SlideShare a Scribd company logo
1 of 1
Download to read offline
Dalian
Cross-sea Bridge
Commoand center
The site is disturbed already and with variable height.
There is one exsiting slope for construction which also
leading to the tunnel connectiong to the main bridge.
the bridge control center
Basement
Parking and equipments room
the administration committee
Basement
Parking and equipments room
1st floor
Traffice control and climate
obsservation office.
1st floor
activies rooms and offices
2nd Floor
Bridge control ,dinning hall and
exhibition room.
The express tunnel
to the bridge tunnel.
Site Plan
Section A-A
A
A
Site Entrance
2nd Floor
Bridge history exhibiation room
and meeting rooms
THe bridge connects the old Dalian to the new developled zone.The site is
located at the eastern end.
The bridges go through the tunnel in the mountains to the downtown Dalian. A
brach tunnel is planned on the site entering into the main tunnel.
The site is a lower plain surrounded by height grounds.On the south it is a cliff
rapidly dropping to the sea level.The site gains the advantages of the great
open view of the bridge on the ocean and the easy entry into the main bridge
tunnel.
Designing a suitable road connecting to main traffic to
the tunnel.
Managing the site into two platforms for two
departments of the government as the client required.
The Bridge Control Center
The Administration Committee Office
Old Dalian
SiteNew developed zone
The Cross-sea Bridge Commoand center
is located at the east end of the bridge
right on the cliff of the coastline
so that it has the best location for
observation and control of the bridge.
This command center is occupied by
two different departments: the bridge
control center and the administration
committee of the local district
government.
Total Areas:
Total Building Areas:
Building A
Building B
Floor Area Ratio:
Total Parking:
10529 m2
3828 m2
2514
1314
0.36
27
+0.000-
-4.200
4.200
+8.400
+0.000-
4.200
+8.400
4.200
+8.400
+8.400

More Related Content

What's hot

Daniel Culqui's Portfolio
Daniel Culqui's PortfolioDaniel Culqui's Portfolio
Daniel Culqui's PortfolioDaniel Culqui
 
World trade center
World trade centerWorld trade center
World trade centersaurabh0261
 
Architecture culture history project 2
Architecture culture history project 2Architecture culture history project 2
Architecture culture history project 2Yu Xian Liew
 
Jami masjid, Ahmedabad (History of Architecture)
Jami masjid, Ahmedabad (History of Architecture)Jami masjid, Ahmedabad (History of Architecture)
Jami masjid, Ahmedabad (History of Architecture)Sarwar Azad
 
Menara Standard Chartered Report
Menara Standard Chartered ReportMenara Standard Chartered Report
Menara Standard Chartered ReportJamie Lee
 
Statica 2011 Eng
Statica 2011 EngStatica 2011 Eng
Statica 2011 Engrezomec
 
Culture History Report
Culture History ReportCulture History Report
Culture History ReportYung Kai
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Vinay Srivastava
 

What's hot (13)

Ataturk dam report
Ataturk dam report Ataturk dam report
Ataturk dam report
 
Ataturk dam
Ataturk damAtaturk dam
Ataturk dam
 
Daniel Culqui's Portfolio
Daniel Culqui's PortfolioDaniel Culqui's Portfolio
Daniel Culqui's Portfolio
 
World trade center
World trade centerWorld trade center
World trade center
 
SEKL
SEKLSEKL
SEKL
 
Architecture culture history project 2
Architecture culture history project 2Architecture culture history project 2
Architecture culture history project 2
 
Jami masjid, Ahmedabad (History of Architecture)
Jami masjid, Ahmedabad (History of Architecture)Jami masjid, Ahmedabad (History of Architecture)
Jami masjid, Ahmedabad (History of Architecture)
 
Menara Standard Chartered Report
Menara Standard Chartered ReportMenara Standard Chartered Report
Menara Standard Chartered Report
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
Statica 2011 Eng
Statica 2011 EngStatica 2011 Eng
Statica 2011 Eng
 
AP Tour packet
AP Tour packetAP Tour packet
AP Tour packet
 
Culture History Report
Culture History ReportCulture History Report
Culture History Report
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011
 

Viewers also liked

Viewers also liked (11)

POS 3.7
POS 3.7POS 3.7
POS 3.7
 
Case Study1PolyArt
Case Study1PolyArtCase Study1PolyArt
Case Study1PolyArt
 
Búsqueda de Información con Google.
Búsqueda de Información con Google.Búsqueda de Información con Google.
Búsqueda de Información con Google.
 
