ERDENES TAVAN TOLGOI JSC
GRAEME HANCOCK
CHIEF OPERATING OFFICER
22 MAY 2012
ERDENES TAVAN TOLGOI JSC // PAGE 1
THIS PRESENTATION INCLUDES CERTAIN “FORWARD-LOOKING STATEMENTS”. ALL STATEMENTS,
OTHER THAN STATEMENTS OF HISTORICAL FACT, ARE FORWARD-LOOKING STATEMENTS THAT
INVOLVE RISKS AND UNCERTAINTIES, INCLUDING BUT NOT LIMITED TO THOSE THAT RELATE TO
COAL RESOURCES AND SALEABLE PRODUCT YIELDS, PRODUCTION PLANS, COSTS OF
PRODUCTION, STRIP RATIOS, CAPITAL EXPENDITURES, COAL PRICES AND MARKETS. THERE CAN
BE NO ASSURANCES THAT THESE STATEMENTS WILL PROVE ACCURATE; AND ACTUAL RESULTS
AND FUTURE EVENTS COULD DIFFER MATERIALLY FROM THOSE ANTICIPATED IN SUCH
STATEMENTS. THE INFORMATION CONTAINED HEREIN REPRESENTS THE COMPANY’S JUDGMENT
AS OF THE DATE HEREOF, BASED ON INFORMATION CURRENTLY AVAILABLE, INCLUDING THE
INFORMATION CONTAINED IN A DRAFT INDEPENDENT TECHNICAL REPORT PREPARED AT THE
REQUEST OF THE COMPANY. THE DRAFT TECHNICAL REPORT AND THE COMPANY’S MINE
DEVELOPMENT PLANS ARE SUBJECT TO CHANGE. THE COMPANY DOES NOT ASSUME ANY
OBLIGATION TO UPDATE ANY STATEMENT. NEITHER THE COMPANY NOR ANY OF ITS PERSONNEL
ACCEPTS OR ASSUMES RESPONSIBILITY, OR HAS ANY LIABILITY, TO ANY PERSON IN RESPECT OF
THIS PRESENTATION. THIS PRESENTATION DOES NOT FORM PART OF AND IS NOT MADE IN
CONNECTON WITH ANY OFFERING OF SECURITIES, AND IT SHOULD NOT BE RELIED UPON IN
CONNECTION WITH ANY CONTACT, INVESTMENT, DECISION OR COMMITMENT WHATSOEVER.
DISCLAIMER
ERDENES TAVAN TOLGOI JSC // PAGE 2
Location
COMPANY SNAPSHOT - LOCATION
 The Tavan Tolgoi coalfield is
located in the central South
Gobi region of Mongolia
 Approximately 200km north
of the Mongolian-Chinese
border
ERDENES TAVAN TOLGOI JSC // PAGE 3
Overview
Current Corporate Structure
 Erdenes Tavan Tolgoi JSC (ETT) is a Mongolian
coal producer and developer
 The Company holds mining licences over the
Tavan Tolgoi coalfield in Mongolia, one of the
largest undeveloped deposits of high-value
coking coal in the world
 The Company holds 7.4Bt of Measured,
Indicated and Inferred coal reserves and
resources and 1.8Bt of Proven and Probable
coal reserves in accordance with JORC
 The Company commenced commercial
production in July 2011
 The Company is in the process of expanding
production with the objective of becoming a
large scale producer and exporter of high
quality washed coking and thermal coal
products to Chinese and North Asian markets
COMPANY SNAPSHOT
Government of Mongolia
Erdenes MGL LLC
Erdenes Tavan Tolgoi JSC
100%
100%
Anticipated Future Corporate Structure
Government of Mongolia
Erdenes MGL LLC
Erdenes Tavan Tolgoi JSC
51% or more
100%
Mongolian Shareholders Publicly Traded Shares
20% Up to 29%
Erdenes Tavan Tolgoi JSC owns licences over a majority of the Tavan Tolgoi coalfield, one
of the largest open pittable coking coal deposits in the world
ERDENES TAVAN TOLGOI JSC // PAGE 4
 Tavan Tolgoi deposit consists of 6 sub-fields: Tsankhi, Ukhaa Khudag, Bortolgoi, Borteeg,
Southwest and Eastern coalfields
 ETT owns licences over 5 of the 6 sub-fields (excluding Ukhaa Khudag)
 Tsankhi is the main and best explored of the coalfields owned by ETT and contains the
highest portion of Measured and Indicated coal resources
 Significant exploration and expansion potential exists at other 4 sub-fields
COALFIELD STRUCTURE
Source: Draft Technical Report
~25km
ERDENES TAVAN TOLGOI JSC // PAGE 5
 Tavan Tolgoi deposit consists of 6 sub-fields: Tsankhi, Ukhaa Khudag, Bortolgoi, Borteeg,
Southwest and Eastern coalfields
 ETT owns licences over 5 of the 6 sub-fields (excluding Ukhaa Khudag)
 Tsankhi is the main and best explored of the coalfields owned by ETT and contains the
highest portion of Measured and Indicated coal resources
 Significant exploration and expansion potential exists at other 4 sub-fields
COALFIELD STRUCTURE
Source: Draft Technical Report
~25km
MMC
ERDENES TAVAN TOLGOI JSC // PAGE 6
The current focus of the Group is on the Tsankhi coalfield
1Represents marketable coal Reserves (i.e. sold raw or washed and sold as premium coal). Reserves for East Tsankhi exclusive of reserves within mining licences owned by third parties
2In-situ coal Resources at <300m depth limit and estimated under JORC Code. Resources inclusive of reserves. Resources for East Tsankhi exclusive of resources within mining licences owned
by third parties
Source: Draft Technical Report
Eastern coalfieldBorteeg
coalfield
Southwest
coalfield
Tavan Tolgoi JSC
(“Small TT”) (third party)
Daitsuki LLC
(third party)
Bortolgoi coalfield
Measured
Indicated
Inferred
287А
11977А
11945А
West Tsankhi coalfield
Reserves1: 888Mt (~59% coking coal)
Resources2: 1,734Mt (~72% coking coal)
East Tsankhi coalfield
Reserves1: 948Mt (~61% coking coal)
Resources2 1,262Mt (~71% coking coal)
JORC RESERVES AND RESOURCES
ERDENES TAVAN TOLGOI JSC // PAGE 7
ERDENES TAVAN TOLGOI JSC // PAGE 8
ERDENES TAVAN TOLGOI JSC // PAGE 9
ERDENES TAVAN TOLGOI JSC // PAGE 10
ERDENES TAVAN TOLGOI JSC // PAGE 11
ERDENES TAVAN TOLGOI JSC // PAGE 12
Coal Resources (Mt, inclusive of coal Reserves)
JORC COAL RESERVES AND RESOURCES
Source: Draft Technical Report
Coalfield
Proved
(Mt ROM)
Probable
(Mt ROM)
Total
(Mt ROM)
Marketable
(Mt Product)
East Tsankhi 359 589 948 619
West Tsankhi 482 406 888 610
Total ETT 841 995 1,836 1,229
Coal Reserves (Mt)
Coal Reserves split by coal type (Mt)
Coalfield
Measured
(Mt ROM)
Indicated
(Mt ROM)
Inferred
(Mt ROM)
Total
(Mt ROM)
East Tsankhi 410 726 126 1,262
West Tsankhi 576 706 452 1,734
Others1 - 1,554 2,833 4,387
Total ETT 986 2,986 3,411 7,382
Coal Resources split by coal type (Mt)
1Include Southwest, Borteeg, Eastern and Bortolgoi coalfields
ERDENES TAVAN TOLGOI JSC // PAGE 13
Tsankhi coking coal specifications Tsankhi coking coal quality benchmarked
against global coking coal projects
COAL QUALITY
Source: Draft Technical Report
ERDENES TAVAN TOLGOI JSC // PAGE 14
Overview
EAST TSANKHI – OVERVIEW
 Independent Technical Report completed by Norwest
 JORC Reserves and Resources statement completed
— Total Reserves 948Mt (>70% coking coal)
— Total reserves and resources 1262Mt
 Commenced pre-stripping and box cut development in August 2010
 Production commenced in July 2011 with total production over 2.2Mt as at May 20th
— 1.3Mt year to date
 Currently producing at an annualized rate of 4.5 Mtpa
 Target 3Mt ROM of coking coal in 2012 and gradually increasing capacity to steady
state 20Mtpa ROM by 2017 with potential for further expansion
— Estimated mine life: 50 years
— Production of high quality unwashed coking coals for export in first two years while
Coal Handling and Preparation Plant (“CHPP”) is being constructed
— Highly competitive cost with the estimated LOM average mine operating cost:
US$40.70/t of saleable washed coal
Source: Draft Technical Report
ERDENES TAVAN TOLGOI JSC // PAGE 15
EAST TSANKHI – OVERVIEW
 Upon completion of first CHPP module, plan is to start producing a range of premium
washed products including hard coking coal, semi-soft coking coal and high quality
thermal coal for export
— The current plan envisages the first module coming on line around mid 2014
 Current mine workforce of 300 expanding to approximately 1,000 as capacity increases
— Mining camp and onsite mine facilities under development
Offtake agreement
 5 Year offtake agreement signed with Chalco
 Exports to China under the agreement commenced in October 2011
 To date exported 1.1Mt to China
Source: Draft Technical Report
Continued…
ERDENES TAVAN TOLGOI JSC // PAGE 16
Contract mining agreement
EAST TSANKHI – OVERVIEW
 Contract mining agreement commenced with Macmahon/Operta Joint Venture in January
2012
 Structured as an Alliance Contract, with a Base + KPI risk based compensation scheme
 An initial 5 year term with option to extend for an additional 2 years on meeting KPIs
