SlideShare a Scribd company logo
1 of 1
Download to read offline
6
10
11
16
22
LINE OF
CANTILEVERED ROOM
ABOVE
GRANITE SLAB (GS)
GS
REF.
SHEET 06
REF.
SHEET 07
2
1
3
4
7
5
9
8
13
12
15
14
17
18
19
20
21
23
UP
AIRWELL (CHIM CHAE)
(3.82M X 2.82M)
OBSTRUCTED
(NOT MEASURED)
ANNEX
(3.54M X 4.90M)
(FFL +0.39M)
BATHROOM 1
STORE
ROOM
(0.90M X
2.50M)
GS
GSGS
GS
SLOPE 2°
WOODEN
PLANK
LINE OF
MONO-PITCHED
ROOF ABOVE
RWP 2
LINE OF
DRAIN
UNDER
UP
DRAIN
DRAIN
DRAIN
FIVE FOOT WAY
(KAKI LIMA)
(FFL +0.21M)
B
C
D
E
HALL 1 (RUANG TAMU)
(4.80M X 4.81M)
(FFL +0.34M)
HALL 2, TIAH GELAP
(5.10M X 4.90M)
(FFL +0.44M)
KITCHEN 1
(2.79 X 4.90M)
(FFL +0.41M)
CARPETED
(FLOOR CONDITION UNKNOWN)
TERRACOTTA TILES (0.4M X 0.4M)
WITH LIME MORTAR JOINT
W1
W2
D1
D3
D6
D2
W3
D5
D4
421 3
TIMBER
PANEL
PARTITION
WASHING
AREA
TO SEPTIC TANK
REF.
SHEET
08
GREEN SQUARE
(FFL +0.20M)
E
BOARDED UP
REF.
SHEET
08
REF.
SHEET
08
REF.
SHEET
08
D
ROLLER SHUTTER
(NOT MEASURED)
.
GROUND FLOOR PLAN
.
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
.
STOVE
NICHE 2
(1.26M X 0.15M X 0.66M)
RWP 3
BASIN
LINE OF CUPBOARD
ABOVE
NICHE 1
(0.46M X 0.15MX 0.46M)
FIRST FLOOR PLAN
WC 2
T&G
(0.03M x 3.50M x 0.20M)
KITCHEN 2
(3.22M X 2.19M)
(FFL +4.69)
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
SHADOW LINE OF EARLIER
TIMBER PARTITION WALL.
NOW REMOVED.
OBSTRUCTED
(NOTMEASURED)
AIR WELL (CHIM CHAE)
(3.82M X 2.82M)
(FFL +0.44M)
WITH RETRACTABLE ROOF
(REF. SHEET 12)
21
13
14
15
16
17
18
19
20
22
23
UP
LINE OF ROOF
HATCH ABOVE
ROOM 1
(3.69M X 4.98M)
(FFL +4.80M)
ROOM 2
(7.09M X 2.00M)
ROOM 5
(2.25M X 4.09M)
(FFL +4.68M)
CORRIDOR (KORIDOR)
(16.22M X 2.90M)
(FFL +4.80M)
ROOM 3
(2.48M X 3.58M)
ROOM 4
(2.49M X 3.58M)
W4
W5
W6
D9
D11
W15
W16
W18
W19
W20
D6
D7
D8
D10D12
W7W8W21
W9
W10W11W12W13
W14
W22
2 31
A
4
TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G)
(0.03M x 3.50M x 0.20M)
TIMBER FRAME
W17
C
B
REF.
SHEET 07
REF.
SHEET 08
BRICK STEP WITH
CONCRETE TOPPING
REF.
SHEET 07
. .
REF.
SHEET
08
D
E
E
REF.
SHEET
08
REF.
SHEET
08
REF.
SHEET
08
D
REF.
SHEET 06
B
C
C
B
REF.
SHEET 07
REF.
SHEET 06
• •
•
•
•
•
•
•
•
NICHE 3
