SlideShare a Scribd company logo
i
CERTIFICATE
This is to certify that the project report entitled “JOB PORTAL” done by
Suraj Kumar Yadava (1173713051), Anuj Singh (1173713009) and Sachin
Kannaujiya (1173713048) is an authentic work carried out by them at
Manyawar Kansi Ram Engineering College of Information Technology under
my guidance. The matter embodied in this project work has not been
submitted earlier for the award of any degree or diploma to the best of my
knowledge and belief.
Mrs. Shashi Prabha Anan
(Assistant Professor)
Date: Information Technology
ii
ABSTRACT
This project is aimed at developing an online search Portal for the Placement
Dept. of the college. The system is an online application that can be accessed
throughout the organization and outside as well with proper login provided.
This system can be used as an Online Job Portal for the Placement Dept of the
college to manage the student information with regards to placement.
Students logging should be able to upload their information in the form of a
CV. Visitors/Company representatives logging in may also access/search any
information put up by Students.
The project has been planned to be having the view of distributed
architecture, with centralized storage of the database. The application for the
storage of the data has been planned. Using the constructs of MS-SQL Server
and all the user interfaces have been designed using the ASP.Net
technologies. The database connectivity is planned using the “SQL
Connection” methodology. The standards of security and data protective
mechanism have been given a big choice for proper usage. The application
takes care of different modules and their associated reports, which are
produced as per the applicable strategies and standards that are put forwarded
by the administrative staff.
The entire project has been developed keeping in view of the
distributed client server computing technology, in mind. The specification has
iii
been normalized up to 3NF to eliminate all the anomalies that may arise due
to the database transaction that are executed by the general users and the
organizational administration. The user interfaces are browser specific to give
distributed accessibility for the overall system. The internal database has been
selected as MS-SQL server 2008.The basic constructs of table spaces, clusters
and indexes have been exploited to provide higher consistency and reliability
for the data storage. The MS-SQL server 2008 was a choice as it provides the
constructs of high-level reliability and security. The total front end was
dominated using the ASP.Net technologies. At all proper levels high care was
taken to check that the system manages the data consistency with proper
business rules or validations. The database connectivity was planned using the
latest “SQL Connection” technology provided by Microsoft Corporation. The
authentication and authorization was crosschecked at all the relevant stages.
The user level accessibility has been restricted into two zones namely.
iv
ACKNOWLEDGMENT
We acknowledge our sincere thanks to those who have contributed
significantly to this project.It is a pleasure to extend the deep gratitude to my
guide Mrs. Shashi Prabha Anan for his valuable guidance and support to
continuously promote us for the progress of the project. I thank him for
valuable suggestions towards our project, which helped us in making this
project more efficient and user friendly.
I feel obliged in taking the opportunity to thank Mr. Shobhit Kumar
(H.O.D. Information Technology). I thank each and every one’s efforts who
helped us in some or the other way for small and significant things.
ANUJ SINGH
SACHIN KANNAUJIYA
SURAJ KUMAR YADAVA
v
LIST OF TABLES
SrNo. Table Name Page No.
1. Login ……………………..………...………………………….......... 34
2. Candidate Basic…...………....……...………….……………..…....... 34
3. Candidate Education……………………...……………………......... 34
4. Candidate Professional……………….……..…….………….…........ 35
5. Candidate Address………………………..…………………………. 36
6. Company…………………………………...………………………... 36
7. Candidate Branch Address……………..………..…………….…….. 36
8. Package………….………………………...…….……………..…….. 37
9. Company Package……………..……………...…………………..…. 37
10. Job Applied……….………………………………..………………... 37
11. Job Post…………………………………...…………………………. 37
12. Company Block……….………………..………………………….… 38
13. Post…………...………………………..…………………………….. 38
14. Category………...……………………..…………………………..… 38
15. Area…...……………………………...……………………..……….. 39
16. Question…….………………………...……………………….…….. 39
17. Country………………...………………..…………………………… 39
18. State……………...………………..……………………………….… 39
19. City……………...…………………..……………………………….. 40
20. Resume……………………………..………………………………... 40
vi
LIST OF FIGURES
SrNo. Figure Name Page No.
1. Waterfall model………...…..……………………………………….. 5
2. Context Diagram……………………………………………..……… 24
3. Sequence diagram for Admin…………………………………..…… 25
4. Sequence diagram for Jobseeker………………………………..…… 26
5. Sequence diagram for Recruiter………………………………...…… 26
6. DFD Level 0 ……………...………………...………………............. 29
7. DFD Level 1….…………...…..………….…...…………..…........… 30
8. DFD Level 2…………......……………………...……………........... 31
9. E-R Diagram……………………………………….……………....... 33

