What You Will Learn?
• Benefits and drawbacks between ceiling and raised floor to run
power, data connection and cooling system
• Detailed overview of components involved in both options
• Common problems associated with both options
Options
• Overhead installation
- Use of false ceiling in which cabling, electrical conduits are
routed
- Termination are done above the servers rows
• Under-Floor installation
- Flat panels are placed in an elevated grid of horizontal and
vertical bars, electrical conduits, cabling and cooling system
are routed under this raised floor.
- Termination are done in a subfloor or into patch panel and
power receptacles within the DC cabinets
Overhead Installation
• Advantages
– Less expensive (Cable try ladder racks and raceways are less expensive
than a complete raised floor system)
– More suitable for limited spaces
– Requires less floor spaces (no entrance ramp)
– Reduce chances to snagging or damaging data cables
• Disadvantages
– Challenges for air circulation within the DC and servers cooling system
– Unplugged power cable or patch cord due to gravity and cord weight
Under-Floor Installation
• Advantages
– Better cooling capabilities
– Protecting infrastructure (patch cords, power cables) against
accidental damage or unplugs
– Easier to support and access infrastructure
• Disadvantages
– More expensive
• Most Data Centers are built with a raised floor
system.
Deciding on whether to go with overhead Or Under Floor installation depends
on:
The needs for the data center
The size of the data center
• If the Data Center is small— In round numbers, generally less than 1000
square feet (100 square meters)—or is being constructed in a building that
has limited space from floor to ceiling, I design it with overhead
infrastructure. The ramp needed for a raised floor and the height it
occupies simply take up too much space in such a small room.
• If the Data Center is larger— I design it with a raised floor and place its
various infrastructure down below. I find the raised floor system essential
for controlling airflow and neatly routing infrastructure. I've also learned
that it is much simpler to lift a floor tile and plug in to or disconnect from
infrastructure components than to climb a stepladder and stretch above a
server cabinet to make connections.
Separation of power & Data
• Separation is a must, EMI may distort information on data cable
• No standards available for the separation distance
Separation of power & Data (Cont.)
• It is not recommended to use overhead & under-floor for
separation (exposed to disadvantages from both scenarios)
• Precautions with using fluorescents lights specially with copper
cables (at least 5 inches distance is recommended)
Plenum and Non-Plenum Spaces
• Plenum: cavities above false ceiling or below raised floor, used for
air distribution in the server environment, such spaces are more
vulnerable to fire
• Certain regulations and building codes have been put in place that
permit only specially rated cables to be used in the plenum to
reduce the chance or effect of a fire
• Chose the right type of cables according to building codes to rout in
a data center
Ceiling Components
• Cable tray (shallow basket), Ladder racks (narrow ladder frame
installed horizontally), both are made of crossed metal bars secured
to the true ceiling and configured to align with infrastructure path
to be followed.
• Raceways: help in organizing the infrastructure to be clustered over
each server cabinet.
• Fire codes are applied on raceways, ladder racks, server cabinets, or
infrastructure equipments which in most of them requires around
50 cm distance between automatic sprinkler and any solid objects
Ceiling Components
Raceways Cable Tray Ladder racks
Ceiling Components (Cont.)
