SlideShare a Scribd company logo
1 of 1
Download to read offline
RIDGE BEAM
(0.15M X 0.15M)
EMBEDDED INTO PARTY
WALLS
16
PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO.
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
07
PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO.
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
SECTION CMEASURED DRAWINGS
1:50
KY;YH;TY
KY;YH;TY
NJ
1827/S/07
28.01.16
07.03.16
RWP 2
CORRUGATED ZINC SHEET
(2.50M X 0.90M)
TIMBER PURLINS
(0.2M x 0.2M) AT
0.30M C/C
EMBEDDED INTO
PARTY WALLS
TIMBER FLOOR
JOIST 1 (TFJ1)
(0.14M X 0.14M)
CONCRETE PURLINS
(0.18M X 0.18M) OF
0.41M C/C
EMBEDDED INTO
PARTY WALLS
MERANTI TIMBER
STRIP CEILING
(0.03M THK)
1 2 3 4
SECTION C
0.00M
+
+
4.80M
0.34M
-
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
KING STREET LEVEL+
11.93M
5.17 3.86 1.72
TOP OF PARTY WALL
RIDGE LEVEL+
12.21M+
FINISHED CEILING LEVEL+ 8.84M
+ 3.13M ASBESTOS BOARD CEILING LEVEL
KING STREET
( 0.00M)+-
•
•
•
•
•
GREEN SQUARE
(FFL +0.20M)
•
8NOS. WHITE
COLOURED
GLAZED TILES
(0.15M X 0.15M)
KEY PLAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
UP
OBSTRUCTED
(NOTMEASURED)
RWP
DRAIN
WC1
UP
N
S/S HALF ROUND GUTTER
(0.20DIA.) FIXED WITH S/S
BRACKET (HRG)
•
NORTH POINT
C
C
3.23 3.44 5.40
DEBONDED LIME
PLASTER, BRICKS
EXPOSED
D2D4
D9 D7D10
T&G
(0.03M x 3.5M x 0.2M) (FFL +4.80M)
ROOM 1CORRIDOR, (KORIDOR)
TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G)
(0.03M x 3.5M x 0.2M) (FFL +4.80M)
KITCHEN 2
HALL 1 (RUANG TAMU)
KITCHEN 1
CEMENT-SAND SCREED WITH
CONCRETE TOPPING
(FFL +0.41M)
RETRACTABLE
ROOF
(REF. SHEET 12)
•
ELECTRICAL WIRE
ELECTRICAL SWITCH •
•
•
ROOF VOID
ROOF VOID
TIMBER FLOOR JOISTS
(0.09M X 0.14M) AT 0.42M C/C
TFJ 2 (0.12M X 0.20M) TFJ 3
(0.13M X 0.13M)
•
•
•
NO.44, KING STREET,
10200 GEORGE TOWN,
PENANG, MALAYSIA.
LIME PLASTER
CORNICE
VOID (INACCESSIBLE)
D3
•
WOODEN RAFTER
(0.15M X 0.10M) AT
0.45M C/C
•
S/S HALF ROUND GUTTER
(0.20M DIA.) FIXED WITH S/S
BRACKET (HRG)
AIRWELL (CHIM CHAE) BLOCKED BY
CORRUGATED
ZINC SHEET
TERRACOTTA TILES WITH LIME MORTAR JOINT
(0.40M X 0.40M) (FFL +0.44M)
TIMBER BATTENS
(0.05M X 0.05M) AT 0.55M C/C
NOTE: ALL DIMENSIONS ARE IN METERS (M)
S/S K-STYLE
PARAPET
GUTTER
(0.15M X 0.13M)
LIME PLASTER CORNICE
CEMENT-SAND SCREED WITH
CONCRETE TOPPING (FFL +4.69M)
•
0.13
0.13
WROUGHT IRON
I-BEAM
(0.14M X 0.09M)
•
VOID (INACCESSIBLE)
W2
0.10
RIDGE BEAM
(0.20M X 0.20M)
EMBEDDED INTO PARTY
WALLS
HALL 2, TIAH GELAP
ANGLED TERRACOTTA
RIDGE TILES SEALED WITH
CEMENT GROUTING
DECORATIVE
OPENING
(0.66M DIA.)
TIMBER PURLINS
(0.30M x 0.30M) AT
0.30M C/C
EMBEDDED INTO
PARTY WALLS
•
ANNEX
BRICK PARAPET WALL
LINED WITH CEMENT
PLASTER (0.90M HIGH)
S/S HRG
(0.20DIA.)
BRICK COLUMN LINED
WITH LIME PLASTER
(0.48M X 0.48M)
TIMBER BATTENS
(0.16M X 0.08M) AT
0.60M C/C
TIMBER RAFTERS
(0.15M X 0.05M)
AT 0.45M C/C
TIMBER LATTICE SCREEN
FOR VENTILATION
S/S HRG (0.20DIA.)
S/S HRG
(0.20DIA.)
TIMBER BATTENS
(0.10M X 0.10M) AT
0.50M C/C
TIMBER CEILING JOISTS
EMBEDDED INTO PARTY
WALLS (0.23M X 0.23M) AT
0.75M C/C
CORRUGATED ZINC SHEET
(2.50M X 0.90M)
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
••
SUSPENDED FALSE CEILING, ASBESTOS
BOARD WITH TIMBER BEADING
(0.03M X 1.21M X 1.21M)
•
CARPETED
(FLOOR CONDITION UNKNOWN) (FFL +0.34M)
3.87
•
TIMBER
U-SHAPED
STAIRCASE.
(REF SHEET 11)
•
• • •
FIVE FOOT WAY
(KAKI LIMA)
CEMENT-SAND SCREED
WITH CONCRETE
TOPPING (FFL +0.21M)