More Related Content

What's hot

sports event management system.report
sports event management system.reportsports event management system.report
sports event management system.reportZuhaib Hunzai
 
Training & Placement Database Management System
Training & Placement Database Management SystemTraining & Placement Database Management System
Training & Placement Database Management SystemRohit Mate
 
Traning and placement management system
Traning and placement management systemTraning and placement management system
Traning and placement management systemriteshitechnosoft
 
Subject Registration System for University Students
Subject  Registration  System  for University StudentsSubject  Registration  System  for University Students
Subject Registration System for University StudentsMOHAMMED Irfan
 
Training & placement management sofware
Training & placement management sofwareTraining & placement management sofware
Training & placement management sofwarePriyankaBCE
 
Online Hotel Room Booking System
Online Hotel Room Booking SystemOnline Hotel Room Booking System
Online Hotel Room Booking SystemAbhishek Kumar
 
Vehicle Tracking System Android Project Report
Vehicle Tracking System Android Project ReportVehicle Tracking System Android Project Report
Vehicle Tracking System Android Project ReportSujit9561
 
Placement Automation System
Placement Automation SystemPlacement Automation System
Placement Automation SystemTushar Dattu
 
Online Book Donation System Project Report (Android)
Online Book Donation System Project Report (Android)Online Book Donation System Project Report (Android)
Online Book Donation System Project Report (Android)Kishan Maurya
 
Alumni Management System
Alumni Management SystemAlumni Management System
Alumni Management Systemsneha indulkar
 
QR code event attendence application system
QR code event attendence application systemQR code event attendence application system
QR code event attendence application systemamirshazmil
 
Specification based testing
Specification based testingSpecification based testing
Specification based testingHabibur Rahman
 
Dormitory management system project report
Dormitory management system project reportDormitory management system project report
Dormitory management system project reportShomnath Somu
 
Training and placement
Training and placementTraining and placement
Training and placementBhavesh Parmar
 
Attendance Management Report 2016
Attendance Management Report 2016Attendance Management Report 2016
Attendance Management Report 2016Pooja Maan
 
Design and Implementation of Student Profile and Placement management system
Design and Implementation of Student Profile and Placement management systemDesign and Implementation of Student Profile and Placement management system
Design and Implementation of Student Profile and Placement management systemChamanth MVS
 
02.project training and placement cell
02.project training and  placement cell02.project training and  placement cell
02.project training and placement cellRicha Malhotra
 
SRS for online examination system
SRS for online examination systemSRS for online examination system
SRS for online examination systemlunarrain
 

What's hot (20)

sports event management system.report
sports event management system.reportsports event management system.report
sports event management system.report
 
Training & Placement Database Management System
Training & Placement Database Management SystemTraining & Placement Database Management System
Training & Placement Database Management System
 
Traning and placement management system
Traning and placement management systemTraning and placement management system
Traning and placement management system
 
Subject Registration System for University Students
Subject  Registration  System  for University StudentsSubject  Registration  System  for University Students
Subject Registration System for University Students
 
Training & placement management sofware
Training & placement management sofwareTraining & placement management sofware
Training & placement management sofware
 
Online Hotel Room Booking System
Online Hotel Room Booking SystemOnline Hotel Room Booking System
Online Hotel Room Booking System
 
Vehicle Tracking System Android Project Report
Vehicle Tracking System Android Project ReportVehicle Tracking System Android Project Report
Vehicle Tracking System Android Project Report
 
Placement Automation System
Placement Automation SystemPlacement Automation System
Placement Automation System
 
