SlideShare a Scribd company logo
Session 22PD:
Avoiding the material weakness:
Case studies in developing effective
controls
MELANIE DUNN, FSA, MAAA
MARK SPONG, FSA, CERA, MAAA
August 27, 2018
The material weakness may be more common than you think
A material weakness is a deficiency, or a combination of
deficiencies, in internal control over financial reporting, such that
there is a reasonable possibility that a material misstatement of
the company's annual or interim financial statements will not be
prevented or detected on a timely basis
A significant deficiency is a single weakness or a combination
of weaknesses in the internal controls associated with financial
reporting, that is less severe than a material control weakness
and yet is sufficient to merit the scrutiny of those responsible for
administering an entity's financial reporting
*Source: Auditing Standard No. 5, Public Company Accounting Oversight Board
In the news
Annual assumption review
Historical examples of material weakness triggers
Discovery of a material financial misstatement
often indicates a weakness in underlying
controls on financial reporting.
Material misstatements
In 2015, Phoenix reported a material
restatement to 2013 financials due to an error
in the 2013 annual assumption review.
In March of 2018, MetLife disclosed a material
weakness after reserves on a VA block were
determined to be too high and released.
Releasing excess reserves
In 2015, Genworth disclosed insufficient controls
on implementation of methodology and
assumption changes for LTC claim reserves.
Controls on methodology changes
Market Reputation Financial
Remediation
effort
Stock price
drop
Lack of trust Costs of
remediation
Strategic priorities
must be shifted
How would you, your team, and your department be affected by a
material weakness?
Impacts of a material weakness
Morale
Positive outlook
eroded
Material weakness
describes the control
environment, not the
accuracy of financial
statements
Common Pitfalls – Case Studies & Discussion
Spreadsheet SNAFU
“This isn’t a model, it just organizes the results. The
governance standards for models would be overkill!”
• The valuation model works flawlessly with top notch
controls
• Results are dumped into Excel, transformed into usable
form, and aggregated with other products via links and
macros
• But business day 8 comes along:
– A last minute update to the process is not flowing
through correctly
– New products are not captured
– Balances are transposed
During the normal course of quarter close, management is
not able to prevent misstatements on a timely basis.
1
WHAT • What are the control standards at your
company for End User Computing
applications, such as Excel?
2
• Models are usually defined as having input,
processing and output components. Why
does End User Computing tend to fall under
the radar?
WHY
3
• How can actuaries structure and design
controls to address the underlying issue?
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
Assumption Malfunction
“We update lapse and mortality every year and have a clear
oversight process. The other assumptions still seem
appropriate.”
• The assumption inventory for a critical high risk model
appears to be complete and annually reviewed
• The model is complex and certain assumptions
associated with mean reversion are not well understood
by the assumption review committee
• As a result, there is a lower degree of scrutiny on those
assumptions plus lack of scrutiny on implicit
assumptions
• The result is economic simulations that are not reflective
of the prolonged low interest rate environment
The assumption review process was not designed to place
sufficient scrutiny on technical aspects of modeling design.
1
2
3
• Why might controls around assumption
management be challenging to keep up?
• How can actuaries structure and design
controls to address the underlying issue?
WHAT • What do the assumption review and update
process look like at your company?
WHY
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
Hand-off Hardships
“We are the model owners and they are the model users”
• A domestic actuary is the “model owner” for a model and
operation is outsourced to a “model user” in another country
• Hand-offs of model updates and review occur over email, since
the model owner and model user don’t work the same hours
• While attributing impacts between quarters, the model owner
discovers an error from incorrectly mapping new issues during
routine updates in Q2
• The model user hadn’t been educated on model governance
requirements, and didn’t know what level of review was
required for the mapping updates
• The model owner didn’t know that the mapping updates had
been made, and didn’t review them in Q2
Hand-offs have increased risk, and effective controls execution
requires clear standards for communication when processes and
data get handed off.
1
WHAT • What does a hand-off look like during
quarter end at your company?
2
• Why is just emailing someone a model
with quarter close updates a problem?
WHY
3
• How can actuaries structure and design
controls to address the underlying
issue?
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
Data Disaster
“Of course we do reasonability checks on the inforce data,
but we don’t have time to completely audit it”
• The admin system is dropping a small number of
policies each quarter in the inforce data feed
• Data controls are focused on quarter over quarter
changes of counts and face amounts, so nothing stands
out
• After 18-24 months reserve balances are significantly
off
The existing control was operating as designed but still did
not meet the objective and reserves are misstated.
1
WHAT • What data quality checks would you
realistically expect to routinely run on
inforce files?
2
• Big changes from period to period are
noticeable. Why might small changes like
this still constitute a significant deficiency?
WHY
3
• How can actuaries structure and design
controls to address the underlying issue?
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
Modeling Mishap
“I’m just relying on what the pricing team provided”
• After pricing a new product, the pricing team hands off
the pricing model to valuation
• Valuation independently defines business requirements
for the inforce model and determines whether any
features not modeled for pricing need to be modeled
• Risk and modeling teams are not involved
• The risk team just checks the results at the end
• Since pricing decisions are made before valuation,
modeling, and risk become involved, those stakeholders
do not have input into the decisions
This may result in modeling and risk teams that do not have
the practical authority to design and perform effective
controls.
1
WHEN • How early do the risk, modeling, and
valuation teams get involved in the pricing
process at your company?
2
• Why might the pricing team have more
influence within the organization?
WHY
3
• How can actuaries coordinate between
teams to address the underlying issue?
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
Error Emergency
“We continuously keep track of modeling issues and address
them as soon as possible”
• An analyst finds a potential coding error in a production
model on business day 3, two days before results are booked
• There is limited time to thoroughly investigate to confirm the
error or to assess its materiality
• Multiple team members work late and the root cause
appears to be identified and reasonable to address
• A fix is implemented just in time and the impact on financials
is attributed to a methodology enhancement
• After quarter close, it was discovered that the change had
unintended consequences for related products
No emergency protocol was in place to guide action when an
issue was found during quarter close.
1
WHAT • What is the emergency procedure at your
company if an issue is found during the
quarter close process? Is it a formalized or
informal procedure?
2
• Why is it a problem to rely on a judgment
call from management when an issue pops
up during quarter close?
WHY
3
• How can actuaries structure and design
controls to address the underlying issue?
HOW
End User Computing Hand-offsAssumptions
Model StakeholdersData Emergency Protocol
End User Computing1
Assumptions2
Recap
Model Stakeholders5
Emergency protocol6
Hand-offs3
Data4
2018 ValAct - Session 22 - Material Weakness