 Contractor to raise financing for and procure all necessary mining equipment – ETT to
purchase all mining equipment at the end of the contract term at book value
 Production targets are as follows:
 2012 – 3 Mt
 2013 – 6 Mt
 2014 – 10 Mt
 2015 – 15 Mt
 Operations going very well with monthly production tonnages increasing month on month
 Occupational health and safety standards are being raised and working conditions of
operators improved
 New large mining equipment entered into service in late April 2012 and additional equipment
on order for delivery late 2012 to ensure 6 Mtpa target is achieved in 2013
Source: Draft Technical Report
ERDENES TAVAN TOLGOI JSC // PAGE 17
EAST TSANKHI PRODUCTION - 2012
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
January February March April May June July August September October November December
YTD
Monthly Production
Cumulative Production YTD
Annual Budget Target
ERDENES TAVAN TOLGOI JSC // PAGE 18
Open-pit surface mining with a life of ~50 years Total LOM saleable product of 619Mt
EAST TSANKHI – OPERATIONS
 Targeted steady state annual ROM production of ~ 20Mtpa (after ramp-up)
 Estimated LOM average strip ratio at ~ 2.74
 Targeted annual saleable production of ~ 13-15 Mtpa (after ramp-up)
 Estimated LOM average washing yield at ~64%
Source: Draft Technical Report and related mine development plan
ERDENES TAVAN TOLGOI JSC // PAGE 19
Chinese Demand for Coking Coal
ETT Cost ranking (CFR Bohai Sea)
EAST TSANKHI – MARKET AND ECONOMICS
Source: Draft Technical Report and related mine development plan
0
20
40
60
80
100
120
140
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Mt
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
Landborne
imports
(Clean)
Seaborne
imports
% Mongolian
Supply
0
50
100
150
200
250
300
0 100 200 300 400
Mt
FOBUS$/t
Erdenes TT
Australia
Canada
China
Mozambique
Indonesia
Russia
South Africa
USA
Venezuela
Vietnam
New Zealand
ETT Cost ranking (FOR Mine Gate)
0
20
40
60
80
100
120
0 100 200 300
Mt
FOBUS$/t
Erdenes TT
Australia
Canada
China
Mozambique
Indonesia
Russia
South Africa
USA
Venezuela
Vietnam
New Zealand
ERDENES TAVAN TOLGOI JSC // PAGE 20
Overview Recent development
WEST TSANKHI – OVERVIEW
 Covering land area of 3,004 hectares
 Independent Technical Report completed
by Norwest Corporation
 JORC Reserves and Resources
statement completed
— Total Reserves 888Mt
— Total reserves and resources 1734Mt
 Pre-feasibility study completed
— Supports a steady state 20Mtpa ROM
production rate over a five year ramp-
up period
— Estimated mine life of ~48 years
 Currently in negotiations with leading
foreign SOEs and private interests to
develop the West Tsankhi Coalfield as a
consortium
— Interested parties from the US, China,
Russia, Japan and Korea
 Erdenes TT will retain title to the West
Tsankhi mining licences and the
consortium will operate under a Contract
arrangement similar to an Indonesian
style Coal Contract of Works
 Erdenes TT now completing Feasibility
Study for the commencement of Mining
on West Tsankhi
ERDENES TAVAN TOLGOI JSC // PAGE 21
Open-pit surface mining with a life of ~48 years Total LOM saleable product of 610Mt
WEST TSANKHI – OPERATIONS
 Targeted steady annual ROM production of ~20Mtpa
 Estimated LOM average strip ratio at ~ 2.8
 Targeted annual saleable production of ~14Mtpa
 Estimated LOM average washing yield at ~67%
Source: Draft Technical Report and related mine development plan
-
5.00
10.00
15.00
20.00
25.00
Yr 01 Yr 07 Yr 13 Yr 19 Yr 25 Yr 31 Yr 37 Yr 43
Production(Mt)
ROM coal Saleable coal
Yr 48
ERDENES TAVAN TOLGOI JSC // PAGE 22
Road from Tavan Tolgoi to Gashuun Sukhait Border Crossing
INFRASTRUCTURE
 The Company has received Cabinet approval to construct a sealed highway
parallel to the Mongolian Mining Corporation (“MMC”) paved road
 Currently planned to commence construction in 2013
 Design, feasibility and EIA studies about to commence
 Combination with MMC paved road will increase capacity and safety
 The CHPP will employ “world-class” technologies and processes and is expected to be one of the
largest and most advanced in Asia
 Phased construction schedule
— 2 x 10Mtpa phases
 Expected commissioning of the first 5Mtpa module by mind 2014 and processing full capacity of
20Mtpa by 2017
 Prequalification of EPC contractors has been completed and tender documents issued.
East Tsankhi CHPP
Railroad from Tavan Tolgoi to Gashuun Sukhait
 Mongolian Mining Corporation (MMC) has a license to build the rail from Tavan Tolgoi to the Gashuun
Sukhait border crossing. ETT anticipates cooperating in this development.
 Design, feasibility and EIA studies completed and construction commenced
ERDENES TAVAN TOLGOI JSC // PAGE 23
INFRASTRUCTURE
Water Supply
 Cabinet approved water use permit for Balgasyn Ulaan Nuur (“BUN”) ground water
— Located ~65km west of East Tsankhi coalfield
 Estimated water requirements for a 20Mtpa CHPP are ~200 litres/sec
 Estimated water requirements for a 300MW Power station are ~20 litres/sec
 ETT has been granted permits to use a minimum of 151 litres/sec from BUN
 The Group plans to begin construction of water pipeline from BUN to mine site by 1H2013
and intends for the pipeline to be operational prior to commissioning the first CHPP module
targeted for 2014
 The Group is currently exploring additional water supplies complementary to BUN
Power Supply
 Currently using diesel generator at mine site with plan to connect to the CES Grid to
provide sufficient supply for the Group’s operations until late 2013
 The Group is completing a bankable feasibility study to develop and construct its own
300MW (two 150MW modules) power plant to meet its long-term power requirements
 The power plant will be sufficient to supply all of East and West Tsankhi operation at steady
state production with excess capacity to be sold to other mines in the region, to the
Mongolian Central Grid and potentially to China via the OT Inner Mongolia grid connection
ERDENES TAVAN TOLGOI JSC // PAGE 24
Expand production at the East Tsankhi coalfield1
Develop the West Tsankhi coalfield to significantly increase output2
Maximise sale prices by developing a CHPP to produce value-added products3
Reduce costs by using low cost rail to export the coal products and taking advantage of
economies of scale
4
Cooperate with other South Gobi coal producers to develop regional transport
infrastructure
5
Develop a 300MW thermal power plant to supply the company’s power needs and create
an additional revenue source
6
Expand sales and marketing capabilities to broaden customer base, develop relationships
with end users and maximize price
7
Conduct sustainable operations in accordance with international best practice for
environmental, social and health and safety standards
8
Explore the potential to expand production through development of other ETT coalfields9
FUTURE BUSINESS DEVELOPMENT STRATEGIES
ERDENES TAVAN TOLGOI JSC // PAGE 25
Mine camp
SELECT PHOTOS
ERDENES TAVAN TOLGOI JSC // PAGE 26
Mine pit from waste dump
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 27
SELECT PHOTOS (CONT’D)
Seam 4 in Pit wall
ERDENES TAVAN TOLGOI JSC // PAGE 28
SELECT PHOTOS (CONT’D)
Seam 4 thickness and low stripping ratio
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 29
SELECT PHOTOS (CONT’D)
In pit equipment Stripping operations
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 30
SELECT PHOTOS (CONT’D)
Coal ROM stockpile
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 31
SELECT PHOTOS (CONT’D)
Current waste dump
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 32
SELECT PHOTOS (CONT’D)
Open cut operations
SELECT PHOTOS (CONT’D)
ERDENES TAVAN TOLGOI JSC // PAGE 33
Jigjidjav 8, 1st khoroo,
Chingeltei District
Ulaanbaatar, Mongolia
Tel: (976) 7011-8585
Fax: (976) 7011-9595
Erdenes Tavan Tolgoi JSC
THANK YOU FOR YOUR ATTENTION

