This document is a curriculum vitae for Sibusiso Jacob Sifundza. It outlines his education, qualifications, skills, and extensive work experience in civil engineering roles including as a technician, site agent, foreman, and project manager on infrastructure projects for municipalities and construction companies in South Africa and Swaziland. His experience includes designing, supervising, and managing road, stormwater, water, and sewer projects.
PWD is replacing sewer infrastructure along 3rd Street in Old City from Chestnut Street to Market Street. The sewer line being replaced was installed in the 1850’s and began to fail in October 2011. During initial repairs, further damage was discovered requiring additional work including the replacement of several sections. This project includes:
• Replacement of 1850s sewer on 3rd Street from Market Street to Elbow Lane
• Lining of existing sewer on 3rd Street from Elbow Lane to Chestnut Street
• Replacement or relocation of PGW and PECO infrastructure
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
The Little River Turnpike walkway pedestrian improvement project was completed on June 29, 2020. The project increases pedestrian safety from Columbia Rd. to Mayhunt Ct. with 2580 linear feet of 5-foot wide concrete sidewalk.
PWD is replacing sewer infrastructure along 3rd Street in Old City from Chestnut Street to Market Street. The sewer line being replaced was installed in the 1850’s and began to fail in October 2011. During initial repairs, further damage was discovered requiring additional work including the replacement of several sections. This project includes:
• Replacement of 1850s sewer on 3rd Street from Market Street to Elbow Lane
• Lining of existing sewer on 3rd Street from Elbow Lane to Chestnut Street
• Replacement or relocation of PGW and PECO infrastructure
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
The Little River Turnpike walkway pedestrian improvement project was completed on June 29, 2020. The project increases pedestrian safety from Columbia Rd. to Mayhunt Ct. with 2580 linear feet of 5-foot wide concrete sidewalk.
Gender capacity assessment and development in agricultural programsILRI
Presented by Annet A. Mulema (ILRI), Shiferaw Tafesse (ILRI) and Wole Kinanti (ICARDA) at the Training to Agricultural Transformation Agency (ATA), Addis Ababa, 15 October 2015
OilWear the monitoring system that allows to increase the reliability and performance in wind turbine gearboxes.
OilWear es el sistema de monitorización que le permitirá incrementar la fiabilidad y disponibilidad de las multiplicadoras en aplicaciones eólicas.
We are providing training on IEEE 2016-17 projects for Ph.D Scalars, M.Tech, B.E, MCA, BCA and Diploma students for
all branches for their academic projects.
For more details call us or watsapp us @ 7676768124 0r 9545252155
Email your base papers to "adritsolutions@gmail.co.in"
We are providing IEEE projects on
1) Cloud Computing, Data Mining, BigData Projects Using JAva
2) Image Processing and Video Procesing (MATLAB) , Signal Processing
3) NS2 (Wireless Sensor, MANET, VANET)
4) ANDRIOD APPS
5) JAVA, JEE, J2EE, J2ME
6) Mechanical Design projects
7) Embedded Systems and IoT Projects
8) VLSI- Verilog Projects (ModelSim and Xilinx using FPGA)
For More details Please Visit us at
Adrit Solutions
Near Maruthi Mandir
#42/5, 18th Cross, 21st Main
Vijaynagar
Bangalore.
Ehs 415-4- PUBLIC UTILITIES AND ENVIRONMENTAL HEALTH ISSUESOCI NIGERIA
SLIDES ON DRAINAGE SYSTEMS, FIRE SERVICES AND POWER SUPPLY. CLASS ASSESSMENTS ON THE CAUSES AND REMEDIAL ACTIONS TO DRAINAGE, FIRE AND POWER SUPPLY IN NIGERIA.
SOME NUGGETS BY EXXONMOBILE ON WORLD ENERGY.
GROUP WORKS...
Gender capacity assessment and development in agricultural programsILRI
Presented by Annet A. Mulema (ILRI), Shiferaw Tafesse (ILRI) and Wole Kinanti (ICARDA) at the Training to Agricultural Transformation Agency (ATA), Addis Ababa, 15 October 2015
OilWear the monitoring system that allows to increase the reliability and performance in wind turbine gearboxes.