More Related Content

What's hot

Risk assessment managment and risk based audit approach
Risk assessment managment and risk based audit approachRisk assessment managment and risk based audit approach
Risk assessment managment and risk based audit approach
n|u - The Open Security Community
 
Risk Based Audit Approach
Risk Based Audit ApproachRisk Based Audit Approach
Risk Based Audit Approach
SALIH AHMED ISLAM
 
Creating a compliance assessment program on a tight budget
Creating a compliance assessment program on a tight budgetCreating a compliance assessment program on a tight budget
Creating a compliance assessment program on a tight budget
Ashley Deuble
 
Six sigma
Six sigmaSix sigma
Six sigma
Jitesh Gaurav
 
Data analytics and audit coverage guide
Data analytics and audit coverage guideData analytics and audit coverage guide
Data analytics and audit coverage guide
CenapSerdarolu
 
Controlling
ControllingControlling
Controlling
Davies Chacko
 
Continous auditing and risk monitoring 9 23-09
Continous auditing and risk monitoring  9 23-09Continous auditing and risk monitoring  9 23-09
Continous auditing and risk monitoring 9 23-09
Gaiani (CarnCorpAudit)
 
Practical approach to Risk Based Internal Audit
Practical approach to Risk Based Internal AuditPractical approach to Risk Based Internal Audit
Practical approach to Risk Based Internal Audit
Manoj Agarwal
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001
Chetan Rathi
 
Webinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgenWebinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgen
Stork
 
Operational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss PreventionOperational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss Prevention
Michael Marshall, PE
 
