s transactions.
In manual systems, data is entered into paper
journals and ledgers.
In computer-based systems, the series of
operations performed on data is referred to as
the data processing cycle.
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
41 of
• The data processing cycle consists of four
steps:
– Data input
– Data storage
– Data processing
– Information output
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
42 of
• The data processing cycle consists of four
steps:
Data input
– Data storage
– Data processing
– Information output
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
43 of
 The first step in data processing is to
capture the data.
 Usually triggered by a business activity.
 Data is captured about:
The event that occurred.
The resources affected by the event.
The agents who participated.
DATA INPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
44 of
 A number of actions can be taken to
improve the accuracy and efficiency of
data input:
Turnaround documents.
DATA INPUT
EXAMPLE:
 The stub on your telephone bill that you tear off and return with
your check when you pay the bill.
 The customer account number is coded on the document, usually
in machine-readable form, which reduces the probability of human
error in applying the check to the correct account.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
45 of
 A number of actions can be taken to
improve the accuracy and efficiency of
data input:
– Turnaround documents.
Source data automation.
DATA INPUT
• Capture data with minimal human intervention.
• EXAMPLES:
– ATMs for banking.
– Point-of-sale (POS) scanners in retail stores.
– Automated gas pumps that accept your credit card.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
46 of
 A number of actions can be taken to
improve the accuracy and efficiency of
data input:
– Turnaround documents.
– Source data automation.
Well-designed source documents and data
entry screens.
DATA INPUT
• How do these improve the accuracy and efficiency of data
input?
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
47 of
• A number of actions can be taken to
improve the accuracy and efficiency of
data input:
– Turnaround documents.
– Source data automation.
– Well-designed source documents and data
entry screens.
Using pre-numbered documents or having
the system automatically assign
sequential numbers to transactions.
DATA INPUT
• What does it mean if a document number is missing in the
sequence?
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
48 of
 A number of actions can be taken to
improve the accuracy and efficiency of
data input:
– Turnaround documents.
– Source data automation.
– Well-designed source documents and data
entry screens.
– Using pre-numbered documents or having
the system automatically assign
sequential numbers to transactions.
DATA INPUT
• What does it mean if there are duplicate document
numbers?
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
49 of
 A number of actions can be taken to improve
the accuracy and efficiency of data input:
– Turnaround documents.
– Source data automation.
– Well-designed source documents and data entry
screens.
– Using pre-numbered documents or having the system
automatically assign sequential numbers to
transactions.
Verify transactions.
DATA INPUT
• EXAMPLE: Check for inventory availability before
completing an online sales transaction.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
50 of
• The data processing cycle consists of four
steps:
– Data input
Data storage
– Data processing
– Information output
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
51 of
 Data needs to be organized for easy and
efficient access.
 Let’s start with some vocabulary terms
with respect to data storage.
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
52 of
Ledger
DATA STORAGE
 A ledger is a file used to store cumulative
information about resources and agents. We
typically use the word ledger to describe the
set of t-accounts.
 The t-account is where we keep track of the
beginning balance, increases, decreases, and
ending balance for each asset, liability,
owners’ equity, revenue, expense, gain, loss,
and dividend account.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
53 of
Ledger
– Following is an example of a ledger account
for accounts receivable:
DATA STORAGE
ACCOUNT: Accounts Receivable Account Number: 120
Date Description Post Ref Debit Credit Balance
01/01/05 42,069.00
01/03/05 Sales S03 1,300.00 43,369.00
01/13/05 Cash collections CR09 4,600.00 38,769.00
01/23/05 Sales S04 5,600.00 44,369.00
GENERAL LEDGER
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
54 of
• Ledger
General ledger
DATA STORAGE
 The general ledger is the summary level
information for all accounts.
 Detail information is not kept in this account.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
55 of
• Ledger
• General ledger
DATA STORAGE
Example:
 Suppose XYZ Co. has three customers. Anthony
Adams owes XYZ $100. Bill Brown owes $200. And
Cory Campbell owes XYZ $300.
 The balance in accounts receivable in the general
ledger will be $600, but you will not be able to tell how
much individual customers owe by looking at that
account. The detail isn’t there.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
56 of
• Ledger
• General ledger
Subsidiary ledger
DATA STORAGE
 The subsidiary ledgers contain the detail accounts
associated with the related general ledger account.
 The accounts receivable subsidiary ledger will
contain three separate t-accounts - one for Anthony
Adams, one for Bill Brown, and one for Cory
Campbell.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
57 of
• Ledger
• General ledger
Subsidiary ledger
DATA STORAGE
 The related general ledger account is
often called a “control” account.
 The sum of the subsidiary account
balances should equal the balance in the
control account.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
58 of
• Ledger
• General ledger
• Subsidiary ledger
Coding techniques
DATA STORAGE
 Coding is a method of systematically assigning numbers or
letters to data items to help classify and organize them.
 There are many types of codes including:
– Sequence codes
– Block codes
– Group codes
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
59 of
• Ledger
• General ledger
• Subsidiary ledger
Coding techniques
DATA STORAGE
 Sequence codes, items (such as checks or invoices) are
numbered consecutively to ensure no gaps in the sequence.
 The numbering helps ensure that:
 All items are accounted for.
 There are no duplicated numbers, which would suggest errors or
fraud.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
60 of
• Ledger
• General ledger
• Subsidiary ledger
Coding techniques
DATA STORAGE
 Block codes are used, blocks of numbers within a numerical
sequence are reserved for a particular category.
 EXAMPLE: The first three digits of a Social Security number
make up a block code that indicates the state in which the
Social Security number was issued:
– 001–003 New Hampshire
– 004–007 Maine
– 008–009 Vermont
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
61 of
• Ledger
• General ledger
• Subsidiary ledger
Coding techniques
DATA STORAGE
 Group codes are used, two or more subgroups of digits are
used to code an item.
 EXAMPLE: The code in the upper, right-hand corner of many
checks is a group code organized as follows:
– Digits 1–2 Bank number
– Digit 3 Federal Reserve District
– Digits 4–7 Branch office of Federal Reserve
– Digits 8–9 State
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
62 of
• Ledger
• General ledger
• Subsidiary ledger
• Coding techniques
DATA STORAGE
 Group coding schemes are often used in assigning general
ledger account numbers.
 The following guidelines should be observed:
 The code should be consistent with its intended use, so make
sure you know what users need.
 Provide enough digits to allow room for growth.
