BIODATA
MOHD JAVED AKHTAR
44A NOOR NAGAR EXT. JAMIA NAGAR OKHLA NEW DELHI
INDIA
Contact: 0590651019
OBJECTIVE
TO WORK IN CHALLENGING ENVIRONMENT FOR CONTINUED
PROFESSIONAL CAREER GROWTH IN THE FIELD OF CIVIL
CONSTRUCTION MANAGEMENT & SUPERVISION.
PERSONAL DETAILS:
Father’s Name : Mohd. Nizam Akhtar
Nationality : Indian
Civil Status : Married
Sex : Male
Religion : Muslim
Permanent : 44-A, Noor Nagar
Address Ext. Okhla
New Delhi - 110025
India
PASSPORT DETAILS:
Passport No : E 7710453
Place of Issue : New Delhi
LANGUAGE KNOWN
English, Arabic and Hindi
COMPUTER LITERACY
Basic Computer Knowledge
MS office,vista,Xp
QUALIFICATION:
Diploma in Civil Engineering
In the year 1979
From Aligarh Muslim University , Aligarh , India .
WORK EXPERIENCE IN BRIEF:
29+ years (10+ years in the Gulf) of work experience in the construction
industry. Having to work on a wide range of projects within contractors and
consulting companies the experience in the execution and construction
supervision of the following is gained:
· Building Construction – Commercial, Residential, Car Park multi-storey
projects.
· Infrastructure Projects – Water Transmission Works, Water Pumping
Stations, Sewerage and Drainage Projects, Sewage Treatment and Utilization
Works, Roads, Bridges and Culverts, Railway Project, Sub-stations and
telephone network.
Having to work within contracting environment since 1979 the work
experience successfully perform the following duties:
· Execution of building/road construction according to construction drawings
and specifications.
· Full-time project monitoring and quality control of site activities including
the implementation of the Health and Safety on site.
· Supervising site surveying and setting out and preparation of Survey Plan
showing size of plots and layout of roads as per municipality rules.
ď‚· Daily, weekly and monthly resource planning and monitoring
(manpower, materials, tools and equipments).
 Review of sub-contractor’s shop drawings and method statements and
preparation of the Monthly Progress Reports.
ď‚· Preparation of monthly payment bills.
ď‚· Preparation of Bill of Quantities, Material Approval Requests and
Inspection Requests.
ď‚· Coordination of various works between different sub-contractors and
implementation of the Master Construction Program .
ď‚· Attendance of meetings and coordination of construction information
with other parties in project including client.
From 2012 to 2015 till I am working as a project Engineer with Madina Al
Nassar
From 8th
January 2011—TO 2012 I am working as a RESIDENT
ENGINEER with
AL GHANEM ENGEENIRING CONSULTANT at RABIGH. The project is
ALRASHED BAKERY, RABIGH.It is the industrial project at Rabigh. My
responsibility includes overlooking the project, attending site meetings, project
programming, coordination between client and contract Or, preparation of snag
list and handing over the projects to the client at zero snag.
From5th April2010—TO 2011 I was working as a CIVIL ENGINEER
CUM FACTORY MANAGER with SKAB--ARINCON LTD, JEDDHA . I
am looking after daily ,weekly
and monthly resources, planning and monitoring(manpower material, tools
and equipments).
Review of drawings and method statement and preparation of Master
Construction Program. Attendance of meetings and co-ordination of
construction
information with other parties in projects including client.
Preparation of bill material approval and inspection request, getting the quality
of work and in time approval of the work.
Full-time project monitoring and quality control of factory activity including
the implementation of health safety etc.
From 2007 – Present GPZ Contracting Company
Position: Site Civil Engineer
Selected Projects:
RIFFA VIEWS
Main Consultant: M.S.S.C.B.
Value: BD. 50 million
My main responsibilities includes overlooking the project team, attending site
meetings, projects programming, coordination between client and contractor,
preparation of snag list and handover villas to client at zero snag.
DURRAT AL BAHRAIN
Main Consultant: Atkins Consulting
I was the in charge of 80 villas of west zone. There are 500 man power
engaged in my section, 6 No. foremen, one general foreman and several
charge hands. I have to deal with the M.E.P. contractors’ and some labor
contractors are also. There.
According to my weekly programs, I have to achieve weekly targets and as
well as supervision and quality of the work etc.
Every day I have to get the preparation of work with the quality of
workmanship for the next day inspection by the consultant (ATKINS).
My main responsibilities includes overlooking the project team, attending site
meetings, projects programming, coordination between client and contractor,
preparation of snag list etc
2003 to 2007 Giex Food Pvt. Ltd
I worked as a Project Engineer in Giex Food Pvt. Ltd. Rampur , It was
sisterly concern of E.T.A Dubai. The work was supervision of construction
work like slaughter House, Lairage, Machine room, D.G house, E.T.P and all
the site development works etc.
Day to day inspection of construction work & sending the daily report &
weekly report to the Director, Checking the bills of the contractors & sending
the bills of the contractors & sending the bill for the payment to the director.
