Banjarmasin “Road safety at road works” workshop
              13-14 December 2011
 Numerous signs
 Generally clean and in good condition
 Delineators (painted bamboo) used


 Sincere efforts appear to have been made.
 The four zones not used
 Insufficient advanced warning
 Some warnings not clear or specific
 No speed restrictions
 Concrete blocks holding the painted bamboo
    delineators
   Inconsistent line marking
   Many rocks and stones on edge of road
   Workers not wearing reflective safety vests
   Machinery on road but no warning
 Long term road works.
 Traffic passes through the work site, except at the end where
    there is a side track.

 Is there a Traffic Management Plan for the road works?

   Good advance warning at each end is essential.
   Advance warning of each main work site is necessary.
   Consistent regulatory speed limit is necessary – 40km/h
   More consistent delineation – lines and cones.
   Clearer messages on signs about what is ahead
   All workers to wear safety vests.
No advance warning zone
Stop sign not correct
Not forgiving
Workers sign too late and should
be removed when no workers         More conspicuous
                                   and forgiving
Cones more conspicuous
Cones more forgiving
Bagus
Bagus
Bagus
Bagus
Stop sign not correct.
Worker sign should NOT be
displayed as there are no workers.
Should speed limit be
20 or 40km/h? Must
be a regulatory sign
Bagus
Cones aid delineation.
Edge line would help also
Bagus
Not a regulatory sign - do
we want 20 or 40km/h
Bagus
Ha ha ha – you
         Australians!




Bagus
Sign is too late – already well
within work zone
Concrete base unsafe
Bagus
No lines – night time?
Centre line only....
Centre line only.... but edge has deep
drop off and is not consistent width
Centre line only.... but edge has deep
drop off and is not consistent width
Edge line plus tired centre line.... but
edge has deep drop off .
Edge line plus tired centre line.... but
1       edge has deep drop off and is not
    1
        consistent width
Edge line ends, so does centre line.... but
2   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
3   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
4   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
5   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
6   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
7   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
8   there is a curve ahead and drop off continues
Centre line.... but no edge line and gravel on road.
There is a surprise ahead!
Surprise! No advance warning of
machinery on road. Traffic must stop.
Narrow, no speed reduction, dangerous
roadside hazards, mud on road
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Flag men too close, no speed reduction, no advance
warning of machinery. This is one way flow and should
be managed that way!
Narrow, dangerous roadside hazards,
workers without safety vests
The side track commences ahead, but there is
nothing to inform road users of this. No delineation.
This sign says “Sorry for disturbing your journey”. To me,
this means the road works have finished! But no.....
This sign says “Sorry for disturbing your journey”. To me,
this means the road works have finished! But no.....
The side track commences ahead, but this
sign only mentions road work. No mention
of what the driver/rider will have to do.
The side track commences ahead, but this
sign only mentions road work. No mention
of what the driver/rider will have to do.
The side track commences here, but there is nothing to
clearly inform road users of this. Little delineation,
rough muddy surface
Are we happy with 15km/h for the side
track? This sign needs washing.
The side track commences here, but there is nothing to
clearly inform road users of this. Little delineation,
rough muddy surface
The side track - no delineation, rough muddy surface
This sign is OK but is too late – it needs
to be before the side track.
No information of going from sealed to
unsealed surface (a rough muddy surface).
Too close to the work site. Is 15 km/h reasonable?
No signs mention a side track. For a long term
work site, should this track be sealed?
The side track is muddy and slippery.
No delineation. Night time?
Poor sight distance to the access road.
Pedestrians need assistance to cross.
The side track has a rough muddy surface
The side track has a rough muddy surface
When I looked at this photo I saw a family travelling with their
little girl. She has her Mickey Mouse bag. She could be an
Indonesian girl or an Australian girl – and she deserves
protection. She is at risk here! We must do better in road works
When I looked at this photo I saw a family travelling with their little
girl. She has her Mickey Mouse bag. She could be an Indonesian girl or
an Australian girl – and she deserves protection. She is at risk here! We
must do better in road works




          South Gippsland Highway, Victoria
Large water pipe was to be placed under a rural highway

Approx 8,000vpd, 100km/h speed limit

A side track was decided

Farm land was purchased – to be sold back to the farmer later

Careful planning went into the entire task.

I audited the work – twice!

The side track was to last for less than one week (in fact it
lasted 4 days)

Cost $50,000AUD
Existing
highway




                        Side track
       Hazardous pole
Hazardous roadside
Four days
$500,000

Prevention is
better than cure
Matthew filmed the work
This example is not to show that all road works in Australia are
great and wonderful.

Nor is it to expect Indonesia to spend $500,000 at each large
road work site.

But it does stress:
        - work sites are important

       - careful planning.

