Kanban Coaching Exchange 10 Nov 2016 Hamish McMinn
Accelerating Product Development FLOW
Kanban at Jaguar Land Rover
hamish@flowlogic.co
2
Who? Why?
Hamish McMinn M.A. PMP®
• Engineering Apprentice MOD Aquila
• IT Operations
• Project Manager (Automotive & IT) 2003
• Kanban epiphany 2012
Objectives:
• How Automotive NPD offers rich opportunities for
improving time, cost and quality equations
• Challenges transferring agile software techniques into
hardware development
• Highlights of our learning
hamish@flowlogic.co
3
What Happened?
Kanban proof of concept
Independent study reported delivery rate and quality up
Delivery rate and quality up with 30% fewer resources
2nd vehicle programme
Rollout to all new vehicle programme
Quantitative data on time & cost improvements, quality improvements
dec jan feb mar apr may jun jul aug sep oct nov dec jan feb mar apr
Users 60 60 60 60 60 60 60 80 80 80 80 80 180 220 280 330 380
Support 2 2 2 2 2 2 2 2 2 2 2 3 4 4 4 10 10
4
Time: 2-4 years
cost of delay - Clark, Chew, Fujimoto estimated nearly $1M/day in 1987
(over $2M / day in today’s dollars)
Cost: £100M - >£1B (9 to 11 figure sums)
Quality: cost of poor quality:
defect containment (inspect, palliatives)
escaped defects:
warranty
cost of lost sales
So What?
Sources:
Kim B. Clark, W. Bruce Chew, and Takahiro Fujimoto Product Development in the World Auto Industry
US Bureau of Labor Statistics, CPI Inflation Calculator, www.bls.gov/data/inflation_calculator.htm
Investment
Return
Cashflow
-45
-35
-25
-15
-5
5
15
25
35
45
TimeBreakeven
Cash
5
Project Scaling
PCDS v2 345
Pilot
PCDS v2 666/664
Time
Pilot vs PCDS v2
UNV1 UPV0 UNV2 UPV1 UPV2 UPV3
Pilot delivered a 666 scale programme with 345 resource
(30% fewer) and improved timing and quality
Planned
Planned
Actual
6
Engineering Team Structure
Body
Structure
Mechs
Climate
Safety
ExtTrim
IntTrim
Seating
CabinSystems
DoorSystems
Chassis
Steering
Brakes
Wheels&Tyres
Suspension
Frames&
Mounts
Electrical
Distribution
Infotainment
Switchgear
DriverAssist
Powertrain
Engine
Transmission
Cooling
Exhaust
Driveline
Hybrid
Project
Leaders
Module
Leaders
Lead Engineers
Component Engineers
CAD Engineers
100 - >300 Engineers, multiple sites, countries, continents
Circa 7000 parts to release
700-7000 CAD files
Requirements, FMEA, Test Plan, Cost, Weight, Supplier…
7
1. How do they ensure compatibility of their design?
2. What parts do they need to interface to? Give clearance to?
3. What is latest design intent?
4. How can they collaborate effectively?
5. Software complexity (lines of code)
• Boeing 787 14M
• F35 Fighter 24M
• Modern Luxury Car 100M
The Challenge for Engineers
Source: http://www.informationisbeautiful.net/visualizations/million-lines-of-code/
8
Visual Management
9
Improving Collaboration
10
Continuous Feedback
11
1. Queues are the root cause of the majority of economic waste in product development
2. Queues are the analogue of inventory
3. We do not measure or manage queues (practically no one does)
4. Every transaction in product development is a potential queue
5. We have thousands of transactions (opportunities to improve)
To improve data supply stability:
1. Make process visible
2. Limit WiP (optimise batch sizes)
3. Focus on flow
4. Identify and reduce blockages and feedback delay
Flow and Kanban
Donald G. Reinertsen The Principles of Product Development Flow: Second Generation Lean Product Development 2009
David J. Anderson Kanban: Successful Evolutionary Change for Your Technology Business 2010
12
Applying Software Development Techniques
Constraints in physical product development
• Minimum viable product
• Architectural hard points
• 6 degrees of freedom to control
• Material requirements and properties
• Material lead times
• Production representative prototype parts
• Build time and cost
• Duplication time and cost
• Modular design constrained by all of the above
Mitigation
• Decompose interim releases (internal
customers)
13
Automotive Product
Development Lead Time
Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71
Concept
Styling
CAD Design
Prototype
Mfr. Eng.
Tooling
Launch
Design Concept Start of ProductionTime
Marketing Business Model
Clay Model Theme Selection
CAD Engineering Change
Launch Support
Product QualityProcess Development
Tooling Construction
Supplier Development
