SlideShare a Scribd company logo
© Siemens Gamesa Renewable Energy Inc.
Siemens Gamesa Renewable Energy
Transportation and Logistics
22 February, 2019
© Siemens Gamesa Renewable Energy Inc.
Agenda
1) About Siemens Gamesa Renewable Energy
2) Environmental, Health, and Safety
3) Components and Movements
4) Transportation Representation
5) Deliveries, Planning, and Efficiencies
6) Future and Industry Trends
© Siemens Gamesa Renewable Energy Inc.
1. About Siemens Gamesa Renewable Energy
Shaping the renewable energy industry
Siemens Gamesa is a leading supplier of wind power solutions to customers all over the globe. A key player
and innovative pioneer in the renewable energy sector which has installed products and technology in more
than 90 countries, with a total capacity base of over 84 GW and 25,000 employees.
Siemens Gamesa offers one of the industry’s broadest product portfolios, with both offshore and onshore
technology as well as industry-leading service solutions. The company was created in 2017 by the merger of
Siemens Wind Power and Gamesa.
Our vision: To be the global leader in the renewable energy industry driving the transition towards a
sustainable world
On-shore Mission: To ensure the long-term success of onshore wind power projects and provide innovative
solutions – with geared technology including two platforms with modular design – based on proven track
record and technological excellence. With a global reach to deploy a regional focus wherever operating with
technology adapted to local needs.
,
© Siemens Gamesa Renewable Energy Inc.
1. About Siemens Gamesa Renewable Energy - Continued
Company profile: Ownership structure Siemens Gamesa is a global leading provider of wind power products
& service solutions
Siemens AG - 59% Iberdrola - 8% Free-float shares - 33%
• #1 in Offshore Wind Energy with over 11 GW installed since 1991.
• #2 in Onshore & Service with Over 75 GW installed since 1980.
A Spanish company, based in Zamudio (Vizcaya, Spain),
Listed on the Spanish Stock Exchange Member of IBEX 35
Traded on Madrid, Barcelona, Valencia and Bilbao
© Siemens Gamesa Renewable Energy Inc.
2. Environmental, Health, and Safety
• PPE for all personnel is mandatory at all projects and facilities .
• Inspect and ensure all machinery and equipment is in proper functioning
order.
• Thoroughly inspect loads before departing DC and request of crews to verify
loading is properly completed with all hatches, doors, covers, and tarps are
properly secure.
• Promote and emphasize a culture of Safety and Caution in all aspects of the
movements from loading at DC to Offload at project site.
• Clear and Consistent Communication and preparation for all weather and
site conditions.
• Utilization of Site Induction Program to ensure drivers and escorts are
provided project rules and regulations.
• Required rigging, lifting, and lashing Method Statements which are reviewed
and approved before a scope of work can proceed.
© Siemens Gamesa Renewable Energy Inc.
3. Components and Movements
• Nacelle : Weight 159000 to 246000 lbs.- Length 34’ to 41’ - Height 14’ to 15’ - Width 12’ to 14’
• Drive Train: Weight 148000 lbs.-Length 21’ -Height 10’ – Width 10’
© Siemens Gamesa Renewable Energy Inc.
3. Components and Movements - Continued
• Hub: Weight 57000 to 88000 lbs.- Length 12’ to 23’ - Height 12’ to 14’- Width 13’ to 14’
• Shell: Weight 4600 lbs.- Length 16’ - Height 14’ - Width 9’
© Siemens Gamesa Renewable Energy Inc.
3. Components and Movements - Continued
• Tower: Weight 86000 to 184000 lbs.- Length 56’ to 91’- Diameter 11’ to 16’
© Siemens Gamesa Renewable Energy Inc.
3. Components and Movements – Continued
• Blade: Weight 21000 to 47000 lbs.- Length 156’ to 214’ - Height 9’ to 14’ - Width 11’ to 14’
• Transport Component Damages, Causes, Solutions
• Bridge contact, Signal Lights, Street Signs, Trees and Branches, Vehicles, Vandalism, Leaving Road,
Rollovers.
• Escorts and Rear Steer-men staying attentive. Verify Height of Load before proceeding. Parking and
Staging in well lit areas. Staying to Permitted Routes.
© Siemens Gamesa Renewable Energy Inc.
4. Transportation Representation
• All moves of components are labeled or recognized to be that of the manufacturer. Any Press or Media
coverage mainly reflects that of the load being transported.
© Siemens Gamesa Renewable Energy Inc.
5. Deliveries, Planning, and Efficiencies
• Wind Project Deliveries are more numerous than normal oversized heavy haul projects. Normally there are
around 12 deliveries per day though some project schedules can command 24 inbound loads a day.
• Deliveries are required to be sequenced for offload and storage at a wind turbine pad site. Usable offload
areas are usually minimal.
• Wind Projects are delivered to areas off of paved roads in which equipment should be capable to perform in
these conditions.
• Proper planning for a project is crucial for maintaining schedule or mitigating delays. Research of the routes
for local or state regulations is as vital as route studies for physical restrictions. Meeting with all government
agencies in the area is key to understanding and planning the scope of deliveries.
• Efficiency of a project provides value to all companies involved in which pre-planning and communication
are necessity. In addition preparing for most common adversities and other possibilities support in a
successful completion of a project.
© Siemens Gamesa Renewable Energy Inc.
6. Future and Industry Trends
• Components will continue to increase and size and weight for the foreseeable future.
• Engineering design researching new blade options.
• Off Shore Wind may increase in which road transport will still be an important mode of transport to bring
components to staging areas.