 Keep it simple in order to:
 Minimize costs
 Facilitate memorization
 Ensure employee acceptance
 Make sure it’s consistent with:
 The company’s organization structure
 Other divisions of the organization
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
63 of
• Ledger
• General ledger
• Subsidiary ledger
• Coding techniques
Chart of accounts
DATA STORAGE
 The chart of accounts is a list of all general ledger accounts an
organization uses.
 Group coding is often used for these numbers, e.g.:
 The first section identifies the major account categories, such as
asset, liability, revenue, etc.
 The second section identifies the primary sub-account, such as
current asset or long-term investment.
 The third section identifies the specific account, such as accounts
receivable or inventory.
 The fourth section identifies the subsidiary account, e.g., the specific
customer code for an account receivable.
 The structure of this chart is an important AIS issue, as it must contain
sufficient detail to meet the organization’s needs.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
64 of
• Ledger
• General ledger
• Subsidiary ledger
• Coding techniques
Chart of accounts
DATA STORAGE
 Table 2-4 in your textbook contains the chart of accounts for S&S.
 What is the account number for federal unemployment taxes
payable?
 What is the account number for cost of goods sold?
 What is the range of account numbers for expenses?
 With this chart of accounts, can S&S easily distinguish the costs they
incur for automobile insurance from the costs for health insurance?
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
65 of
• Ledger
• General ledger
• Subsidiary ledger
• Coding techniques
• Chart of accounts
Journals
DATA STORAGE
 In manual systems and some accounting packages, the
first place that transactions are entered is called the
journal.
 A general journal is used to record:
• Non-routine transactions, such as loan payments
• Summaries of routine transactions
• Adjusting entries
• Closing entries
 A special journal is used to record routine transactions. The
most common special journals are:
• Cash receipts
• Cash disbursements
• Credit sales
• Credit purchases
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
66 of
• Ledger
• General ledger
• Subsidiary ledger
• Coding techniques
• Chart of accounts
• Journals
Audit trail
DATA STORAGE
 An audit trail exists when there is sufficient
documentation to allow the tracing of a
transaction from beginning to end or from the
end back to the beginning.
 The inclusion of posting references and
document numbers enable the tracing of
transactions through the journals and ledgers
and therefore facilitate the audit trail.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
67 of
Now that we’ve learned some storage
terminology, let’s return to the data
storage process.
When transaction data is captured on a
source document, the next step is to
record the data in a journal.
A journal entry is made for each
transaction showing the accounts and
amounts to be credited.
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
68 of
• If you took a principles of financial accounting
class, you probably worked with journals that
looked something like this:
DATA STORAGE
01/15/04 Accounts receivable 2,200
Sales revenue 2,200
01/18/04 Cash 1,800
Accounts receivable 1,800
01/21/04 Salaries expense 900
Cash 900
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
69 of
You may not have gotten much experience with
special journals, but in most real-world
situations, journal entries really work like this.
Entries are originally made in the general journal only
for:
• Non-routine transactions
• Summaries of routine transactions
Routine transactions are originally entered in special
journals. The most common special journals are:
• Credit sales
• Cash receipts
• Credit purchases
• Cash disbursements
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
70 of
• Let’s work through an example with a
special journal.
• In this case we’ll use the sales journal.
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
71 of
• On December 1, a sale is made to Lee Co.
for $800. Lee Co. was sent Invoice No. 201.
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
72 of
 The general ledger account number for accounts
receivable is No. 120. Lee Co. was about the 122nd
customer, so their subsidiary account number is
120-122.
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
73 of
The next sale on December 1 was made
to May Co. for $700.
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
12/01/04 202 May Co. 120-033 700.00
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
74 of
The third and final sale on December 1
was made to DLK Co. for $900.
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
12/01/04 202 May Co. 120-033 700.00
12/01/04 203 DLK Co. 120-111 900.00
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
75 of
 Suppose the company making these sales posts
transactions at the end of each day.
 Consequently, at day’s end, they will post each
individual transaction to the accounts receivable
subsidiary ledger:
 An $800 increase in accounts receivable (debit) will
be posted to Lee Co.’s subsidiary account (120-122).
 A $700 debit will be posted to May Co.’s subsidiary
account (120-033).
 A $900 debit will be posted to DLK Co.’s subsidiary
account (120-111).
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
76 of
• Then a summary journal entry must be made to
the general journal. The sales for the period are
totaled. In this case, they add up to $2,400.
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
12/01/04 202 May Co. 120-033 700.00
12/01/04 203 DLK Co. 120-111 900.00
TOTAL 2,400.00
120/502
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
77 of
• The “120/502” that appears beneath the total indicates
that a summary journal entry is made in the general
journal with a debit to accounts receivable (120) and a
credit to sales (502).
DATA STORAGE
Page 5
Date
Invoice
Number
Account
Debited
Account
Number Post Ref. Amount
12/01/04 201 Lee Co. 120-122 800.00
12/01/04 202 May Co. 120-033 700.00
12/01/04 203 DLK Co. 120-111 900.00
TOTAL 2,400.00
120/502
Sales Journal
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
78 of
 The entries in the general journal are periodically (or
automatically) posted to the general ledger. The $2,400
debit to accounts receivable will be posted to the
accounts receivable control account, and the $2,400
credit will be posted to the general ledger account for
sales.
DATA STORAGE
12/01/04 Accounts receivable 2,400
Sales revenue 2,400
12/01/04 Cash 1,800
Accounts receivable 1,800
12/01/04 Salaries expense 900
Cash 900
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
79 of
 From time to time, the subsidiary account
balances will be added up, and this sum
will be compared to the balance of the
control account.
 What does it mean if they aren’t equal?
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
80 of
 Review so far:
 When routine transactions occur, they are recorded in
special journals.
 When non-routine transactions occur, they are recorded in
the general journal.
 Periodically, the transactions in the special journal are totaled,
and a summary entry is made in the general journal.
 The individual line items in the special journal are posted to
the subsidiary ledger accounts.
 The items in the general journal are posted to the general
ledger.
 Periodically, the balances in the general ledger control
accounts are compared to the sums of the balances in the
related subsidiary accounts.
DATA STORAGE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
81 of
Click the button below if you wish to
go through a summary of the
remaining steps in the accounting
cycle:
DATA STORAGE
See Remainder
Of
Accounting Cycle
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
85 of
• Now let’s move on to discussing some
computer-based storage concepts, including:
– Entity
– Attribute
– Record
– Data Value
– Field
– File
– Master File
– Transaction File
– Database
COMPUTER-BASED STORAGE
CONCEPTS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
86 of
An entity is something about which information
is stored.
