The document provides an overview of the TIHACM Line project including descriptions of the membrane weld equipment (MWE), laser weld equipment (LWE), and calibration equipment (CAL). The MWE welds membranes to housings and covers to housings. The LWE welds covers to calibration assemblies and performs electrical checks. The CAL equipment is used to calibrate sensors and includes a gas mixture system. Key milestones for the project include completing detailed designs by the end of 2005, installation qualification at Lux in January 2006, and operational qualification at IMS in February 2006.