Automation The Key To Success Ppt V5 (4)
Automation The Key To Success Ppt V5 (4)Automation The Key To Success Ppt V5 (4)
Automation The Key To Success Ppt V5 (4)
SandraKeaveny
 
Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)
Sparta Systems
 
SafePaaS AuditPaaS
SafePaaS AuditPaaS SafePaaS AuditPaaS
SafePaaS AuditPaaS
Jane Jones
 
Corrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous QualityCorrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous Quality
IBS America
 
The state of ia pandemic plan
The state of ia  pandemic planThe state of ia  pandemic plan
The state of ia pandemic plan
Manoj Agarwal
 
APM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added ValueAPM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added Value
Stork
 

What's hot (18)

Risk assessment managment and risk based audit approach
Risk assessment managment and risk based audit approachRisk assessment managment and risk based audit approach
Risk assessment managment and risk based audit approach
 
Risk Based Audit Approach
Risk Based Audit ApproachRisk Based Audit Approach
Risk Based Audit Approach
 
Creating a compliance assessment program on a tight budget
Creating a compliance assessment program on a tight budgetCreating a compliance assessment program on a tight budget
Creating a compliance assessment program on a tight budget
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Presentation 11, Test of controls of the system, Workshop on System-based aud...
Presentation 11, Test of controls of the system, Workshop on System-based aud...Presentation 11, Test of controls of the system, Workshop on System-based aud...
Presentation 11, Test of controls of the system, Workshop on System-based aud...
 
Data analytics and audit coverage guide
Data analytics and audit coverage guideData analytics and audit coverage guide
Data analytics and audit coverage guide
 
Controlling
ControllingControlling
Controlling
 
Continous auditing and risk monitoring 9 23-09
Continous auditing and risk monitoring  9 23-09Continous auditing and risk monitoring  9 23-09
Continous auditing and risk monitoring 9 23-09
 
Practical approach to Risk Based Internal Audit
Practical approach to Risk Based Internal AuditPractical approach to Risk Based Internal Audit
Practical approach to Risk Based Internal Audit
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001
 
Webinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgenWebinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgen
 
Operational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss PreventionOperational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss Prevention
 
Automation The Key To Success Ppt V5 (4)
Automation The Key To Success Ppt V5 (4)Automation The Key To Success Ppt V5 (4)
Automation The Key To Success Ppt V5 (4)
 
Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)
 
SafePaaS AuditPaaS
SafePaaS AuditPaaS SafePaaS AuditPaaS
SafePaaS AuditPaaS
 
Corrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous QualityCorrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous Quality
 
The state of ia pandemic plan
The state of ia  pandemic planThe state of ia  pandemic plan
The state of ia pandemic plan
 
APM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added ValueAPM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added Value
 

Similar to 2018 ValAct - Session 22 - Material Weakness

2018 Val Act: Session 22 - Material weakness
2018 Val Act: Session 22 - Material weakness2018 Val Act: Session 22 - Material weakness
2018 Val Act: Session 22 - Material weakness
Alex Hovi
 
Audit ratings guide
Audit ratings guideAudit ratings guide
Audit ratings guide
CenapSerdarolu
 
Internal audit ratings guide
Internal audit ratings guideInternal audit ratings guide
Internal audit ratings guide
CenapSerdarolu
 
Software Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking StudySoftware Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking Study
John Carter
 
Pm chapter 6...
Pm chapter 6...Pm chapter 6...
Pm chapter 6...
Golam Bitonsir
 
Lecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptxLecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptx
AYONELSON
 
Pm chapter 6
Pm chapter 6Pm chapter 6
Pm chapter 6
Golam Bitonsir
 
Pm chapter 6
Pm chapter 6Pm chapter 6
Pm chapter 6
Golam Bitonsir
 
The Good, The Bad, and The Metrics
 The Good, The Bad, and The Metrics The Good, The Bad, and The Metrics
The Good, The Bad, and The Metrics
TeamQualityPro
 
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
Sovos
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
meritweb
 
MonetizingStatistics
MonetizingStatisticsMonetizingStatistics
MonetizingStatisticsAaron Sankey
 
Internal Controls
Internal ControlsInternal Controls
Internal Controls
National Pork Board
 