1996 to 2003 Self Employed.
The work was repair maintenance of Industries of Industrial area, Jamuna
Sand and Earthwork etc. I was also worked as a sub-contractor with Haji
Construction Co. The work involves construction of Multistoried Buildings.
1989 to 1995 M/s. Unitech Ltd
I worked as a Construction Engineer with M/s. Unitech Ltd. The Project had
a Sewerage Treatment Plant, Steel Fabrication, and Earthwork etc.
Sep 1984 to July 1988 Benladen Organization.
Posted as a Civil Foreman with Benladen Organization at Makkah ( Saudi
Arabia ). The Project had a housing complex of 23 sectors (A-1 to C-23) with
sewerage line, water supply line, Irrigation line, Hose Bib etc. Pre Cast
Manhole placing according to invert level etc. According to drawing data
calculation from 1 manhole to next manhole. According to their level and
given to the consultant for the inspection and getting the approval from
Ministry for the Billing etc. Co-ordination with the technical Dept. According
to site & Drawing differences of invert level and given the information to the
technical department for making the shop drawing etc.
June 1983 to August 1984 ARCHITECTURAL CONSTRUCTION
TEAM.
Working with A.C.T. as a Civil Foreman at HILLA SEVERAGE
TREATMENT PLANT Layout & construction of steel structure & Structure
like distribution Chamber, Separation chamber, Final Settlement C Tank,
Aeration Lagoons & Administration Building, road & Curb Stone etc.
May 1982 to May 1983 A.C.C. Organization.
Posted as a Civil Supervisor with the A.C.C. Organization for Overseas
Project Samawa Railway Project, IRAQ. The work was 349 double storey
quarters, Construction of quarters Construction of maintenance center, station
building, Refrigeration and fright shed. Layout and Excavation of crossing
Railway Station etc. I also worked in pre-cast Yard for pre cost of Silver cool
slab, its length is 13 meters & conc. Slump was only 2 cm. Erection and
placement of pre cost slab etc.
Consultant was Sotechni (Italian).
Nov. 1981 to April 1982 Unitech Pvt. Ltd.
Working with Unitech Pvt. Ltd as a Civil Supervisor. The Job entailed like
Modi Chemical Alkalis. Lay out, Excavation and Construction of Chemical
Laboratories. Brine Saturation, Cell house etc. I have also done the layout of
Modi Medicine Factory Independently.
Consultant Were:
Udhe India Ltd.
Hamphri Galassco.
1979 to October 1981 Haji Construction Co.
Posted as a Civil Supervisor with Haji Construction Co. The Job involved
Construction of guide band at Jamuna River, Back filling work at Patpadganj,
3 star Hotel (Rajhans).

BIODATA

  • 1.
    BIODATA MOHD JAVED AKHTAR 44ANOOR NAGAR EXT. JAMIA NAGAR OKHLA NEW DELHI INDIA Contact: 0590651019 OBJECTIVE TO WORK IN CHALLENGING ENVIRONMENT FOR CONTINUED PROFESSIONAL CAREER GROWTH IN THE FIELD OF CIVIL CONSTRUCTION MANAGEMENT & SUPERVISION. PERSONAL DETAILS: Father’s Name : Mohd. Nizam Akhtar Nationality : Indian Civil Status : Married Sex : Male Religion : Muslim Permanent : 44-A, Noor Nagar Address Ext. Okhla New Delhi - 110025 India PASSPORT DETAILS: Passport No : E 7710453 Place of Issue : New Delhi LANGUAGE KNOWN English, Arabic and Hindi COMPUTER LITERACY Basic Computer Knowledge MS office,vista,Xp QUALIFICATION: Diploma in Civil Engineering In the year 1979 From Aligarh Muslim University , Aligarh , India . WORK EXPERIENCE IN BRIEF: 29+ years (10+ years in the Gulf) of work experience in the construction industry. Having to work on a wide range of projects within contractors and consulting companies the experience in the execution and construction supervision of the following is gained: · Building Construction – Commercial, Residential, Car Park multi-storey
  • 2.
    projects. · Infrastructure Projects– Water Transmission Works, Water Pumping Stations, Sewerage and Drainage Projects, Sewage Treatment and Utilization Works, Roads, Bridges and Culverts, Railway Project, Sub-stations and telephone network. Having to work within contracting environment since 1979 the work experience successfully perform the following duties: · Execution of building/road construction according to construction drawings and specifications. · Full-time project monitoring and quality control of site activities including the implementation of the Health and Safety on site. · Supervising site surveying and setting out and preparation of Survey Plan showing size of plots and layout of roads as per municipality rules.  Daily, weekly and monthly resource planning and monitoring (manpower, materials, tools and equipments).  Review of sub-contractor’s shop drawings and method statements and preparation of the Monthly Progress Reports.  Preparation of monthly payment bills.  Preparation of Bill of Quantities, Material Approval Requests and Inspection Requests.  Coordination of various works between different sub-contractors and implementation of the Master Construction Program .  Attendance of meetings and coordination of construction information with other parties in project including client. From 2012 to 2015 till I am working as a project Engineer with Madina Al Nassar From 8th January 2011—TO 2012 I am working as a RESIDENT ENGINEER with AL GHANEM ENGEENIRING CONSULTANT at RABIGH. The project is ALRASHED BAKERY, RABIGH.It is the industrial project at Rabigh. My responsibility includes overlooking the project, attending site meetings, project programming, coordination between client and contract Or, preparation of snag list and handing over the projects to the client at zero snag. From5th April2010—TO 2011 I was working as a CIVIL ENGINEER CUM FACTORY MANAGER with SKAB--ARINCON LTD, JEDDHA . I am looking after daily ,weekly and monthly resources, planning and monitoring(manpower material, tools and equipments). Review of drawings and method statement and preparation of Master Construction Program. Attendance of meetings and co-ordination of construction information with other parties in projects including client.