Online Book Donation System Project Report (Android)
Online Book Donation System Project Report (Android)Online Book Donation System Project Report (Android)
Online Book Donation System Project Report (Android)
 
Alumni Management System
Alumni Management SystemAlumni Management System
Alumni Management System
 
QR code event attendence application system
QR code event attendence application systemQR code event attendence application system
QR code event attendence application system
 
Specification based testing
Specification based testingSpecification based testing
Specification based testing
 
Resume 3
Resume 3Resume 3
Resume 3
 
Dormitory management system project report
Dormitory management system project reportDormitory management system project report
Dormitory management system project report
 
Training and placement
Training and placementTraining and placement
Training and placement
 
Attendance Management Report 2016
Attendance Management Report 2016Attendance Management Report 2016
Attendance Management Report 2016
 
Design and Implementation of Student Profile and Placement management system
Design and Implementation of Student Profile and Placement management systemDesign and Implementation of Student Profile and Placement management system
Design and Implementation of Student Profile and Placement management system
 
02.project training and placement cell
02.project training and  placement cell02.project training and  placement cell
02.project training and placement cell
 
Online attendance management system
Online attendance management systemOnline attendance management system
Online attendance management system
 
SRS for online examination system
SRS for online examination systemSRS for online examination system
SRS for online examination system
 

Viewers also liked

Job portal project documentary
Job portal project documentaryJob portal project documentary
Job portal project documentaryUmang_jain
 
Job portal system doc
Job portal system   docJob portal system   doc
Job portal system docPIYUSH Dubey
 
Online Job Portal ppt presentation
Online Job Portal ppt presentationOnline Job Portal ppt presentation
Online Job Portal ppt presentationPrateek Kulshrestha
 
Online job portal
Online job portal Online job portal
Online job portal Aj Maurya
 
online job portal system
online job portal systemonline job portal system
online job portal systemKrishna Ranjan
 

Viewers also liked (6)

Job portal project documentary
Job portal project documentaryJob portal project documentary
Job portal project documentary
 
Job portal
Job portalJob portal
Job portal
 
Job portal system doc
Job portal system   docJob portal system   doc
Job portal system doc
 
Online Job Portal ppt presentation
Online Job Portal ppt presentationOnline Job Portal ppt presentation
Online Job Portal ppt presentation
 
Online job portal
Online job portal Online job portal
Online job portal
 
online job portal system
online job portal systemonline job portal system
online job portal system
 

Similar to 3 job adda doc 1

online test system project report
online test system project reportonline test system project report
online test system project reportabhishek kumar
 
Major File On web Development
Major File On web Development Major File On web Development
Major File On web Development Love Kothari
 
6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdfRmsDagi
 
E learning project report (Yashraj Nigam)
E learning project report (Yashraj Nigam)E learning project report (Yashraj Nigam)
E learning project report (Yashraj Nigam)Yashraj Nigam
 
Attendance management system project report.
Attendance management system project report.Attendance management system project report.
Attendance management system project report.Manoj Kumar
 
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.Lavkushpatkar
 
Training and placement reportmsword
Training and placement reportmswordTraining and placement reportmsword
Training and placement reportmswordBhavesh Parmar
 
Employee work management system project using codeIgniter
Employee work management system project using codeIgniter Employee work management system project using codeIgniter
Employee work management system project using codeIgniter Shahinul Islam Sujon
 
Untitled design_20231103_152929_0000.pptx
Untitled design_20231103_152929_0000.pptxUntitled design_20231103_152929_0000.pptx
Untitled design_20231103_152929_0000.pptxpradhansubhashree75
 
Minor Project Report On Intranet database
Minor Project Report On Intranet databaseMinor Project Report On Intranet database
Minor Project Report On Intranet databaseAnjeet Kumar
 
TY BSc.IT Blackbook Cover page
TY BSc.IT  Blackbook   Cover pageTY BSc.IT  Blackbook   Cover page
TY BSc.IT Blackbook Cover pageAkashChauhan139
 
Multicast chat with file and desktop sharing
Multicast chat with file and desktop sharingMulticast chat with file and desktop sharing
Multicast chat with file and desktop sharingKhagendra Chapre
 