Raceway overhead Termination Example—Front View Raceway overhead Termination Example—Back View
Having the data ports above the back of the server cabinet in the raceways
would help in connecting them easily while it is not the case with plugging
power cables at the front of the raceways
Raised Floor Components
• During design phase, we need to identify:
- Floor height
- Mechanisms for bringing in equipment
- Weight-bearing capacity
- Types and numbers of floor tiles
- Termination infrastructure
- Other subfloor details
Raised Floor Components (Cont.)
• Floor Height:
some evaluation factors are tide to cooling issues (server
environment size and shape, number of equipment, and how much
cold air needs to be channeled in the space) while others are tide to
infrastructure (how much infrastructure is routed under the floor)
The simple rule is that the more height you have the more air you
can circulate within that space the more effect it has above the
floor, and the more infrastructure can be routed under the raised
floor
Raised Floor Components (Cont.)
• Elevated floor vs. sunken floor
Deciding whether to go with either option should be made early in
the design phase
Mechanisms for bringing in equipment
• Ramps:
- More popular
- Raised floor height and slop determine the ramps length
- Ideal ramps, 1.8 M wide with 1.8m of landings at both ends
- Many building codes requires handrail on both side
- It is recommended to install slip-resistance tread on the ramp
- More than one ramp may be required depending on the DC size
and approved building codes
• Lifts
- Occupies less space
- More expensive
Raised Floor Components (Cont.)
Weight Bearing Ability
• Considered by many as the most important element of any DC floor
• Ideally, DC floor should support 2000 pounds or more per cabinet
location
• Overall weight bearing ability depends on structure of the building
that entail
- Thickness & integrity of the concrete slab with bottom floor
- steel skeleton with above the ground DC
• Weight bearing ability should be specified during the design phase
Weight Bearing Ability (Cont.)
• Other type of loads that needs to be specified:
- Static Loads
1. Concentrated or point load: weight applied on small area, area
where pegs or casters for fully loaded cabinets touches the floor
2. Uniform or static load: weight distributed over large area, as in
case of heavy boxes or large equipment sits on the ground
- Dynamic loads
1. Rolling Load(weight rolled over an area from passing
equipment)
2. Affect load (force generated by dropped objects – item weight
& falling distance)
3. Ultimate load (breaking point of the floor panel)
• It is recommended to apply weight load on ramps or lifts equipped wit
the room
Types and Numbers of Floor Tiles
• Floor tiles comes with standard size (2 feet)
• Typically made of steel with either wood, concrete or steel at the
core
• Types of floor tiles:
Types and Numbers of Floor Tiles (Cont.)
• It is recommended to review the planed floor tiles deployment with
the person responsible for room cooling as the more use of
perforated and notched panels the harder it is to maintain air
pressure
• Use static control tiles to reduce voltage generated by walking people
Types of static floor tiles
Termination Details
• Too many methods are available to terminate electrical outlets and
structured cables (end of flexible conduit, stationary raceways,
server cabinet…etc)
• The goal is to be flexible, not to restrict access, prepare for growth,
and can be reassembled else where
Common Problems
• Poor sizing of tile cut-outs, or placing them in wrong location
causing air to escape from notches
• Mistakes with relation to cable type installation (plenum, non-
plenum or low smoke/zero halogen)
• Problems with relation to the strength of the raised floor

