Calcom Cement India Limited.

                   Accident Reporting Procedure


1. Scope & Purpose:

   The procedure is applicable to manufacturing process, maintenance, project
   activities & mining in Calcom Cement India Limited & B. K. Group for
   reporting, immediate action & investigation.

2. Internal Reporting:

   Based on severity the accident will be communicated & a necessary
   action will be taken as follows:

      •   “First Aid” will be communicated to GM-EHS, GM-Ops.
      •   “Reportable case/Lost Time Injury” will be communicated to GM-EHS,
          GM-Ops & Managing Director.
      •   “Fatality” will be communicated to GM-EHS, GM-Ops, Managing
          Director & Chairman.

   In case of an accident:

      •   The site in -charge/ line Engineer will immediate inform to safety
          officer , plant head , HR head & simultaneously he will inform to time
          office.
      •   Within the same day / 12 hrs the site in -charge/ line Engineer will
          summit dully signed accident prelim report in the prescribed format
          (Annexure-2) to Safety deptt.
      •   Time office personnel & Head-HR will arrange vehicle, if required.
      •   GM Operation & GM EHS will communicate to Managing Director &
          Chairman.
      •   Overall administration/internal Law & Order will be maintained by
          Head-HR.

3. External Reporting:

      •   Reportable accident will be communicated to Chief Inspector of
          Factories & Inspector of factories
      •   Fatality will be communicated to Chief Inspector of Factories,
          Inspector of factories, Local Police station, SDM/DM, Relative of
          victim, DEG-FMO.

   In case of fatal & reportable case:

      •   Rule – 95 of Assam Factories Rule will be followed.
      •   Head- HR / GM-EHS will communicate to Chief Inspector of factories
          & Inspector factory inspector after consultation with GM-OPS.
      •   Within 04 hrs the site in –charge will summit dully signed accident
          prelim report in the prescribed format (Annexure-1) to Safety deptt.
•   The accident will be reported thru Form no 18 (Under rule 95) to Chief
                Inspector of Factories & Inspector of factories by Factory Manager
                within 48hrs after consultation with GM-EHS/Safety Officer/ Head-HR .
            •   Head- HR will communicate the accident to local authorities, Govt
                officials & relative of victim & other, if any like as media / union
                representative/ panchayet.
            •   The report will be communicated to DEG-FMO by GM-EHS/MD.
            •   Overall administration/internal Law & Order will be maintained by
                Head-HR.


      4. Investigation:

            •   Basis on the Accident Prelim Report & interview of witness, the
                accident will be investigated as below committee.
            •   The report will be prepared by team leader / member (s) as below in
                the prescribed format (Annexure-3).
            •   The report will be communicated by safety officer to concerned HOD,
                GM-EHS, GM-OPS, HR-Head, MD & Chairman.
            •   Overall investigation will be co-ordinated by safety officer.


                             INVESTIGATION COMMITTEE

Investigation committee is constituted as below:

S.N         Type of Accident                Investigation committee member (s)

   1        First aid                       Safety officer & concerned HOD
   2        Lost time injury / Reportable   Safety officer & HOD from other deptt
            case
   3        Fatality                        Safety officer, GM- EHS, GM –Ops from
                                            other location, Head- HR, Safety
                                            Committee member.



      5. Compliance:

            •   Recommendations will be implemented by concerned HOD & a report
                will be sent to safety officer.
            •   Implementation-status will be reviewed by GM-OPS.
            •   Status will be discussed in safety committee meeting.

      6. Others:

            •   Compensation, Medical expenses & other settlement shall be
                coordinated by HR department as per contract.
            •   Shifting of injured person for medical treatment will co-ordinated by
                Head- HR.
            •   For a better compliance, Flow chart may refer for accident reporting as
                annexure-1.
Annexure-1



                   Flow Chart for Accident Reporting




  Departmental                Site In charge /                 Time Office
     HOD                         Line Engr



                                 Inform to
                                                              Ambulance will
                               Safety officer
                                                               be arranged
 GM -OPS/ GM-
 EHS/HR-Head



                           Inform to GM-EHS &                First aid centre
                             Co-ordinating the
                               investigation
 Factory
Inspector, Local
authorities, MD,
Chairman

                          Report to be send to                   Hospital
                          all concerned



                             Safety committee
                                 meeting




       Note: For detail information, refer to Accident Reporting Procedure.
Annexure-2


                        Calcom Cement India Limited

                        ACCIDENT PRELIM REPORT

                  (To be filled by Site Engineer/ Shift in-charge)

                                                                     Date-:   / /

   1. Name of Injured person ---
   2. Sex & Age:
   3. Designation ---
   4. Company: M/S
   5. Date &Time of Accident --
   6. Nature of Injury:
   7. Body part Injured:
   8. Location :
   9. Property Damaged (if any) / Cost :
   10. Brief description of the accident ---


   11. Immediate Cause of accident ---


Name & Sign of the Shift in-charge/Site Engr

Name & Sign of the HOD:
Annexure-3

                        Calcom Cement India Limited

                      ACCIDENT Investigation REPORT

                                                                 Date-:   / /

   1. Name of Injured person --
   2. Sex / Age:
   3. Designation ---
   4. Company: M/S
   5. Date &Time of Accident -- / /
   6. Nature of Injury:
   7. Body part Injured:
   8. Location :
   9. Property Damaged, if any/Cost :
   10. Name of witness & interviewed persons :
              • M/s
              • M/s
   11. Description of the accident ---


