SlideShare a Scribd company logo
Wilbur Huang, P.E., CFM
Jason Brabec, P.E., CFM
Flood Projects Office
Division of Flood Management
California Department of Water Resources
September 8, 2016
Collaborative
Flood Risk Reduction Projects
in the Greater Sacramento Region
Earlier Historic Floods
2
• Birds-eye view of
Sacramento 1857;
• Historic floods of
1861-62 (USGS)
Flood of 1986
3Flood of 1997
More Recent Historic Floods
Broken Gate on
Folsom Dam (1995)
4
• Sacramento Floods: 1850, 1852, 1862
• Sacramento raised almost 15 ft after 1862 flood
• 1880 – First Comprehensive Flood Control Plan
developed by William Hammond Hall
• More floods 1902-1909
• 1917 – Plan from 1880 finally accepted –
Sacramento Flood Control System authorized by
Congress
• 1944 – Folsom Dam authorized – Designed to
provide 500-year level of flood protection
• 1951 – Record Flood
• 1956 – Record Flood
• 1964 – Record Flood – Folsom Dam flood
protection downgraded to 120-year storm
• 1986 – Record Flood – Folsom Dam flood
protection downgraded to 60-year storm!
• 1997 – Record Flood – Definitely a theme…
12/15/2016 5
SPONSORS OF FLOOD RISK
REDUCTION PROJECTS
12/15/2016 6
Federal Sponsor:
• United States Army Corps of Engineers
(USACE)
– Project Management by Sacramento District
(USACE-SPK)
Non-Federal Sponsors:
• Central Valley Flood Protection Board (Board)
– Project Management by Department of Water
Resources (DWR) Flood Projects Office and
Board Staff Coordination
• Sacramento Area Flood Control Agency
(SAFCA)
12/15/2016 7
Folsom Dam Modifications, JFP
ARCF, WRDA 96/99 Sites
ARCF, GRR Project
Sac Weir
South Sacramento
County Streams Project
ARCF, GRR Project
North Area Streams
ARCF, GRR Project
Pocket Levees
ARCF, Natomas Basin
American River Common Features,
WRDA 96/99 Sites
12/15/2016 8
AMERICAN RIVER WRDA
1996 AND 1999 COMMON
FEATURES REMAINING
SITES
Existing Cut-Off Wall
Rivers
Project Levees
Incomplete
0 1.5 3 4.5 60.75
Miles
ARCF Project Background
• Project Cooperation Agreement (PCA)
and Local Project Cooperation
Agreement (LPCA) signed in July
1998.
• Under WRDA 96 authorization: 22
miles of cutoff wall was installed along
American River, leaving about 32 gaps
due to the needs of complex design
and construction.
• Gaps include Bridge crossings,
Railway line crossings, Pipe crossings,
Overhead utility lines, etc.
12/15/2016 9
ARCF Project Finance
(Estimate)
12/15/2016 10
• Total Project Cost - $ 326 million
• Federal Share - $ 243 million
• Non-Federal Share - $ 81 million
 State Cost Share - $ 56 m
 SAFCA Cost Share - $ 25 m
ARCF
Construction Photos
12/15/2016 11
ARCF Project Accomplishments
• 25 miles of continuous seepage
cutoff wall
• 200-year Level of Flood
Protection for more than
500,000 people and several
billion dollar worth assets
• Safely passage the 160k cfs
release from the Folsom Dam
during high water events
• Two ASCE awards (2012 and
2014) for best construction
practice
• April 2016 Project Completion
12/15/2016 12
South Sacramento County
Streams Project
13
2016 Work
Completed Work
I-5
SR 99
Beach-Stone Lake Basin
Elder Creek
Morrison Creek Stream
Group Basin
SSS Project Background
• Final Feasibility report and EIS/EIR completed in
March 1998
• Authorized in WRDA of 1999
• Limited Reevaluation Report (LRR), included
revised hydrology, and Environmental
Assessment completed December 2004
• Project Cooperation Agreement (PCA) and Local
Project Cooperation Agreement (LPCA) signed
in May 2005
12/15/2016 14
 Divided into Phases 1A, 1B1, 1B2, 2A,
2D1
SSS DESIGN & CONSTRUCTION STATUS
15