More Related Content

Similar to 07 seca1

tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdfKSLDESIGN
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 
civil engineering possible interview questions
civil engineering possible interview questionscivil engineering possible interview questions
civil engineering possible interview questionsDHAVASHANKARAN D
 
many projects shoring
many projects shoringmany projects shoring
many projects shoringSamir Salman
 

Similar to 07 seca1 (8)

tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdf
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Thong so hilti
Thong so hiltiThong so hilti
Thong so hilti
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 
civil engineering possible interview questions
civil engineering possible interview questionscivil engineering possible interview questions
civil engineering possible interview questions
 
many projects shoring
many projects shoringmany projects shoring
many projects shoring
 

More from ChengWei Chia

Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission finalChengWei Chia
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017ChengWei Chia
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's universityChengWei Chia
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...ChengWei Chia
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)ChengWei Chia
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)ChengWei Chia
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseChengWei Chia
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_houseChengWei Chia
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseChengWei Chia
 

More from ChengWei Chia (20)

Project 2 report
Project 2 reportProject 2 report
Project 2 report
 
Studio report a3
Studio report a3Studio report a3
Studio report a3
 
Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission final
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Introduction
IntroductionIntroduction
Introduction
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017
 
Btech IBS
Btech IBSBtech IBS
Btech IBS
 
Project 2
Project 2Project 2
Project 2
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's university
 
Log sheets
Log sheetsLog sheets
Log sheets
 
Internship report
Internship reportInternship report
Internship report
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_house
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_house
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_house
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Recently uploaded (20)

Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

07 seca1

  • 1. RIDGE BEAM (0.15M X 0.15M) EMBEDDED INTO PARTY WALLS 16 PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO. STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY 07 PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO. STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY SECTION CMEASURED DRAWINGS 1:50 KY;YH;TY KY;YH;TY NJ 1827/S/07 28.01.16 07.03.16 RWP 2 CORRUGATED ZINC SHEET (2.50M X 0.90M) TIMBER PURLINS (0.2M x 0.2M) AT 0.30M C/C EMBEDDED INTO PARTY WALLS TIMBER FLOOR JOIST 1 (TFJ1) (0.14M X 0.14M) CONCRETE PURLINS (0.18M X 0.18M) OF 0.41M C/C EMBEDDED INTO PARTY WALLS MERANTI TIMBER STRIP CEILING (0.03M THK) 1 2 3 4 SECTION C 0.00M + + 4.80M 0.34M - FIRST FLOOR LEVEL GROUND FLOOR LEVEL KING STREET LEVEL+ 11.93M 5.17 3.86 1.72 TOP OF PARTY WALL RIDGE LEVEL+ 12.21M+ FINISHED CEILING LEVEL+ 8.84M + 3.13M ASBESTOS BOARD CEILING LEVEL KING STREET ( 0.00M)+- • • • • • GREEN SQUARE (FFL +0.20M) • 8NOS. WHITE COLOURED GLAZED TILES (0.15M X 0.15M) KEY PLAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 UP OBSTRUCTED (NOTMEASURED) RWP DRAIN WC1 UP N S/S HALF ROUND GUTTER (0.20DIA.) FIXED WITH S/S BRACKET (HRG) • NORTH POINT C C 3.23 3.44 5.40 DEBONDED LIME PLASTER, BRICKS EXPOSED D2D4 D9 D7D10 T&G (0.03M x 3.5M x 0.2M) (FFL +4.80M) ROOM 1CORRIDOR, (KORIDOR) TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G) (0.03M x 3.5M x 0.2M) (FFL +4.80M) KITCHEN 2 HALL 1 (RUANG TAMU) KITCHEN 1 CEMENT-SAND SCREED WITH CONCRETE TOPPING (FFL +0.41M) RETRACTABLE ROOF (REF. SHEET 12) • ELECTRICAL WIRE ELECTRICAL SWITCH • • • ROOF VOID ROOF VOID TIMBER FLOOR JOISTS (0.09M X 0.14M) AT 0.42M C/C TFJ 2 (0.12M X 0.20M) TFJ 3 (0.13M X 0.13M) • • • NO.44, KING STREET, 10200 GEORGE TOWN, PENANG, MALAYSIA. LIME PLASTER CORNICE VOID (INACCESSIBLE) D3 • WOODEN RAFTER (0.15M X 0.10M) AT 0.45M C/C • S/S HALF ROUND GUTTER (0.20M DIA.) FIXED WITH S/S BRACKET (HRG) AIRWELL (CHIM CHAE) BLOCKED BY CORRUGATED ZINC SHEET TERRACOTTA TILES WITH LIME MORTAR JOINT (0.40M X 0.40M) (FFL +0.44M) TIMBER BATTENS (0.05M X 0.05M) AT 0.55M C/C NOTE: ALL DIMENSIONS ARE IN METERS (M) S/S K-STYLE PARAPET GUTTER (0.15M X 0.13M) LIME PLASTER CORNICE CEMENT-SAND SCREED WITH CONCRETE TOPPING (FFL +4.69M) • 0.13 0.13 WROUGHT IRON I-BEAM (0.14M X 0.09M) • VOID (INACCESSIBLE) W2 0.10 RIDGE BEAM (0.20M X 0.20M) EMBEDDED INTO PARTY WALLS HALL 2, TIAH GELAP ANGLED TERRACOTTA RIDGE TILES SEALED WITH CEMENT GROUTING DECORATIVE OPENING (0.66M DIA.) TIMBER PURLINS (0.30M x 0.30M) AT 0.30M C/C EMBEDDED INTO PARTY WALLS • ANNEX BRICK PARAPET WALL LINED WITH CEMENT PLASTER (0.90M HIGH) S/S HRG (0.20DIA.) BRICK COLUMN LINED WITH LIME PLASTER (0.48M X 0.48M) TIMBER BATTENS (0.16M X 0.08M) AT 0.60M C/C TIMBER RAFTERS (0.15M X 0.05M) AT 0.45M C/C TIMBER LATTICE SCREEN FOR VENTILATION S/S HRG (0.20DIA.) S/S HRG (0.20DIA.) TIMBER BATTENS (0.10M X 0.10M) AT 0.50M C/C TIMBER CEILING JOISTS EMBEDDED INTO PARTY WALLS (0.23M X 0.23M) AT 0.75M C/C CORRUGATED ZINC SHEET (2.50M X 0.90M) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• SUSPENDED FALSE CEILING, ASBESTOS BOARD WITH TIMBER BEADING (0.03M X 1.21M X 1.21M) • CARPETED (FLOOR CONDITION UNKNOWN) (FFL +0.34M) 3.87 • TIMBER U-SHAPED STAIRCASE. (REF SHEET 11) • • • • FIVE FOOT WAY (KAKI LIMA) CEMENT-SAND SCREED WITH CONCRETE TOPPING (FFL +0.21M)