OilWear es el sistema de monitorización que le permitirá incrementar la fiabilidad y disponibilidad de las multiplicadoras en aplicaciones eólicas.
We are providing training on IEEE 2016-17 projects for Ph.D Scalars, M.Tech, B.E, MCA, BCA and Diploma students for
all branches for their academic projects.
For more details call us or watsapp us @ 7676768124 0r 9545252155
Email your base papers to "adritsolutions@gmail.co.in"
We are providing IEEE projects on
1) Cloud Computing, Data Mining, BigData Projects Using JAva
2) Image Processing and Video Procesing (MATLAB) , Signal Processing
3) NS2 (Wireless Sensor, MANET, VANET)
4) ANDRIOD APPS
5) JAVA, JEE, J2EE, J2ME
6) Mechanical Design projects
7) Embedded Systems and IoT Projects
8) VLSI- Verilog Projects (ModelSim and Xilinx using FPGA)
For More details Please Visit us at
Adrit Solutions
Near Maruthi Mandir
#42/5, 18th Cross, 21st Main
Vijaynagar
Bangalore.
Ehs 415-4- PUBLIC UTILITIES AND ENVIRONMENTAL HEALTH ISSUESOCI NIGERIA
SLIDES ON DRAINAGE SYSTEMS, FIRE SERVICES AND POWER SUPPLY. CLASS ASSESSMENTS ON THE CAUSES AND REMEDIAL ACTIONS TO DRAINAGE, FIRE AND POWER SUPPLY IN NIGERIA.
SOME NUGGETS BY EXXONMOBILE ON WORLD ENERGY.
GROUP WORKS...
2. CURRICULUM VITAE (CV)
FIRST NAMES : SIBUSISO JACOB
SURNAME : SIFUNDZA
ID NO : 8612196100303
CELL NO : 079 126 7049
NEXT OF KEN : 072 631 7389 [WIFE]
NATIONALITY : SWAZI
SEX : MALE
DRIVERS LICENCE : CODE 08/ LIGHT DUTY
PROFESSION : CIVIL/STRUCTURAL/PIPE LAYING /FOREMAN/TECHNICIAN
EMAIL ADRESS : SSIFUNDZA099@GMAIL.COM
TERTIALLY EDUCATION
COURSE : NATIONAL DIPLOMA IN CIVIL ENGINEERING [ N6]
INSTITUTION : MAJUBA TECHNOLOGY CENTRE [NEWCASTLE]
COMPUTER LITERACY MS WORD, MS EXCELL, MS OFFICE, MS PROJECT
ATTENDING SAFETY MEETINGS
CONDUCTING TOOL BOX TALK MEETINGS
CONDUCTING INDUCTION TRAININGS
BEING PART OF A DESIGNING TEAM IN A 50M LONG RIVER CROSSING WITH A 200MM
PIPE SLEIVED AND GABIONS IN CONNECTION WITH PIPE PROTECTION
3. KEY EXPERIENCE
DESIGNING AND SUPERVISING THE CONSTRUCTION OF ROADS & STORMWATER
LAYOUTS AT HLATHIKHULU HOSPITAL WORKING AS FOREMAN UNDER NS
CONSTRUCTION IN SWAZILAND
CONCEPTUAL DESIGNING WATER AND SEWER RETICULATION WORKING AS A
FOREMAN AT HLATHIKHULU PROJECT UNDER NS CONSTRUCTION IN SWAZILAND