= Non Value Add Time (Waste)
= Value Add Time
14
Automotive Product
Development Lead Time
Concept
Styling
CAD Design
Prototype
Mfr. Eng.
Tooling
Launch
Design Concept Start of ProductionTime
= Non Value Add Time (Waste)
= Value Add Time
Value Added Time is only a very small percentage of the Lead-Time
Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71
15
Automotive Product
Development Lead Time
Concept
Styling
CAD Design
Prototype
Mfr. Eng.
Tooling
Launch
Design Concept Start of ProductionTime
= Non Value Add Time (Waste)
= Value Add Time
Value Added Time is only a very small percentage of the Lead-Time
Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71
16
Virtual
Virtual Series
CAD Progression
UNV1
CAD Progression
UNV2
CAD Progression
UPV2
CAD Progression
UPV3
Analysis
Issue
Resolution
Data
Freeze
Data
Freeze
Data
Freeze
Data
Freeze
Analysis
Issue
Resolution
Analysis
Issue Resolution
Analysis
Issue Resolution
Virtual Series Loops
10-16 weeks duration
Data
Freeze
M1 Prototype Release
VP Prototyp
Release
M1 Build and Test
Physical
17
Virtual Series
CAD Progression
UNV1
CAD Progression
UNV2
CAD Progression
UPV2
CAD Progression
UPV3
Analysis
Issue
Resolution
Data
Freeze
Data
Freeze
Data
Freeze
Data
Freeze
Analysis
Issue
Resolution
Analysis
Issue Resolution
Analysis
Issue Resolution
Virtual Series Loops
10-16 weeks duration
Data
Freeze
Current batch sizes and feedback delay render virtual series data delivery systemically
unstable, forcing a stark choice: scale upstream resource, or tolerate delays
Defect Created
Defect Detected
Defect Resolved
Detection DelayResolution Delay
18
Late “hockey stick”
delivery results in
asynchronous
engineering i.e low
quality, incompatible
data.
Sprint 1 Sprint 2 Sprint 3 Sprint 4
The Hockey StickGatewayDataReadiness
-12 -9 -6 -3
Countdown (weeks)
+2
100%
Av loop slip 2 weeks
Reduced delta represents
improved compatibility at the
same point
Data flow is driven by Sprint
glidepaths, not single deadline.
Data integrity improved
19
Shortening Feedback: Sprints
20
Shortening Feedback: Sprints
21
22
Effect of Batch Size
23
0
2
4
6
8
10
12
14
16
18
20
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Batch size 1
Batch size 1 with Errors
Batch size 5
Batch size 5 with Errors
Batch size 10
Batch size 10 with Errors
Effect of Batch Size
Undetected
Defects
24
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Combined Status
Combined Completion Prediction
Combined Compatibility Target %
Compatibility Achieved
Metrics
25
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
UPV2 Geometry - Chassis Assessment Readiness
Chassis Completion Prediction
Chassis Compatibility Target %
Compatibility Achieved
Metrics
26
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
UPV2 Geometry - Chassis Assessment Readiness
Chassis Completion Prediction
Chassis Compatibility Target %
Compatibility Achieved
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
UPV2 Geometry - Electrical Assessment Readiness
Electrical Completion Prediction
Compatibility Achieved
Electrical Compatibility Target %
Metrics
27
Daily Stand up Meetings
In front of the board, three questions:
1. What did we accomplish yesterday?
2. What will we do today?
3. What obstacles are impeding our
progress?
Objective is not to discuss details in the
meeting, but to agree offline help required
28
So What is the Board Telling Us?
The board is a signalling system, its effectiveness relies on our ability to read the signals and
raise the questions it prompts. E.g.:
• What needs to happen to progress these items?
• Why is this item blocked?
• Who has the next action?
• What is date to green?
• When will overdue be ready?
29
The Big Picture
30
Highlights of Our Learning to Date
• Visual Management
• Decompose large batches
• Accelerate feedback
• People’s behaviour (not tools) delivers outcomes
• WIIFM
• Success breeds success
• Replicate good practice
• Deep vs superficial learning
31
Summary
• Reduced batch size
• Shortens feedback loops
• Reduces defects / rework / technical debt
• Increases throughput and quality
• Adopt Kanban / visual management to enable intense collaboration
• Result – complex programme achieved in less time with
• Improved quality
• 30% fewer resources
• What Next?
• Deeper enterprise integration
• ?
hamish@flowlogic.co

