About the TPB and Visualize 2045
Abigail Zenner
TPB Communications Specialist
Fairfax County TAC
April 17, 2018
Presentation Overview
• What is a Metropolitan Planning Organization
(MPO)?
• What is theTransportation Planning Board?
• All aboutVisualize 2045 and the long-range
planning process.
What is an MPO?
• A federally-mandated and federally funded
transportation policy-making organization.
• Made up of representatives from local
governments and governmental transportation
authorities.
• Must follow the Federal Metropolitan
Transportation Planning Process as regulated by
the latest federal transportation authorization.
(FAST Act)
What is an MPO?
• Serves as a representative group of local stakeholders of
the region.
• Carries out a “Continuing, cooperative, and
comprehensive” consultation process. (3Cs)
• Leads the regional transportation planning process in
cooperation with the state DOTs and transit operators
• Develops plans and programs that consider all
transportation modes and support metropolitan
community, and economic development.
• Works in conjunction with state air and transportation
agencies to meet federal Clean Air Act standards.
What is an MPO?
Key MPO products:
• Transportation Improvement Program (TIP): Each
MPO develops a short 4-6 year program for project
implementation.
• Long-range Metropolitan Transportation Plan:
Each MPO develops a LRP which serves as the
vision for the region and includes all of the
transportation improvements where funding is
reasonably expected to be available over the next
20 years.
What is an MPO?
Long-range plan
• Minimum 20-year span
• Current horizon is 2040
• Funding must be “reasonably
expected to be available”
• Major update every four years,
amended annually
TIP
• Minimum 4-year span
• FY 2017-2022, 6 years
• Funding in first two years must
be “available and committed”
• Major update every two years,
amended weekly/monthly
What is an MPO?
• All federally funded projects and other regionally
significant transportation projects must be included in the
long-range plan and theTIP.
• Financial constraint:The long-range plan andTIP may
only include projects that can be “reasonably anticipated”
to be funded.
• Emissions impacts:The long-range plan andTIP must
meet the limits established in the region’s air quality
improvement plan.This is called a “conformity finding.”
What is theTPB?
• Federally designated Metropolitan
PlanningOrganization (MPO) for the
Washington region
• 3,500 square miles in area
• Home to more than 5 million people
and 3 million jobs
• Members include:
• State transportation agencies
• 23 local jurisdictions
• State and DC legislatures
• WMATA
• Others
What is theTPB?
Transportation
Planning
Regional
Planning
Local
Planning
State
Planning
What is theTPB?
• Who develops projects?
Project development typically occurs at the state and local levels.The
TPB usually does not select and fund projects.
• Who controls the money?
D.C., Maryland andVirginia each controls its own funding stream.
Each has its own system for moving projects forward.
• Influence of the TPB process is often indirect.
Regional policies and federal transportation planning requirements
exert an influence on the types of projects that are developed and
submitted by the states and locals to theTPB.
What is theTPB?
Transportation Planning Board
• Transportation PlanningGoals
• RegionalTransportation Priorities Plan
• Scenario Analysis
• CLRP Performance Analysis
• Congestion Management Reports
State/Local Governments
• Land use, Economic, and Environmental
Policies and Priorities
• Needs assessment
• Transportation Plans and Programs
• Capital Budget Priorities
The long-range planning process is top-down/bottom up
What isVisualize 2045?
FinanciallyConstrained Element
(formerly known as CLRP)
Seven Endorsed Initiatives
Unmet Needs (All-Build)
What isVisualize 2045?
Introduction
Regional
Context
Regional
Policies
Seven
Endorsed
Initiatives
Financially
Constrained
Element
Performance
Planning
Additional
Elements
Plan Dev. &
Public
Participation
Conclusion
What isVisualize 2045?
Winter/Spring 2018
Preparing Content for Visualize
2045 Plan Document
Spring 2018 Public Forums
Summer 2018 Technical Analysis
September 2018
Draft Plan Released for Public
Comment and Public Open Houses
October 2018 Final TPB Approval
Visualize 2045 Timeline
Abigail Zenner
TPBCommunications Specialist
(202) 962-3237
azenner@mwcog.org visualize2045.org
MetropolitanWashington Council of Governments
777 North Capitol Street NE, Suite 300
Washington, DC 20002

About the TPB and Visualize 2045

  • 1.