(0.12M X 0.37M X 0.33M)
•
CONCRETE
BLOCK UNDER
TIMBER PANEL
TIMBER STUD WALL
(ASSUMED), LINED WITH
PLYWOOD
•
T&G
(0.03M x 3.50M x 0.20M)
T&G
(0.03M x 3.50M x 0.20M)
(FFL +4.80M)
•
T&G
(0.03M x 3.50M x 0.20M)
LINE OF ROOF
HATCH ABOVE
•
RWP 2
PROJECT TITLE
02
16
DRAWING TITLE
07.03.16
DRAWN BY
SCALE
SHEET NO.
DATE
CHECKED BY
1827/FP/02
JW;EL;AK
DRAWING NO.
JW;EL;AK
28.01.16
MEASURED BY
STARTING DATE
GROUND FLOOR PLAN
FIRST FLOOR PLAN 1:50
NJ
MEASURED DRAWINGS
NO. 44, KING STREET,
10200 GEORGE TOWN,
PENANG, MALAYSIA.
NORTH POINT
N
• PARKING
SIGNAGE,
BOTTOM FIXED
TO THE ROAD
GRANITE STEPS
LOCKED
CORRUGATED ZINC SHEET ROOFING
(CZS)
T&G
(0.03M x 3.50M x 0.20M)
(FFL +4.80M)
T&G
(0.03M x 3.50M x 0.20M)
•
CORRUGATED ZINC SHEET
MONO-PITCHED ROOF
-
.
LINE OF WALL BELOW
•
DRAIN
UP
0.87 0.90
DRAIN
DRAIN
DRAIN
42, KING STREET
KING STREET
( 0.00M)
SIDE ALLEY (LORONG)
(FFL +0.01)
TIMBER PANEL
PARTITION
CORRIDOR (KORIDOR)
(7.47M X 2.02M)
DECORATIVE
OPENING
(0.66M DIA.)
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
•
TIMBER PANEL
PARTITION
WC 1
•
TIMBER PANEL
PARTITION
•
BRICK WATER TANK
LINED WITH CEMENT
PLASTER, GLAZED
CLAY TILES FIXED
AT BASE
•
BRICK PARAPET WALL
LINED WITH CEMENT
PLASTER
(0.90M HIGH)
6.67 20.12
RWP 1
RWP 1
7.715.06 5.10 2.25
B
OIL PAINT YELLOW
COLOURED FIRE
HYDRANT
•
•
FITTINGS OF
ORIGINAL DOOR
•
•
6.67
B
DC
DC
NOTE: ALL DIMENSIONS ARE IN METERS (M)
+
.
BLOCKED BY
CORRUGATED
METAL SHEET
•
LOCKED
3.71
•
TO SEPTIC TANK
•
1.13
• TIMBER PANEL
PARTITION
•
DFB
DAMAGED FLOOR
BOARD (DFB)
DFB
DFB
DFB
DFB
GRANITEEDGEBLOCK
TERRACOTTA TILES WITH LIME MORTAR JOINT
(0.40M X 0.40M)
•
SLOPE 2°
DC
•
RWP 3
DRAIN
0.27
0.37
0.27
•
•
LINE OF ROLLER
CASING ABOVE
A
5.16
DFB
5.16
DFB
DC
DC
DFB
0.37
• LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
•
• LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
•
LINE OF METAL
ROOF ABOVE
.
CEMENT-SAND SCREED
WITH CONCRETE
TOPPING
TIMBER U-SHAPED
STAIRCASE
(REF. SHEET 11)
GS DRAIN
COVER
•
•
DAMAGED
CZS (DC)
FFL +1.61M
•
•
•
•
•
•
•
•
•
• •
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
TIMBER U-SHAPED
STAIRCASE
(REF. SHEET 11)