• Approx. 7 miles of Flood Wall
• Approx. 9 miles of levee improvement
• Approx. 1.5 miles of new levee
• Approx. 200 acre ecosystem restoration
COMPLETED WORK:
SRCSD
Phase 1A
Phase 1B1
Phase 1B2
Phase 2A
Phase 2D1
Florin Creek Construction (2D1)
• Started in Summer 2016; scheduled to be
completed in late 2016
• Little over a mile of channel bottom widening
and slope flattening
• Low flow concrete invert channel lining
• Approx. 350 feet retaining wall
• Approx. 170 feet sheet pile wall
12/15/2016 16
SSS Construction Photos
12/15/2016 17
SSS Project Finance
(Estimate)
12/15/2016 18
• Total Project Cost - $ 93 million
• Federal Share - $ 60 million
• Non-Federal Share - $ 33 million
State Cost Share - $ 23 m
SAFCA Cost Share - $ 10 m
SSS Project Accomplishments
• Level of flood protection will increase to 100-
year for South Sacramento Area
• About 30,000 parcels will be in reduced flood
risk
• About 28,000 residential properties are or will
be eligible for Preferred Risk Flood Policies
(PRP)
• More than 200 acre ecosystem restoration
• Enhance the recreation and restore wildlife
habitat
12/15/2016 19
JFP PROJECT
12/15/2016 20
The Folsom Dam
Modification Project is
a cooperative effort to
improve flood damage
reduction features,
dam safety, and
security of the Folsom
Dam and its
associated facilities to
a 200-year or better
level of Protection.
JFP Project Background
• Intent of Project was to attenuate peak storms with earlier
releases to achieve a greater than 200-year level of flood
protection, within rated flow capacity of downstream levees.
• Mass excavation for Phases I & II completed by United States
Bureau of Reclamation in January 2011.
• Project was presented at the FMA Conference held in 2012. This
presentation will focus on construction updates since that time.
• JFP Project continued in three primary phases:
– Phase III: Control Structure
– Phase IV: Step Chute, Stilling Basin, Upper Chute, and Approach Channel
– Phase V: Site Restoration.
12/15/2016 21
JFP CONSTRUCTION PHASES
12/15/2016 22
JFP Project Finance
(Estimate)
12/15/2016 23
• Total Project Cost $ 833 million
• Federal Share - $ 541 million
• Non-Federal Share - $ 292 million
State Cost Share - $ 204 m
SAFCA Cost Share - $ 88 m
APRIL 2011
12/15/2016 24
OCTOBER 2013
12/15/2016 25
JANUARY 2015
12/15/2016 26
JANUARY 2016
12/15/2016 27 of 35
JULY 2016
12/15/2016 28
STEP CHUTE & STILLING BASIN
2013 2016
12/15/2016 29
CONTROL STRUCTURE
COMPLETE (AUG 2015)
12/15/2016 30
BULK HEAD GATE SIZE
12/15/2016 31
MARINE BLASTING OF THE
APPROACH CHANNEL
12/15/2016 32
Construction Progress
November 2012 August 2016
Phase Design Construction Design Construction
Phase III 100% 34% 100% 99%
Phase IV 100% 0% 100% 94%
Phase V 0% 0% 100% 14%
Overall 86% 15% 100% 95%
12/15/2016 33
• 3.8 million cubic yards of rock and soil
excavated
• 300,000 cubic yards of concrete poured
• 30 million pounds of steel reinforcing
FUTURE JFP ACTIVITIES
• Construction
– Approach Channel final excavation
– Restoration of Site
• Water Control Manual
• Commissioning
• Turn-over
12/15/2016 34
SAFCA PROJECTS
IN THE WORKS
• American River Common Features – General
Re-Evaluation Report (GRR)
• Habitat Restoration and Ecosystem
Improvements (Corridor Management Plan)
• Levee and Channel Maintenance
12/15/2016 35
12/15/2016 36
ARCF, GRR Project
Sac Weir
ARCF, GRR Project
North Area Streams
ARCF, GRR Project
Pocket Levees
COORIDOR MANAGEMENT PLAN
NEMDC/North Area Streams
THANKS!
Appreciate your Attention
Questions?
-Wilbur Huang & Jason M. Brabec
12/15/2016 37