More Related Content

Similar to 05_Overhead_or_Under_Floor_Installation.pptx

Supplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoSupplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindo
Stahlindo Indonesia
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centers
Internap
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminar
michaeljmack
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
Anirudh Gupta
 
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
Inflectiontech Ltd
 
DCD London 2016 Open Compute Project data center project engineering worksho...
DCD London 2016  Open Compute Project data center project engineering worksho...DCD London 2016  Open Compute Project data center project engineering worksho...
DCD London 2016 Open Compute Project data center project engineering worksho...
Inflectiontech Ltd
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
Yamini K
 
national building code
national building codenational building code
national building code
Ruhiya Garg
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
neerajtri
 
loadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdfloadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdf
nileshsurti
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
Bee Key Verma
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
Hajee Mohammad Danesh Science & Technology University, Dinajpur
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptx
NashmilYahya
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
Aishwarya Deopujari
 
CCTVHeadquarters.pdf
CCTVHeadquarters.pdfCCTVHeadquarters.pdf
CCTVHeadquarters.pdf
DANISHPUTRAMDFARIS
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
AnchitSharma17
 
Panel Built Information Packet
Panel Built Information PacketPanel Built Information Packet
Panel Built Information Packet
Panel Built
 
Form-woks-additional.pptx
Form-woks-additional.pptxForm-woks-additional.pptx
Form-woks-additional.pptx
ssuserc0bf9b
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
Anuj Singhal
 
Installing the network
Installing the networkInstalling the network
Installing the network
Online
 

Similar to 05_Overhead_or_Under_Floor_Installation.pptx (20)

Supplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoSupplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindo
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centers
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminar
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
 
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
 
DCD London 2016 Open Compute Project data center project engineering worksho...
DCD London 2016  Open Compute Project data center project engineering worksho...DCD London 2016  Open Compute Project data center project engineering worksho...
DCD London 2016 Open Compute Project data center project engineering worksho...
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
national building code
national building codenational building code
national building code
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
loadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdfloadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdf
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptx
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
CCTVHeadquarters.pdf
CCTVHeadquarters.pdfCCTVHeadquarters.pdf
CCTVHeadquarters.pdf
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
 
Panel Built Information Packet
Panel Built Information PacketPanel Built Information Packet
Panel Built Information Packet
 
Form-woks-additional.pptx
Form-woks-additional.pptxForm-woks-additional.pptx
Form-woks-additional.pptx
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
Installing the network
Installing the networkInstalling the network
Installing the network
 

Recently uploaded

The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 

Recently uploaded (20)