More Related Content

What's hot

Oil & gas companies - Classification
Oil & gas companies - ClassificationOil & gas companies - Classification
Oil & gas companies - ClassificationPrince Patni
 
New base special 05 august 2014
New base special  05 august 2014New base special  05 august 2014
New base special 05 august 2014
Khaled Al Awadi
 
08.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 13908.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 139
The Business Council of Mongolia
 
08.07.2011, NEWSWIRE, Issues 176-177
08.07.2011, NEWSWIRE, Issues 176-17708.07.2011, NEWSWIRE, Issues 176-177
08.07.2011, NEWSWIRE, Issues 176-177
The Business Council of Mongolia
 
Republic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South SudanRepublic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South Sudan
Mining On Top
 
Mining Investment in Uganda
Mining Investment in UgandaMining Investment in Uganda
Mining Investment in Uganda
Mining On Top
 
BCM NewsWire Issue 450
BCM NewsWire Issue 450BCM NewsWire Issue 450
BCM NewsWire Issue 450
The Business Council of Mongolia
 
20.01.2012, NEWSWIRE, Issue 205
20.01.2012, NEWSWIRE, Issue 20520.01.2012, NEWSWIRE, Issue 205
20.01.2012, NEWSWIRE, Issue 205
The Business Council of Mongolia
 
Current mineing ----mineskyawthet-120629220751-phpapp02
Current mineing ----mineskyawthet-120629220751-phpapp02Current mineing ----mineskyawthet-120629220751-phpapp02
Current mineing ----mineskyawthet-120629220751-phpapp02MYO AUNG Myanmar
 
11.03.2011, NEWSWIRE, Issue 158
11.03.2011, NEWSWIRE, Issue 15811.03.2011, NEWSWIRE, Issue 158
11.03.2011, NEWSWIRE, Issue 158
The Business Council of Mongolia
 
South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014
Symposium
 
20.08.2010, NEWSWIRE, Issue 132
20.08.2010, NEWSWIRE, Issue 13220.08.2010, NEWSWIRE, Issue 132
20.08.2010, NEWSWIRE, Issue 132
The Business Council of Mongolia
 