In your university’s student information system,
one entity is the student. The student
information system stores information about
students.
What are some other entities in your student
information system?
COMPUTER-BASED STORAGE
CONCEPTS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
87 of
Attributes are characteristics of interest with
respect to the entity.
Some attributes that a student information
system typically stores about the student entity
are:
– Student ID number
– Phone number
– Address
What are some other attributes about students
that a university might store?
COMPUTER-BASED STORAGE
CONCEPTS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
88 of
A field is the physical space where an attribute
is stored.
The space where the student ID number is
stored is the student ID field.
COMPUTER-BASED STORAGE
CONCEPTS
Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50
328469993 SIMPSON ALICE 4053721111
328500732 ANDREWS BARRY 4057440236
529036409 FLANDERS CARLA 4057475863
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
89 of
A record is the set of attributes stored for a
particular instance of an entity.
The combination of attributes stored for Barry
Andrews is Barry’s record.
COMPUTER-BASED STORAGE
CONCEPTS
Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50
328469993 SIMPSON ALICE 4053721111
328500732 ANDREWS BARRY 4057440236
529036409 FLANDERS CARLA 4057475863
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
90 of
A data value is the intersection of the row and
column. (Field Vs Record)
The data value for Barry Andrews’ phone
number is 405-744-0236.
COMPUTER-BASED STORAGE
CONCEPTS
Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50
328469993 SIMPSON ALICE 4053721111
328500732 ANDREWS BARRY 4057440236
529036409 FLANDERS CARLA 4057475863
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
91 of
A file is a group of related records.
The collection of records about all students at
the university might be called the student file.
If there were only three students and four
attributes stored for each student, the file might
appear as shown below:
COMPUTER-BASED STORAGE
CONCEPTS
Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50
328469993 SIMPSON ALICE 4053721111
328500732 ANDREWS BARRY 4057440236
529036409 FLANDERS CARLA 4057475863
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
92 of
A master file is a file that stores
cumulative information about an
organization’s entities.
It is conceptually similar to a ledger in a
manual AIS in that:
The file is permanent.
The file exists across fiscal periods.
Changes are made to the file to reflect the
effects of new transactions.
COMPUTER-BASED STORAGE
CONCEPTS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
93 of
A transaction file is a file that contains
records of individual transactions (events)
that occur during a fiscal period.
It is conceptually similar to a journal in a
manual AIS in that:
The files are temporary.
The files are usually maintained for one fiscal
period.
COMPUTER-BASED STORAGE
CONCEPTS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
94 of
A database is a set of interrelated, centrally-
coordinated files.
When files about students are integrated with
files about classes and files about instructors,
we have a database.
COMPUTER-BASED STORAGE
CONCEPTS
Student
File
Class
File
Instructor
File
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
95 of
• The data processing cycle consists of four
steps:
– Data input
– Data storage
– Data processing
– Information output
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
96 of
Once data about a business activity has
been collected and entered into a system,
it must be processed.
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
97 of
There are four different types of file
processing:
Updating data to record the occurrence of an
event, the resources affected by the event,
and the agents who participated, e.g.,
recording a sale to a customer.
Changing data, e.g., a customer address.
Adding data, e.g., a new customer.
Deleting data, e.g., removing an old customer
that has not purchased anything in 5 years.
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
98 of
Updating can be done through several
approaches:
Batch processing
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
99 of
• Batch processing:
 Source documents are grouped into batches,
and control totals are calculated.
 Periodically, the batches are entered into the
computer system, edited, sorted, and stored
in a temporary file.
 The temporary transaction file is run against
the master file to update the master file.
 Output is printed or displayed, along with error
reports, transaction reports, and control totals.
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
100 of
Updating can be done through several
approaches:
– Batch processing
Online batch processing
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
101 of
• Online batch processing:
 Transactions are entered into a computer
system as they occur and stored in a
temporary file.
 Periodically, the temporary transaction file is
run against the master file to update the
master file.
 The output is printed or displayed.
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
102 of
Updating can be done through several
approaches:
– Batch processing
– Online batch processing
Online, real-time processing
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
103 of
• Online, real-time processing
Transactions are entered into a computer
system as they occur.
The master file is immediately updated with
the data from the transaction.
Output is printed or displayed.
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
104 of
Updating can be done through several
approaches:
 Batch processing
 Online batch processing
 Online, real-time processing
If you’re going through enrollment,
which of these approaches would you
prefer that your university was using?
Why?
DATA PROCESSING
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
105 of
The data processing cycle consists of four
steps:
– Data input
– Data storage
– Data processing
– Information output
TRANSACTION PROCESSING:
THE DATA PROCESSING CYCLE
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
106 of
• The final step in the information process is
information output.
• This output can be in the form of:
– Documents
INFORMATION OUTPUT
• Documents are records of transactions or
other company data.
• EXAMPLE: Employee paychecks or
purchase orders for merchandise.
• Documents generated at the end of the
transaction processing activities are
known as operational documents (as
opposed to source documents).
• They can be printed or stored as
electronic images.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
107 of
• The final step in the information process is
information output.
• This output can be in the form of:
– Documents
– Reports
INFORMATION OUTPUT
 Reports are used by employees to
control operational activities and by
managers to make decisions and
design strategies.
 They may be produced:
– On a regular basis
– On an exception basis
– On demand
 Organizations should periodically
reassess whether each report is
needed.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
108 of
• The final step in the information process is
information output.
• This output can be in the form of:
– Documents
– Reports
– Queries
INFORMATION OUTPUT
 Queries are user requests for specific
pieces of information.
 They may be requested:
– Periodically
– One time
 They can be displayed:
– On the monitor, called soft copy.
– On the screen, called hard copy.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
109 of
Output can serve a variety of purposes:
Financial statements can be provided to both
external and internal parties.
Some outputs are specifically for internal use:
• For planning purposes
INFORMATION OUTPUT
• Examples of outputs for planning
purposes include:
– Budgets
• Budgets are an entity’s formal expression of
goals in financial terms.
– Sales forecasts
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
110 of
• Output can serve a variety of purposes:
– Financial statements can be provided to both
external and internal parties.
– Some outputs are specifically for internal use:
• For planning purposes
• For management of day-to-day operations
INFORMATION OUTPUT
• Example: Delivery schedules
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
111 of
• Output can serve a variety of purposes:
– Financial statements can be provided to both
external and internal parties.
– Some outputs are specifically for internal use:
• For planning purposes
• For management of day-to-day operations
• For control purposes
INFORMATION OUTPUT
• Performance reports are outputs that are
used for control purposes.