More Related Content

What's hot

Lean Six Sigma - Introduction
Lean Six Sigma - IntroductionLean Six Sigma - Introduction
Lean Six Sigma - Introduction
vivek pandey
 
Innovation at 50x 031616
Innovation at 50x 031616Innovation at 50x 031616
Innovation at 50x 031616
Stanford University
 
Analysis In Agile: It's More than Just User Stories
Analysis In Agile: It's More than Just User StoriesAnalysis In Agile: It's More than Just User Stories
Analysis In Agile: It's More than Just User Stories
Kent McDonald
 
Operation and Support using Agile
Operation and Support using AgileOperation and Support using Agile
Operation and Support using Agile
Tal Aviv
 
Lightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningLightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI Planning
Martin Burns
 
How to do effective pi planning
How to do effective pi planningHow to do effective pi planning
How to do effective pi planning
SwatiKapoor43
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True North
W3 Group Canada Inc.
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
netmind
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
bhanutomar
 
Go To Market Strategy Example Ppt Presentation
Go To Market Strategy Example Ppt PresentationGo To Market Strategy Example Ppt Presentation
Go To Market Strategy Example Ppt Presentation
SlideTeam
 
Agile practices using jira atlassian
Agile practices using jira atlassianAgile practices using jira atlassian
Agile practices using jira atlassian
Michal Epstein
 
Organizational process improvement online presentation
Organizational process improvement online presentationOrganizational process improvement online presentation
Organizational process improvement online presentation
Ojiugo Ajunwa
 
WEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAICWEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAIC
GoLeanSixSigma.com
 
100 Task Playbook - Sample
100 Task Playbook - Sample100 Task Playbook - Sample
100 Task Playbook - Sample
Martin Bell
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
Yudha Satya Perdana
 
Go to Market Strategy
Go to Market StrategyGo to Market Strategy
Go to Market Strategy
Rajiv Netra
 
Product Development Using Agile and Lean Principles
Product Development Using Agile and Lean PrinciplesProduct Development Using Agile and Lean Principles
Product Development Using Agile and Lean Principles
Tathagat Varma
 
How Agile works in samsung SDS
How Agile works in samsung SDSHow Agile works in samsung SDS
How Agile works in samsung SDS
Hubert Shin
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
Abhishek Prasoon
 
Business Excellence and Project Management
Business Excellence and Project ManagementBusiness Excellence and Project Management
Business Excellence and Project Management
Rohit Kanaglekar
 

What's hot (20)

Lean Six Sigma - Introduction
Lean Six Sigma - IntroductionLean Six Sigma - Introduction
Lean Six Sigma - Introduction
 
Innovation at 50x 031616
Innovation at 50x 031616Innovation at 50x 031616
Innovation at 50x 031616
 
Analysis In Agile: It's More than Just User Stories
Analysis In Agile: It's More than Just User StoriesAnalysis In Agile: It's More than Just User Stories
Analysis In Agile: It's More than Just User Stories
 
Operation and Support using Agile
Operation and Support using AgileOperation and Support using Agile
Operation and Support using Agile
 
Lightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningLightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI Planning
 
How to do effective pi planning
How to do effective pi planningHow to do effective pi planning
How to do effective pi planning
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True North
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Go To Market Strategy Example Ppt Presentation
Go To Market Strategy Example Ppt PresentationGo To Market Strategy Example Ppt Presentation
Go To Market Strategy Example Ppt Presentation
 