The Oil And Gas Industry Embassy Of Denmark, Vietnam
The Oil And Gas Industry   Embassy Of Denmark, VietnamThe Oil And Gas Industry   Embassy Of Denmark, Vietnam
The Oil And Gas Industry Embassy Of Denmark, Vietnamhaison
 
10.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 17110.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 171
The Business Council of Mongolia
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
oilandgas
 
Uganda mineral sector presentation
Uganda mineral sector presentation Uganda mineral sector presentation
Uganda mineral sector presentation
Brian Mukasa
 
Challenges of investing in junior mining companies and Sotkamo Silver
Challenges of investing in junior mining companies and Sotkamo SilverChallenges of investing in junior mining companies and Sotkamo Silver
Challenges of investing in junior mining companies and Sotkamo Silver
Mining On Top
 
Geology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South SudanGeology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South Sudan
Mining On Top
 

What's hot (18)

Oil & gas companies - Classification
Oil & gas companies - ClassificationOil & gas companies - Classification
Oil & gas companies - Classification
 
New base special 05 august 2014
New base special  05 august 2014New base special  05 august 2014
New base special 05 august 2014
 
08.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 13908.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 139
 
08.07.2011, NEWSWIRE, Issues 176-177
08.07.2011, NEWSWIRE, Issues 176-17708.07.2011, NEWSWIRE, Issues 176-177
08.07.2011, NEWSWIRE, Issues 176-177
 
Republic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South SudanRepublic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South Sudan
 
Mining Investment in Uganda
Mining Investment in UgandaMining Investment in Uganda
Mining Investment in Uganda
 
BCM NewsWire Issue 450
BCM NewsWire Issue 450BCM NewsWire Issue 450
BCM NewsWire Issue 450
 
20.01.2012, NEWSWIRE, Issue 205
20.01.2012, NEWSWIRE, Issue 20520.01.2012, NEWSWIRE, Issue 205
20.01.2012, NEWSWIRE, Issue 205
 
Current mineing ----mineskyawthet-120629220751-phpapp02
Current mineing ----mineskyawthet-120629220751-phpapp02Current mineing ----mineskyawthet-120629220751-phpapp02
Current mineing ----mineskyawthet-120629220751-phpapp02
 
11.03.2011, NEWSWIRE, Issue 158
11.03.2011, NEWSWIRE, Issue 15811.03.2011, NEWSWIRE, Issue 158
11.03.2011, NEWSWIRE, Issue 158
 
South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014
 
20.08.2010, NEWSWIRE, Issue 132
20.08.2010, NEWSWIRE, Issue 13220.08.2010, NEWSWIRE, Issue 132
20.08.2010, NEWSWIRE, Issue 132
 
The Oil And Gas Industry Embassy Of Denmark, Vietnam
The Oil And Gas Industry   Embassy Of Denmark, VietnamThe Oil And Gas Industry   Embassy Of Denmark, Vietnam
The Oil And Gas Industry Embassy Of Denmark, Vietnam
 
10.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 17110.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 171
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
 
Uganda mineral sector presentation
Uganda mineral sector presentation Uganda mineral sector presentation
Uganda mineral sector presentation
 
Challenges of investing in junior mining companies and Sotkamo Silver
Challenges of investing in junior mining companies and Sotkamo SilverChallenges of investing in junior mining companies and Sotkamo Silver
Challenges of investing in junior mining companies and Sotkamo Silver
 
Geology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South SudanGeology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South Sudan
 

Viewers also liked

04.01.2014, NEWSWIRE, Issue 254-255
04.01.2014, NEWSWIRE, Issue 254-25504.01.2014, NEWSWIRE, Issue 254-255
04.01.2014, NEWSWIRE, Issue 254-255
The Business Council of Mongolia
 
Risk forum 2016 Introduction & Agenda
Risk forum 2016 Introduction & AgendaRisk forum 2016 Introduction & Agenda
Risk forum 2016 Introduction & Agenda
The Business Council of Mongolia
 
18.02.2011, NEWSWIRE, Issue 155
18.02.2011, NEWSWIRE, Issue 15518.02.2011, NEWSWIRE, Issue 155
18.02.2011, NEWSWIRE, Issue 155
The Business Council of Mongolia
 
10.08.2012, NEWSWIRE, Issue 234
10.08.2012, NEWSWIRE, Issue 23410.08.2012, NEWSWIRE, Issue 234
10.08.2012, NEWSWIRE, Issue 234
The Business Council of Mongolia
 
22.01.2010, NEWSWIRE, Issue 102
22.01.2010, NEWSWIRE, Issue 10222.01.2010, NEWSWIRE, Issue 102
22.01.2010, NEWSWIRE, Issue 102
The Business Council of Mongolia
 
27.04.2015 Trends in public attitudes in 2015, Sumati
27.04.2015 Trends in public attitudes in 2015, Sumati27.04.2015 Trends in public attitudes in 2015, Sumati
27.04.2015 Trends in public attitudes in 2015, Sumati
The Business Council of Mongolia
 
2016.04.27 workplace safety 2 bcm
2016.04.27 workplace safety  2  bcm2016.04.27 workplace safety  2  bcm
2016.04.27 workplace safety 2 bcm
The Business Council of Mongolia
 
30.03.2012, NEWSWIRE, Issue 215
30.03.2012, NEWSWIRE, Issue 21530.03.2012, NEWSWIRE, Issue 215
30.03.2012, NEWSWIRE, Issue 215
The Business Council of Mongolia
 
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
The Business Council of Mongolia
 
31.10.2013 Ovoot coking coal project, David Paull
31.10.2013 Ovoot coking coal project, David Paull31.10.2013 Ovoot coking coal project, David Paull
31.10.2013 Ovoot coking coal project, David Paull
The Business Council of Mongolia
 
18.05.2012, NEWSWIRE, Issue 222
18.05.2012, NEWSWIRE, Issue 22218.05.2012, NEWSWIRE, Issue 222
18.05.2012, NEWSWIRE, Issue 222
The Business Council of Mongolia
 
07.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 27707.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 277
The Business Council of Mongolia
 
14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel
The Business Council of Mongolia
 
03.03.2010 Environmental and social risks in mining, Amy Sexton
03.03.2010 Environmental and social risks in mining, Amy Sexton03.03.2010 Environmental and social risks in mining, Amy Sexton
03.03.2010 Environmental and social risks in mining, Amy Sexton
The Business Council of Mongolia
 
09.11.2012, NEWSWIRE, Issue 247
09.11.2012, NEWSWIRE, Issue 24709.11.2012, NEWSWIRE, Issue 247
09.11.2012, NEWSWIRE, Issue 247
The Business Council of Mongolia
 
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
The Business Council of Mongolia
 
12.02.2010, NEWSWIRE, Issue 105
12.02.2010, NEWSWIRE, Issue 10512.02.2010, NEWSWIRE, Issue 105
12.02.2010, NEWSWIRE, Issue 105
The Business Council of Mongolia
 
