SlideShare a Scribd company logo
1 of 15
OPS 571 Final Exam Version 3
Link : http://uopexam.com/product/ops-571-final-exam-version-3/
OPS 571 Final Exam Version 3 Answers
1) According to your text, the most common process metric is:
A. Productivity
B. Utilization
C. Throughput time
D. Efficiency
2) Which of the following is true about make-to-stock processes?
A. Make-to-stock processes can be controlled based on the actual or anticipated
amount of finished goods
B. Make-to-stock process is used when demand is seasonal and the firm does not
have enough
C. Services by their very nature often use make-to-stock processes.
D. A and B
3) ________ is when the activities in the stage must stop because there is no
place to deposit the item just completed.
A. Buffering
B. Starving
C. None of these answers
D. Blocking
4) According to Hayes and Wheelwright, which of the following is not a major
process flow structure? A. Job Shop
B. Assembly Line
C. Project
D. Batch
5) The best process flow structure to use for making automobiles is?
A. Job Shop
B. Group technology cell
C. Assembly line
D. Batch Shop
6) The type of processing structure that is used to produce gasoline, chemicals,
and steel is:
A. Job Shop
B. Assembly Line
C. Continuous Flow
D. Batch
7) The most important performance dimension for product development projects
is:
A. Quality
B. Product flexibility
C. Time-to-market
D. Productivity
8) When evaluating a new product development project using net present value
analysis, which of the following will make the project more attractive?
A. Delaying the start of the project
B. Making the project run over a longer period of time
C. Improving (bringing forward) the date when revenue will begin
D. A and B
9) Which of the following statements is true about value analysis/value
engineering (VA/VE)?
A. The purpose of VA/VE is to simplify products and processes.
B. The objective of VA/VE is to achieve equivalent or better performance at a
lower cost.
C. VA is performed before the production stage, while VE deals with products
already in production.
D. both A and B
10) The category given the maximum point value in the Baldrige award is:
A. Business results
B. Process management
C. Strategic planning
D. Customer and market focus
11) Which of the following is not a dimension of design quality?
A. Serviceability
B. Customization
C. Features
D. Durability
12) Which Quality Guru advocated that senior management is responsible for
94% of quality problems?
A. Ishikawa
B. Juran
C. Crosby
D. Deming
13) Which of the following is not an assumption of the basic economic-order
quantity model?
A. ordering or setup costs are constant
B. quantity discounts are available
C. annual demand is constant and known
D. lead time is constant
14) The basic difference between P and Q systems is:
A. P models favor more expensive items
B. P model is more appropriate for important items such as critical repair parts
C. Q models are event triggered while P models are time triggered
D. Q models are time triggered while P models are event triggered
15) Which of the following statements is true about the Q-system?
A. It does not have an EOQ, since the quantity varies according to demand.
B. The order interval is fixed not the order quantity.
C. It does not have a reorder point but rather a target inventory.
D. The system is completely determined by the two parameters, Q and R.
16) The objectives of work-center scheduling include(s):
A. To meet due dates
B. To minimize lead times
C. To minimize finish goods inventory
D. A and B
17) A _________ approach actually schedules in detail each resource using the
setup and runtime required for each order.
A. Forward scheduling
B. Backward scheduling
C. Infinite loading
D. Finite loading
18) The assignment method is appropriate in solving problems that have the
following characteristics: A. There are ‘n’ things to be distributed to
‘n’
destinations
B. Though each destination may handle all the things, the final assignment has
each thing assigned to one and only one destination
C. Only one criterion should be used (minimum cost, maximum profit, for
example)
D. A and C
19) Which of the following according to Goldratt is not a component of production
cycle time?
A. Wait time
B. Maintenance time
C. Setup time
D. Process time
20) Goldratt’s rule of production scheduling include all but:
A. An hour saved at a non-bottleneck is a mirage
B. A process batch should be fixed both along its route and in time
C. Do not balance the capacity - balance the flow
D. Utilization and activation of a resource is not the same thing
21) According to Goldratt and Fox, a useful performance measure to treat
inventory is ______.
A. Inventory turnover
B. Current ratio
C. Quick ratio
D. Dollar days
22) Which of the following would not be considered in deciding how far to
minimum-cost schedule (crash) a project?
A. Project overrun penalties
B. Incentives for early completion
C. Indirect project costs (e.g. interest on a construction loan)
D. The normal duration times of tasks not on a critical path
23) The advantages of pure project include all but:
A. The project manager has full authority over the project.
B. Team pride, motivation, and commitments are high.
C. Decisions are made quickly.
D. A team member can work on several projects.
24) Which of the following is not a typical project milestone?
A. Completion of design