More Related Content

Similar to 2019 STS: Meeting the Needs of the Energy Sector

Air Energi - Gas Development Projects
Air Energi - Gas Development ProjectsAir Energi - Gas Development Projects
Air Energi - Gas Development Projects
Freedom Vision - Laser Eye Surgery
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
fcreaven
 
Power Projects
Power ProjectsPower Projects
Power Projects
Per Lyager
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - London
KTN
 
About amec-foster-wheeler
About amec-foster-wheelerAbout amec-foster-wheeler
About amec-foster-wheeler
Demetrio Marino
 
Zinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate BrochureZinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate Brochure
Zinfra Group
 
Blue is the new green
Blue is the new greenBlue is the new green
Blue is the new green
Tristan Wiggill
 
evrmac01122015
evrmac01122015evrmac01122015
evrmac01122015
Khaled Omar
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdfThe Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
Rockley Transport
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
Naqqash Todai
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1
dCORE
 
siemens-energy-company-presentation-en-2022.pdf
siemens-energy-company-presentation-en-2022.pdfsiemens-energy-company-presentation-en-2022.pdf
siemens-energy-company-presentation-en-2022.pdf
galihbimo
 
RINA@WORK 3/2015
RINA@WORK 3/2015RINA@WORK 3/2015
RINA@WORK 3/2015
RINA GROUP
 
Capability overview
Capability overview Capability overview
Capability overview
Marwan Bajjali
 
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chainAlan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
BVG Associates
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
raghunathan janarthanan
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
raghunathan janarthanan
 
Jos Linkedin Pres
Jos Linkedin PresJos Linkedin Pres
Jos Linkedin Pres
jlaw123
 
GE조선해양(Global Offshore & Marine) 소개
GE조선해양(Global Offshore & Marine) 소개GE조선해양(Global Offshore & Marine) 소개
GE조선해양(Global Offshore & Marine) 소개
GE코리아
 

Similar to 2019 STS: Meeting the Needs of the Energy Sector (20)

Air Energi - Gas Development Projects
Air Energi - Gas Development ProjectsAir Energi - Gas Development Projects
Air Energi - Gas Development Projects
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
 
Power Projects
Power ProjectsPower Projects
Power Projects
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - London
 
About amec-foster-wheeler
About amec-foster-wheelerAbout amec-foster-wheeler
About amec-foster-wheeler
 
Zinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate BrochureZinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate Brochure
 
Blue is the new green
Blue is the new greenBlue is the new green
Blue is the new green
 
evrmac01122015
evrmac01122015evrmac01122015
evrmac01122015
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdfThe Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
The Ultimate Guide to Heavy Haulage in the UK_ What You Need to Know.pdf
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1
 
siemens-energy-company-presentation-en-2022.pdf
siemens-energy-company-presentation-en-2022.pdfsiemens-energy-company-presentation-en-2022.pdf
siemens-energy-company-presentation-en-2022.pdf
 
RINA@WORK 3/2015
RINA@WORK 3/2015RINA@WORK 3/2015
RINA@WORK 3/2015
 
Capability overview
Capability overview Capability overview
Capability overview
 
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chainAlan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Jos Linkedin Pres
Jos Linkedin PresJos Linkedin Pres
Jos Linkedin Pres
 