8º Contrubusiness - Apresentação do Ministro Henrique Meirelles
8º Contrubusiness - Apresentação do Ministro Henrique Meirelles8º Contrubusiness - Apresentação do Ministro Henrique Meirelles
8º Contrubusiness - Apresentação do Ministro Henrique Meirelles
 
Mountain man beer
Mountain man beerMountain man beer
Mountain man beer
 
❷ 買う
❷ 買う❷ 買う
❷ 買う
 
Evaluación módulo 1 Camila Colicheo
Evaluación módulo 1 Camila ColicheoEvaluación módulo 1 Camila Colicheo
Evaluación módulo 1 Camila Colicheo
 
Esquema de lengua tema 2
Esquema de lengua tema 2Esquema de lengua tema 2
Esquema de lengua tema 2
 
A2 Tectonic Hazards Definitions
A2 Tectonic Hazards DefinitionsA2 Tectonic Hazards Definitions
A2 Tectonic Hazards Definitions
 
Team work
Team workTeam work
Team work
 
Complementos Circunstanciales
Complementos CircunstancialesComplementos Circunstanciales
Complementos Circunstanciales
 

More from 晓宁 张

More from 晓宁 张 (14)

quebec house_(NING)-A1.01
quebec house_(NING)-A1.01quebec house_(NING)-A1.01
quebec house_(NING)-A1.01
 
Steel DrawinG-7
Steel DrawinG-7Steel DrawinG-7
Steel DrawinG-7
 
TITLE BLOCK METRIC-ASSIGNMENT 2-B16
TITLE BLOCK METRIC-ASSIGNMENT 2-B16TITLE BLOCK METRIC-ASSIGNMENT 2-B16
TITLE BLOCK METRIC-ASSIGNMENT 2-B16
 
M611 (2)-FLOOR1
M611 (2)-FLOOR1M611 (2)-FLOOR1
M611 (2)-FLOOR1
 
M611 (2)-WALLSECTION
M611 (2)-WALLSECTIONM611 (2)-WALLSECTION
M611 (2)-WALLSECTION
 
wall section-Arch D (2)
wall section-Arch D (2)wall section-Arch D (2)
wall section-Arch D (2)
 
10
1010
10
 
9
99
9
 
2
22
2
 
1
11
1
 
5
55
5
 
7
77
7
 
4
44
4
 
3
33
3
 

6

  • 1. Dalian Cross-sea Bridge Commoand center The site is disturbed already and with variable height. There is one exsiting slope for construction which also leading to the tunnel connectiong to the main bridge. the bridge control center Basement Parking and equipments room the administration committee Basement Parking and equipments room 1st floor Traffice control and climate obsservation office. 1st floor activies rooms and offices 2nd Floor Bridge control ,dinning hall and exhibition room. The express tunnel to the bridge tunnel. Site Plan Section A-A A A Site Entrance 2nd Floor Bridge history exhibiation room and meeting rooms THe bridge connects the old Dalian to the new developled zone.The site is located at the eastern end. The bridges go through the tunnel in the mountains to the downtown Dalian. A brach tunnel is planned on the site entering into the main tunnel. The site is a lower plain surrounded by height grounds.On the south it is a cliff rapidly dropping to the sea level.The site gains the advantages of the great open view of the bridge on the ocean and the easy entry into the main bridge tunnel. Designing a suitable road connecting to main traffic to the tunnel. Managing the site into two platforms for two departments of the government as the client required. The Bridge Control Center The Administration Committee Office Old Dalian SiteNew developed zone The Cross-sea Bridge Commoand center is located at the east end of the bridge right on the cliff of the coastline so that it has the best location for observation and control of the bridge. This command center is occupied by two different departments: the bridge control center and the administration committee of the local district government. Total Areas: Total Building Areas: Building A Building B Floor Area Ratio: Total Parking: 10529 m2 3828 m2 2514 1314 0.36 27 +0.000- -4.200 4.200 +8.400 +0.000- 4.200 +8.400 4.200 +8.400 +8.400