More Related Content

What's hot

Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
Fairfax County
 
Royal Lake Dredging and Restoration
Royal Lake Dredging and RestorationRoyal Lake Dredging and Restoration
Royal Lake Dredging and Restoration
Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
Ismael Vazquez, LSIT
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
Ali Sial
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Fairfax County
 
Vol.9 appendices to environmental impact assessment and resettlement aspects
Vol.9  appendices to environmental impact assessment and resettlement aspectsVol.9  appendices to environmental impact assessment and resettlement aspects
Vol.9 appendices to environmental impact assessment and resettlement aspects
zubeditufail
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
Fairfax County
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA Presentation
Jones Edmunds
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Fairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
Fairfax County
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
Fairfax County
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Fairfax County
 
Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015
Fairfax County
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Fairfax County
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Fairfax County
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Fairfax County
 

What's hot (20)

Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
Royal Lake Dredging and Restoration
Royal Lake Dredging and RestorationRoyal Lake Dredging and Restoration
Royal Lake Dredging and Restoration
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
Vol.9 appendices to environmental impact assessment and resettlement aspects
Vol.9  appendices to environmental impact assessment and resettlement aspectsVol.9  appendices to environmental impact assessment and resettlement aspects
Vol.9 appendices to environmental impact assessment and resettlement aspects
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA Presentation
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 
Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
 

Viewers also liked

Nhsa Flood Control Project Release[1][1]
Nhsa Flood Control Project Release[1][1]Nhsa Flood Control Project Release[1][1]
Nhsa Flood Control Project Release[1][1]
Hoboken Resistance
 
Guidelines on-flood-mgmt
Guidelines on-flood-mgmtGuidelines on-flood-mgmt
Guidelines on-flood-mgmt
uyelinnbo
 
Gujarat flood presentation
Gujarat flood presentationGujarat flood presentation
Gujarat flood presentation
Tushar Dholakia
 
Sediment management in flood control dams
Sediment management in flood control damsSediment management in flood control dams
Sediment management in flood control dams
erfanmohebi
 
Floods in Pakistan
Floods in PakistanFloods in Pakistan
Floods in Pakistan
flashbulbnerd777
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep Yadav
Pradeep Yadav
 
Flood control
Flood controlFlood control
Flood control
tharamttc
 
floods
floodsfloods
floods
ctlachu
 
Structural flood control options
Structural flood control optionsStructural flood control options
Structural flood control options
Priodeep Chowdhury
 

Viewers also liked (9)

Nhsa Flood Control Project Release[1][1]
Nhsa Flood Control Project Release[1][1]Nhsa Flood Control Project Release[1][1]
Nhsa Flood Control Project Release[1][1]
 
Guidelines on-flood-mgmt
Guidelines on-flood-mgmtGuidelines on-flood-mgmt
Guidelines on-flood-mgmt
 
Gujarat flood presentation
Gujarat flood presentationGujarat flood presentation
Gujarat flood presentation
 
Sediment management in flood control dams
Sediment management in flood control damsSediment management in flood control dams
Sediment management in flood control dams
 
Floods in Pakistan
Floods in PakistanFloods in Pakistan
Floods in Pakistan
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep Yadav
 
Flood control
Flood controlFlood control
Flood control
 
floods
floodsfloods
floods
 
Structural flood control options
Structural flood control optionsStructural flood control options
Structural flood control options
 

Similar to 2016 FMA-presentation-Collaborateve FRR Projects (REV8)

Rocky Run Tributary at Dulles Access Road Stream Restoration Project
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectRocky Run Tributary at Dulles Access Road Stream Restoration Project
Rocky Run Tributary at Dulles Access Road Stream Restoration Project
Fairfax County
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
Graeme Donaldson
 
091913 nk public_mtg
091913 nk public_mtg091913 nk public_mtg
091913 nk public_mtg
riseagrant
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Libby Zemaitis
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Climate Resilience in the Hudson Valley
 
IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16
Graeme Donaldson
 
Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans
Bill Kovarik
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
Amanda Post
 
Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018
Fairfax County
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
YourAlberta
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Fairfax County
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Fairfax County
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
New Jersey Future
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
Fairfax County
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
TWCA
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Fairfax County
 
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Fairfax County
 
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County
 
Mark Cowin Same 10282009
Mark Cowin Same 10282009Mark Cowin Same 10282009
Mark Cowin Same 10282009
SAME 2009 California Water Conference
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
Fairfax County
 

Similar to 2016 FMA-presentation-Collaborateve FRR Projects (REV8) (20)