GE조선해양(Global Offshore & Marine) 소개
GE조선해양(Global Offshore & Marine) 소개GE조선해양(Global Offshore & Marine) 소개
GE조선해양(Global Offshore & Marine) 소개
 

More from Specialized Carriers & Rigging Association

2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business
Specialized Carriers & Rigging Association
 
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
Specialized Carriers & Rigging Association
 
2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert
Specialized Carriers & Rigging Association
 
2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing
Specialized Carriers & Rigging Association
 
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
Specialized Carriers & Rigging Association
 
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
Specialized Carriers & Rigging Association
 
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
Specialized Carriers & Rigging Association
 
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
Specialized Carriers & Rigging Association
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
Specialized Carriers & Rigging Association
 
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
Specialized Carriers & Rigging Association
 
2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)
Specialized Carriers & Rigging Association
 
2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)
Specialized Carriers & Rigging Association
 
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
Specialized Carriers & Rigging Association
 
2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting
Specialized Carriers & Rigging Association
 
2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting
Specialized Carriers & Rigging Association
 
2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting
Specialized Carriers & Rigging Association
 
2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting
Specialized Carriers & Rigging Association
 

More from Specialized Carriers & Rigging Association (20)

2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business
 
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
 
2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert
 
2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing
 
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
 
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
 
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)
 
2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)
 
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
 
2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting
 
2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting
 
2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting
 
2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting
 

Recently uploaded

Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
RidwanHassanYusuf
 
How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17
Celine George
 
Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.
IsmaelVazquez38
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
danielkiash986
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
heathfieldcps1
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
Nguyen Thanh Tu Collection
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
nitinpv4ai
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
Steve Thomason
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
EduSkills OECD
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
David Douglas School District
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
giancarloi8888
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
zuzanka
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
TechSoup
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 

Recently uploaded (20)

Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
 
How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17
 
Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.Bossa N’ Roll Records by Ismael Vazquez.
Bossa N’ Roll Records by Ismael Vazquez.
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 8 - CẢ NĂM - FRIENDS PLUS - NĂM HỌC 2023-2024 (B...
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 