TEACHING BUILDING SCIENCE AT WESTWOOD COLLAGE [PART TIME] IN MBABANE
AND MANZINI SWAZILAND
WORKING AS QUANTITY SURVEYOR; COST ESTIMATION, MATERIAL ESTIMATION,
COST ESTIMATION FOR SUB CONTRACTORS AND PRICING A DOCUMENT WORKING
WITH NS CONSTRUCTION AND ALSO WITH BSA GROUP OF COMPANIES MBABANE
SWAZILAND
WORKING AS A STRUCTURAL ENGINEER; SITE CLEARANCE, EXCAVATION OF
TRENCHES,SETTING OUT AND LEVELLING USING A DUMPY LEVEL
WORKING AS A FOREMAN; 42 PEOPLE UNDER MY INSTRUCTION; 7 BRICKLAYERS,
2 STEEL FIXERS, 4 CAPENTERS, 2 PLUMBERS AND 27 LABOURES AND OLSO SUB
CONTRACTORS FOR PAINTING, TILE FIXING AND GLAZING
WRITING PROGRESS REPORT FOR EVERY WORK DONE ON SITE
ATTENDING SITE MEETINGS SCHEDULED BY THE ENGINEERS
ATTENDING SITE SEEING AND BRIEFING SCHEDULED BY THE CLIENT
WORKING AS SENIOR MAINTENANCE FOREMAN WHEN RENOVATING AND
MAINTAINING HLATHIKULU GOVERNMENT HOSPITAL
WORKING AS A SITE AGENT/MANAGER AT WOODLANDS PROJECT WHEN BUILDING
AN AGRICULTURE LAB
W0RKING AS A PROJECT MANAGER AT BSA GROUP OF COMPANIES RUNNING
THREE PROJECTS SIMALTANEOUSLY, BEING THE FOOTBALL ASSOSIATION OF
SWAZILAND OFFICES BOTH LOBAMBA AND MBABANE BRANCH AND OLSO THE
WOODLANDS PROJECT,MAINLY PAVING OF THE ENTRANCE PARKING, PAINTING
OF THE INTERNAL AND EXTERNAL WALL AS WELL AS PAINTING OF THE ROOF,
RENEWING OF ALL GUTTERS AND DAMAGED WALLS
DETAILING WALLS, COLUMNS, BASES, PIERS, BEAMS,RAMPS AND STAIRCASES
BEING THE FOREMAN, HERE AT HLATHIKHULU LEADING A 45 MILLION PROJECT
PREPARING GENERAL ARRANGEMENT [GA] OR A LAYOUT OF A STAIRCASE
REINFORCING AND PREPARING A BENDING SCHEDULE FOR A GIVEN STRUCTURE
TENDER EVALUATION, ADJUDICATION, CONTRACT DOCUMENTATION AND TENDER
DOCUMENTS
4. PREPARING INTERIM PAYMENT CERTIFICATE, AND MINUTES FOR MEETINGS
SUPERVISING THE BUILDING OF A 250KILOLITRE RESEVOIR AT THE [ZDM]
ZULULAND DISTRICT MUNICIPALITY [ULUNDI MAKHOSINI]
60KL RESEVOIR UNDER THE UPHONGOLO DISTRICT MUNICIPALITY
SUPPEVISING THE CONSTRACTION OF WATER RETICULATION PROJECT ABOUT 29
KM CONNECTION FROM THE RISING MAIN OF 200MM CONNECTION TO HOME TO
HOME CONNECTION, CONNECTION OF WATER METER AND AS WELL AS YARD
TAPS
HOLDING A POSITION OF A SENIOR TECHNICIAN, SUPERVISING JUNIOR
TECHNICIANS AND AS WELL AS GENERAL FOREMAN, PREPARING DAILY REPORTS
AND AS WELL AS WEEKLY REPORTS AND MONTLY PROGRESS REPORTS.
