More Related Content
Similar to 2010 Highway Capacity Manual
Similar to 2010 Highway Capacity Manual (20)
More from Kittelson Slides
More from Kittelson Slides (20)
2010 Highway Capacity Manual
- 1. A Look Ahead to the 2010 HCM Mark Vandehey, PE February 4, 2010
- 13. Service Measures in the 2010 HCM System Element Service Measure Provided Chapter Auto Ped Bike Transit Freeway Facility 10 Basic Freeway Segment 11 Freeway Weaving Segment 12 Fwy. Merge/Diverge Seg. 13 Multilane Highway 14 Two-Lane Highway 15 Urban Street Facility 16 Urban Street Segment 17 Signalized Intersection 18 Two-Way Stop 19 All-Way Stop 20 Roundabout 21 Interchange Ramp Term. 22 Off-Street Ped-Bike Facility 23
- 15. Alternative Tool Example: Backup from Signal Mainline vehicles unable to reach the exit lanes Wasted time on the signal approach
- 24. Overall Organization of HCM 2010 Volume Target Audience Format % Total Printed Pages I: Concepts New analysts and decision makers Bound & PDF 20 II: Uninterrupted Flow Facilities Analysts Loose leaf & PDF 30 III: Interrupted flow Facilities Analysts Loose leaf & PDF 50 IV: Applications Guide and Supplemental Material Analysts, software engineers, and researchers Live/On-line N/A
- 32. Facility and Segments Directional Facility Segment Number 1 2 3 4 5 6 7 8 9 10 11 Segment Type B ONR B OFR B B or W B ONR R OFR B Segment Length (ft.) 5280 1500 2280 1500 5280 2640 5280 1140 360 1140 5280 No. Lanes 3 3 3 3 3 4 3 3 3 3 3
Editor's Notes
- A Look Ahead to the 2010 HCM Kittelson & Associates, Inc.
- A Look Ahead to the 2010 HCM Kittelson & Associates, Inc.
- A Look Ahead to the 2010 HCM Kittelson & Associates, Inc.
- 4 4