• These reports compare an organization’s
standard or expected performance with
its actual outcomes.
• Management by exception is an
approach to utilizing performance
reports that focuses on investigating and
acting on only those variances that are
significant.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
112 of
• Output can serve a variety of purposes:
– Financial statements can be provided to both
external and internal parties.
– Some outputs are specifically for internal use:
• For planning purposes
• For management of day-to-day operations
• For control purposes
• For evaluation purposes
INFORMATION OUTPUT
• These outputs might include:
– Surveys of customer satisfaction.
– Reports on employee error rates.
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
113 of
• Behavioral implications of managerial
reports:
– YOU GET WHAT YOU MEASURE!
INFORMATION OUTPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
114 of
Suppose an instructor wants to improve student
learning.
 He decides to encourage better attendance by
grading students on attendance (i.e., measuring it).
 The result will be better student attendance, i.e., you
get what you measure.
 The improved attendance may or may not improve
learning outcomes.
 Students may be getting better grades when
attendance is measured, but not learning more.
 Some students may in fact reduce their studying
because they believe they can use the attendance
score to boost their grade. This behavior would be a
dysfunctional result of the measurement.
INFORMATION OUTPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
115 of
Budgets can cause dysfunctional behavior.
– EXAMPLE:
– In order to stay within budget, the IT department
did not buy a security package for its system.
– A hacker broke in and devastated some of their
data files.
– Critical security measures were foregone in order
to meet budgetary goals.
– The resulting costs far outweighed the savings.
INFORMATION OUTPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
116 of
 Budgeting can also be dysfunctional in
that the focus can be redirected to
creating acceptable numbers instead
of achieving organizational objectives.
 Does this mean organizations
shouldn’t budget?
INFORMATION OUTPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
117 of
• The saying goes, “Not many people sit
around and have a roast goose fall in their
lap.”
• In other words, if you want a roast goose,
you have to aim.
• With financial results, you’re also unlikely to
achieve when you don’t aim.
• Just be careful where you aim!
INFORMATION OUTPUT
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
118 of
The traditional AIS captured financial data.
– Non-financial data was captured in other,
sometimes-redundant systems
ROLE OF THE AIS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
119 of
Enterprise resource planning (ERP) systems
are designed to integrate all aspects of a
company’s operations (including both
financial and non-financial information) with
the traditional functions of an AIS.
ROLE OF THE AIS
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
120 of
• We’ve learned about the basic business processes
in which an organization engages, the decisions
that need to be made, and the information required
to make those decisions.
• We’ve reviewed the data processing cycle and its
role in organizing business processes and
providing information to users.
• Finally, we’ve touched on the role of the
information systems in modern organizations and
introduced the notion of enterprise resource
planning systems.
SUMMARY
© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart
121 of
End
of
Chapter 2

@$Accounting information system Ch-2.ppt

  • 1.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 1 of 119 C HAPTER 2 Overview of Business Processes
  • 2.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 2 of 119 INTRODUCTION • Questions to be addressed in this chapter include:  What are the basic business processes in which an organization engages?  What decisions must be made to undertake these processes?  What information is required to make those decisions?  does data processing cycle play an important role in organizing business processes and providing information to users?  What is the role of the information system and enterprise resource planning in modern organizations?
  • 3.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 3 of 119 INFORMATION NEEDS AND BUSINESS PROCESSES • Businesses engage in a variety of processes, including: – Acquiring capital – Buying buildings and equipment – Hiring and training employees – Purchasing inventory – Doing advertising and marketing – Selling goods or services – Collecting payment from customers – Paying employees – Paying taxes – Paying vendors Each activity requires different types of decisions.
  • 4.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 4 of 119 INFORMATION NEEDS AND BUSINESS PROCESSES • Businesses engage in a variety of processes, including: – Acquiring capital – Buying buildings and equipment – Hiring and training employees – Purchasing inventory – Doing advertising and marketing – Selling goods or services – Collecting payment from customers – Paying employees – Paying taxes – Paying vendors Each decision requires different types of information.
  • 5.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 5 of 119 • Types of information needed for decisions: – Some is financial – Some is nonfinancial – Some comes from internal sources – Some comes from external sources • An effective AIS needs to be able to integrate information of different types and from different sources. INFORMATION NEEDS AND BUSINESS PROCESSES By improving business processes leading to efficient production, Toyota has become the largest automobile manufacturer in the world, a title held by General Motors for almost 100 years.
  • 6.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 6 of 119 INTERACTION WITH EXTERNAL AND INTERNAL PARTIES • The AIS interacts with external parties, such as customers, vendors, creditors, and governmental agencies. AIS External Parties
  • 7.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 7 of 119 INTERACTION WITH EXTERNAL AND INTERNAL PARTIES • The AIS also interacts with internal parties such as employees and management. AIS Internal Parties External Parties
  • 8.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 8 of 119 INTERACTION WITH EXTERNAL AND INTERNAL PARTIES • The interaction is typically two way, in that the AIS sends information to and receives information from these parties. AIS Internal Parties External Parties
  • 9.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 9 of 119 • A transaction is: – An agreement between two entities to exchange goods or services; OR – Any other event that can be measured in economic terms by an organization. EXAMPLES: – Sell goods to customers – Depreciate equipment BUSINESS CYCLES
  • 10.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 10 of • The business transaction cycle is a process that: – Begins with capturing data about a transaction. – Ends with an information output, such as financial statements. BUSINESS CYCLES
  • 11.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 11 of • Many business processes are paired in give-get exchanges. • Basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 12.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 12 of • Many business processes are paired in give-get exchanges. • The basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 13.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 13 of • The revenue cycle involves interactions with your customers. • You sell goods or services and get cash. REVENUE CYCLE Give Goods Get Cash
  • 14.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 14 of • Many business processes are paired in give-get exchanges. • The basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 15.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 15 of • The expenditure cycle involves interactions with your suppliers. • You buy goods or services and pay cash. EXPENDITURE CYCLE Give Cash Get Goods
  • 16.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 16 of • Many business processes are paired in give-get exchanges. • The basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 17.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 17 of • In the production cycle, raw materials and labor are transformed into finished goods. PRODUCTION CYCLE Give Raw Materials & Labor Get Finished Goods
  • 18.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 18 of • Many business processes are paired in give-get exchanges. • The basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 19.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 19 of • The human resources cycle involves interactions with your employees. • Employees are hired, trained, paid, evaluated, promoted, and terminated. HUMAN RESOURCES/ PAYROLL CYCLE Give Cash Get Labor
  • 20.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 20 of • Many business processes are paired in give-get exchanges. • The basic exchanges can be grouped into five major transaction cycles: – Revenue cycle – Expenditure cycle – Production cycle – Human resources/payroll cycle – Financing cycle BUSINESS CYCLES
  • 21.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 21 of • The financing cycle involves interactions with investors and creditors. • You raise capital (through stock or debt), repay the capital, and pay a return on it (interest or dividends). FINANCING CYCLE Give Cash Get cash
  • 22.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 22 of • Thousands of transactions can occur within any of these cycles. • But there are relatively few types of transactions in a cycle. BUSINESS CYCLES
  • 23.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 23 of EXAMPLE: • In the revenue cycle, the basic give-get transaction is: – Give goods – Get cash BUSINESS CYCLES
  • 24.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 24 of • Other transactions in the revenue cycle include: BUSINESS CYCLES • Handle customer inquiries • Take customer orders • Approve credit sales • Check inventory availability • Initiate back orders • Pick and pack orders • Ship goods • Bill customers • Update sales and Accts Rec. for sales • Receive customer payments • Update Accts Rec. for collections • Handle sales returns, discounts, and bad debts • Prepare management reports • Send info to other cycles Note that the last activity in any cycle is to send information to other cycles.