2019 STS: Meeting the Needs of the Energy Sector

  • 1. © Siemens Gamesa Renewable Energy Inc. Siemens Gamesa Renewable Energy Transportation and Logistics 22 February, 2019
  • 2. © Siemens Gamesa Renewable Energy Inc. Agenda 1) About Siemens Gamesa Renewable Energy 2) Environmental, Health, and Safety 3) Components and Movements 4) Transportation Representation 5) Deliveries, Planning, and Efficiencies 6) Future and Industry Trends
  • 3. © Siemens Gamesa Renewable Energy Inc. 1. About Siemens Gamesa Renewable Energy Shaping the renewable energy industry Siemens Gamesa is a leading supplier of wind power solutions to customers all over the globe. A key player and innovative pioneer in the renewable energy sector which has installed products and technology in more than 90 countries, with a total capacity base of over 84 GW and 25,000 employees. Siemens Gamesa offers one of the industry’s broadest product portfolios, with both offshore and onshore technology as well as industry-leading service solutions. The company was created in 2017 by the merger of Siemens Wind Power and Gamesa. Our vision: To be the global leader in the renewable energy industry driving the transition towards a sustainable world On-shore Mission: To ensure the long-term success of onshore wind power projects and provide innovative solutions – with geared technology including two platforms with modular design – based on proven track record and technological excellence. With a global reach to deploy a regional focus wherever operating with technology adapted to local needs. ,
  • 4. © Siemens Gamesa Renewable Energy Inc. 1. About Siemens Gamesa Renewable Energy - Continued Company profile: Ownership structure Siemens Gamesa is a global leading provider of wind power products & service solutions Siemens AG - 59% Iberdrola - 8% Free-float shares - 33% • #1 in Offshore Wind Energy with over 11 GW installed since 1991. • #2 in Onshore & Service with Over 75 GW installed since 1980. A Spanish company, based in Zamudio (Vizcaya, Spain), Listed on the Spanish Stock Exchange Member of IBEX 35 Traded on Madrid, Barcelona, Valencia and Bilbao
  • 5. © Siemens Gamesa Renewable Energy Inc. 2. Environmental, Health, and Safety • PPE for all personnel is mandatory at all projects and facilities . • Inspect and ensure all machinery and equipment is in proper functioning order. • Thoroughly inspect loads before departing DC and request of crews to verify loading is properly completed with all hatches, doors, covers, and tarps are properly secure. • Promote and emphasize a culture of Safety and Caution in all aspects of the movements from loading at DC to Offload at project site. • Clear and Consistent Communication and preparation for all weather and site conditions. • Utilization of Site Induction Program to ensure drivers and escorts are provided project rules and regulations. • Required rigging, lifting, and lashing Method Statements which are reviewed and approved before a scope of work can proceed.
  • 6. © Siemens Gamesa Renewable Energy Inc. 3. Components and Movements • Nacelle : Weight 159000 to 246000 lbs.- Length 34’ to 41’ - Height 14’ to 15’ - Width 12’ to 14’ • Drive Train: Weight 148000 lbs.-Length 21’ -Height 10’ – Width 10’
  • 7. © Siemens Gamesa Renewable Energy Inc. 3. Components and Movements - Continued • Hub: Weight 57000 to 88000 lbs.- Length 12’ to 23’ - Height 12’ to 14’- Width 13’ to 14’ • Shell: Weight 4600 lbs.- Length 16’ - Height 14’ - Width 9’
  • 8. © Siemens Gamesa Renewable Energy Inc. 3. Components and Movements - Continued • Tower: Weight 86000 to 184000 lbs.- Length 56’ to 91’- Diameter 11’ to 16’
  • 9. © Siemens Gamesa Renewable Energy Inc. 3. Components and Movements – Continued • Blade: Weight 21000 to 47000 lbs.- Length 156’ to 214’ - Height 9’ to 14’ - Width 11’ to 14’ • Transport Component Damages, Causes, Solutions • Bridge contact, Signal Lights, Street Signs, Trees and Branches, Vehicles, Vandalism, Leaving Road, Rollovers. • Escorts and Rear Steer-men staying attentive. Verify Height of Load before proceeding. Parking and Staging in well lit areas. Staying to Permitted Routes.
  • 10. © Siemens Gamesa Renewable Energy Inc. 4. Transportation Representation • All moves of components are labeled or recognized to be that of the manufacturer. Any Press or Media coverage mainly reflects that of the load being transported.
  • 11. © Siemens Gamesa Renewable Energy Inc. 5. Deliveries, Planning, and Efficiencies • Wind Project Deliveries are more numerous than normal oversized heavy haul projects. Normally there are around 12 deliveries per day though some project schedules can command 24 inbound loads a day. • Deliveries are required to be sequenced for offload and storage at a wind turbine pad site. Usable offload areas are usually minimal. • Wind Projects are delivered to areas off of paved roads in which equipment should be capable to perform in these conditions. • Proper planning for a project is crucial for maintaining schedule or mitigating delays. Research of the routes for local or state regulations is as vital as route studies for physical restrictions. Meeting with all government agencies in the area is key to understanding and planning the scope of deliveries. • Efficiency of a project provides value to all companies involved in which pre-planning and communication are necessity. In addition preparing for most common adversities and other possibilities support in a successful completion of a project.
  • 12. © Siemens Gamesa Renewable Energy Inc. 6. Future and Industry Trends • Components will continue to increase and size and weight for the foreseeable future. • Engineering design researching new blade options. • Off Shore Wind may increase in which road transport will still be an important mode of transport to bring components to staging areas.

Editor's Notes

  1. 1
  2. 2
  3. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  4. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  5. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  6. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  7. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  8. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  9. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  10. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  11. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).
  12. Title slide There is a single Title master for the Title slide. The logotype on this slide layout is set up at the correct size and position and should not be altered. The master includes a picture placeholder for the insertion of pattern or picture files. When inserting images, always check the dimensions of the picture placeholder and use these proportions to avoid distortion. It is recommended that images are used at 120dpi resolution – this will provide a good quality output to desktop printers without unduly inflating the file size of your presentation. Always check that you have the appropriate rights for use of images – there may be specific usage rights as part of copyright restriction. The footer and date info is not included on the Title slides but it can be edited across all slides by using the ‘Header and Footer’ settings on the ‘Insert’ ribbon (do not edit these manually on the individual slides or the slide masters).