16.10.2009, NEWSWIRE, Issue 90
16.10.2009, NEWSWIRE, Issue 9016.10.2009, NEWSWIRE, Issue 90
16.10.2009, NEWSWIRE, Issue 90
The Business Council of Mongolia
 
28.03.2014, Lessons learnt from japan and the first steps for applying it in...
 28.03.2014, Lessons learnt from japan and the first steps for applying it in... 28.03.2014, Lessons learnt from japan and the first steps for applying it in...
28.03.2014, Lessons learnt from japan and the first steps for applying it in...
The Business Council of Mongolia
 

Viewers also liked (20)

BCM Report
BCM ReportBCM Report
BCM Report
 
04.01.2014, NEWSWIRE, Issue 254-255
04.01.2014, NEWSWIRE, Issue 254-25504.01.2014, NEWSWIRE, Issue 254-255
04.01.2014, NEWSWIRE, Issue 254-255
 
Risk forum 2016 Introduction & Agenda
Risk forum 2016 Introduction & AgendaRisk forum 2016 Introduction & Agenda
Risk forum 2016 Introduction & Agenda
 
18.02.2011, NEWSWIRE, Issue 155
18.02.2011, NEWSWIRE, Issue 15518.02.2011, NEWSWIRE, Issue 155
18.02.2011, NEWSWIRE, Issue 155
 
10.08.2012, NEWSWIRE, Issue 234
10.08.2012, NEWSWIRE, Issue 23410.08.2012, NEWSWIRE, Issue 234
10.08.2012, NEWSWIRE, Issue 234
 
22.01.2010, NEWSWIRE, Issue 102
22.01.2010, NEWSWIRE, Issue 10222.01.2010, NEWSWIRE, Issue 102
22.01.2010, NEWSWIRE, Issue 102
 
27.04.2015 Trends in public attitudes in 2015, Sumati
27.04.2015 Trends in public attitudes in 2015, Sumati27.04.2015 Trends in public attitudes in 2015, Sumati
27.04.2015 Trends in public attitudes in 2015, Sumati
 
2016.04.27 workplace safety 2 bcm
2016.04.27 workplace safety  2  bcm2016.04.27 workplace safety  2  bcm
2016.04.27 workplace safety 2 bcm
 
30.03.2012, NEWSWIRE, Issue 215
30.03.2012, NEWSWIRE, Issue 21530.03.2012, NEWSWIRE, Issue 215
30.03.2012, NEWSWIRE, Issue 215
 
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
11.08.2010 What investors in Mongolia need to know, Mr. Jim Dwyer
 
31.10.2013 Ovoot coking coal project, David Paull
31.10.2013 Ovoot coking coal project, David Paull31.10.2013 Ovoot coking coal project, David Paull
31.10.2013 Ovoot coking coal project, David Paull
 
18.05.2012, NEWSWIRE, Issue 222
18.05.2012, NEWSWIRE, Issue 22218.05.2012, NEWSWIRE, Issue 222
18.05.2012, NEWSWIRE, Issue 222
 
07.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 27707.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 277
 
14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel
 
03.03.2010 Environmental and social risks in mining, Amy Sexton
03.03.2010 Environmental and social risks in mining, Amy Sexton03.03.2010 Environmental and social risks in mining, Amy Sexton
03.03.2010 Environmental and social risks in mining, Amy Sexton
 
09.11.2012, NEWSWIRE, Issue 247
09.11.2012, NEWSWIRE, Issue 24709.11.2012, NEWSWIRE, Issue 247
09.11.2012, NEWSWIRE, Issue 247
 
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
13.11.2014, Power Trading Strategy for Mongolia (Asian Super Grid & Gobitec),...
 
12.02.2010, NEWSWIRE, Issue 105
12.02.2010, NEWSWIRE, Issue 10512.02.2010, NEWSWIRE, Issue 105
12.02.2010, NEWSWIRE, Issue 105
 
16.10.2009, NEWSWIRE, Issue 90
16.10.2009, NEWSWIRE, Issue 9016.10.2009, NEWSWIRE, Issue 90
16.10.2009, NEWSWIRE, Issue 90
 
28.03.2014, Lessons learnt from japan and the first steps for applying it in...
 28.03.2014, Lessons learnt from japan and the first steps for applying it in... 28.03.2014, Lessons learnt from japan and the first steps for applying it in...
28.03.2014, Lessons learnt from japan and the first steps for applying it in...
 

Similar to 23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock

23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
The Business Council of Mongolia
 
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
The Business Council of Mongolia
 
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
The Business Council of Mongolia
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
The Business Council of Mongolia
 
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
The Business Council of Mongolia
 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
The Business Council of Mongolia
 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
The Business Council of Mongolia
 
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
The Business Council of Mongolia
 
08.04.2011, NEWSWIRE, Issue 162
08.04.2011, NEWSWIRE, Issue 16208.04.2011, NEWSWIRE, Issue 162
08.04.2011, NEWSWIRE, Issue 162
The Business Council of Mongolia
 
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
The Business Council of Mongolia
 
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
The Business Council of Mongolia
 
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
The Business Council of Mongolia
 
14.10.2010 Erdene resource development, Peter C. Akerley
14.10.2010 Erdene resource development, Peter C. Akerley14.10.2010 Erdene resource development, Peter C. Akerley
14.10.2010 Erdene resource development, Peter C. Akerley
The Business Council of Mongolia
 
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
The Business Council of Mongolia
 
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
The Business Council of Mongolia
 
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
The Business Council of Mongolia
 
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
The Business Council of Mongolia
 
25.04.2011, Briefing Erdenes Tavan Tolgoi Project, Mr. G. Temuulin
25.04.2011, Briefing Erdenes Tavan Tolgoi Project,  Mr. G. Temuulin25.04.2011, Briefing Erdenes Tavan Tolgoi Project,  Mr. G. Temuulin
25.04.2011, Briefing Erdenes Tavan Tolgoi Project, Mr. G. Temuulin
The Business Council of Mongolia
 
Ggg 6 Ireec Nov 2010 0
Ggg 6 Ireec Nov 2010 0Ggg 6 Ireec Nov 2010 0
Ggg 6 Ireec Nov 2010 0
Damien Krebs
 
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
The Business Council of Mongolia
 

Similar to 23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock (20)

23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
23.04.2012, An update on developments at Tavan Tolgoi, Graeme Hancock
 
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
 
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
 
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
 
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
31.10.2013 MONGOLIAN MINING CORPORATION, Battsengel Gotov
 
08.04.2011, NEWSWIRE, Issue 162
08.04.2011, NEWSWIRE, Issue 16208.04.2011, NEWSWIRE, Issue 162
08.04.2011, NEWSWIRE, Issue 162
 