  • 25.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 25 of • Click on the buttons below if you wish to see the transactions that occur in the other cycles: BUSINESS CYCLES Expenditure Cycle Human Res./ Payroll Cycle Production Cycle Financing Cycle
  • 26.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 30 of • Every transaction cycle: – Relates to other cycles. – Interfaces with the general ledger and reporting system, which generates information for management and external parties. BUSINESS CYCLES
  • 27.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 31 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle  The Revenue Cycle  Gets finished goods from the production cycle.  Provides funds to the financing cycle.  Provides data to the general ledger and reporting system. Finished Goods
  • 28.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 32 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle The Expenditure Cycle  Gets funds from the financing cycle.  Provides raw materials to the production cycle.  Provides data to the general ledger and reporting system. Raw Mats. Data
  • 29.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 33 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle  The Production Cycle:  Gets raw materials from the expenditure cycle.  Gets labor from the HR/payroll cycle.  Provides finished goods to the revenue cycle.  Provides data to the general ledger and reporting system. Raw Mats. Finished Goods
  • 30.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 34 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle  The HR/Payroll Cycle:  Gets funds from the financing cycle  Provides labor to the production cycle.  Provides data to the general ledger and reporting system. Funds
  • 31.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 35 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle  The Financing Cycle:  Gets funds from the revenue cycle.  Provides funds to the expenditure and HR/payroll cycles.  Provides data to the general ledger and reporting system. Funds
  • 32.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 36 of General Ledger and Reporting System Revenue Cycle Expenditure Cycle Production Cycle Human Res./ Payroll Cycle Financing Cycle  The General Ledger and Reporting System:  Gets data from all of the cycles.  Provides information for internal and external users. Information for Internal & External Users Data Data
  • 33.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 37 of Many accounting software packages implement the different transaction cycles as separate modules.  Not every module is needed in every organization, e.g., retail companies don’t have a production cycle. Some companies may need extra modules. The implementation of each transaction cycle can differ significantly across companies. BUSINESS CYCLES
  • 34.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 38 of • However the cycles are implemented, it is critical that the AIS be able to: – Accommodate the information needs of managers. – Integrate financial and nonfinancial data. BUSINESS CYCLES
  • 35.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 39 of Accountants play an important role in data processing. They answer questions such as: What data should be entered and stored? Who should be able to access the data? How should the data be organized, updated, stored, accessed, and retrieved? How can scheduled and unanticipated information needs be met? To answer these questions, they must understand data processing concepts. TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 36.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 40 of An important function of the AIS is to efficiently and effectively process the data about a company’s transactions. In manual systems, data is entered into paper journals and ledgers. In computer-based systems, the series of operations performed on data is referred to as the data processing cycle. TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 37.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 41 of • The data processing cycle consists of four steps: – Data input – Data storage – Data processing – Information output TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 38.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 42 of • The data processing cycle consists of four steps: Data input – Data storage – Data processing – Information output TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 39.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 43 of  The first step in data processing is to capture the data.  Usually triggered by a business activity.  Data is captured about: The event that occurred. The resources affected by the event. The agents who participated. DATA INPUT
  • 40.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 44 of  A number of actions can be taken to improve the accuracy and efficiency of data input: Turnaround documents. DATA INPUT EXAMPLE:  The stub on your telephone bill that you tear off and return with your check when you pay the bill.  The customer account number is coded on the document, usually in machine-readable form, which reduces the probability of human error in applying the check to the correct account.
  • 41.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 45 of  A number of actions can be taken to improve the accuracy and efficiency of data input: – Turnaround documents. Source data automation. DATA INPUT • Capture data with minimal human intervention. • EXAMPLES: – ATMs for banking. – Point-of-sale (POS) scanners in retail stores. – Automated gas pumps that accept your credit card.
  • 42.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 46 of  A number of actions can be taken to improve the accuracy and efficiency of data input: – Turnaround documents. – Source data automation. Well-designed source documents and data entry screens. DATA INPUT • How do these improve the accuracy and efficiency of data input?
  • 43.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 47 of • A number of actions can be taken to improve the accuracy and efficiency of data input: – Turnaround documents. – Source data automation. – Well-designed source documents and data entry screens. Using pre-numbered documents or having the system automatically assign sequential numbers to transactions. DATA INPUT • What does it mean if a document number is missing in the sequence?
  • 44.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 48 of  A number of actions can be taken to improve the accuracy and efficiency of data input: – Turnaround documents. – Source data automation. – Well-designed source documents and data entry screens. – Using pre-numbered documents or having the system automatically assign sequential numbers to transactions. DATA INPUT • What does it mean if there are duplicate document numbers?
  • 45.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 49 of  A number of actions can be taken to improve the accuracy and efficiency of data input: – Turnaround documents. – Source data automation. – Well-designed source documents and data entry screens. – Using pre-numbered documents or having the system automatically assign sequential numbers to transactions. Verify transactions. DATA INPUT • EXAMPLE: Check for inventory availability before completing an online sales transaction.