       - attention to safety

       - prevention rather than cure

When the work was ended, the asphalt was recycled and
reused. The land was sold back to the farmer.
Roadside hazards. Fabricate away from
road, lift into place immediately.
Roadside hazards. Fabricate away from
road, lift into place immediately.
Driving into sun.
Night time?
Driving into sun.
Night time?
 Long term road works.
 Traffic passes through the work site, except at the end where
    there is a side track.

 Is there a Traffic Management Plan for the road works?

   Good advance warning at each end is essential.
   Advance warning of each main work site is necessary.
   Consistent regulatory speed limit is necessary – 40km/h
   More consistent delineation – lines and cones.
   Clearer messages on signs about what is ahead
   All workers to wear safety vests.
Bagus
Bagus
Bagus
Bagus

More Related Content

Similar to 20120118103352.phillip j inspection of banjarmasin road works on

Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long articleDasarathi GV
 
Make It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesMake It A Roundtrip: Student Notes
Make It A Roundtrip: Student Notes
Operation Lifesaver
 
Live to Help Another Day: Student Notes
Live to Help Another Day: Student NotesLive to Help Another Day: Student Notes
Live to Help Another Day: Student Notes
Operation Lifesaver
 
Motor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesMotor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student Notes
Operation Lifesaver
 
Roads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need RoadsRoads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need RoadsSafe Software
 
Share cyclisy motorist
Share cyclisy motoristShare cyclisy motorist
Share cyclisy motoristAdam Guerguis
 

Similar to 20120118103352.phillip j inspection of banjarmasin road works on (6)

Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long article
 
Make It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesMake It A Roundtrip: Student Notes
Make It A Roundtrip: Student Notes
 
Live to Help Another Day: Student Notes
Live to Help Another Day: Student NotesLive to Help Another Day: Student Notes
Live to Help Another Day: Student Notes
 
Motor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesMotor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student Notes
 
Roads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need RoadsRoads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need Roads
 
Share cyclisy motorist
Share cyclisy motoristShare cyclisy motorist
Share cyclisy motorist
 

More from Indonesia Infrastructure Initiative

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
Indonesia Infrastructure Initiative
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
Indonesia Infrastructure Initiative
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
Indonesia Infrastructure Initiative
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesia Infrastructure Initiative
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
Indonesia Infrastructure Initiative
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
Indonesia Infrastructure Initiative
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
Indonesia Infrastructure Initiative
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
Indonesia Infrastructure Initiative
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
Indonesia Infrastructure Initiative
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
Indonesia Infrastructure Initiative
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
Indonesia Infrastructure Initiative
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
Indonesia Infrastructure Initiative
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
Indonesia Infrastructure Initiative
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
Indonesia Infrastructure Initiative
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 me
Ws3 meWs3 me
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
Indonesia Infrastructure Initiative
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
Indonesia Infrastructure Initiative
 
Ws2 introduction
Ws2 introductionWs2 introduction
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
Indonesia Infrastructure Initiative
 

More from Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Recently uploaded

ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 

Recently uploaded (20)

ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 

20120118103352.phillip j inspection of banjarmasin road works on

  • 1. Banjarmasin “Road safety at road works” workshop 13-14 December 2011
  • 2.  Numerous signs  Generally clean and in good condition  Delineators (painted bamboo) used  Sincere efforts appear to have been made.
  • 3.  The four zones not used  Insufficient advanced warning  Some warnings not clear or specific  No speed restrictions  Concrete blocks holding the painted bamboo delineators  Inconsistent line marking  Many rocks and stones on edge of road  Workers not wearing reflective safety vests  Machinery on road but no warning
  • 4.
  • 5.  Long term road works.  Traffic passes through the work site, except at the end where there is a side track.  Is there a Traffic Management Plan for the road works?  Good advance warning at each end is essential.  Advance warning of each main work site is necessary.  Consistent regulatory speed limit is necessary – 40km/h  More consistent delineation – lines and cones.  Clearer messages on signs about what is ahead  All workers to wear safety vests.
  • 7. Stop sign not correct
  • 9. Workers sign too late and should be removed when no workers More conspicuous and forgiving
  • 12. Bagus
  • 13. Bagus
  • 14. Bagus
  • 15. Bagus
  • 16. Stop sign not correct. Worker sign should NOT be displayed as there are no workers.
  • 17. Should speed limit be 20 or 40km/h? Must be a regulatory sign
  • 18. Bagus
  • 19. Cones aid delineation. Edge line would help also
  • 20. Bagus
  • 21. Not a regulatory sign - do we want 20 or 40km/h
  • 22. Bagus
  • 23. Ha ha ha – you Australians! Bagus
  • 24. Sign is too late – already well within work zone
  • 26. Bagus
  • 27. No lines – night time?
  • 29. Centre line only.... but edge has deep drop off and is not consistent width
  • 30. Centre line only.... but edge has deep drop off and is not consistent width
  • 31. Edge line plus tired centre line.... but edge has deep drop off .
  • 32. Edge line plus tired centre line.... but 1 edge has deep drop off and is not 1 consistent width
  • 33. Edge line ends, so does centre line.... but 2 there is a curve ahead and drop off continues
  • 34. Edge line ends, so does centre line.... but 3 there is a curve ahead and drop off continues
  • 35. Edge line ends, so does centre line.... but 4 there is a curve ahead and drop off continues
  • 36. Edge line ends, so does centre line.... but 5 there is a curve ahead and drop off continues
  • 37. Edge line ends, so does centre line.... but 6 there is a curve ahead and drop off continues
  • 38. Edge line ends, so does centre line.... but 7 there is a curve ahead and drop off continues
  • 39. Edge line ends, so does centre line.... but 8 there is a curve ahead and drop off continues
  • 40. Centre line.... but no edge line and gravel on road. There is a surprise ahead!
  • 41. Surprise! No advance warning of machinery on road. Traffic must stop.
  • 42. Narrow, no speed reduction, dangerous roadside hazards, mud on road
  • 43. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 44. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 45. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 46. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 47.
  • 48. Flag men too close, no speed reduction, no advance warning of machinery. This is one way flow and should be managed that way!
  • 49. Narrow, dangerous roadside hazards, workers without safety vests
  • 50. The side track commences ahead, but there is nothing to inform road users of this. No delineation.
  • 51. This sign says “Sorry for disturbing your journey”. To me, this means the road works have finished! But no.....
  • 52. This sign says “Sorry for disturbing your journey”. To me, this means the road works have finished! But no.....
  • 53. The side track commences ahead, but this sign only mentions road work. No mention of what the driver/rider will have to do.
  • 54. The side track commences ahead, but this sign only mentions road work. No mention of what the driver/rider will have to do.
  • 55. The side track commences here, but there is nothing to clearly inform road users of this. Little delineation, rough muddy surface
  • 56. Are we happy with 15km/h for the side track? This sign needs washing.
  • 57. The side track commences here, but there is nothing to clearly inform road users of this. Little delineation, rough muddy surface
  • 58. The side track - no delineation, rough muddy surface
  • 59. This sign is OK but is too late – it needs to be before the side track.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66. No information of going from sealed to unsealed surface (a rough muddy surface).
  • 67. Too close to the work site. Is 15 km/h reasonable?
  • 68.
  • 69.
  • 70. No signs mention a side track. For a long term work site, should this track be sealed?
  • 71. The side track is muddy and slippery. No delineation. Night time?
  • 72. Poor sight distance to the access road. Pedestrians need assistance to cross.
  • 73. The side track has a rough muddy surface
  • 74. The side track has a rough muddy surface
  • 75.
  • 76. When I looked at this photo I saw a family travelling with their little girl. She has her Mickey Mouse bag. She could be an Indonesian girl or an Australian girl – and she deserves protection. She is at risk here! We must do better in road works
  • 77. When I looked at this photo I saw a family travelling with their little girl. She has her Mickey Mouse bag. She could be an Indonesian girl or an Australian girl – and she deserves protection. She is at risk here! We must do better in road works South Gippsland Highway, Victoria
  • 78.
  • 79. Large water pipe was to be placed under a rural highway Approx 8,000vpd, 100km/h speed limit A side track was decided Farm land was purchased – to be sold back to the farmer later Careful planning went into the entire task. I audited the work – twice! The side track was to last for less than one week (in fact it lasted 4 days) Cost $50,000AUD
  • 80.
  • 81.
  • 82. Existing highway Side track Hazardous pole
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 89.
  • 90.
  • 92.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99. This example is not to show that all road works in Australia are great and wonderful. Nor is it to expect Indonesia to spend $500,000 at each large road work site. But it does stress: - work sites are important - careful planning. - attention to safety - prevention rather than cure When the work was ended, the asphalt was recycled and reused. The land was sold back to the farmer.
  • 100.
  • 101.
  • 102. Roadside hazards. Fabricate away from road, lift into place immediately.
  • 103. Roadside hazards. Fabricate away from road, lift into place immediately.
  • 106.  Long term road works.  Traffic passes through the work site, except at the end where there is a side track.  Is there a Traffic Management Plan for the road works?  Good advance warning at each end is essential.  Advance warning of each main work site is necessary.  Consistent regulatory speed limit is necessary – 40km/h  More consistent delineation – lines and cones.  Clearer messages on signs about what is ahead  All workers to wear safety vests.
  • 107. Bagus
  • 108. Bagus
  • 109. Bagus
  • 110. Bagus