The document outlines proposed service changes to Fairfax County public transportation. It discusses adjustments to bus routes and schedules to account for new Silver Line metro stations, traffic conditions, and development. Key changes include buses serving the new Dunn Loring metro station, adjusting times on many routes, extending some routes to new stations, and adding additional trips during rush hour. Public comment was sought on the proposals through November 2014.
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFairfax County
Base Realignment and Closure (BRAC) is the process the U.S. Department of Defense uses to reorganize its military installations to adapt to changing circumstances.
The 2005 BRAC law will result in the transfer of 14,000-19,000 Department of Defense jobs to Fort Belvoir in September 2011
Service implementation Fall 2011
Proposed May 2014 Service Changes. Two public meetings will be held: the first on Tuesday, January 28, at 12 p.m., the second on Thursday, January 30, at 6 p.m.
Meetings will be held in the W. G. Porter Boardroom at 33 N. High St., Columbus, OH 43215
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFairfax County
Base Realignment and Closure (BRAC) is the process the U.S. Department of Defense uses to reorganize its military installations to adapt to changing circumstances.
The 2005 BRAC law will result in the transfer of 14,000-19,000 Department of Defense jobs to Fort Belvoir in September 2011
Service implementation Fall 2011
Proposed May 2014 Service Changes. Two public meetings will be held: the first on Tuesday, January 28, at 12 p.m., the second on Thursday, January 30, at 6 p.m.
Meetings will be held in the W. G. Porter Boardroom at 33 N. High St., Columbus, OH 43215
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
An astonishing, first-of-its-kind, report by the NYT assessing damage in Ukraine. Even if the war ends tomorrow, in many places there will be nothing to go back to.
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
Fairfax Connector: January 2015 Proposed Service Changes
1. County of Fairfax, Virginia
January 2015
Proposed
Service
Changes
Department of Transportation
2. County of Fairfax, Virginia
Department of Transportation
Welcome
2
• Service overview
• Proposal details
• Q & A
• Open house
discussion
3. County of Fairfax, Virginia
Service Overview
• Silver Line Metrorail now serves
Wiehle, Spring Hill, Greensboro, Tysons
Corner, and McLean stations
• 40% of Fairfax Connector service changed
Jul. 26, 2014 in response to Silver Line
• Most proposed service changes adjust
bus travel times due to traffic conditions
Department of Transportation
3
4. County of Fairfax, Virginia
Service Overview
• Dulles Corridor bus
ridership:
− 2% weekday increase
− 7% weekend increase
• Silver Line Metrorail:
– 30,000 weekday trips to or from the new stations
– Wiehle: the “commuting powerhouse;” 16,800
weekday entries and exits -- half the lines ridership
Department of Transportation
4
5. County of Fairfax, Virginia
Service Overview
• Dulles Corridor park and ride utilization:
– Herndon-Monroe: 74%
– Reston North: 100%
– Reston South: 35%
– Wiehle: 79%
Department of Transportation
5
6. County of Fairfax, Virginia
Route 401/402 – Backlick-Gallows
• A new schedule will reflect travel times
adjusted for traffic conditions
• Additional adjustments needed to serve:
– New Dunn Loring Metro station bus facility
– Redeveloped Springfield Town Center
– Tysons Westpark Transit Station via Greensboro
Drive and Spring Hill Road connecting to Route 574
Department of Transportation
6
Proposal Details
7. County of Fairfax, Virginia
Route 401/402 – Backlick-Gallows
Department of Transportation
7
Proposal Details
Buses serve Tysons
Westpark Transit Station via
Greensboro Drive and
Spring Hill Road
8. County of Fairfax, Virginia
Route 422 – Boone Boulevard-
Howard Avenue
• Buses will serve the Tysons Corner Metro
station bus lane along northbound Chain
Bridge Road (Rte. 123)
Department of Transportation
8
Proposal Details
Buses will directly serve
Tysons Corner Metro Station
9. County of Fairfax, Virginia
Route 463 – Maple Ave-Vienna
• A new schedule will reflect travel times
adjusted for current traffic conditions
– Too much time in the northbound schedule
between Vienna Metro and the Horse Shoe
Lane timepoint
Department of Transportation
9
Proposal Details
10. County of Fairfax, Virginia
Routes 493,494,495 –
Tysons-495 Express Lanes
• Buses will serve the Spring Hill Metro
station bus lane along westbound
Leesburg Pike (Rte. 7)
Department of Transportation
10
Proposal Details
Buses will directly serve
Spring Hill Metro Station
11. County of Fairfax, Virginia
Route 505 – Reston Town Center
Routes 981,983 – Dulles Airport
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Departures on routes 505, 981, and 983
will be timed to provide an even spacing of
buses between Reston Town Center and