  • 46.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 50 of • The data processing cycle consists of four steps: – Data input Data storage – Data processing – Information output TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 47.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 51 of  Data needs to be organized for easy and efficient access.  Let’s start with some vocabulary terms with respect to data storage. DATA STORAGE
  • 48.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 52 of Ledger DATA STORAGE  A ledger is a file used to store cumulative information about resources and agents. We typically use the word ledger to describe the set of t-accounts.  The t-account is where we keep track of the beginning balance, increases, decreases, and ending balance for each asset, liability, owners’ equity, revenue, expense, gain, loss, and dividend account.
  • 49.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 53 of Ledger – Following is an example of a ledger account for accounts receivable: DATA STORAGE ACCOUNT: Accounts Receivable Account Number: 120 Date Description Post Ref Debit Credit Balance 01/01/05 42,069.00 01/03/05 Sales S03 1,300.00 43,369.00 01/13/05 Cash collections CR09 4,600.00 38,769.00 01/23/05 Sales S04 5,600.00 44,369.00 GENERAL LEDGER
  • 50.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 54 of • Ledger General ledger DATA STORAGE  The general ledger is the summary level information for all accounts.  Detail information is not kept in this account.
  • 51.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 55 of • Ledger • General ledger DATA STORAGE Example:  Suppose XYZ Co. has three customers. Anthony Adams owes XYZ $100. Bill Brown owes $200. And Cory Campbell owes XYZ $300.  The balance in accounts receivable in the general ledger will be $600, but you will not be able to tell how much individual customers owe by looking at that account. The detail isn’t there.
  • 52.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 56 of • Ledger • General ledger Subsidiary ledger DATA STORAGE  The subsidiary ledgers contain the detail accounts associated with the related general ledger account.  The accounts receivable subsidiary ledger will contain three separate t-accounts - one for Anthony Adams, one for Bill Brown, and one for Cory Campbell.
  • 53.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 57 of • Ledger • General ledger Subsidiary ledger DATA STORAGE  The related general ledger account is often called a “control” account.  The sum of the subsidiary account balances should equal the balance in the control account.
  • 54.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 58 of • Ledger • General ledger • Subsidiary ledger Coding techniques DATA STORAGE  Coding is a method of systematically assigning numbers or letters to data items to help classify and organize them.  There are many types of codes including: – Sequence codes – Block codes – Group codes
  • 55.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 59 of • Ledger • General ledger • Subsidiary ledger Coding techniques DATA STORAGE  Sequence codes, items (such as checks or invoices) are numbered consecutively to ensure no gaps in the sequence.  The numbering helps ensure that:  All items are accounted for.  There are no duplicated numbers, which would suggest errors or fraud.
  • 56.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 60 of • Ledger • General ledger • Subsidiary ledger Coding techniques DATA STORAGE  Block codes are used, blocks of numbers within a numerical sequence are reserved for a particular category.  EXAMPLE: The first three digits of a Social Security number make up a block code that indicates the state in which the Social Security number was issued: – 001–003 New Hampshire – 004–007 Maine – 008–009 Vermont
  • 57.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 61 of • Ledger • General ledger • Subsidiary ledger Coding techniques DATA STORAGE  Group codes are used, two or more subgroups of digits are used to code an item.  EXAMPLE: The code in the upper, right-hand corner of many checks is a group code organized as follows: – Digits 1–2 Bank number – Digit 3 Federal Reserve District – Digits 4–7 Branch office of Federal Reserve – Digits 8–9 State
  • 58.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 62 of • Ledger • General ledger • Subsidiary ledger • Coding techniques DATA STORAGE  Group coding schemes are often used in assigning general ledger account numbers.  The following guidelines should be observed:  The code should be consistent with its intended use, so make sure you know what users need.  Provide enough digits to allow room for growth.  Keep it simple in order to:  Minimize costs  Facilitate memorization  Ensure employee acceptance  Make sure it’s consistent with:  The company’s organization structure  Other divisions of the organization
  • 59.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 63 of • Ledger • General ledger • Subsidiary ledger • Coding techniques Chart of accounts DATA STORAGE  The chart of accounts is a list of all general ledger accounts an organization uses.  Group coding is often used for these numbers, e.g.:  The first section identifies the major account categories, such as asset, liability, revenue, etc.  The second section identifies the primary sub-account, such as current asset or long-term investment.  The third section identifies the specific account, such as accounts receivable or inventory.  The fourth section identifies the subsidiary account, e.g., the specific customer code for an account receivable.  The structure of this chart is an important AIS issue, as it must contain sufficient detail to meet the organization’s needs.
  • 60.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 64 of • Ledger • General ledger • Subsidiary ledger • Coding techniques Chart of accounts DATA STORAGE  Table 2-4 in your textbook contains the chart of accounts for S&S.  What is the account number for federal unemployment taxes payable?  What is the account number for cost of goods sold?  What is the range of account numbers for expenses?  With this chart of accounts, can S&S easily distinguish the costs they incur for automobile insurance from the costs for health insurance?
  • 61.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 65 of • Ledger • General ledger • Subsidiary ledger • Coding techniques • Chart of accounts Journals DATA STORAGE  In manual systems and some accounting packages, the first place that transactions are entered is called the journal.  A general journal is used to record: • Non-routine transactions, such as loan payments • Summaries of routine transactions • Adjusting entries • Closing entries  A special journal is used to record routine transactions. The most common special journals are: • Cash receipts • Cash disbursements • Credit sales • Credit purchases
  • 62.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 66 of • Ledger • General ledger • Subsidiary ledger • Coding techniques • Chart of accounts • Journals Audit trail DATA STORAGE  An audit trail exists when there is sufficient documentation to allow the tracing of a transaction from beginning to end or from the end back to the beginning.  The inclusion of posting references and document numbers enable the tracing of transactions through the journals and ledgers and therefore facilitate the audit trail.