FINAL documentation (Rupai Bhadra)
FINAL documentation (Rupai Bhadra)FINAL documentation (Rupai Bhadra)
FINAL documentation (Rupai Bhadra)Rupai Bhadra
 
Project.12
Project.12Project.12
Project.12GS Kosta
 

Similar to 3 job adda doc 1 (20)

Online Job Portal
Online Job PortalOnline Job Portal
Online Job Portal
 
online test system project report
online test system project reportonline test system project report
online test system project report
 
Major File On web Development
Major File On web Development Major File On web Development
Major File On web Development
 
6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf6475- RAILWAY RESERVATION SYSTEM.pdf
6475- RAILWAY RESERVATION SYSTEM.pdf
 
Intranet database
Intranet databaseIntranet database
Intranet database
 
E learning project report (Yashraj Nigam)
E learning project report (Yashraj Nigam)E learning project report (Yashraj Nigam)
E learning project report (Yashraj Nigam)
 
Attendance management system project report.
Attendance management system project report.Attendance management system project report.
Attendance management system project report.
 
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.
ONLINE FLAT BOOKING SERVICE MINOR PROJECT REPORT.
 
Sport.net(2).doc
Sport.net(2).docSport.net(2).doc
Sport.net(2).doc
 
Training and placement reportmsword
Training and placement reportmswordTraining and placement reportmsword
Training and placement reportmsword
 
Employee work management system project using codeIgniter
Employee work management system project using codeIgniter Employee work management system project using codeIgniter
Employee work management system project using codeIgniter
 
bus reservation.pptx
bus reservation.pptxbus reservation.pptx
bus reservation.pptx
 
Billing project
Billing projectBilling project
Billing project
 
Untitled design_20231103_152929_0000.pptx
Untitled design_20231103_152929_0000.pptxUntitled design_20231103_152929_0000.pptx
Untitled design_20231103_152929_0000.pptx
 
Minor Project Report On Intranet database
Minor Project Report On Intranet databaseMinor Project Report On Intranet database
Minor Project Report On Intranet database
 
TY BSc.IT Blackbook Cover page
TY BSc.IT  Blackbook   Cover pageTY BSc.IT  Blackbook   Cover page
TY BSc.IT Blackbook Cover page
 
File tracking system
File tracking systemFile tracking system
File tracking system
 
Multicast chat with file and desktop sharing
Multicast chat with file and desktop sharingMulticast chat with file and desktop sharing
Multicast chat with file and desktop sharing
 
FINAL documentation (Rupai Bhadra)
FINAL documentation (Rupai Bhadra)FINAL documentation (Rupai Bhadra)
FINAL documentation (Rupai Bhadra)
 
Project.12
Project.12Project.12
Project.12
 

More from SURAJ KUMAR YADAVA (10)

5 job adda doc 2
5 job adda doc 25 job adda doc 2
5 job adda doc 2
 
5 job adda doc 2
5 job adda doc 25 job adda doc 2
5 job adda doc 2
 
4 contents
4 contents4 contents
4 contents
 
4 contents
4 contents4 contents
4 contents
 
2 title page
2 title page2 title page
2 title page
 
1 cover page
1 cover page1 cover page
1 cover page
 
1 cover page
1 cover page1 cover page
1 cover page
 
presentation on lifi technology by suraj kumar yadava
presentation on lifi technology by suraj kumar yadavapresentation on lifi technology by suraj kumar yadava
presentation on lifi technology by suraj kumar yadava
 
li fi report
li fi reportli fi report
li fi report
 
1 sky
1 sky1 sky
1 sky
 

Recently uploaded

shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptxfaamieahmd
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 