The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 

05_Overhead_or_Under_Floor_Installation.pptx

  • 1. Chapter 5: Overhead or Under-Floor Installation?
  • 2. What You Will Learn? • Benefits and drawbacks between ceiling and raised floor to run power, data connection and cooling system • Detailed overview of components involved in both options • Common problems associated with both options
  • 3. Options • Overhead installation - Use of false ceiling in which cabling, electrical conduits are routed - Termination are done above the servers rows • Under-Floor installation - Flat panels are placed in an elevated grid of horizontal and vertical bars, electrical conduits, cabling and cooling system are routed under this raised floor. - Termination are done in a subfloor or into patch panel and power receptacles within the DC cabinets
  • 4. Overhead Installation • Advantages – Less expensive (Cable try ladder racks and raceways are less expensive than a complete raised floor system) – More suitable for limited spaces – Requires less floor spaces (no entrance ramp) – Reduce chances to snagging or damaging data cables • Disadvantages – Challenges for air circulation within the DC and servers cooling system – Unplugged power cable or patch cord due to gravity and cord weight
  • 5. Under-Floor Installation • Advantages – Better cooling capabilities – Protecting infrastructure (patch cords, power cables) against accidental damage or unplugs – Easier to support and access infrastructure • Disadvantages – More expensive • Most Data Centers are built with a raised floor system.
  • 6. Deciding on whether to go with overhead Or Under Floor installation depends on: The needs for the data center The size of the data center • If the Data Center is small— In round numbers, generally less than 1000 square feet (100 square meters)—or is being constructed in a building that has limited space from floor to ceiling, I design it with overhead infrastructure. The ramp needed for a raised floor and the height it occupies simply take up too much space in such a small room. • If the Data Center is larger— I design it with a raised floor and place its various infrastructure down below. I find the raised floor system essential for controlling airflow and neatly routing infrastructure. I've also learned that it is much simpler to lift a floor tile and plug in to or disconnect from infrastructure components than to climb a stepladder and stretch above a server cabinet to make connections.
  • 7. Separation of power & Data • Separation is a must, EMI may distort information on data cable • No standards available for the separation distance
  • 8. Separation of power & Data (Cont.) • It is not recommended to use overhead & under-floor for separation (exposed to disadvantages from both scenarios) • Precautions with using fluorescents lights specially with copper cables (at least 5 inches distance is recommended)
  • 9. Plenum and Non-Plenum Spaces • Plenum: cavities above false ceiling or below raised floor, used for air distribution in the server environment, such spaces are more vulnerable to fire • Certain regulations and building codes have been put in place that permit only specially rated cables to be used in the plenum to reduce the chance or effect of a fire • Chose the right type of cables according to building codes to rout in a data center
  • 10. Ceiling Components • Cable tray (shallow basket), Ladder racks (narrow ladder frame installed horizontally), both are made of crossed metal bars secured to the true ceiling and configured to align with infrastructure path to be followed. • Raceways: help in organizing the infrastructure to be clustered over each server cabinet. • Fire codes are applied on raceways, ladder racks, server cabinets, or infrastructure equipments which in most of them requires around 50 cm distance between automatic sprinkler and any solid objects
  • 12. Ceiling Components (Cont.) Raceway overhead Termination Example—Front View Raceway overhead Termination Example—Back View Having the data ports above the back of the server cabinet in the raceways would help in connecting them easily while it is not the case with plugging power cables at the front of the raceways
  • 13. Raised Floor Components • During design phase, we need to identify: - Floor height - Mechanisms for bringing in equipment - Weight-bearing capacity - Types and numbers of floor tiles - Termination infrastructure - Other subfloor details
  • 14. Raised Floor Components (Cont.) • Floor Height: some evaluation factors are tide to cooling issues (server environment size and shape, number of equipment, and how much cold air needs to be channeled in the space) while others are tide to infrastructure (how much infrastructure is routed under the floor) The simple rule is that the more height you have the more air you can circulate within that space the more effect it has above the floor, and the more infrastructure can be routed under the raised floor
  • 15. Raised Floor Components (Cont.) • Elevated floor vs. sunken floor Deciding whether to go with either option should be made early in the design phase
  • 16. Mechanisms for bringing in equipment • Ramps: - More popular - Raised floor height and slop determine the ramps length - Ideal ramps, 1.8 M wide with 1.8m of landings at both ends - Many building codes requires handrail on both side - It is recommended to install slip-resistance tread on the ramp - More than one ramp may be required depending on the DC size and approved building codes • Lifts - Occupies less space - More expensive Raised Floor Components (Cont.)
  • 17. Weight Bearing Ability • Considered by many as the most important element of any DC floor • Ideally, DC floor should support 2000 pounds or more per cabinet location • Overall weight bearing ability depends on structure of the building that entail - Thickness & integrity of the concrete slab with bottom floor - steel skeleton with above the ground DC • Weight bearing ability should be specified during the design phase
  • 18. Weight Bearing Ability (Cont.) • Other type of loads that needs to be specified: - Static Loads 1. Concentrated or point load: weight applied on small area, area where pegs or casters for fully loaded cabinets touches the floor 2. Uniform or static load: weight distributed over large area, as in case of heavy boxes or large equipment sits on the ground - Dynamic loads 1. Rolling Load(weight rolled over an area from passing equipment) 2. Affect load (force generated by dropped objects – item weight & falling distance) 3. Ultimate load (breaking point of the floor panel) • It is recommended to apply weight load on ramps or lifts equipped wit the room
  • 19. Types and Numbers of Floor Tiles • Floor tiles comes with standard size (2 feet) • Typically made of steel with either wood, concrete or steel at the core • Types of floor tiles:
  • 20. Types and Numbers of Floor Tiles (Cont.) • It is recommended to review the planed floor tiles deployment with the person responsible for room cooling as the more use of perforated and notched panels the harder it is to maintain air pressure • Use static control tiles to reduce voltage generated by walking people Types of static floor tiles
  • 21. Termination Details • Too many methods are available to terminate electrical outlets and structured cables (end of flexible conduit, stationary raceways, server cabinet…etc) • The goal is to be flexible, not to restrict access, prepare for growth, and can be reassembled else where
  • 22. Common Problems • Poor sizing of tile cut-outs, or placing them in wrong location causing air to escape from notches • Mistakes with relation to cable type installation (plenum, non- plenum or low smoke/zero halogen) • Problems with relation to the strength of the raised floor