Agile practices using jira atlassian
Agile practices using jira atlassianAgile practices using jira atlassian
Agile practices using jira atlassian
 
Organizational process improvement online presentation
Organizational process improvement online presentationOrganizational process improvement online presentation
Organizational process improvement online presentation
 
WEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAICWEBINAR: Introduction to DMAIC
WEBINAR: Introduction to DMAIC
 
100 Task Playbook - Sample
100 Task Playbook - Sample100 Task Playbook - Sample
100 Task Playbook - Sample
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
Go to Market Strategy
Go to Market StrategyGo to Market Strategy
Go to Market Strategy
 
Product Development Using Agile and Lean Principles
Product Development Using Agile and Lean PrinciplesProduct Development Using Agile and Lean Principles
Product Development Using Agile and Lean Principles
 
How Agile works in samsung SDS
How Agile works in samsung SDSHow Agile works in samsung SDS
How Agile works in samsung SDS
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Business Excellence and Project Management
Business Excellence and Project ManagementBusiness Excellence and Project Management
Business Excellence and Project Management
 

Similar to Accelerating Product Development FLOW: Kanban at Jaguar Land Rover

Agile conference 2013
Agile conference 2013Agile conference 2013
Agile conference 2013
gbgruver
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
TechWell
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
AJAL A J
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
Jitesh Gaurav
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
Jitesh Gaurav
 
Strategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive IndustryStrategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive Industry
Vedant Borse
 
3803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v43803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v4Vedant Borse
 
What Can DevOps Learn from Formula 1?
What Can DevOps Learn from Formula 1?What Can DevOps Learn from Formula 1?
What Can DevOps Learn from Formula 1?
Stephen Burton
 
Business Value of Lean Thinking
Business Value of Lean ThinkingBusiness Value of Lean Thinking
Business Value of Lean Thinking
David Rico
 
FlowCon 2013 Conference
FlowCon 2013 ConferenceFlowCon 2013 Conference
FlowCon 2013 Conference
gbgruver
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
AngelainBay
 
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
TEST Huddle
 
20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo
LeClubQualiteLogicielle
 
DevOps at TestausOSY 20june2017
DevOps at TestausOSY 20june2017DevOps at TestausOSY 20june2017
DevOps at TestausOSY 20june2017
Jouni Jätyri
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro ResumeLuis Navarro
 
Week 7
Week 7Week 7
Week 7
Arthur Shum
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
guest524810
 
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip LewWhen Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
XBOSoft
 
Concept development using Optimization, DFM & CAE - In DFSS Way
Concept development using Optimization, DFM & CAE - In DFSS WayConcept development using Optimization, DFM & CAE - In DFSS Way
Concept development using Optimization, DFM & CAE - In DFSS Way
nsahay
 

Similar to Accelerating Product Development FLOW: Kanban at Jaguar Land Rover (20)

Agile conference 2013
Agile conference 2013Agile conference 2013
Agile conference 2013
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
 
Strategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive IndustryStrategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive Industry
 
3803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v43803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v4
 
What Can DevOps Learn from Formula 1?
What Can DevOps Learn from Formula 1?What Can DevOps Learn from Formula 1?
What Can DevOps Learn from Formula 1?
 
Business Value of Lean Thinking
Business Value of Lean ThinkingBusiness Value of Lean Thinking
Business Value of Lean Thinking
 
FlowCon 2013 Conference
FlowCon 2013 ConferenceFlowCon 2013 Conference
FlowCon 2013 Conference
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
 
Chap12
Chap12Chap12
Chap12
 
20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo
 
DevOps at TestausOSY 20june2017
DevOps at TestausOSY 20june2017DevOps at TestausOSY 20june2017
DevOps at TestausOSY 20june2017
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 
Week 7
Week 7Week 7
Week 7
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip LewWhen Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
 
Concept development using Optimization, DFM & CAE - In DFSS Way
Concept development using Optimization, DFM & CAE - In DFSS WayConcept development using Optimization, DFM & CAE - In DFSS Way
Concept development using Optimization, DFM & CAE - In DFSS Way
 