More Related Content

Viewers also liked

Letter of recommendation_Mads Pedersen
Letter of recommendation_Mads PedersenLetter of recommendation_Mads Pedersen
Letter of recommendation_Mads PedersenMads Pedersen
 
Newton divided difference interpolation
Newton divided difference interpolationNewton divided difference interpolation
Newton divided difference interpolationVISHAL DONGA
 

Viewers also liked (6)

Letter of recommendation_Mads Pedersen
Letter of recommendation_Mads PedersenLetter of recommendation_Mads Pedersen
Letter of recommendation_Mads Pedersen
 
CARTE-2011_Agenda
CARTE-2011_AgendaCARTE-2011_Agenda
CARTE-2011_Agenda
 
Bionic gold
Bionic goldBionic gold
Bionic gold
 
глаз о.м.
глаз о.м.глаз о.м.
глаз о.м.
 
Newton divided difference interpolation
Newton divided difference interpolationNewton divided difference interpolation
Newton divided difference interpolation
 
Zafar
ZafarZafar
Zafar
 

More from ChengWei Chia

Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission finalChengWei Chia
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017ChengWei Chia
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's universityChengWei Chia
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...ChengWei Chia
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)ChengWei Chia
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)ChengWei Chia
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseChengWei Chia
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_houseChengWei Chia
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseChengWei Chia
 

More from ChengWei Chia (20)

Project 2 report
Project 2 reportProject 2 report
Project 2 report
 
Studio report a3
Studio report a3Studio report a3
Studio report a3
 
Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission final
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Introduction
IntroductionIntroduction
Introduction
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017
 
Btech IBS
Btech IBSBtech IBS
Btech IBS
 
Project 2
Project 2Project 2
Project 2
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's university
 
Log sheets
Log sheetsLog sheets
Log sheets
 
Internship report
Internship reportInternship report
Internship report
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_house
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_house
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_house
 

