FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
Production log.docxhh
1. Productionlog
14/4/15
Today we decidedonwhatjobsme and Emmanuel are goingtodo, fittingare skillstothe certain
jobsthat workedwell.We decidedthatEmmanuel wasgoingtothe scriptbecause he isgood with
Englishandhe is more imaginative andwillchange thingsif he comesupwitha betteridea. Hisnext
jobthat was givento Emmanuel was‘productionroles.The jobthatIwas givenwas‘recce,
storyboard,andshootinglist.The reasonwhyIgot giventhese rolesisbecause Iammore creative
whichmeanswhendoingthe shotlistIwouldknow whatshotwouldlookmore effective when
filmingandwhatwill catchthe audience attention.
15/4/15
Everyone continuedwhattheyweredoingIcontinueddoingthe recce,goingoutside andtaking
picturesforthe recce. The reece includedlistof actorsand whytheyare suitable forthe partand
whatcostumesisneeded.
21/4/15
I continueddoingthe Reece writingaboutthe potentialhazardsthatcan occur whenfilmingduring
the day/night.Emmanuel carriedondoingthe scriptforthe film.
22/4/15
The nextday I finishedthe Reece thenI startedonthe shot list.The sotlistwascoincidedof 15+
shotssayingwhyI usedthese certainshotsandwhatpart itis usedfor.
28/4/15
I finished the shotlistandwentontodoing the storyboardI usedPhotoshop toeditthe picturesto
make it look realisticandmore professional Iusedthe shotlisttohelpme know whichshotsshould
go where onthe storyboardand alsocalculate the secondsof eachshots.I finishedeverythingand
justwentback and re read correctinganymistakesthatI have made.
29/4/15
Today we ae doingautomaticstoryboardwhichispractisingthe shotsforare filmsothisis a practise
run many shotsare actually goinggotbe in the filmsowhenwe filmonSundaywe don’thave to
rehearse howmanyshotsae goingto be inthe filmwe know how manyshots.
2/4/15
Today we wenttothe locationof the filmat11am we arrivedpriorhour earlybefore the actors
arrivedhisisbecause we neededtosetupthe camera and equipmentandtosee if any faultswere
inthe camera,because of thiswe foundoutthe camerawas faultyandhad to try and fix itbefore
the actors arrivedluckilywe wasable tofix itand filminglastedfor 3-4 hours.
5/4/15
As filmingwasfinishedwe thenhadtoeditourfilmindividually,Iuploadedthe footage ontofinal
cut pro and startedto editthe filmby puttingthe filminthe orderI wanteditto go, thisincluded
cuttingout some footage andcroppingthe footage
2. 6/4/15
Today we realisedthere couldhave beensome extrashotsintothe filmsowe wentoutside anddid
some pickup shots thisisso we couldtake itback to final cut proand place theminside the shoot.
8/5/15
Today I hadto colour grade the footage sothat the colour of the footage will matchthe storyof the
film,I alsoaddedsoundin the filmthiscompletedthe filmassoundisthe keyof the filmsothe
audience will knowhowthe actorsare feelingetc.
11/5/15
I completedmy filmandjustwatchedittosee if everythingisinorderandit makessense tothe
audience.