PIPE CONNECTION,HDPE PIPE 25MM,50MM,75MMAND 110MM LAYING ACCORDING
TO THE ENGINEERS SPECIFICATIONS ABOUT 7KM
PIPE CONNECTION UPVC PIPE 90MM, 110MM AND 200MM ABOUT 21KM
STEEL PIPE CONNECTION 200MM ABOUT 2500M
BUILDING OF SCOURS AND CHAMBERS AS WELL AS THE FITTINGS
BUILDING OF HEADWALLS ON ROADS CROSSING
CONNECTION OF AIR VALVES, ISOLATION VALVES AND SCOUR VALVES USUALLY
THE BERMARD AND THE VENTOMAT TYPE CLASS 16
SEWER WOKS EXTENSION AND SERVICING, BUILDING AND DESIGNING OF BUFFER
TANK SLAP AS WELL AS THE DRYING BEDS, WATER TREATMENT IN A BIOLOGICAL
WAY
SERVISING OF SLUDGE PONDS AS WELL AS SERVISING THE SLUDGE DRYING BEDS
SERVISING OF EXISTING ISOLATION VALVES 200MM AS WELL AS THE INLET FLOW
METER
UPGRADING OF ACCESS ROAD AND ASPHALTING IT 600M
UPGRADING OF ACCESS ROAD WITH A FINAL LAYER OF G5 APPROXIMATELY 1KM
CONNECTING OF A 250MM STRAINER INTO AN EXISTING PIPELINE
CONTROLLING AND MONITORING THE FLOW OF WASTE WATER FOR RECYCLING
COMING FROM THE WASTE PIPE 200MM THEN GOING THROUGH A SIEVE WHICH
HAS AN INLET FLOW METER, THEN GOES INTO THE REACTOR TANK,THEN
COLLECTED INTO THE BUFFER TANK THEN FLOWS INTO SLUDGE DRYING BEDS
FOR FURTHER PURIFICATION AND GOES INTO THE PONDS AND FINALY GOES OUT
A OUTLET FLOW METER THEN DISCHARGED INTO THE STREAM
I AM CURRENTLY WORKING AS A SITE AGENT FOR THREE PIPING
PROJECTS
WHICH ARE MTUBATUBA GRAVITY MAIN,ESIKHUMBENI RISING MAIN AND
ESHOWE SEWER WORKS
PRISING A 200M BRIDGE WORTH 21MILLION AT ETHEKWINI MUNICIPALITY
PRISING A WATER RETICULATION PROJECT WORTH 31 MILLION AT
UTHUNGULU
5. Current job description
Assistant site manager, in sewer reticulation
Building of three sewer pump stations
Construction of a sewer pipe line
MUNICIPALITIES I HAVE WORKED FOR
• CHIEF ALBERT LUTHULI [MPUMALANGA] ROAD PAVING
• ZULULAND DISTRICT MUNICIPALITY ZDM [WATER RETICULATION]
• UTHUNGULU DISTRICT MUNICIPALITY UDM [SEWER WORKS]
• UMHLATHUZE [PUMP STATIONS]
• UMKHANYA KUDE DISTRICT MUNICIPALITY [PIPE CONNECTION]
• ABAXULUSI DISTRICT MUNICIPALITY [TENDERING ON ROADS]
• UPHONGOLO DISTRICT MUNICIPALITY [RESEVOIRS]
• MBABANE TOWN COUNSEL
• HLATHIKHULU TOWNBOARD
COMPANIES I HAVE WORKED FOR
• NS CONSTRUCTION [MBABANE SWAZILAND] BUILDING FOREMAN
• BSA GROUP OF COMPANIES [MBABANE SWAZILAND] QUANTITY SURVEYOR
• GP GININDZA CONSTRUCTION AND TRANSPORT [MPUMALANGA
RSA] SENIOR PIPE LAYING FORMAN
• ITHWINI CONSTRUCTION AND PROJECTS [KWAZULU NATAL]
TECHNICIAN/SITE AGENT IN PIPING PROJECTS
• QAMBOTHI DEVELOPMENT [RICHARDS BAY]
• THAKGOGA PROJECTS [RICHARDS BAY/CENTURION]
REFERENCES
MR RYLAND ITHWINI CONSTRUCTION AND PROJECTS 072 621 2870
MR M NGOBESE DLV CONSULTING ENGINEERS 073 490 7720
MR S MATOLO NS CONSTRUCTION +268 7611 2393
6. MISS LOMANGISI BSA GROUP OF COMPANIES+268 76420 322
MR S MAGAGULA GP GININDZA CONSTRUCTION AND TRANSPORT 083 948 3072 MR
MKHIZE QAMBOTHI DEVELOPMENT