Value-added it auditing
Value-added it auditingValue-added it auditing
Value-added it auditing
Marc Vael
 
Validating your-model
Validating your-modelValidating your-model
Validating your-modelGuy VdB
 
Hanrick Curran Audit Training - Internal Controls - March 2013
Hanrick Curran Audit Training - Internal Controls - March 2013Hanrick Curran Audit Training - Internal Controls - March 2013
Hanrick Curran Audit Training - Internal Controls - March 2013
Matthew Green
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
RahulSen633699
 
Prepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docxPrepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docx
ChantellPantoja184
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
himanshu260688
 
The System and Process of Controlling
The System and Process of ControllingThe System and Process of Controlling
The System and Process of Controlling
Mahamid Rahman
 

Similar to 2018 ValAct - Session 22 - Material Weakness (20)

2018 Val Act: Session 22 - Material weakness
2018 Val Act: Session 22 - Material weakness2018 Val Act: Session 22 - Material weakness
2018 Val Act: Session 22 - Material weakness
 
Audit ratings guide
Audit ratings guideAudit ratings guide
Audit ratings guide
 
Internal audit ratings guide
Internal audit ratings guideInternal audit ratings guide
Internal audit ratings guide
 
Software Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking StudySoftware Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking Study
 
Pm chapter 6...
Pm chapter 6...Pm chapter 6...
Pm chapter 6...
 
Lecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptxLecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptx
 
Pm chapter 6
Pm chapter 6Pm chapter 6
Pm chapter 6
 
Pm chapter 6
Pm chapter 6Pm chapter 6
Pm chapter 6
 
The Good, The Bad, and The Metrics
 The Good, The Bad, and The Metrics The Good, The Bad, and The Metrics
The Good, The Bad, and The Metrics
 
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
Building the Tax Team of the Future to Navigate the Storm of Regulatory Change
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
MonetizingStatistics
MonetizingStatisticsMonetizingStatistics
MonetizingStatistics
 
Internal Controls
Internal ControlsInternal Controls
Internal Controls
 
Value-added it auditing
Value-added it auditingValue-added it auditing
Value-added it auditing
 
Validating your-model
Validating your-modelValidating your-model
Validating your-model
 
Hanrick Curran Audit Training - Internal Controls - March 2013
Hanrick Curran Audit Training - Internal Controls - March 2013Hanrick Curran Audit Training - Internal Controls - March 2013
Hanrick Curran Audit Training - Internal Controls - March 2013
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
 
Prepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docxPrepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docx
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
 
The System and Process of Controlling
The System and Process of ControllingThe System and Process of Controlling
The System and Process of Controlling
 

Recently uploaded

Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
beulahfernandes8
 
US Economic Outlook - Being Decided - M Capital Group August 2021.pdf
US Economic Outlook - Being Decided - M Capital Group August 2021.pdfUS Economic Outlook - Being Decided - M Capital Group August 2021.pdf
US Economic Outlook - Being Decided - M Capital Group August 2021.pdf
pchutichetpong
 
The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.
DOT TECH
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
DOT TECH
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
FinTech Belgium
 
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdfWhich Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Kezex (KZX)
 
Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024
Commercial Bank of Ceylon PLC
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
DOT TECH
 
Scope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theoriesScope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theories
nomankalyar153
 
Introduction to Indian Financial System ()
Introduction to Indian Financial System ()Introduction to Indian Financial System ()
Introduction to Indian Financial System ()
Avanish Goel
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
va2132004
 
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
muslimdavidovich670
 
how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.
DOT TECH
 
how to sell pi coins on Binance exchange
how to sell pi coins on Binance exchangehow to sell pi coins on Binance exchange
how to sell pi coins on Binance exchange
DOT TECH
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
DOT TECH
 
The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...
Antonis Zairis
 
how can I sell pi coins after successfully completing KYC
how can I sell pi coins after successfully completing KYChow can I sell pi coins after successfully completing KYC
how can I sell pi coins after successfully completing KYC
DOT TECH
 
managementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.pptmanagementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.ppt
SuseelaPalanimuthu
 
how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.
DOT TECH
 
The European Unemployment Puzzle: implications from population aging
The European Unemployment Puzzle: implications from population agingThe European Unemployment Puzzle: implications from population aging
The European Unemployment Puzzle: implications from population aging
GRAPE
 

Recently uploaded (20)

Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
Exploring Abhay Bhutada’s Views After Poonawalla Fincorp’s Collaboration With...
 