    About the TPBand Visualize 2045 Abigail Zenner TPB Communications Specialist Fairfax County TAC April 17, 2018
  • 2.
    Presentation Overview • Whatis a Metropolitan Planning Organization (MPO)? • What is theTransportation Planning Board? • All aboutVisualize 2045 and the long-range planning process.
  • 3.
    What is anMPO? • A federally-mandated and federally funded transportation policy-making organization. • Made up of representatives from local governments and governmental transportation authorities. • Must follow the Federal Metropolitan Transportation Planning Process as regulated by the latest federal transportation authorization. (FAST Act)
  • 4.
    What is anMPO? • Serves as a representative group of local stakeholders of the region. • Carries out a “Continuing, cooperative, and comprehensive” consultation process. (3Cs) • Leads the regional transportation planning process in cooperation with the state DOTs and transit operators • Develops plans and programs that consider all transportation modes and support metropolitan community, and economic development. • Works in conjunction with state air and transportation agencies to meet federal Clean Air Act standards.
  • 5.
    What is anMPO? Key MPO products: • Transportation Improvement Program (TIP): Each MPO develops a short 4-6 year program for project implementation. • Long-range Metropolitan Transportation Plan: Each MPO develops a LRP which serves as the vision for the region and includes all of the transportation improvements where funding is reasonably expected to be available over the next 20 years.
  • 6.
    What is anMPO? Long-range plan • Minimum 20-year span • Current horizon is 2040 • Funding must be “reasonably expected to be available” • Major update every four years, amended annually TIP • Minimum 4-year span • FY 2017-2022, 6 years • Funding in first two years must be “available and committed” • Major update every two years, amended weekly/monthly
  • 7.
    What is anMPO? • All federally funded projects and other regionally significant transportation projects must be included in the long-range plan and theTIP. • Financial constraint:The long-range plan andTIP may only include projects that can be “reasonably anticipated” to be funded. • Emissions impacts:The long-range plan andTIP must meet the limits established in the region’s air quality improvement plan.This is called a “conformity finding.”
  • 8.
    What is theTPB? •Federally designated Metropolitan PlanningOrganization (MPO) for the Washington region • 3,500 square miles in area • Home to more than 5 million people and 3 million jobs • Members include: • State transportation agencies • 23 local jurisdictions • State and DC legislatures • WMATA • Others
  • 9.
  • 10.
    What is theTPB? •Who develops projects? Project development typically occurs at the state and local levels.The TPB usually does not select and fund projects. • Who controls the money? D.C., Maryland andVirginia each controls its own funding stream. Each has its own system for moving projects forward. • Influence of the TPB process is often indirect. Regional policies and federal transportation planning requirements exert an influence on the types of projects that are developed and submitted by the states and locals to theTPB.
  • 11.
    What is theTPB? TransportationPlanning Board • Transportation PlanningGoals • RegionalTransportation Priorities Plan • Scenario Analysis • CLRP Performance Analysis • Congestion Management Reports State/Local Governments • Land use, Economic, and Environmental Policies and Priorities • Needs assessment • Transportation Plans and Programs • Capital Budget Priorities The long-range planning process is top-down/bottom up
  • 12.
    What isVisualize 2045? FinanciallyConstrainedElement (formerly known as CLRP) Seven Endorsed Initiatives Unmet Needs (All-Build)
  • 13.
  • 14.
    What isVisualize 2045? Winter/Spring2018 Preparing Content for Visualize 2045 Plan Document Spring 2018 Public Forums Summer 2018 Technical Analysis September 2018 Draft Plan Released for Public Comment and Public Open Houses October 2018 Final TPB Approval Visualize 2045 Timeline
  • 15.
    Abigail Zenner TPBCommunications Specialist (202)962-3237 azenner@mwcog.org visualize2045.org MetropolitanWashington Council of Governments 777 North Capitol Street NE, Suite 300 Washington, DC 20002