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
 
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
17.04.2013 Shariin Gol - A New Dawn, Graham Chapman
 
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
 
14.10.2010 Erdene resource development, Peter C. Akerley
14.10.2010 Erdene resource development, Peter C. Akerley14.10.2010 Erdene resource development, Peter C. Akerley
14.10.2010 Erdene resource development, Peter C. Akerley
 
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
10.14.2010, PRESENTATION, Erdene resource development, Peter C.Akerleya
 
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
 
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
 
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
 
25.04.2011, Briefing Erdenes Tavan Tolgoi Project, Mr. G. Temuulin
25.04.2011, Briefing Erdenes Tavan Tolgoi Project,  Mr. G. Temuulin25.04.2011, Briefing Erdenes Tavan Tolgoi Project,  Mr. G. Temuulin
25.04.2011, Briefing Erdenes Tavan Tolgoi Project, Mr. G. Temuulin
 
Ggg 6 Ireec Nov 2010 0
Ggg 6 Ireec Nov 2010 0Ggg 6 Ireec Nov 2010 0
Ggg 6 Ireec Nov 2010 0
 
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
 

More from The Business Council of Mongolia

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
The Business Council of Mongolia
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
The Business Council of Mongolia
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
The Business Council of Mongolia
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
The Business Council of Mongolia
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
The Business Council of Mongolia
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
The Business Council of Mongolia
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
The Business Council of Mongolia
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
The Business Council of Mongolia
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
The Business Council of Mongolia
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
The Business Council of Mongolia
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
The Business Council of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
The Business Council of Mongolia
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
The Business Council of Mongolia
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
The Business Council of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
The Business Council of Mongolia
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
The Business Council of Mongolia
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
The Business Council of Mongolia
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
The Business Council of Mongolia
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
The Business Council of Mongolia
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
The Business Council of Mongolia
 

More from The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Recently uploaded