US Economic Outlook - Being Decided - M Capital Group August 2021.pdf
US Economic Outlook - Being Decided - M Capital Group August 2021.pdfUS Economic Outlook - Being Decided - M Capital Group August 2021.pdf
US Economic Outlook - Being Decided - M Capital Group August 2021.pdf
 
The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.The secret way to sell pi coins effortlessly.
The secret way to sell pi coins effortlessly.
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
 
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdfWhich Crypto to Buy Today for Short-Term in May-June 2024.pdf
Which Crypto to Buy Today for Short-Term in May-June 2024.pdf
 
Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024
 
how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.how to swap pi coins to foreign currency withdrawable.
how to swap pi coins to foreign currency withdrawable.
 
Scope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theoriesScope Of Macroeconomics introduction and basic theories
Scope Of Macroeconomics introduction and basic theories
 
Introduction to Indian Financial System ()
Introduction to Indian Financial System ()Introduction to Indian Financial System ()
Introduction to Indian Financial System ()
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
 
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
 
how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.how to sell pi coins in South Korea profitably.
how to sell pi coins in South Korea profitably.
 
how to sell pi coins on Binance exchange
how to sell pi coins on Binance exchangehow to sell pi coins on Binance exchange
how to sell pi coins on Binance exchange
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
 
The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...
 
how can I sell pi coins after successfully completing KYC
how can I sell pi coins after successfully completing KYChow can I sell pi coins after successfully completing KYC
how can I sell pi coins after successfully completing KYC
 
managementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.pptmanagementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.ppt
 
how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.
 
The European Unemployment Puzzle: implications from population aging
The European Unemployment Puzzle: implications from population agingThe European Unemployment Puzzle: implications from population aging
The European Unemployment Puzzle: implications from population aging
 