B. Production of a prototype
C. Training of project members
D. Completed testing of the prototype
25) Supply-chain response relates to the following:
A. How quickly a customer order can be filled
B. How quickly a company can react to a new competing product
C. How inexpensive the product is
D. A and B
26) According to Hau Lee, which of the following types of products need to be
delivered with efficient supply-chains?
A. Custom products
B. Innovative products
C. Grocery products
D. High technology products
27) The idea of the Value Density calculation is:
A. Finding a carrier that can handle the weight
B. Matching the weight of the product with an appropriate carrier
C. Determining how a product should be shipped considering its weight
and value
D. Finding the minimum cost carrier
28) Which of the following statements is not true about capacity management in
operations?
A. When looking at capacity, operations managers need to look at both resource
input and product outputs.
B. An operations management view also emphasizes the time dimension of
capacity.
C. Capacity planning itself has different meaning to individuals at different levels
within the operations management hierarchy.
D. The definition of capacity, in an operations management context,
makes a clear distinction between efficient and inefficient use of
capacity.
29) The steps to determining capacity requirements include:
A. Using decision trees to evaluate capacity alternatives
B. Calculating equipment and labor requirements to meet product line forecasts
C. Projecting labor and equipment availabilities over the planning horizon
D. B and C
30) Capacity utilization rate can be computed as:
A. Capacity used - best operating level
B. Capacity used x best operating level
C. Capacity used / best operating level
D. Capacity used + best operating level
31) Which of the following is NOT one of the more successful applications of lean
concepts in services?
A. Organize problem-solving groups
B. Upgrade housekeeping
C. Upgrade quality
D. Introduction of demand-push scheduling
32) A kanban card is used to signal that:
A. work is ready to be moved to the next station
B. a worker has run out of parts
C. a machine has broken down
D. work is authorized to replenish a downstream station
33) Which of the following is not true about JIT systems?
A. The JIT system is based on the philosophy of eliminating waste and utilizing
the full capability of the worker.
B. Under JIT the ideal lot size is one.
C. JIT is typically applied to repetitive manufacturing.
D. The goal of JIT is to drive all inventory queues to a moderate level
thus minimizing inventory investment and shortening lead times.
34) Which phrase most closely describes the Delphi forecasting technique?
A. consumer survey
B. random individual opinions
C. group of expert’s opinions
D. test markets
35) Which of the following would not be classified as a component of demand?
A. Cycle
B. Seasonality
C. Trend
D. Causal variation
36) Under exponential smoothing, if we want our forecast to be very responsive
to recent demand, the value of alpha should be:
A. moderate
B. zero
C. small
D. large
E. No, Acme is not a holder in due course because of some other reason.
37) One option for altering the pattern of demand is:
A. carrying inventory
B. using overtime
C. hiring employees
D. pricing
38) Which of the following is not a cost relevant to aggregate production
planning?
A. Costs associated with changes in the production rate
B. Quantity discounts
C. Basic production costs
D. Inventory holding costs
39) Aggregate planners balance:
A. demand and capacity
B. demand and inventories
C. demand and costs
D. supply and inventories
40) Which MRP system input element specifies how many and when the firm
plans to build each end item?
A. Master production schedule
B. Bills of material
C. Inventory records file
D. Capacity planning
41) Which of the following most closely describes net material requirements?
A. gross requirements - on-hand - planned order receipts
B. gross requirements - on-hand + planned order receipts
C. gross requirements - planned order receipts
D. gross requirements - planned order releases
42) Which of the following is true about MRP Systems?
A. demand pattern is random
B. lot sizing is EOQ
C. based on independent demand
D. objective is to meet manufacturing needs
43) Which of the following statements is not true about capacity management in
operations?
A. Capacity planning itself has different meaning to individuals at different levels
within the operations management hierarchy.
B. An operations management view also emphasizes the time dimension of
capacity.
C. When looking at capacity, operations managers need to look at both resource
input and product outputs.
D. The definition of capacity, in an operations management context,
makes a clear distinction between efficient and inefficient use of
capacity.
44) Service capacity:
A. is highly time and location dependent
B. is subject to less volatile demand fluctuations
C. utilization directly impacts service quality
D. A and C
45) The steps to determining capacity requirements include:
A. Using decision trees to evaluate capacity alternatives
B. Calculating equipment and labor requirements to meet product line forecasts
C. Projecting labor and equipment availabilities over the planning horizon
D. B and C
http://uopexam.com/product/ops-571-final-exam-version-3/