  • 63.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 67 of Now that we’ve learned some storage terminology, let’s return to the data storage process. When transaction data is captured on a source document, the next step is to record the data in a journal. A journal entry is made for each transaction showing the accounts and amounts to be credited. DATA STORAGE
  • 64.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 68 of • If you took a principles of financial accounting class, you probably worked with journals that looked something like this: DATA STORAGE 01/15/04 Accounts receivable 2,200 Sales revenue 2,200 01/18/04 Cash 1,800 Accounts receivable 1,800 01/21/04 Salaries expense 900 Cash 900
  • 65.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 69 of You may not have gotten much experience with special journals, but in most real-world situations, journal entries really work like this. Entries are originally made in the general journal only for: • Non-routine transactions • Summaries of routine transactions Routine transactions are originally entered in special journals. The most common special journals are: • Credit sales • Cash receipts • Credit purchases • Cash disbursements DATA STORAGE
  • 66.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 70 of • Let’s work through an example with a special journal. • In this case we’ll use the sales journal. DATA STORAGE
  • 67.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 71 of • On December 1, a sale is made to Lee Co. for $800. Lee Co. was sent Invoice No. 201. DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 Sales Journal
  • 68.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 72 of  The general ledger account number for accounts receivable is No. 120. Lee Co. was about the 122nd customer, so their subsidiary account number is 120-122. DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 Sales Journal
  • 69.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 73 of The next sale on December 1 was made to May Co. for $700. DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 12/01/04 202 May Co. 120-033 700.00 Sales Journal
  • 70.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 74 of The third and final sale on December 1 was made to DLK Co. for $900. DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 12/01/04 202 May Co. 120-033 700.00 12/01/04 203 DLK Co. 120-111 900.00 Sales Journal
  • 71.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 75 of  Suppose the company making these sales posts transactions at the end of each day.  Consequently, at day’s end, they will post each individual transaction to the accounts receivable subsidiary ledger:  An $800 increase in accounts receivable (debit) will be posted to Lee Co.’s subsidiary account (120-122).  A $700 debit will be posted to May Co.’s subsidiary account (120-033).  A $900 debit will be posted to DLK Co.’s subsidiary account (120-111). DATA STORAGE
  • 72.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 76 of • Then a summary journal entry must be made to the general journal. The sales for the period are totaled. In this case, they add up to $2,400. DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 12/01/04 202 May Co. 120-033 700.00 12/01/04 203 DLK Co. 120-111 900.00 TOTAL 2,400.00 120/502 Sales Journal
  • 73.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 77 of • The “120/502” that appears beneath the total indicates that a summary journal entry is made in the general journal with a debit to accounts receivable (120) and a credit to sales (502). DATA STORAGE Page 5 Date Invoice Number Account Debited Account Number Post Ref. Amount 12/01/04 201 Lee Co. 120-122 800.00 12/01/04 202 May Co. 120-033 700.00 12/01/04 203 DLK Co. 120-111 900.00 TOTAL 2,400.00 120/502 Sales Journal
  • 74.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 78 of  The entries in the general journal are periodically (or automatically) posted to the general ledger. The $2,400 debit to accounts receivable will be posted to the accounts receivable control account, and the $2,400 credit will be posted to the general ledger account for sales. DATA STORAGE 12/01/04 Accounts receivable 2,400 Sales revenue 2,400 12/01/04 Cash 1,800 Accounts receivable 1,800 12/01/04 Salaries expense 900 Cash 900
  • 75.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 79 of  From time to time, the subsidiary account balances will be added up, and this sum will be compared to the balance of the control account.  What does it mean if they aren’t equal? DATA STORAGE
  • 76.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 80 of  Review so far:  When routine transactions occur, they are recorded in special journals.  When non-routine transactions occur, they are recorded in the general journal.  Periodically, the transactions in the special journal are totaled, and a summary entry is made in the general journal.  The individual line items in the special journal are posted to the subsidiary ledger accounts.  The items in the general journal are posted to the general ledger.  Periodically, the balances in the general ledger control accounts are compared to the sums of the balances in the related subsidiary accounts. DATA STORAGE
  • 77.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 81 of Click the button below if you wish to go through a summary of the remaining steps in the accounting cycle: DATA STORAGE See Remainder Of Accounting Cycle
  • 78.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 85 of • Now let’s move on to discussing some computer-based storage concepts, including: – Entity – Attribute – Record – Data Value – Field – File – Master File – Transaction File – Database COMPUTER-BASED STORAGE CONCEPTS
  • 79.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 86 of An entity is something about which information is stored. In your university’s student information system, one entity is the student. The student information system stores information about students. What are some other entities in your student information system? COMPUTER-BASED STORAGE CONCEPTS
  • 80.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 87 of Attributes are characteristics of interest with respect to the entity. Some attributes that a student information system typically stores about the student entity are: – Student ID number – Phone number – Address What are some other attributes about students that a university might store? COMPUTER-BASED STORAGE CONCEPTS
  • 81.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 88 of A field is the physical space where an attribute is stored. The space where the student ID number is stored is the student ID field. COMPUTER-BASED STORAGE CONCEPTS Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50 328469993 SIMPSON ALICE 4053721111 328500732 ANDREWS BARRY 4057440236 529036409 FLANDERS CARLA 4057475863
  • 82.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 89 of A record is the set of attributes stored for a particular instance of an entity. The combination of attributes stored for Barry Andrews is Barry’s record. COMPUTER-BASED STORAGE CONCEPTS Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50 328469993 SIMPSON ALICE 4053721111 328500732 ANDREWS BARRY 4057440236 529036409 FLANDERS CARLA 4057475863
  • 83.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 90 of A data value is the intersection of the row and column. (Field Vs Record) The data value for Barry Andrews’ phone number is 405-744-0236. COMPUTER-BASED STORAGE CONCEPTS Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50 328469993 SIMPSON ALICE 4053721111 328500732 ANDREWS BARRY 4057440236 529036409 FLANDERS CARLA 4057475863
  • 84.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 91 of A file is a group of related records. The collection of records about all students at the university might be called the student file. If there were only three students and four attributes stored for each student, the file might appear as shown below: COMPUTER-BASED STORAGE CONCEPTS Col. 1–9 Col. 10–30 Col. 31–40 Col. 41–50 328469993 SIMPSON ALICE 4053721111 328500732 ANDREWS BARRY 4057440236 529036409 FLANDERS CARLA 4057475863
  • 85.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 92 of A master file is a file that stores cumulative information about an organization’s entities. It is conceptually similar to a ledger in a manual AIS in that: The file is permanent. The file exists across fiscal periods. Changes are made to the file to reflect the effects of new transactions. COMPUTER-BASED STORAGE CONCEPTS
  • 86.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 93 of A transaction file is a file that contains records of individual transactions (events) that occur during a fiscal period. It is conceptually similar to a journal in a manual AIS in that: The files are temporary. The files are usually maintained for one fiscal period. COMPUTER-BASED STORAGE CONCEPTS
  • 87.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 94 of A database is a set of interrelated, centrally- coordinated files. When files about students are integrated with files about classes and files about instructors, we have a database. COMPUTER-BASED STORAGE CONCEPTS Student File Class File Instructor File