Rocky Run Tributary at Dulles Access Road Stream Restoration Project
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectRocky Run Tributary at Dulles Access Road Stream Restoration Project
Rocky Run Tributary at Dulles Access Road Stream Restoration Project
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
091913 nk public_mtg
091913 nk public_mtg091913 nk public_mtg
091913 nk public_mtg
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
 
IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16
 
Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
 
Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
 
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
 
Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016Fairfax County Leigh Meadow Stream Restoration July 2016
Fairfax County Leigh Meadow Stream Restoration July 2016
 
Mark Cowin Same 10282009
Mark Cowin Same 10282009Mark Cowin Same 10282009
Mark Cowin Same 10282009
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 

2016 FMA-presentation-Collaborateve FRR Projects (REV8)

  • 1. Wilbur Huang, P.E., CFM Jason Brabec, P.E., CFM Flood Projects Office Division of Flood Management California Department of Water Resources September 8, 2016 Collaborative Flood Risk Reduction Projects in the Greater Sacramento Region
  • 2. Earlier Historic Floods 2 • Birds-eye view of Sacramento 1857; • Historic floods of 1861-62 (USGS)
  • 3. Flood of 1986 3Flood of 1997 More Recent Historic Floods Broken Gate on Folsom Dam (1995)
  • 4. 4 • Sacramento Floods: 1850, 1852, 1862 • Sacramento raised almost 15 ft after 1862 flood • 1880 – First Comprehensive Flood Control Plan developed by William Hammond Hall • More floods 1902-1909 • 1917 – Plan from 1880 finally accepted – Sacramento Flood Control System authorized by Congress • 1944 – Folsom Dam authorized – Designed to provide 500-year level of flood protection • 1951 – Record Flood • 1956 – Record Flood • 1964 – Record Flood – Folsom Dam flood protection downgraded to 120-year storm • 1986 – Record Flood – Folsom Dam flood protection downgraded to 60-year storm! • 1997 – Record Flood – Definitely a theme…
  • 6. SPONSORS OF FLOOD RISK REDUCTION PROJECTS 12/15/2016 6 Federal Sponsor: • United States Army Corps of Engineers (USACE) – Project Management by Sacramento District (USACE-SPK) Non-Federal Sponsors: • Central Valley Flood Protection Board (Board) – Project Management by Department of Water Resources (DWR) Flood Projects Office and Board Staff Coordination • Sacramento Area Flood Control Agency (SAFCA)
  • 7. 12/15/2016 7 Folsom Dam Modifications, JFP ARCF, WRDA 96/99 Sites ARCF, GRR Project Sac Weir South Sacramento County Streams Project ARCF, GRR Project North Area Streams ARCF, GRR Project Pocket Levees ARCF, Natomas Basin
  • 8. American River Common Features, WRDA 96/99 Sites 12/15/2016 8 AMERICAN RIVER WRDA 1996 AND 1999 COMMON FEATURES REMAINING SITES Existing Cut-Off Wall Rivers Project Levees Incomplete 0 1.5 3 4.5 60.75 Miles
  • 9. ARCF Project Background • Project Cooperation Agreement (PCA) and Local Project Cooperation Agreement (LPCA) signed in July 1998. • Under WRDA 96 authorization: 22 miles of cutoff wall was installed along American River, leaving about 32 gaps due to the needs of complex design and construction. • Gaps include Bridge crossings, Railway line crossings, Pipe crossings, Overhead utility lines, etc. 12/15/2016 9
  • 10. ARCF Project Finance (Estimate) 12/15/2016 10 • Total Project Cost - $ 326 million • Federal Share - $ 243 million • Non-Federal Share - $ 81 million  State Cost Share - $ 56 m  SAFCA Cost Share - $ 25 m
  • 12. ARCF Project Accomplishments • 25 miles of continuous seepage cutoff wall • 200-year Level of Flood Protection for more than 500,000 people and several billion dollar worth assets • Safely passage the 160k cfs release from the Folsom Dam during high water events • Two ASCE awards (2012 and 2014) for best construction practice • April 2016 Project Completion 12/15/2016 12