More Related Content

Recently uploaded

會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
17thcssbs2
 

Recently uploaded (20)

Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptx
 
philosophy and it's principles based on the life
philosophy and it's principles based on the lifephilosophy and it's principles based on the life
philosophy and it's principles based on the life
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceutics
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptxREPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
Discover the Dark Web .pdf InfosecTrain
Discover the Dark Web .pdf  InfosecTrainDiscover the Dark Web .pdf  InfosecTrain
Discover the Dark Web .pdf InfosecTrain
 
The Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxThe Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptx
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 

OPS 571 Final Exam Version 3 2015 version

  • 1. OPS 571 Final Exam Version 3 Link : http://uopexam.com/product/ops-571-final-exam-version-3/ OPS 571 Final Exam Version 3 Answers 1) According to your text, the most common process metric is: A. Productivity B. Utilization C. Throughput time
  • 2. D. Efficiency 2) Which of the following is true about make-to-stock processes? A. Make-to-stock processes can be controlled based on the actual or anticipated amount of finished goods B. Make-to-stock process is used when demand is seasonal and the firm does not have enough C. Services by their very nature often use make-to-stock processes. D. A and B 3) ________ is when the activities in the stage must stop because there is no place to deposit the item just completed. A. Buffering B. Starving C. None of these answers D. Blocking 4) According to Hayes and Wheelwright, which of the following is not a major process flow structure? A. Job Shop B. Assembly Line C. Project D. Batch
  • 3. 5) The best process flow structure to use for making automobiles is? A. Job Shop B. Group technology cell C. Assembly line D. Batch Shop 6) The type of processing structure that is used to produce gasoline, chemicals, and steel is: A. Job Shop B. Assembly Line C. Continuous Flow D. Batch 7) The most important performance dimension for product development projects is: A. Quality B. Product flexibility C. Time-to-market D. Productivity 8) When evaluating a new product development project using net present value analysis, which of the following will make the project more attractive? A. Delaying the start of the project
  • 4. B. Making the project run over a longer period of time C. Improving (bringing forward) the date when revenue will begin D. A and B 9) Which of the following statements is true about value analysis/value engineering (VA/VE)? A. The purpose of VA/VE is to simplify products and processes. B. The objective of VA/VE is to achieve equivalent or better performance at a lower cost. C. VA is performed before the production stage, while VE deals with products already in production. D. both A and B 10) The category given the maximum point value in the Baldrige award is: A. Business results B. Process management C. Strategic planning D. Customer and market focus 11) Which of the following is not a dimension of design quality? A. Serviceability B. Customization
  • 5. C. Features D. Durability 12) Which Quality Guru advocated that senior management is responsible for 94% of quality problems? A. Ishikawa B. Juran C. Crosby D. Deming 13) Which of the following is not an assumption of the basic economic-order quantity model? A. ordering or setup costs are constant B. quantity discounts are available C. annual demand is constant and known D. lead time is constant 14) The basic difference between P and Q systems is: A. P models favor more expensive items B. P model is more appropriate for important items such as critical repair parts C. Q models are event triggered while P models are time triggered D. Q models are time triggered while P models are event triggered 15) Which of the following statements is true about the Q-system?
  • 6. A. It does not have an EOQ, since the quantity varies according to demand. B. The order interval is fixed not the order quantity. C. It does not have a reorder point but rather a target inventory. D. The system is completely determined by the two parameters, Q and R. 16) The objectives of work-center scheduling include(s): A. To meet due dates B. To minimize lead times C. To minimize finish goods inventory D. A and B 17) A _________ approach actually schedules in detail each resource using the setup and runtime required for each order. A. Forward scheduling B. Backward scheduling C. Infinite loading D. Finite loading 18) The assignment method is appropriate in solving problems that have the following characteristics: A. There are ‘n’ things to be distributed to ‘n’ destinations
  • 7. B. Though each destination may handle all the things, the final assignment has each thing assigned to one and only one destination C. Only one criterion should be used (minimum cost, maximum profit, for example) D. A and C 19) Which of the following according to Goldratt is not a component of production cycle time? A. Wait time B. Maintenance time C. Setup time D. Process time 20) Goldratt’s rule of production scheduling include all but: A. An hour saved at a non-bottleneck is a mirage B. A process batch should be fixed both along its route and in time C. Do not balance the capacity - balance the flow D. Utilization and activation of a resource is not the same thing 21) According to Goldratt and Fox, a useful performance measure to treat inventory is ______. A. Inventory turnover B. Current ratio