  • 88.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 95 of • The data processing cycle consists of four steps: – Data input – Data storage – Data processing – Information output TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 89.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 96 of Once data about a business activity has been collected and entered into a system, it must be processed. DATA PROCESSING
  • 90.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 97 of There are four different types of file processing: Updating data to record the occurrence of an event, the resources affected by the event, and the agents who participated, e.g., recording a sale to a customer. Changing data, e.g., a customer address. Adding data, e.g., a new customer. Deleting data, e.g., removing an old customer that has not purchased anything in 5 years. DATA PROCESSING
  • 91.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 98 of Updating can be done through several approaches: Batch processing DATA PROCESSING
  • 92.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 99 of • Batch processing:  Source documents are grouped into batches, and control totals are calculated.  Periodically, the batches are entered into the computer system, edited, sorted, and stored in a temporary file.  The temporary transaction file is run against the master file to update the master file.  Output is printed or displayed, along with error reports, transaction reports, and control totals. DATA PROCESSING
  • 93.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 100 of Updating can be done through several approaches: – Batch processing Online batch processing DATA PROCESSING
  • 94.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 101 of • Online batch processing:  Transactions are entered into a computer system as they occur and stored in a temporary file.  Periodically, the temporary transaction file is run against the master file to update the master file.  The output is printed or displayed. DATA PROCESSING
  • 95.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 102 of Updating can be done through several approaches: – Batch processing – Online batch processing Online, real-time processing DATA PROCESSING
  • 96.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 103 of • Online, real-time processing Transactions are entered into a computer system as they occur. The master file is immediately updated with the data from the transaction. Output is printed or displayed. DATA PROCESSING
  • 97.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 104 of Updating can be done through several approaches:  Batch processing  Online batch processing  Online, real-time processing If you’re going through enrollment, which of these approaches would you prefer that your university was using? Why? DATA PROCESSING
  • 98.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 105 of The data processing cycle consists of four steps: – Data input – Data storage – Data processing – Information output TRANSACTION PROCESSING: THE DATA PROCESSING CYCLE
  • 99.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 106 of • The final step in the information process is information output. • This output can be in the form of: – Documents INFORMATION OUTPUT • Documents are records of transactions or other company data. • EXAMPLE: Employee paychecks or purchase orders for merchandise. • Documents generated at the end of the transaction processing activities are known as operational documents (as opposed to source documents). • They can be printed or stored as electronic images.
  • 100.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 107 of • The final step in the information process is information output. • This output can be in the form of: – Documents – Reports INFORMATION OUTPUT  Reports are used by employees to control operational activities and by managers to make decisions and design strategies.  They may be produced: – On a regular basis – On an exception basis – On demand  Organizations should periodically reassess whether each report is needed.
  • 101.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 108 of • The final step in the information process is information output. • This output can be in the form of: – Documents – Reports – Queries INFORMATION OUTPUT  Queries are user requests for specific pieces of information.  They may be requested: – Periodically – One time  They can be displayed: – On the monitor, called soft copy. – On the screen, called hard copy.
  • 102.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 109 of Output can serve a variety of purposes: Financial statements can be provided to both external and internal parties. Some outputs are specifically for internal use: • For planning purposes INFORMATION OUTPUT • Examples of outputs for planning purposes include: – Budgets • Budgets are an entity’s formal expression of goals in financial terms. – Sales forecasts
  • 103.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 110 of • Output can serve a variety of purposes: – Financial statements can be provided to both external and internal parties. – Some outputs are specifically for internal use: • For planning purposes • For management of day-to-day operations INFORMATION OUTPUT • Example: Delivery schedules
  • 104.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 111 of • Output can serve a variety of purposes: – Financial statements can be provided to both external and internal parties. – Some outputs are specifically for internal use: • For planning purposes • For management of day-to-day operations • For control purposes INFORMATION OUTPUT • Performance reports are outputs that are used for control purposes. • These reports compare an organization’s standard or expected performance with its actual outcomes. • Management by exception is an approach to utilizing performance reports that focuses on investigating and acting on only those variances that are significant.
  • 105.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 112 of • Output can serve a variety of purposes: – Financial statements can be provided to both external and internal parties. – Some outputs are specifically for internal use: • For planning purposes • For management of day-to-day operations • For control purposes • For evaluation purposes INFORMATION OUTPUT • These outputs might include: – Surveys of customer satisfaction. – Reports on employee error rates.
  • 106.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 113 of • Behavioral implications of managerial reports: – YOU GET WHAT YOU MEASURE! INFORMATION OUTPUT
  • 107.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 114 of Suppose an instructor wants to improve student learning.  He decides to encourage better attendance by grading students on attendance (i.e., measuring it).  The result will be better student attendance, i.e., you get what you measure.  The improved attendance may or may not improve learning outcomes.  Students may be getting better grades when attendance is measured, but not learning more.  Some students may in fact reduce their studying because they believe they can use the attendance score to boost their grade. This behavior would be a dysfunctional result of the measurement. INFORMATION OUTPUT
  • 108.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 115 of Budgets can cause dysfunctional behavior. – EXAMPLE: – In order to stay within budget, the IT department did not buy a security package for its system. – A hacker broke in and devastated some of their data files. – Critical security measures were foregone in order to meet budgetary goals. – The resulting costs far outweighed the savings. INFORMATION OUTPUT
  • 109.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 116 of  Budgeting can also be dysfunctional in that the focus can be redirected to creating acceptable numbers instead of achieving organizational objectives.  Does this mean organizations shouldn’t budget? INFORMATION OUTPUT
  • 110.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 117 of • The saying goes, “Not many people sit around and have a roast goose fall in their lap.” • In other words, if you want a roast goose, you have to aim. • With financial results, you’re also unlikely to achieve when you don’t aim. • Just be careful where you aim! INFORMATION OUTPUT
  • 111.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 118 of The traditional AIS captured financial data. – Non-financial data was captured in other, sometimes-redundant systems ROLE OF THE AIS
  • 112.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 119 of Enterprise resource planning (ERP) systems are designed to integrate all aspects of a company’s operations (including both financial and non-financial information) with the traditional functions of an AIS. ROLE OF THE AIS
  • 113.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 120 of • We’ve learned about the basic business processes in which an organization engages, the decisions that need to be made, and the information required to make those decisions. • We’ve reviewed the data processing cycle and its role in organizing business processes and providing information to users. • Finally, we’ve touched on the role of the information systems in modern organizations and introduced the notion of enterprise resource planning systems. SUMMARY
  • 114.
    © 2008 PrenticeHall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart 121 of End of Chapter 2