Recently uploaded (20)

shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

3 job adda doc 1

  • 1. i CERTIFICATE This is to certify that the project report entitled “JOB PORTAL” done by Suraj Kumar Yadava (1173713051), Anuj Singh (1173713009) and Sachin Kannaujiya (1173713048) is an authentic work carried out by them at Manyawar Kansi Ram Engineering College of Information Technology under my guidance. The matter embodied in this project work has not been submitted earlier for the award of any degree or diploma to the best of my knowledge and belief. Mrs. Shashi Prabha Anan (Assistant Professor) Date: Information Technology
  • 2. ii ABSTRACT This project is aimed at developing an online search Portal for the Placement Dept. of the college. The system is an online application that can be accessed throughout the organization and outside as well with proper login provided. This system can be used as an Online Job Portal for the Placement Dept of the college to manage the student information with regards to placement. Students logging should be able to upload their information in the form of a CV. Visitors/Company representatives logging in may also access/search any information put up by Students. The project has been planned to be having the view of distributed architecture, with centralized storage of the database. The application for the storage of the data has been planned. Using the constructs of MS-SQL Server and all the user interfaces have been designed using the ASP.Net technologies. The database connectivity is planned using the “SQL Connection” methodology. The standards of security and data protective mechanism have been given a big choice for proper usage. The application takes care of different modules and their associated reports, which are produced as per the applicable strategies and standards that are put forwarded by the administrative staff. The entire project has been developed keeping in view of the distributed client server computing technology, in mind. The specification has
  • 3. iii been normalized up to 3NF to eliminate all the anomalies that may arise due to the database transaction that are executed by the general users and the organizational administration. The user interfaces are browser specific to give distributed accessibility for the overall system. The internal database has been selected as MS-SQL server 2008.The basic constructs of table spaces, clusters and indexes have been exploited to provide higher consistency and reliability for the data storage. The MS-SQL server 2008 was a choice as it provides the constructs of high-level reliability and security. The total front end was dominated using the ASP.Net technologies. At all proper levels high care was taken to check that the system manages the data consistency with proper business rules or validations. The database connectivity was planned using the latest “SQL Connection” technology provided by Microsoft Corporation. The authentication and authorization was crosschecked at all the relevant stages. The user level accessibility has been restricted into two zones namely.
  • 4. iv ACKNOWLEDGMENT We acknowledge our sincere thanks to those who have contributed significantly to this project.It is a pleasure to extend the deep gratitude to my guide Mrs. Shashi Prabha Anan for his valuable guidance and support to continuously promote us for the progress of the project. I thank him for valuable suggestions towards our project, which helped us in making this project more efficient and user friendly. I feel obliged in taking the opportunity to thank Mr. Shobhit Kumar (H.O.D. Information Technology). I thank each and every one’s efforts who helped us in some or the other way for small and significant things. ANUJ SINGH SACHIN KANNAUJIYA SURAJ KUMAR YADAVA
  • 5. v LIST OF TABLES SrNo. Table Name Page No. 1. Login ……………………..………...………………………….......... 34 2. Candidate Basic…...………....……...………….……………..…....... 34 3. Candidate Education……………………...……………………......... 34 4. Candidate Professional……………….……..…….………….…........ 35 5. Candidate Address………………………..…………………………. 36 6. Company…………………………………...………………………... 36 7. Candidate Branch Address……………..………..…………….…….. 36 8. Package………….………………………...…….……………..…….. 37 9. Company Package……………..……………...…………………..…. 37 10. Job Applied……….………………………………..………………... 37 11. Job Post…………………………………...…………………………. 37 12. Company Block……….………………..………………………….… 38 13. Post…………...………………………..…………………………….. 38 14. Category………...……………………..…………………………..… 38 15. Area…...……………………………...……………………..……….. 39 16. Question…….………………………...……………………….…….. 39 17. Country………………...………………..…………………………… 39 18. State……………...………………..……………………………….… 39 19. City……………...…………………..……………………………….. 40 20. Resume……………………………..………………………………... 40
  • 6. vi LIST OF FIGURES SrNo. Figure Name Page No. 1. Waterfall model………...…..……………………………………….. 5 2. Context Diagram……………………………………………..……… 24 3. Sequence diagram for Admin…………………………………..…… 25 4. Sequence diagram for Jobseeker………………………………..…… 26 5. Sequence diagram for Recruiter………………………………...…… 26 6. DFD Level 0 ……………...………………...………………............. 29 7. DFD Level 1….…………...…..………….…...…………..…........… 30 8. DFD Level 2…………......……………………...……………........... 31 9. E-R Diagram……………………………………….……………....... 33