Recently uploaded

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

02 plana1

  • 1. 6 10 11 16 22 LINE OF CANTILEVERED ROOM ABOVE GRANITE SLAB (GS) GS REF. SHEET 06 REF. SHEET 07 2 1 3 4 7 5 9 8 13 12 15 14 17 18 19 20 21 23 UP AIRWELL (CHIM CHAE) (3.82M X 2.82M) OBSTRUCTED (NOT MEASURED) ANNEX (3.54M X 4.90M) (FFL +0.39M) BATHROOM 1 STORE ROOM (0.90M X 2.50M) GS GSGS GS SLOPE 2° WOODEN PLANK LINE OF MONO-PITCHED ROOF ABOVE RWP 2 LINE OF DRAIN UNDER UP DRAIN DRAIN DRAIN FIVE FOOT WAY (KAKI LIMA) (FFL +0.21M) B C D E HALL 1 (RUANG TAMU) (4.80M X 4.81M) (FFL +0.34M) HALL 2, TIAH GELAP (5.10M X 4.90M) (FFL +0.44M) KITCHEN 1 (2.79 X 4.90M) (FFL +0.41M) CARPETED (FLOOR CONDITION UNKNOWN) TERRACOTTA TILES (0.4M X 0.4M) WITH LIME MORTAR JOINT W1 W2 D1 D3 D6 D2 W3 D5 D4 421 3 TIMBER PANEL PARTITION WASHING AREA TO SEPTIC TANK REF. SHEET 08 GREEN SQUARE (FFL +0.20M) E BOARDED UP REF. SHEET 08 REF. SHEET 08 REF. SHEET 08 D ROLLER SHUTTER (NOT MEASURED) . GROUND FLOOR PLAN . CEMENT-SAND SCREED WITH CONCRETE TOPPING CEMENT-SAND SCREED WITH CONCRETE TOPPING . STOVE NICHE 2 (1.26M X 0.15M X 0.66M) RWP 3 BASIN LINE OF CUPBOARD ABOVE NICHE 1 (0.46M X 0.15MX 0.46M) FIRST FLOOR PLAN WC 2 T&G (0.03M x 3.50M x 0.20M) KITCHEN 2 (3.22M X 2.19M) (FFL +4.69) CEMENT-SAND SCREED WITH CONCRETE TOPPING SHADOW LINE OF EARLIER TIMBER PARTITION WALL. NOW REMOVED. OBSTRUCTED (NOTMEASURED) AIR WELL (CHIM CHAE) (3.82M X 2.82M) (FFL +0.44M) WITH RETRACTABLE ROOF (REF. SHEET 12) 21 13 14 15 16 17 18 19 20 22 23 UP LINE OF ROOF HATCH ABOVE ROOM 1 (3.69M X 4.98M) (FFL +4.80M) ROOM 2 (7.09M X 2.00M) ROOM 5 (2.25M X 4.09M) (FFL +4.68M) CORRIDOR (KORIDOR) (16.22M X 2.90M) (FFL +4.80M) ROOM 3 (2.48M X 3.58M) ROOM 4 (2.49M X 3.58M) W4 W5 W6 D9 D11 W15 W16 W18 W19 W20 D6 D7 D8 D10D12 W7W8W21 W9 W10W11W12W13 W14 W22 2 31 A 4 TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G) (0.03M x 3.50M x 0.20M) TIMBER FRAME W17 C B REF. SHEET 07 REF. SHEET 08 BRICK STEP WITH CONCRETE TOPPING REF. SHEET 07 . . REF. SHEET 08 D E E REF. SHEET 08 REF. SHEET 08 REF. SHEET 08 D REF. SHEET 06 B C C B REF. SHEET 07 REF. SHEET 06 • • • • • • • • • NICHE 3 (0.12M X 0.37M X 0.33M) • CONCRETE BLOCK UNDER TIMBER PANEL TIMBER STUD WALL (ASSUMED), LINED WITH PLYWOOD • T&G (0.03M x 3.50M x 0.20M) T&G (0.03M x 3.50M x 0.20M) (FFL +4.80M) • T&G (0.03M x 3.50M x 0.20M) LINE OF ROOF HATCH ABOVE • RWP 2 PROJECT TITLE 02 16 DRAWING TITLE 07.03.16 DRAWN BY SCALE SHEET NO. DATE CHECKED BY 1827/FP/02 JW;EL;AK DRAWING NO. JW;EL;AK 28.01.16 MEASURED BY STARTING DATE GROUND FLOOR PLAN FIRST FLOOR PLAN 1:50 NJ MEASURED DRAWINGS NO. 44, KING STREET, 10200 GEORGE TOWN, PENANG, MALAYSIA. NORTH POINT N • PARKING SIGNAGE, BOTTOM FIXED TO THE ROAD GRANITE STEPS LOCKED CORRUGATED ZINC SHEET ROOFING (CZS) T&G (0.03M x 3.50M x 0.20M) (FFL +4.80M) T&G (0.03M x 3.50M x 0.20M) • CORRUGATED ZINC SHEET MONO-PITCHED ROOF - . LINE OF WALL BELOW • DRAIN UP 0.87 0.90 DRAIN DRAIN DRAIN 42, KING STREET KING STREET ( 0.00M) SIDE ALLEY (LORONG) (FFL +0.01) TIMBER PANEL PARTITION CORRIDOR (KORIDOR) (7.47M X 2.02M) DECORATIVE OPENING (0.66M DIA.) CEMENT-SAND SCREED WITH CONCRETE TOPPING • TIMBER PANEL PARTITION WC 1 • TIMBER PANEL PARTITION • BRICK WATER TANK LINED WITH CEMENT PLASTER, GLAZED CLAY TILES FIXED AT BASE • BRICK PARAPET WALL LINED WITH CEMENT PLASTER (0.90M HIGH) 6.67 20.12 RWP 1 RWP 1 7.715.06 5.10 2.25 B OIL PAINT YELLOW COLOURED FIRE HYDRANT • • FITTINGS OF ORIGINAL DOOR • • 6.67 B DC DC NOTE: ALL DIMENSIONS ARE IN METERS (M) + . BLOCKED BY CORRUGATED METAL SHEET • LOCKED 3.71 • TO SEPTIC TANK • 1.13 • TIMBER PANEL PARTITION • DFB DAMAGED FLOOR BOARD (DFB) DFB DFB DFB DFB GRANITEEDGEBLOCK TERRACOTTA TILES WITH LIME MORTAR JOINT (0.40M X 0.40M) • SLOPE 2° DC • RWP 3 DRAIN 0.27 0.37 0.27 • • LINE OF ROLLER CASING ABOVE A 5.16 DFB 5.16 DFB DC DC DFB 0.37 • LINE OF ASBESTOS ROOF ABOVE (REF. SHEET 03) LINE OF ASBESTOS ROOF ABOVE (REF. SHEET 03) • • LINE OF ASBESTOS ROOF ABOVE (REF. SHEET 03) • LINE OF METAL ROOF ABOVE . CEMENT-SAND SCREED WITH CONCRETE TOPPING TIMBER U-SHAPED STAIRCASE (REF. SHEET 11) GS DRAIN COVER • • DAMAGED CZS (DC) FFL +1.61M • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • TIMBER U-SHAPED STAIRCASE (REF. SHEET 11)