  • 13. South Sacramento County Streams Project 13 2016 Work Completed Work I-5 SR 99 Beach-Stone Lake Basin Elder Creek Morrison Creek Stream Group Basin
  • 14. SSS Project Background • Final Feasibility report and EIS/EIR completed in March 1998 • Authorized in WRDA of 1999 • Limited Reevaluation Report (LRR), included revised hydrology, and Environmental Assessment completed December 2004 • Project Cooperation Agreement (PCA) and Local Project Cooperation Agreement (LPCA) signed in May 2005 12/15/2016 14
  • 15.  Divided into Phases 1A, 1B1, 1B2, 2A, 2D1 SSS DESIGN & CONSTRUCTION STATUS 15 • Approx. 7 miles of Flood Wall • Approx. 9 miles of levee improvement • Approx. 1.5 miles of new levee • Approx. 200 acre ecosystem restoration COMPLETED WORK: SRCSD Phase 1A Phase 1B1 Phase 1B2 Phase 2A Phase 2D1
  • 16. Florin Creek Construction (2D1) • Started in Summer 2016; scheduled to be completed in late 2016 • Little over a mile of channel bottom widening and slope flattening • Low flow concrete invert channel lining • Approx. 350 feet retaining wall • Approx. 170 feet sheet pile wall 12/15/2016 16
  • 18. SSS Project Finance (Estimate) 12/15/2016 18 • Total Project Cost - $ 93 million • Federal Share - $ 60 million • Non-Federal Share - $ 33 million State Cost Share - $ 23 m SAFCA Cost Share - $ 10 m
  • 19. SSS Project Accomplishments • Level of flood protection will increase to 100- year for South Sacramento Area • About 30,000 parcels will be in reduced flood risk • About 28,000 residential properties are or will be eligible for Preferred Risk Flood Policies (PRP) • More than 200 acre ecosystem restoration • Enhance the recreation and restore wildlife habitat 12/15/2016 19
  • 20. JFP PROJECT 12/15/2016 20 The Folsom Dam Modification Project is a cooperative effort to improve flood damage reduction features, dam safety, and security of the Folsom Dam and its associated facilities to a 200-year or better level of Protection.
  • 21. JFP Project Background • Intent of Project was to attenuate peak storms with earlier releases to achieve a greater than 200-year level of flood protection, within rated flow capacity of downstream levees. • Mass excavation for Phases I & II completed by United States Bureau of Reclamation in January 2011. • Project was presented at the FMA Conference held in 2012. This presentation will focus on construction updates since that time. • JFP Project continued in three primary phases: – Phase III: Control Structure – Phase IV: Step Chute, Stilling Basin, Upper Chute, and Approach Channel – Phase V: Site Restoration. 12/15/2016 21
  • 23. JFP Project Finance (Estimate) 12/15/2016 23 • Total Project Cost $ 833 million • Federal Share - $ 541 million • Non-Federal Share - $ 292 million State Cost Share - $ 204 m SAFCA Cost Share - $ 88 m
  • 29. STEP CHUTE & STILLING BASIN 2013 2016 12/15/2016 29
  • 30. CONTROL STRUCTURE COMPLETE (AUG 2015) 12/15/2016 30
  • 31. BULK HEAD GATE SIZE 12/15/2016 31
  • 32. MARINE BLASTING OF THE APPROACH CHANNEL 12/15/2016 32
  • 33. Construction Progress November 2012 August 2016 Phase Design Construction Design Construction Phase III 100% 34% 100% 99% Phase IV 100% 0% 100% 94% Phase V 0% 0% 100% 14% Overall 86% 15% 100% 95% 12/15/2016 33 • 3.8 million cubic yards of rock and soil excavated • 300,000 cubic yards of concrete poured • 30 million pounds of steel reinforcing
  • 34. FUTURE JFP ACTIVITIES • Construction – Approach Channel final excavation – Restoration of Site • Water Control Manual • Commissioning • Turn-over 12/15/2016 34
  • 35. SAFCA PROJECTS IN THE WORKS • American River Common Features – General Re-Evaluation Report (GRR) • Habitat Restoration and Ecosystem Improvements (Corridor Management Plan) • Levee and Channel Maintenance 12/15/2016 35
  • 36. 12/15/2016 36 ARCF, GRR Project Sac Weir ARCF, GRR Project North Area Streams ARCF, GRR Project Pocket Levees COORIDOR MANAGEMENT PLAN NEMDC/North Area Streams
  • 37. THANKS! Appreciate your Attention Questions? -Wilbur Huang & Jason M. Brabec 12/15/2016 37