Recently uploaded

What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 

Recently uploaded (19)

What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 

Accelerating Product Development FLOW: Kanban at Jaguar Land Rover

  • 1. 1 Kanban Coaching Exchange 10 Nov 2016 Hamish McMinn Accelerating Product Development FLOW Kanban at Jaguar Land Rover hamish@flowlogic.co
  • 2. 2 Who? Why? Hamish McMinn M.A. PMP® • Engineering Apprentice MOD Aquila • IT Operations • Project Manager (Automotive & IT) 2003 • Kanban epiphany 2012 Objectives: • How Automotive NPD offers rich opportunities for improving time, cost and quality equations • Challenges transferring agile software techniques into hardware development • Highlights of our learning hamish@flowlogic.co
  • 3. 3 What Happened? Kanban proof of concept Independent study reported delivery rate and quality up Delivery rate and quality up with 30% fewer resources 2nd vehicle programme Rollout to all new vehicle programme Quantitative data on time & cost improvements, quality improvements dec jan feb mar apr may jun jul aug sep oct nov dec jan feb mar apr Users 60 60 60 60 60 60 60 80 80 80 80 80 180 220 280 330 380 Support 2 2 2 2 2 2 2 2 2 2 2 3 4 4 4 10 10
  • 4. 4 Time: 2-4 years cost of delay - Clark, Chew, Fujimoto estimated nearly $1M/day in 1987 (over $2M / day in today’s dollars) Cost: £100M - >£1B (9 to 11 figure sums) Quality: cost of poor quality: defect containment (inspect, palliatives) escaped defects: warranty cost of lost sales So What? Sources: Kim B. Clark, W. Bruce Chew, and Takahiro Fujimoto Product Development in the World Auto Industry US Bureau of Labor Statistics, CPI Inflation Calculator, www.bls.gov/data/inflation_calculator.htm Investment Return Cashflow -45 -35 -25 -15 -5 5 15 25 35 45 TimeBreakeven Cash
  • 5. 5 Project Scaling PCDS v2 345 Pilot PCDS v2 666/664 Time Pilot vs PCDS v2 UNV1 UPV0 UNV2 UPV1 UPV2 UPV3 Pilot delivered a 666 scale programme with 345 resource (30% fewer) and improved timing and quality Planned Planned Actual
  • 7. 7 1. How do they ensure compatibility of their design? 2. What parts do they need to interface to? Give clearance to? 3. What is latest design intent? 4. How can they collaborate effectively? 5. Software complexity (lines of code) • Boeing 787 14M • F35 Fighter 24M • Modern Luxury Car 100M The Challenge for Engineers Source: http://www.informationisbeautiful.net/visualizations/million-lines-of-code/
  • 11. 11 1. Queues are the root cause of the majority of economic waste in product development 2. Queues are the analogue of inventory 3. We do not measure or manage queues (practically no one does) 4. Every transaction in product development is a potential queue 5. We have thousands of transactions (opportunities to improve) To improve data supply stability: 1. Make process visible 2. Limit WiP (optimise batch sizes) 3. Focus on flow 4. Identify and reduce blockages and feedback delay Flow and Kanban Donald G. Reinertsen The Principles of Product Development Flow: Second Generation Lean Product Development 2009 David J. Anderson Kanban: Successful Evolutionary Change for Your Technology Business 2010
  • 12. 12 Applying Software Development Techniques Constraints in physical product development • Minimum viable product • Architectural hard points • 6 degrees of freedom to control • Material requirements and properties • Material lead times • Production representative prototype parts • Build time and cost • Duplication time and cost • Modular design constrained by all of the above Mitigation • Decompose interim releases (internal customers)
  • 13. 13 Automotive Product Development Lead Time Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71 Concept Styling CAD Design Prototype Mfr. Eng. Tooling Launch Design Concept Start of ProductionTime Marketing Business Model Clay Model Theme Selection CAD Engineering Change Launch Support Product QualityProcess Development Tooling Construction Supplier Development = Non Value Add Time (Waste) = Value Add Time