2018 ValAct - Session 22 - Material Weakness

  • 1. Session 22PD: Avoiding the material weakness: Case studies in developing effective controls MELANIE DUNN, FSA, MAAA MARK SPONG, FSA, CERA, MAAA August 27, 2018
  • 2. The material weakness may be more common than you think A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the company's annual or interim financial statements will not be prevented or detected on a timely basis A significant deficiency is a single weakness or a combination of weaknesses in the internal controls associated with financial reporting, that is less severe than a material control weakness and yet is sufficient to merit the scrutiny of those responsible for administering an entity's financial reporting *Source: Auditing Standard No. 5, Public Company Accounting Oversight Board
  • 4. Annual assumption review Historical examples of material weakness triggers Discovery of a material financial misstatement often indicates a weakness in underlying controls on financial reporting. Material misstatements In 2015, Phoenix reported a material restatement to 2013 financials due to an error in the 2013 annual assumption review. In March of 2018, MetLife disclosed a material weakness after reserves on a VA block were determined to be too high and released. Releasing excess reserves In 2015, Genworth disclosed insufficient controls on implementation of methodology and assumption changes for LTC claim reserves. Controls on methodology changes
  • 5. Market Reputation Financial Remediation effort Stock price drop Lack of trust Costs of remediation Strategic priorities must be shifted How would you, your team, and your department be affected by a material weakness? Impacts of a material weakness Morale Positive outlook eroded
  • 6. Material weakness describes the control environment, not the accuracy of financial statements
  • 7. Common Pitfalls – Case Studies & Discussion
  • 8. Spreadsheet SNAFU “This isn’t a model, it just organizes the results. The governance standards for models would be overkill!” • The valuation model works flawlessly with top notch controls • Results are dumped into Excel, transformed into usable form, and aggregated with other products via links and macros • But business day 8 comes along: – A last minute update to the process is not flowing through correctly – New products are not captured – Balances are transposed During the normal course of quarter close, management is not able to prevent misstatements on a timely basis. 1 WHAT • What are the control standards at your company for End User Computing applications, such as Excel? 2 • Models are usually defined as having input, processing and output components. Why does End User Computing tend to fall under the radar? WHY 3 • How can actuaries structure and design controls to address the underlying issue? HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 9. Assumption Malfunction “We update lapse and mortality every year and have a clear oversight process. The other assumptions still seem appropriate.” • The assumption inventory for a critical high risk model appears to be complete and annually reviewed • The model is complex and certain assumptions associated with mean reversion are not well understood by the assumption review committee • As a result, there is a lower degree of scrutiny on those assumptions plus lack of scrutiny on implicit assumptions • The result is economic simulations that are not reflective of the prolonged low interest rate environment The assumption review process was not designed to place sufficient scrutiny on technical aspects of modeling design. 1 2 3 • Why might controls around assumption management be challenging to keep up? • How can actuaries structure and design controls to address the underlying issue? WHAT • What do the assumption review and update process look like at your company? WHY HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 10. Hand-off Hardships “We are the model owners and they are the model users” • A domestic actuary is the “model owner” for a model and operation is outsourced to a “model user” in another country • Hand-offs of model updates and review occur over email, since the model owner and model user don’t work the same hours • While attributing impacts between quarters, the model owner discovers an error from incorrectly mapping new issues during routine updates in Q2 • The model user hadn’t been educated on model governance requirements, and didn’t know what level of review was required for the mapping updates • The model owner didn’t know that the mapping updates had been made, and didn’t review them in Q2 Hand-offs have increased risk, and effective controls execution requires clear standards for communication when processes and data get handed off. 1 WHAT • What does a hand-off look like during quarter end at your company? 2 • Why is just emailing someone a model with quarter close updates a problem? WHY 3 • How can actuaries structure and design controls to address the underlying issue? HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 11. Data Disaster “Of course we do reasonability checks on the inforce data, but we don’t have time to completely audit it” • The admin system is dropping a small number of policies each quarter in the inforce data feed • Data controls are focused on quarter over quarter changes of counts and face amounts, so nothing stands out • After 18-24 months reserve balances are significantly off The existing control was operating as designed but still did not meet the objective and reserves are misstated. 1 WHAT • What data quality checks would you realistically expect to routinely run on inforce files? 2 • Big changes from period to period are noticeable. Why might small changes like this still constitute a significant deficiency? WHY 3 • How can actuaries structure and design controls to address the underlying issue? HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 12. Modeling Mishap “I’m just relying on what the pricing team provided” • After pricing a new product, the pricing team hands off the pricing model to valuation • Valuation independently defines business requirements for the inforce model and determines whether any features not modeled for pricing need to be modeled • Risk and modeling teams are not involved • The risk team just checks the results at the end • Since pricing decisions are made before valuation, modeling, and risk become involved, those stakeholders do not have input into the decisions This may result in modeling and risk teams that do not have the practical authority to design and perform effective controls. 1 WHEN • How early do the risk, modeling, and valuation teams get involved in the pricing process at your company? 2 • Why might the pricing team have more influence within the organization? WHY 3 • How can actuaries coordinate between teams to address the underlying issue? HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 13. Error Emergency “We continuously keep track of modeling issues and address them as soon as possible” • An analyst finds a potential coding error in a production model on business day 3, two days before results are booked • There is limited time to thoroughly investigate to confirm the error or to assess its materiality • Multiple team members work late and the root cause appears to be identified and reasonable to address • A fix is implemented just in time and the impact on financials is attributed to a methodology enhancement • After quarter close, it was discovered that the change had unintended consequences for related products No emergency protocol was in place to guide action when an issue was found during quarter close. 1 WHAT • What is the emergency procedure at your company if an issue is found during the quarter close process? Is it a formalized or informal procedure? 2 • Why is it a problem to rely on a judgment call from management when an issue pops up during quarter close? WHY 3 • How can actuaries structure and design controls to address the underlying issue? HOW End User Computing Hand-offsAssumptions Model StakeholdersData Emergency Protocol
  • 14. End User Computing1 Assumptions2 Recap Model Stakeholders5 Emergency protocol6 Hand-offs3 Data4