  • 3.
    Preparation of billmaterial approval and inspection request, getting the quality of work and in time approval of the work. Full-time project monitoring and quality control of factory activity including the implementation of health safety etc. From 2007 – Present GPZ Contracting Company Position: Site Civil Engineer Selected Projects: RIFFA VIEWS Main Consultant: M.S.S.C.B. Value: BD. 50 million My main responsibilities includes overlooking the project team, attending site meetings, projects programming, coordination between client and contractor, preparation of snag list and handover villas to client at zero snag. DURRAT AL BAHRAIN Main Consultant: Atkins Consulting I was the in charge of 80 villas of west zone. There are 500 man power engaged in my section, 6 No. foremen, one general foreman and several charge hands. I have to deal with the M.E.P. contractors’ and some labor contractors are also. There. According to my weekly programs, I have to achieve weekly targets and as well as supervision and quality of the work etc. Every day I have to get the preparation of work with the quality of workmanship for the next day inspection by the consultant (ATKINS). My main responsibilities includes overlooking the project team, attending site meetings, projects programming, coordination between client and contractor, preparation of snag list etc 2003 to 2007 Giex Food Pvt. Ltd I worked as a Project Engineer in Giex Food Pvt. Ltd. Rampur , It was sisterly concern of E.T.A Dubai. The work was supervision of construction work like slaughter House, Lairage, Machine room, D.G house, E.T.P and all the site development works etc. Day to day inspection of construction work & sending the daily report & weekly report to the Director, Checking the bills of the contractors & sending the bills of the contractors & sending the bill for the payment to the director. 1996 to 2003 Self Employed. The work was repair maintenance of Industries of Industrial area, Jamuna Sand and Earthwork etc. I was also worked as a sub-contractor with Haji Construction Co. The work involves construction of Multistoried Buildings. 1989 to 1995 M/s. Unitech Ltd I worked as a Construction Engineer with M/s. Unitech Ltd. The Project had a Sewerage Treatment Plant, Steel Fabrication, and Earthwork etc.
  • 4.
    Sep 1984 toJuly 1988 Benladen Organization. Posted as a Civil Foreman with Benladen Organization at Makkah ( Saudi Arabia ). The Project had a housing complex of 23 sectors (A-1 to C-23) with sewerage line, water supply line, Irrigation line, Hose Bib etc. Pre Cast Manhole placing according to invert level etc. According to drawing data calculation from 1 manhole to next manhole. According to their level and given to the consultant for the inspection and getting the approval from Ministry for the Billing etc. Co-ordination with the technical Dept. According to site & Drawing differences of invert level and given the information to the technical department for making the shop drawing etc. June 1983 to August 1984 ARCHITECTURAL CONSTRUCTION TEAM. Working with A.C.T. as a Civil Foreman at HILLA SEVERAGE TREATMENT PLANT Layout & construction of steel structure & Structure like distribution Chamber, Separation chamber, Final Settlement C Tank, Aeration Lagoons & Administration Building, road & Curb Stone etc. May 1982 to May 1983 A.C.C. Organization. Posted as a Civil Supervisor with the A.C.C. Organization for Overseas Project Samawa Railway Project, IRAQ. The work was 349 double storey quarters, Construction of quarters Construction of maintenance center, station building, Refrigeration and fright shed. Layout and Excavation of crossing Railway Station etc. I also worked in pre-cast Yard for pre cost of Silver cool slab, its length is 13 meters & conc. Slump was only 2 cm. Erection and placement of pre cost slab etc. Consultant was Sotechni (Italian). Nov. 1981 to April 1982 Unitech Pvt. Ltd. Working with Unitech Pvt. Ltd as a Civil Supervisor. The Job entailed like Modi Chemical Alkalis. Lay out, Excavation and Construction of Chemical Laboratories. Brine Saturation, Cell house etc. I have also done the layout of Modi Medicine Factory Independently. Consultant Were: Udhe India Ltd. Hamphri Galassco. 1979 to October 1981 Haji Construction Co. Posted as a Civil Supervisor with Haji Construction Co. The Job involved Construction of guide band at Jamuna River, Back filling work at Patpadganj, 3 star Hotel (Rajhans).