the Wiehle Metro Station
Department of Transportation
11
Proposal Details
12. County of Fairfax, Virginia
Routes 551,552,557,558,559 –
Reston North & Reston South
• New schedules will reflect travel times
adjusted for current traffic conditions
Department of Transportation
12
Proposal Details
13. County of Fairfax, Virginia
Route 574 – Reston-Tysons
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Route will be extended to serve Tysons
Westpark transit station via Spring Hill
Road connecting to Route 401/402
Department of Transportation
13
Proposal Details
14. County of Fairfax, Virginia
Route 574 – Reston-Tysons
Department of Transportation
14
Proposal Details
Buses will serve Tysons
Westpark Transit
Station via Spring Hill
Road
15. County of Fairfax, Virginia
Route 585 –
Reston South-Franklin Farm
• A new schedule will reflect travel times
adjusted for current traffic conditions
– Too much time in the southbound schedule
south of Reston South Park & Ride
Department of Transportation
15
Proposal Details
16. County of Fairfax, Virginia
Route 599 –
Pentagon-Crystal City Express
• A new schedule will reflect travel times
adjusted for current traffic conditions
– Not enough time in the afternoon schedule
between Crystal City and Pentagon Station
Department of Transportation
16
Proposal Details
17. County of Fairfax, Virginia
Route 605 – Fair Oaks-Reston
• A new schedule will reflect travel times
adjusted for current traffic conditions
• The time between buses will change from
every 60 minutes to every 45 minutes
weekdays; from every 60 minutes to every
70 minutes weekends
• Buses will serve Fair Oaks Mall via the
Fairfax County Government Center
Department of Transportation
17
Proposal Details
18. County of Fairfax, Virginia
Route 605 – Fair Oaks-Reston
Department of Transportation
18
Proposal Details
Buses will travel to and
from Fair Oaks Mall via
West Ox Road, Post Forest
Drive, Government Center
Pkwy, and Monument Drive
19. County of Fairfax, Virginia
Route 721 –
Chain Bridge Road-McLean
• A new schedule will reflect travel times
adjusted for current traffic conditions
Department of Transportation
19
Proposal Details
• Buses will travel through
the Old McLean Village
Drive timepoint,
eliminating layover on
Beverly Road
20. County of Fairfax, Virginia
Routes 924,926 –
Dranesville Road-Worldgate
• A new schedule will reflect travel times
adjusted for current traffic conditions
– Too much time from Herndon-Monroe to the
Wiehle Metro station
– Not enough time from the Wiehle Metro
station to Herndon-Monroe
Department of Transportation
20
Proposal Details
21. County of Fairfax, Virginia
Route 927 –
Dulles Corner-McNair Farms
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Two additional afternoon rush hour trips
will be added to the schedule, departing
Herndon-Monroe at 3 p.m. and 8 p.m. to
address demand
Department of Transportation
21
Proposal Details
22. County of Fairfax, Virginia
Route 929 – Centreville Road
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Buses will serve bus stops along Park
Center Drive and Towerview Road
Department of Transportation
22
Proposal Details
23. County of Fairfax, Virginia
Department of Transportation
23
Route 929 –
Centreville Rd
Proposal Details
Buses will serve Park
Center Drive and
Towerview Road via
McLearen Road
24. County of Fairfax, Virginia
Routes 950,980 – Herndon
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Departures on routes 950 and 980 will be
timed to provide an even spacing of buses
between Herndon-Monroe and Wiehle
• Additional Route 980 trips at the busiest
rush hour travel times
Department of Transportation
24
Proposal Details
25. County of Fairfax, Virginia
Routes 951,952 –
Sunrise Valley-Sunset Hills
• A new schedule will reflect travel times
adjusted for current traffic conditions
• Route 951 buses will serve USGS via
Sunrise Valley Drive on all AM rush hour,
mid-day, and PM rush hour trips
Department of Transportation
25
Proposal Details
26. County of Fairfax, Virginia
Route 985 –
Dulles Corner-Wall Road
• A new schedule will reflect travel times
adjusted for current traffic conditions
Department of Transportation
26
Proposal Details
27. County of Fairfax, Virginia
Route 335 – Fort Belvoir
• The 6 p.m. departure from the Franconia-
Springfield Metro station will only travel as
far south as Morning View Lane and View
Lane
• Fort Belvoir’s Telegraph Gate closes at 6
p.m.
Department of Transportation
27
Proposal Details
28. County of Fairfax, Virginia
• Comments due by 5 p.m. Friday, Nov. 7, 2014
– public meeting comment forms
– fairfaxconnector@fairfaxcounty.gov
– (703) 339-7200, TTY (703) 339-1608
• Develop final staff recommendations to Board
– added service hours: 6,400 (FY-15 est.)
• Board approval requested: Dec. 2, 2014
• Proposal implementation: Jan. 24, 2015
• Q & A and open house
Department of Transportation
Next Steps
28