  • 8. C. Quick ratio D. Dollar days 22) Which of the following would not be considered in deciding how far to minimum-cost schedule (crash) a project? A. Project overrun penalties B. Incentives for early completion C. Indirect project costs (e.g. interest on a construction loan) D. The normal duration times of tasks not on a critical path 23) The advantages of pure project include all but: A. The project manager has full authority over the project. B. Team pride, motivation, and commitments are high. C. Decisions are made quickly. D. A team member can work on several projects. 24) Which of the following is not a typical project milestone? A. Completion of design B. Production of a prototype C. Training of project members D. Completed testing of the prototype 25) Supply-chain response relates to the following:
  • 9. A. How quickly a customer order can be filled B. How quickly a company can react to a new competing product C. How inexpensive the product is D. A and B 26) According to Hau Lee, which of the following types of products need to be delivered with efficient supply-chains? A. Custom products B. Innovative products C. Grocery products D. High technology products 27) The idea of the Value Density calculation is: A. Finding a carrier that can handle the weight B. Matching the weight of the product with an appropriate carrier C. Determining how a product should be shipped considering its weight and value D. Finding the minimum cost carrier 28) Which of the following statements is not true about capacity management in operations? A. When looking at capacity, operations managers need to look at both resource input and product outputs.
  • 10. B. An operations management view also emphasizes the time dimension of capacity. C. Capacity planning itself has different meaning to individuals at different levels within the operations management hierarchy. D. The definition of capacity, in an operations management context, makes a clear distinction between efficient and inefficient use of capacity. 29) The steps to determining capacity requirements include: A. Using decision trees to evaluate capacity alternatives B. Calculating equipment and labor requirements to meet product line forecasts C. Projecting labor and equipment availabilities over the planning horizon D. B and C 30) Capacity utilization rate can be computed as: A. Capacity used - best operating level B. Capacity used x best operating level C. Capacity used / best operating level D. Capacity used + best operating level 31) Which of the following is NOT one of the more successful applications of lean concepts in services?
  • 11. A. Organize problem-solving groups B. Upgrade housekeeping C. Upgrade quality D. Introduction of demand-push scheduling 32) A kanban card is used to signal that: A. work is ready to be moved to the next station B. a worker has run out of parts C. a machine has broken down D. work is authorized to replenish a downstream station 33) Which of the following is not true about JIT systems? A. The JIT system is based on the philosophy of eliminating waste and utilizing the full capability of the worker. B. Under JIT the ideal lot size is one. C. JIT is typically applied to repetitive manufacturing. D. The goal of JIT is to drive all inventory queues to a moderate level thus minimizing inventory investment and shortening lead times. 34) Which phrase most closely describes the Delphi forecasting technique? A. consumer survey B. random individual opinions C. group of expert’s opinions
  • 12. D. test markets 35) Which of the following would not be classified as a component of demand? A. Cycle B. Seasonality C. Trend D. Causal variation 36) Under exponential smoothing, if we want our forecast to be very responsive to recent demand, the value of alpha should be: A. moderate B. zero C. small D. large E. No, Acme is not a holder in due course because of some other reason. 37) One option for altering the pattern of demand is: A. carrying inventory B. using overtime C. hiring employees D. pricing 38) Which of the following is not a cost relevant to aggregate production
  • 13. planning? A. Costs associated with changes in the production rate B. Quantity discounts C. Basic production costs D. Inventory holding costs 39) Aggregate planners balance: A. demand and capacity B. demand and inventories C. demand and costs D. supply and inventories 40) Which MRP system input element specifies how many and when the firm plans to build each end item? A. Master production schedule B. Bills of material C. Inventory records file D. Capacity planning 41) Which of the following most closely describes net material requirements? A. gross requirements - on-hand - planned order receipts B. gross requirements - on-hand + planned order receipts C. gross requirements - planned order receipts
  • 14. D. gross requirements - planned order releases 42) Which of the following is true about MRP Systems? A. demand pattern is random B. lot sizing is EOQ C. based on independent demand D. objective is to meet manufacturing needs 43) Which of the following statements is not true about capacity management in operations? A. Capacity planning itself has different meaning to individuals at different levels within the operations management hierarchy. B. An operations management view also emphasizes the time dimension of capacity. C. When looking at capacity, operations managers need to look at both resource input and product outputs. D. The definition of capacity, in an operations management context, makes a clear distinction between efficient and inefficient use of capacity. 44) Service capacity: A. is highly time and location dependent
  • 15. B. is subject to less volatile demand fluctuations C. utilization directly impacts service quality D. A and C 45) The steps to determining capacity requirements include: A. Using decision trees to evaluate capacity alternatives B. Calculating equipment and labor requirements to meet product line forecasts C. Projecting labor and equipment availabilities over the planning horizon D. B and C http://uopexam.com/product/ops-571-final-exam-version-3/