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 

Recently uploaded (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 

23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock

  • 1. ERDENES TAVAN TOLGOI JSC GRAEME HANCOCK CHIEF OPERATING OFFICER 22 MAY 2012
  • 2. ERDENES TAVAN TOLGOI JSC // PAGE 1 THIS PRESENTATION INCLUDES CERTAIN “FORWARD-LOOKING STATEMENTS”. ALL STATEMENTS, OTHER THAN STATEMENTS OF HISTORICAL FACT, ARE FORWARD-LOOKING STATEMENTS THAT INVOLVE RISKS AND UNCERTAINTIES, INCLUDING BUT NOT LIMITED TO THOSE THAT RELATE TO COAL RESOURCES AND SALEABLE PRODUCT YIELDS, PRODUCTION PLANS, COSTS OF PRODUCTION, STRIP RATIOS, CAPITAL EXPENDITURES, COAL PRICES AND MARKETS. THERE CAN BE NO ASSURANCES THAT THESE STATEMENTS WILL PROVE ACCURATE; AND ACTUAL RESULTS AND FUTURE EVENTS COULD DIFFER MATERIALLY FROM THOSE ANTICIPATED IN SUCH STATEMENTS. THE INFORMATION CONTAINED HEREIN REPRESENTS THE COMPANY’S JUDGMENT AS OF THE DATE HEREOF, BASED ON INFORMATION CURRENTLY AVAILABLE, INCLUDING THE INFORMATION CONTAINED IN A DRAFT INDEPENDENT TECHNICAL REPORT PREPARED AT THE REQUEST OF THE COMPANY. THE DRAFT TECHNICAL REPORT AND THE COMPANY’S MINE DEVELOPMENT PLANS ARE SUBJECT TO CHANGE. THE COMPANY DOES NOT ASSUME ANY OBLIGATION TO UPDATE ANY STATEMENT. NEITHER THE COMPANY NOR ANY OF ITS PERSONNEL ACCEPTS OR ASSUMES RESPONSIBILITY, OR HAS ANY LIABILITY, TO ANY PERSON IN RESPECT OF THIS PRESENTATION. THIS PRESENTATION DOES NOT FORM PART OF AND IS NOT MADE IN CONNECTON WITH ANY OFFERING OF SECURITIES, AND IT SHOULD NOT BE RELIED UPON IN CONNECTION WITH ANY CONTACT, INVESTMENT, DECISION OR COMMITMENT WHATSOEVER. DISCLAIMER
  • 3. ERDENES TAVAN TOLGOI JSC // PAGE 2 Location COMPANY SNAPSHOT - LOCATION  The Tavan Tolgoi coalfield is located in the central South Gobi region of Mongolia  Approximately 200km north of the Mongolian-Chinese border
  • 4. ERDENES TAVAN TOLGOI JSC // PAGE 3 Overview Current Corporate Structure  Erdenes Tavan Tolgoi JSC (ETT) is a Mongolian coal producer and developer  The Company holds mining licences over the Tavan Tolgoi coalfield in Mongolia, one of the largest undeveloped deposits of high-value coking coal in the world  The Company holds 7.4Bt of Measured, Indicated and Inferred coal reserves and resources and 1.8Bt of Proven and Probable coal reserves in accordance with JORC  The Company commenced commercial production in July 2011  The Company is in the process of expanding production with the objective of becoming a large scale producer and exporter of high quality washed coking and thermal coal products to Chinese and North Asian markets COMPANY SNAPSHOT Government of Mongolia Erdenes MGL LLC Erdenes Tavan Tolgoi JSC 100% 100% Anticipated Future Corporate Structure Government of Mongolia Erdenes MGL LLC Erdenes Tavan Tolgoi JSC 51% or more 100% Mongolian Shareholders Publicly Traded Shares 20% Up to 29% Erdenes Tavan Tolgoi JSC owns licences over a majority of the Tavan Tolgoi coalfield, one of the largest open pittable coking coal deposits in the world
  • 5. ERDENES TAVAN TOLGOI JSC // PAGE 4  Tavan Tolgoi deposit consists of 6 sub-fields: Tsankhi, Ukhaa Khudag, Bortolgoi, Borteeg, Southwest and Eastern coalfields  ETT owns licences over 5 of the 6 sub-fields (excluding Ukhaa Khudag)  Tsankhi is the main and best explored of the coalfields owned by ETT and contains the highest portion of Measured and Indicated coal resources  Significant exploration and expansion potential exists at other 4 sub-fields COALFIELD STRUCTURE Source: Draft Technical Report ~25km
  • 6. ERDENES TAVAN TOLGOI JSC // PAGE 5  Tavan Tolgoi deposit consists of 6 sub-fields: Tsankhi, Ukhaa Khudag, Bortolgoi, Borteeg, Southwest and Eastern coalfields  ETT owns licences over 5 of the 6 sub-fields (excluding Ukhaa Khudag)  Tsankhi is the main and best explored of the coalfields owned by ETT and contains the highest portion of Measured and Indicated coal resources  Significant exploration and expansion potential exists at other 4 sub-fields COALFIELD STRUCTURE Source: Draft Technical Report ~25km MMC
  • 7. ERDENES TAVAN TOLGOI JSC // PAGE 6 The current focus of the Group is on the Tsankhi coalfield 1Represents marketable coal Reserves (i.e. sold raw or washed and sold as premium coal). Reserves for East Tsankhi exclusive of reserves within mining licences owned by third parties 2In-situ coal Resources at <300m depth limit and estimated under JORC Code. Resources inclusive of reserves. Resources for East Tsankhi exclusive of resources within mining licences owned by third parties Source: Draft Technical Report Eastern coalfieldBorteeg coalfield Southwest coalfield Tavan Tolgoi JSC (“Small TT”) (third party) Daitsuki LLC (third party) Bortolgoi coalfield Measured Indicated Inferred 287А 11977А 11945А West Tsankhi coalfield Reserves1: 888Mt (~59% coking coal) Resources2: 1,734Mt (~72% coking coal) East Tsankhi coalfield Reserves1: 948Mt (~61% coking coal) Resources2 1,262Mt (~71% coking coal) JORC RESERVES AND RESOURCES
  • 8. ERDENES TAVAN TOLGOI JSC // PAGE 7
  • 9. ERDENES TAVAN TOLGOI JSC // PAGE 8
  • 10. ERDENES TAVAN TOLGOI JSC // PAGE 9
  • 11. ERDENES TAVAN TOLGOI JSC // PAGE 10
  • 12. ERDENES TAVAN TOLGOI JSC // PAGE 11
  • 13. ERDENES TAVAN TOLGOI JSC // PAGE 12 Coal Resources (Mt, inclusive of coal Reserves) JORC COAL RESERVES AND RESOURCES Source: Draft Technical Report Coalfield Proved (Mt ROM) Probable (Mt ROM) Total (Mt ROM) Marketable (Mt Product) East Tsankhi 359 589 948 619 West Tsankhi 482 406 888 610 Total ETT 841 995 1,836 1,229 Coal Reserves (Mt) Coal Reserves split by coal type (Mt) Coalfield Measured (Mt ROM) Indicated (Mt ROM) Inferred (Mt ROM) Total (Mt ROM) East Tsankhi 410 726 126 1,262 West Tsankhi 576 706 452 1,734 Others1 - 1,554 2,833 4,387 Total ETT 986 2,986 3,411 7,382 Coal Resources split by coal type (Mt) 1Include Southwest, Borteeg, Eastern and Bortolgoi coalfields
  • 14. ERDENES TAVAN TOLGOI JSC // PAGE 13 Tsankhi coking coal specifications Tsankhi coking coal quality benchmarked against global coking coal projects COAL QUALITY Source: Draft Technical Report
  • 15. ERDENES TAVAN TOLGOI JSC // PAGE 14 Overview EAST TSANKHI – OVERVIEW  Independent Technical Report completed by Norwest  JORC Reserves and Resources statement completed — Total Reserves 948Mt (>70% coking coal) — Total reserves and resources 1262Mt  Commenced pre-stripping and box cut development in August 2010  Production commenced in July 2011 with total production over 2.2Mt as at May 20th — 1.3Mt year to date  Currently producing at an annualized rate of 4.5 Mtpa  Target 3Mt ROM of coking coal in 2012 and gradually increasing capacity to steady state 20Mtpa ROM by 2017 with potential for further expansion — Estimated mine life: 50 years — Production of high quality unwashed coking coals for export in first two years while Coal Handling and Preparation Plant (“CHPP”) is being constructed — Highly competitive cost with the estimated LOM average mine operating cost: US$40.70/t of saleable washed coal Source: Draft Technical Report
  • 16. ERDENES TAVAN TOLGOI JSC // PAGE 15 EAST TSANKHI – OVERVIEW  Upon completion of first CHPP module, plan is to start producing a range of premium washed products including hard coking coal, semi-soft coking coal and high quality thermal coal for export — The current plan envisages the first module coming on line around mid 2014  Current mine workforce of 300 expanding to approximately 1,000 as capacity increases — Mining camp and onsite mine facilities under development Offtake agreement  5 Year offtake agreement signed with Chalco  Exports to China under the agreement commenced in October 2011  To date exported 1.1Mt to China Source: Draft Technical Report Continued…
