SlideShare a Scribd company logo
Case Study: ACCL takes off with TUI
TUI Group is the largest leisure, travel and tourism company in the world. Previously known as
Thomson Holidays in the UK, TUI UK & Ireland serves 6 million holidaymakers and employs 12,500
people from travel agents to cabin crew, and engineers to back office staff. The UK Head Office in
Luton employs more than 3000 people and advances in technology meant that a new IT network
was required to allow faster applications, consistent WiFi, and to ensure an efficient and productive
workplace. With a large building and 24/7 operations, TUI required a trusted, experienced partner
and ACCL was selected.
Custom Solution
ACCL worked closely with TUI to understand their specific requirements and identified that a new 10
gigabit network was required, with a new fibre optic backbone linking 20 network cabinets. The
Head Office network supports all the IT systems as well as the building access control, meeting room
system, WiFi and CCTV.
Ensuring business as usual
Maintaining business as usual was critical for TUI’s 24/7 operations and once the specification and
timing for the project was agreed, ACCL developed a plan, with back-up contingencies, split into
phases.
Phase 1: The existing fibre backbone
would not be able to support the new
10Gig switches and so a new fibre
network was installed by an 8 man ACCL
team over 2 weekends. 8 kilometres of
OM4 fibre optic cable and a total of 40
fibre cables were diversely run under
floors and above ceilings, split so that the
whole network in the building could never
go down.
Phase 2: The existing network
configuration was not recorded and the
cabinet cabling was disorganised, with unlabelled cables. An audit was needed to identify and
document the functions of all of the circuits, and to create a clear plan for the new cabling.
Phase 3: TUI purchased the 65 CISCO switches needed for the upgrade and ACCL built, configured
and tested these at their off-site build labs, to ensure that all components functioned correctly.
Phase 4: Over 4 weekends, each of the 4 floors of the building was in turn connected to the new
network. The existing cabling was checked on the Friday night and removed from the cabinet,
allowing the new cabling and switches to
be connected on Saturday. The new
cabling was carefully planned, labelled
and documented, ensuring that any future
changes will be straightforward.
On the Sunday, all the IT equipment and
other systems on the floor were checked,
and during Monday’s troubleshooting
there were never more than 3 fault calls
due to the careful planning. This phase
required close liaison with TUI employees,
to ensure that all weekend workers were
relocated to active network areas in
advance.
ACCL project managed the work, working closely with the TUI team to ensure that all challenges
were overcome and all of the work was completed to schedule, with minimal TUI employee
disruption.
Scott Ronan, General Manager Technical Services, at TUI UK and Ireland commented: “Installation of
our new network was an amazing piece of team work. To coordinate this work around other issues
was challenging, but Wayne and the ACCL team were great, and I am delighted that they will be TUI
UK and Ireland’s preferred cabling partner going forwards.”
Wayne Connors, Managing Director at ACCL responded: “This was a challenging project, both due to
the technical aspects and the co-ordination required to maintain business as usual operations
throughout. I am very pleased that everyone’s hard work paid off and I am looking forward to
working with TUI on future projects in the coming months.”
About ACCL
ACCL designs, implements and supports the data and communications networks which provide
connectivity and drive business performance. Privately owned, and with more than 25 years of
experience in London and the South East, customers are at the heart of everything we do. Our
specialist cabling services are designed with your current and future needs in mind, bringing high
quality solutions that are excellent value. Please visit https://network-data-cabling.co.uk/
A network for the future
 Faster network applications have increased employee productivity.
 Greater energy efficiency save money, as organised cabling allows easier air
penetration and system cooling.
 Structure and well documented network to allow future additions and changes.
 Minimal business disruption whilst the programme was carried out.