  • 14. 14 Automotive Product Development Lead Time Concept Styling CAD Design Prototype Mfr. Eng. Tooling Launch Design Concept Start of ProductionTime = Non Value Add Time (Waste) = Value Add Time Value Added Time is only a very small percentage of the Lead-Time Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71
  • 15. 15 Automotive Product Development Lead Time Concept Styling CAD Design Prototype Mfr. Eng. Tooling Launch Design Concept Start of ProductionTime = Non Value Add Time (Waste) = Value Add Time Value Added Time is only a very small percentage of the Lead-Time Source: James M. Morgan, Jeffrey K. Liker: The Toyota Product Development System: Integrating People, Process, and Technology 2006, 71
  • 16. 16 Virtual Virtual Series CAD Progression UNV1 CAD Progression UNV2 CAD Progression UPV2 CAD Progression UPV3 Analysis Issue Resolution Data Freeze Data Freeze Data Freeze Data Freeze Analysis Issue Resolution Analysis Issue Resolution Analysis Issue Resolution Virtual Series Loops 10-16 weeks duration Data Freeze M1 Prototype Release VP Prototyp Release M1 Build and Test Physical
  • 17. 17 Virtual Series CAD Progression UNV1 CAD Progression UNV2 CAD Progression UPV2 CAD Progression UPV3 Analysis Issue Resolution Data Freeze Data Freeze Data Freeze Data Freeze Analysis Issue Resolution Analysis Issue Resolution Analysis Issue Resolution Virtual Series Loops 10-16 weeks duration Data Freeze Current batch sizes and feedback delay render virtual series data delivery systemically unstable, forcing a stark choice: scale upstream resource, or tolerate delays Defect Created Defect Detected Defect Resolved Detection DelayResolution Delay
  • 18. 18 Late “hockey stick” delivery results in asynchronous engineering i.e low quality, incompatible data. Sprint 1 Sprint 2 Sprint 3 Sprint 4 The Hockey StickGatewayDataReadiness -12 -9 -6 -3 Countdown (weeks) +2 100% Av loop slip 2 weeks Reduced delta represents improved compatibility at the same point Data flow is driven by Sprint glidepaths, not single deadline. Data integrity improved
  • 21. 21
  • 23. 23 0 2 4 6 8 10 12 14 16 18 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Batch size 1 Batch size 1 with Errors Batch size 5 Batch size 5 with Errors Batch size 10 Batch size 10 with Errors Effect of Batch Size Undetected Defects
  • 24. 24 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Combined Status Combined Completion Prediction Combined Compatibility Target % Compatibility Achieved Metrics
  • 25. 25 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% UPV2 Geometry - Chassis Assessment Readiness Chassis Completion Prediction Chassis Compatibility Target % Compatibility Achieved Metrics
  • 26. 26 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% UPV2 Geometry - Chassis Assessment Readiness Chassis Completion Prediction Chassis Compatibility Target % Compatibility Achieved 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% UPV2 Geometry - Electrical Assessment Readiness Electrical Completion Prediction Compatibility Achieved Electrical Compatibility Target % Metrics
  • 27. 27 Daily Stand up Meetings In front of the board, three questions: 1. What did we accomplish yesterday? 2. What will we do today? 3. What obstacles are impeding our progress? Objective is not to discuss details in the meeting, but to agree offline help required
  • 28. 28 So What is the Board Telling Us? The board is a signalling system, its effectiveness relies on our ability to read the signals and raise the questions it prompts. E.g.: • What needs to happen to progress these items? • Why is this item blocked? • Who has the next action? • What is date to green? • When will overdue be ready?
  • 30. 30 Highlights of Our Learning to Date • Visual Management • Decompose large batches • Accelerate feedback • People’s behaviour (not tools) delivers outcomes • WIIFM • Success breeds success • Replicate good practice • Deep vs superficial learning
  • 31. 31 Summary • Reduced batch size • Shortens feedback loops • Reduces defects / rework / technical debt • Increases throughput and quality • Adopt Kanban / visual management to enable intense collaboration • Result – complex programme achieved in less time with • Improved quality • 30% fewer resources • What Next? • Deeper enterprise integration • ? hamish@flowlogic.co