  • 17. ERDENES TAVAN TOLGOI JSC // PAGE 16 Contract mining agreement EAST TSANKHI – OVERVIEW  Contract mining agreement commenced with Macmahon/Operta Joint Venture in January 2012  Structured as an Alliance Contract, with a Base + KPI risk based compensation scheme  An initial 5 year term with option to extend for an additional 2 years on meeting KPIs  Contractor to raise financing for and procure all necessary mining equipment – ETT to purchase all mining equipment at the end of the contract term at book value  Production targets are as follows:  2012 – 3 Mt  2013 – 6 Mt  2014 – 10 Mt  2015 – 15 Mt  Operations going very well with monthly production tonnages increasing month on month  Occupational health and safety standards are being raised and working conditions of operators improved  New large mining equipment entered into service in late April 2012 and additional equipment on order for delivery late 2012 to ensure 6 Mtpa target is achieved in 2013 Source: Draft Technical Report
  • 18. ERDENES TAVAN TOLGOI JSC // PAGE 17 EAST TSANKHI PRODUCTION - 2012 0 500000 1000000 1500000 2000000 2500000 3000000 3500000 January February March April May June July August September October November December YTD Monthly Production Cumulative Production YTD Annual Budget Target
  • 19. ERDENES TAVAN TOLGOI JSC // PAGE 18 Open-pit surface mining with a life of ~50 years Total LOM saleable product of 619Mt EAST TSANKHI – OPERATIONS  Targeted steady state annual ROM production of ~ 20Mtpa (after ramp-up)  Estimated LOM average strip ratio at ~ 2.74  Targeted annual saleable production of ~ 13-15 Mtpa (after ramp-up)  Estimated LOM average washing yield at ~64% Source: Draft Technical Report and related mine development plan
  • 20. ERDENES TAVAN TOLGOI JSC // PAGE 19 Chinese Demand for Coking Coal ETT Cost ranking (CFR Bohai Sea) EAST TSANKHI – MARKET AND ECONOMICS Source: Draft Technical Report and related mine development plan 0 20 40 60 80 100 120 140 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Mt 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Landborne imports (Clean) Seaborne imports % Mongolian Supply 0 50 100 150 200 250 300 0 100 200 300 400 Mt FOBUS$/t Erdenes TT Australia Canada China Mozambique Indonesia Russia South Africa USA Venezuela Vietnam New Zealand ETT Cost ranking (FOR Mine Gate) 0 20 40 60 80 100 120 0 100 200 300 Mt FOBUS$/t Erdenes TT Australia Canada China Mozambique Indonesia Russia South Africa USA Venezuela Vietnam New Zealand
  • 21. ERDENES TAVAN TOLGOI JSC // PAGE 20 Overview Recent development WEST TSANKHI – OVERVIEW  Covering land area of 3,004 hectares  Independent Technical Report completed by Norwest Corporation  JORC Reserves and Resources statement completed — Total Reserves 888Mt — Total reserves and resources 1734Mt  Pre-feasibility study completed — Supports a steady state 20Mtpa ROM production rate over a five year ramp- up period — Estimated mine life of ~48 years  Currently in negotiations with leading foreign SOEs and private interests to develop the West Tsankhi Coalfield as a consortium — Interested parties from the US, China, Russia, Japan and Korea  Erdenes TT will retain title to the West Tsankhi mining licences and the consortium will operate under a Contract arrangement similar to an Indonesian style Coal Contract of Works  Erdenes TT now completing Feasibility Study for the commencement of Mining on West Tsankhi
  • 22. ERDENES TAVAN TOLGOI JSC // PAGE 21 Open-pit surface mining with a life of ~48 years Total LOM saleable product of 610Mt WEST TSANKHI – OPERATIONS  Targeted steady annual ROM production of ~20Mtpa  Estimated LOM average strip ratio at ~ 2.8  Targeted annual saleable production of ~14Mtpa  Estimated LOM average washing yield at ~67% Source: Draft Technical Report and related mine development plan - 5.00 10.00 15.00 20.00 25.00 Yr 01 Yr 07 Yr 13 Yr 19 Yr 25 Yr 31 Yr 37 Yr 43 Production(Mt) ROM coal Saleable coal Yr 48
  • 23. ERDENES TAVAN TOLGOI JSC // PAGE 22 Road from Tavan Tolgoi to Gashuun Sukhait Border Crossing INFRASTRUCTURE  The Company has received Cabinet approval to construct a sealed highway parallel to the Mongolian Mining Corporation (“MMC”) paved road  Currently planned to commence construction in 2013  Design, feasibility and EIA studies about to commence  Combination with MMC paved road will increase capacity and safety  The CHPP will employ “world-class” technologies and processes and is expected to be one of the largest and most advanced in Asia  Phased construction schedule — 2 x 10Mtpa phases  Expected commissioning of the first 5Mtpa module by mind 2014 and processing full capacity of 20Mtpa by 2017  Prequalification of EPC contractors has been completed and tender documents issued. East Tsankhi CHPP Railroad from Tavan Tolgoi to Gashuun Sukhait  Mongolian Mining Corporation (MMC) has a license to build the rail from Tavan Tolgoi to the Gashuun Sukhait border crossing. ETT anticipates cooperating in this development.  Design, feasibility and EIA studies completed and construction commenced
  • 24. ERDENES TAVAN TOLGOI JSC // PAGE 23 INFRASTRUCTURE Water Supply  Cabinet approved water use permit for Balgasyn Ulaan Nuur (“BUN”) ground water — Located ~65km west of East Tsankhi coalfield  Estimated water requirements for a 20Mtpa CHPP are ~200 litres/sec  Estimated water requirements for a 300MW Power station are ~20 litres/sec  ETT has been granted permits to use a minimum of 151 litres/sec from BUN  The Group plans to begin construction of water pipeline from BUN to mine site by 1H2013 and intends for the pipeline to be operational prior to commissioning the first CHPP module targeted for 2014  The Group is currently exploring additional water supplies complementary to BUN Power Supply  Currently using diesel generator at mine site with plan to connect to the CES Grid to provide sufficient supply for the Group’s operations until late 2013  The Group is completing a bankable feasibility study to develop and construct its own 300MW (two 150MW modules) power plant to meet its long-term power requirements  The power plant will be sufficient to supply all of East and West Tsankhi operation at steady state production with excess capacity to be sold to other mines in the region, to the Mongolian Central Grid and potentially to China via the OT Inner Mongolia grid connection
  • 25. ERDENES TAVAN TOLGOI JSC // PAGE 24 Expand production at the East Tsankhi coalfield1 Develop the West Tsankhi coalfield to significantly increase output2 Maximise sale prices by developing a CHPP to produce value-added products3 Reduce costs by using low cost rail to export the coal products and taking advantage of economies of scale 4 Cooperate with other South Gobi coal producers to develop regional transport infrastructure 5 Develop a 300MW thermal power plant to supply the company’s power needs and create an additional revenue source 6 Expand sales and marketing capabilities to broaden customer base, develop relationships with end users and maximize price 7 Conduct sustainable operations in accordance with international best practice for environmental, social and health and safety standards 8 Explore the potential to expand production through development of other ETT coalfields9 FUTURE BUSINESS DEVELOPMENT STRATEGIES
  • 26. ERDENES TAVAN TOLGOI JSC // PAGE 25 Mine camp SELECT PHOTOS
  • 27. ERDENES TAVAN TOLGOI JSC // PAGE 26 Mine pit from waste dump SELECT PHOTOS (CONT’D)
  • 28. ERDENES TAVAN TOLGOI JSC // PAGE 27 SELECT PHOTOS (CONT’D) Seam 4 in Pit wall
  • 29. ERDENES TAVAN TOLGOI JSC // PAGE 28 SELECT PHOTOS (CONT’D) Seam 4 thickness and low stripping ratio SELECT PHOTOS (CONT’D)
  • 30. ERDENES TAVAN TOLGOI JSC // PAGE 29 SELECT PHOTOS (CONT’D) In pit equipment Stripping operations SELECT PHOTOS (CONT’D)
  • 31. ERDENES TAVAN TOLGOI JSC // PAGE 30 SELECT PHOTOS (CONT’D) Coal ROM stockpile SELECT PHOTOS (CONT’D)
  • 32. ERDENES TAVAN TOLGOI JSC // PAGE 31 SELECT PHOTOS (CONT’D) Current waste dump SELECT PHOTOS (CONT’D)
  • 33. ERDENES TAVAN TOLGOI JSC // PAGE 32 SELECT PHOTOS (CONT’D) Open cut operations SELECT PHOTOS (CONT’D)
  • 34. ERDENES TAVAN TOLGOI JSC // PAGE 33 Jigjidjav 8, 1st khoroo, Chingeltei District Ulaanbaatar, Mongolia Tel: (976) 7011-8585 Fax: (976) 7011-9595 Erdenes Tavan Tolgoi JSC THANK YOU FOR YOUR ATTENTION