   12. Cause of accident ---



Name & signature of Investigation team member (s):

Name & sign of sign of safety officer:




Prepared by                                            Approved by




(CHUN CHUN KUMAR)                                     (RITESH BAWRI)

General Manger -EHS                                   Managing Director
Accident reporting procedure

Accident reporting procedure

  • 1.
    Calcom Cement IndiaLimited. Accident Reporting Procedure 1. Scope & Purpose: The procedure is applicable to manufacturing process, maintenance, project activities & mining in Calcom Cement India Limited & B. K. Group for reporting, immediate action & investigation. 2. Internal Reporting: Based on severity the accident will be communicated & a necessary action will be taken as follows: • “First Aid” will be communicated to GM-EHS, GM-Ops. • “Reportable case/Lost Time Injury” will be communicated to GM-EHS, GM-Ops & Managing Director. • “Fatality” will be communicated to GM-EHS, GM-Ops, Managing Director & Chairman. In case of an accident: • The site in -charge/ line Engineer will immediate inform to safety officer , plant head , HR head & simultaneously he will inform to time office. • Within the same day / 12 hrs the site in -charge/ line Engineer will summit dully signed accident prelim report in the prescribed format (Annexure-2) to Safety deptt. • Time office personnel & Head-HR will arrange vehicle, if required. • GM Operation & GM EHS will communicate to Managing Director & Chairman. • Overall administration/internal Law & Order will be maintained by Head-HR. 3. External Reporting: • Reportable accident will be communicated to Chief Inspector of Factories & Inspector of factories • Fatality will be communicated to Chief Inspector of Factories, Inspector of factories, Local Police station, SDM/DM, Relative of victim, DEG-FMO. In case of fatal & reportable case: • Rule – 95 of Assam Factories Rule will be followed. • Head- HR / GM-EHS will communicate to Chief Inspector of factories & Inspector factory inspector after consultation with GM-OPS. • Within 04 hrs the site in –charge will summit dully signed accident prelim report in the prescribed format (Annexure-1) to Safety deptt.
  • 2.
    The accident will be reported thru Form no 18 (Under rule 95) to Chief Inspector of Factories & Inspector of factories by Factory Manager within 48hrs after consultation with GM-EHS/Safety Officer/ Head-HR . • Head- HR will communicate the accident to local authorities, Govt officials & relative of victim & other, if any like as media / union representative/ panchayet. • The report will be communicated to DEG-FMO by GM-EHS/MD. • Overall administration/internal Law & Order will be maintained by Head-HR. 4. Investigation: • Basis on the Accident Prelim Report & interview of witness, the accident will be investigated as below committee. • The report will be prepared by team leader / member (s) as below in the prescribed format (Annexure-3). • The report will be communicated by safety officer to concerned HOD, GM-EHS, GM-OPS, HR-Head, MD & Chairman. • Overall investigation will be co-ordinated by safety officer. INVESTIGATION COMMITTEE Investigation committee is constituted as below: S.N Type of Accident Investigation committee member (s) 1 First aid Safety officer & concerned HOD 2 Lost time injury / Reportable Safety officer & HOD from other deptt case 3 Fatality Safety officer, GM- EHS, GM –Ops from other location, Head- HR, Safety Committee member. 5. Compliance: • Recommendations will be implemented by concerned HOD & a report will be sent to safety officer. • Implementation-status will be reviewed by GM-OPS. • Status will be discussed in safety committee meeting. 6. Others: • Compensation, Medical expenses & other settlement shall be coordinated by HR department as per contract. • Shifting of injured person for medical treatment will co-ordinated by Head- HR. • For a better compliance, Flow chart may refer for accident reporting as annexure-1.
  • 3.
    Annexure-1 Flow Chart for Accident Reporting Departmental Site In charge / Time Office HOD Line Engr Inform to Ambulance will Safety officer be arranged GM -OPS/ GM- EHS/HR-Head Inform to GM-EHS & First aid centre Co-ordinating the investigation Factory Inspector, Local authorities, MD, Chairman Report to be send to Hospital all concerned Safety committee meeting Note: For detail information, refer to Accident Reporting Procedure.
  • 4.
    Annexure-2 Calcom Cement India Limited ACCIDENT PRELIM REPORT (To be filled by Site Engineer/ Shift in-charge) Date-: / / 1. Name of Injured person --- 2. Sex & Age: 3. Designation --- 4. Company: M/S 5. Date &Time of Accident -- 6. Nature of Injury: 7. Body part Injured: 8. Location : 9. Property Damaged (if any) / Cost : 10. Brief description of the accident --- 11. Immediate Cause of accident --- Name & Sign of the Shift in-charge/Site Engr Name & Sign of the HOD:
  • 5.
    Annexure-3 Calcom Cement India Limited ACCIDENT Investigation REPORT Date-: / / 1. Name of Injured person -- 2. Sex / Age: 3. Designation --- 4. Company: M/S 5. Date &Time of Accident -- / / 6. Nature of Injury: 7. Body part Injured: 8. Location : 9. Property Damaged, if any/Cost : 10. Name of witness & interviewed persons : • M/s • M/s 11. Description of the accident --- 12. Cause of accident --- Name & signature of Investigation team member (s): Name & sign of sign of safety officer: Prepared by Approved by (CHUN CHUN KUMAR) (RITESH BAWRI) General Manger -EHS Managing Director