2. Senior engineer / project manager
Site engineer
Contractor
Mistri
Mason / labour
Authorities on a construction site
3. Compressive strength of bricks:
First class brick -105 kg/cm2
Second class brick – 70 kg/ cm2
Fire brick – 125 kg/cm2
Water absorption bricks – 16 % to 20 %.
Weight of brick 3.5 to 5 kg.
Standard brick size – 190 x 90 x 90 mm
BRICKS
4. Volume (L x W x H) = 1 meter cube.
Mortar thickness = 8 mm.
Mortar Ratio = 1:4
Size of brick = 190 mm ×90 mm ×90 mm. or (0.19 m x 0.09 m x 0.09 m).
Size of brick with mortar = 198 mm × 98 mm× 98 mm. or (0.198 m x 0.098
m x 0.098 m).
BRICKS = 526
CEMENT = 1.5 bags.
SAND = 7.1 cubic feet.
Note: These ratios may change by changing the dimension of the mortar
thickness or size of the bricks as well as the mortar ratios 1: 4, 1: 6 etc.
BRICKS
5. 4.5 inch wall thickness = 531 bricks
9 inch wall thickness = 1062 bricks
13.3 inch wall thickness = 1593 bricks
6. Slope – 25 to 40 as per IS 456-2000.
No.of.steps : 15 steps max.
tread – 300mm, rise -150 mm
Volume of cement bag - 0.0347 m3 = 50/1440
volume(eg: 1:1.5:3 = 5.5 = 1/5.5 *1.57 = 0.285 m3
standard sand now used in India is obtained from – Ennore
(chennai).
Stair case
7. Concrete details:
Workability –slump cone test
Hardened concrete test – compressive test
M20 – M- mix, 20 char. compressive strength of concrete in
28 days i.e., 20N/mm2
Unit weight of concrete
PCC- 24 kN/m3
RCC – 25 kN/m3
Minimum Grade of concrete used for RCC – M20.
8. Unit weight of steel – 78.5 kN/m3
Minimum reinforcement for circular : 6 no’s
Minimum reinforcement for Square : 4 no’s
Calculation of weight of steel bar- D2/162
Function of stirrups in beam – resist SF.
Steel
9. Types :
OPC -33,43,53
PPC - 43
Setting time:
Initial settling time of cement – 30 min(OPC)
Final setting time -10 hrs (OPC)
Initial settling time of cement – 10 min(PPC)
Final setting time – 90 min (PPC)
cement
11. Pile foundation – SBC less than 24 kN/m3
Standard height of each floor – 3 m
Multi storey – 15 m
Full form of 1 BHK – BED ROOM , HALL , KITCHEN.
Thickness of plaster – 12 mm
Mortar b/w the bricks 12 mm
Slab thickness -150 to 200 mm
12. Door size – 3.75 ft *7 ft
Window size – 3,5 ft * 3.5 ft
Ventilation normal – 2 ft * 2 ft
Sill level – 3 ft
Lintel level – 7 ft
Roof level – 10 ft to 11 ft (residential building)
Parapet wall – 3m high above the roof.
13. Shuttering removal timing:
Side of wall, column and outer side of beam – 24hrs to
48 hrs.
Beam soffits – 7 days
Shuttering
14. Maximum spacing b/w the bars in beam – 25 mm.
Least cover
Footing – 50 mm
Column – 40mm
Beam – 25 mm
Slab – 20 mm
cover
15. Vertical member
Support structural load
Finally to the ground through footings.
M 10 – 1:3:6
M15 – 1:2:4 NOMINAL MIX
M20 – 1:1.5:3
M25 – 1:1:2
column
16. TMT BARS – THERMO MECHANICALLY TREATED
BARS.
High Strength And High Corrosion Resistance.
FIELD TEST OF CEMENT:
Colour
Feel Smooth When Rubbish With Hands