More Related Content

Similar to ACCL takes off with TUI

Kemrock Case Study
Kemrock Case StudyKemrock Case Study
Kemrock Case Study
Naimish Pathak
 
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and AirmastsDriving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
3G4G
 
Steve Lincoln CV
Steve Lincoln CVSteve Lincoln CV
Steve Lincoln CV
Steve Lincoln
 
Telecom Times 2.0
Telecom Times 2.0Telecom Times 2.0
19972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v219972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v2
Niamh Horan
 
SPIE Security Submission
SPIE Security SubmissionSPIE Security Submission
SPIE Security Submission
gthomsontd
 
Milcom (ict20215) - Certificate ii in telecommunications network build and op...
Milcom (ict20215) - Certificate ii in telecommunications network build and op...Milcom (ict20215) - Certificate ii in telecommunications network build and op...
Milcom (ict20215) - Certificate ii in telecommunications network build and op...
MILCOM Institute
 
Milcom ict30415 certificate iii in telecommunications network build and ope...
Milcom ict30415   certificate iii in telecommunications network build and ope...Milcom ict30415   certificate iii in telecommunications network build and ope...
Milcom ict30415 certificate iii in telecommunications network build and ope...
MILCOM Institute
 
Digitechx Services Presentation
Digitechx Services PresentationDigitechx Services Presentation
Digitechx Services Presentation
Jean-Francois Cavelier
 
Digitechx Services
Digitechx ServicesDigitechx Services
Digitechx Services
Rachel Mc Hugh
 
Data Cabling for Schools.docx
Data Cabling for Schools.docxData Cabling for Schools.docx
Data Cabling for Schools.docx
Gary Crilly, RCDD/OSP
 
Data Cabling for Schools.docx
Data Cabling for Schools.docxData Cabling for Schools.docx
Data Cabling for Schools.docx
Gary Crilly, RCDD/OSP
 
Garry Nicholas Bunce CV
Garry Nicholas Bunce CVGarry Nicholas Bunce CV
Garry Nicholas Bunce CV
Garry Bunce
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
minerlawrence
 
Telecoms for Smart Grids
Telecoms for Smart GridsTelecoms for Smart Grids
Telecoms for Smart Grids
Dale Butler
 
Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - Copy
Karl Jones
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
Stephen Smith
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
Stephen Smith
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
Stephen Smith
 
Essential infrastructure: A Siklu Presentation
Essential infrastructure: A Siklu PresentationEssential infrastructure: A Siklu Presentation
Essential infrastructure: A Siklu Presentation
Carla Nadin
 

Similar to ACCL takes off with TUI (20)

Kemrock Case Study
Kemrock Case StudyKemrock Case Study
Kemrock Case Study
 
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and AirmastsDriving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
 
Steve Lincoln CV
Steve Lincoln CVSteve Lincoln CV
Steve Lincoln CV
 
Telecom Times 2.0
Telecom Times 2.0Telecom Times 2.0
Telecom Times 2.0
 
19972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v219972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v2
 
SPIE Security Submission
SPIE Security SubmissionSPIE Security Submission
SPIE Security Submission
 
Milcom (ict20215) - Certificate ii in telecommunications network build and op...
Milcom (ict20215) - Certificate ii in telecommunications network build and op...Milcom (ict20215) - Certificate ii in telecommunications network build and op...
Milcom (ict20215) - Certificate ii in telecommunications network build and op...
 
Milcom ict30415 certificate iii in telecommunications network build and ope...
Milcom ict30415   certificate iii in telecommunications network build and ope...Milcom ict30415   certificate iii in telecommunications network build and ope...
Milcom ict30415 certificate iii in telecommunications network build and ope...
 
Digitechx Services Presentation
Digitechx Services PresentationDigitechx Services Presentation
Digitechx Services Presentation
 
Digitechx Services
Digitechx ServicesDigitechx Services
Digitechx Services
 
Data Cabling for Schools.docx
Data Cabling for Schools.docxData Cabling for Schools.docx
Data Cabling for Schools.docx
 
Data Cabling for Schools.docx
Data Cabling for Schools.docxData Cabling for Schools.docx
Data Cabling for Schools.docx
 
Garry Nicholas Bunce CV
Garry Nicholas Bunce CVGarry Nicholas Bunce CV
Garry Nicholas Bunce CV
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
Telecoms for Smart Grids
Telecoms for Smart GridsTelecoms for Smart Grids
Telecoms for Smart Grids
 
Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - Copy
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
 
Summary Experience & achievements
Summary Experience & achievementsSummary Experience & achievements
Summary Experience & achievements
 
Essential infrastructure: A Siklu Presentation
Essential infrastructure: A Siklu PresentationEssential infrastructure: A Siklu Presentation
Essential infrastructure: A Siklu Presentation
 

Recently uploaded

HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
Pixlogix Infotech
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
Zilliz
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 

Recently uploaded (20)

HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 

ACCL takes off with TUI

  • 1. Case Study: ACCL takes off with TUI TUI Group is the largest leisure, travel and tourism company in the world. Previously known as Thomson Holidays in the UK, TUI UK & Ireland serves 6 million holidaymakers and employs 12,500 people from travel agents to cabin crew, and engineers to back office staff. The UK Head Office in Luton employs more than 3000 people and advances in technology meant that a new IT network was required to allow faster applications, consistent WiFi, and to ensure an efficient and productive workplace. With a large building and 24/7 operations, TUI required a trusted, experienced partner and ACCL was selected. Custom Solution ACCL worked closely with TUI to understand their specific requirements and identified that a new 10 gigabit network was required, with a new fibre optic backbone linking 20 network cabinets. The Head Office network supports all the IT systems as well as the building access control, meeting room system, WiFi and CCTV. Ensuring business as usual Maintaining business as usual was critical for TUI’s 24/7 operations and once the specification and timing for the project was agreed, ACCL developed a plan, with back-up contingencies, split into phases. Phase 1: The existing fibre backbone would not be able to support the new 10Gig switches and so a new fibre network was installed by an 8 man ACCL team over 2 weekends. 8 kilometres of OM4 fibre optic cable and a total of 40 fibre cables were diversely run under floors and above ceilings, split so that the whole network in the building could never go down. Phase 2: The existing network configuration was not recorded and the cabinet cabling was disorganised, with unlabelled cables. An audit was needed to identify and document the functions of all of the circuits, and to create a clear plan for the new cabling. Phase 3: TUI purchased the 65 CISCO switches needed for the upgrade and ACCL built, configured and tested these at their off-site build labs, to ensure that all components functioned correctly. Phase 4: Over 4 weekends, each of the 4 floors of the building was in turn connected to the new network. The existing cabling was checked on the Friday night and removed from the cabinet,
  • 2. allowing the new cabling and switches to be connected on Saturday. The new cabling was carefully planned, labelled and documented, ensuring that any future changes will be straightforward. On the Sunday, all the IT equipment and other systems on the floor were checked, and during Monday’s troubleshooting there were never more than 3 fault calls due to the careful planning. This phase required close liaison with TUI employees, to ensure that all weekend workers were relocated to active network areas in advance. ACCL project managed the work, working closely with the TUI team to ensure that all challenges were overcome and all of the work was completed to schedule, with minimal TUI employee disruption. Scott Ronan, General Manager Technical Services, at TUI UK and Ireland commented: “Installation of our new network was an amazing piece of team work. To coordinate this work around other issues was challenging, but Wayne and the ACCL team were great, and I am delighted that they will be TUI UK and Ireland’s preferred cabling partner going forwards.” Wayne Connors, Managing Director at ACCL responded: “This was a challenging project, both due to the technical aspects and the co-ordination required to maintain business as usual operations throughout. I am very pleased that everyone’s hard work paid off and I am looking forward to working with TUI on future projects in the coming months.” About ACCL ACCL designs, implements and supports the data and communications networks which provide connectivity and drive business performance. Privately owned, and with more than 25 years of experience in London and the South East, customers are at the heart of everything we do. Our specialist cabling services are designed with your current and future needs in mind, bringing high quality solutions that are excellent value. Please visit https://network-data-cabling.co.uk/ A network for the future  Faster network applications have increased employee productivity.  Greater energy efficiency save money, as organised cabling allows easier air penetration and system cooling.  Structure and well documented network to allow future additions and changes.  Minimal business disruption whilst the programme was carried out. 