WHAT IS PUMPED CONCRETE?
Pumped concrete is the concrete which is
transported to heights by means of pumping
using concrete pumps. This method is used
where large quantity of concrete work is
involved at greater height, where other means
of transporting is not easy to do.
The system for pumping concrete essentially
consists of a hopper into which the concrete is
discharged from the mixer, which in turn, feeds
the concrete pump itself and finally the
delivery pipelines through which the concrete
is delivered.
PROPERTIES OF PUMPED CONCRETE
Its slump value of 50mm to 100 mm
or more.
Materials bind under pump
pressure.
There is no segregation and
bleeding due to concreting.
VIDEO CLIP OF PUMPED CONCRET
CAUSES OF BLOCKAGE IN PIPELINES
Operator’s errors
High temperatures
Pipelines & joint deficiencies
Too many & too sharp bends
Not well cleaned pipeline.
MEASURES TO CLEAR BLOCKAGE
Careful design of concrete mix
Shortning the pipeline
Continuous pumping operations
Time to time washout
THANK YOU

More Related Content

What's hot

Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concreteMeet Shah
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketingAditya Sanyal
 
Properties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteProperties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteVijay RAWAT
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) laxman singh
 
Recycled Aggregate Concrete
Recycled Aggregate Concrete  Recycled Aggregate Concrete
Recycled Aggregate Concrete NEELANJAN SARKAR
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 
lightweight concrete
lightweight concretelightweight concrete
lightweight concreteAgatha Fred
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteRajesh Prasad
 
Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....SJMIT,now NMAMIT NITTE
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures kamariya keyur
 
Project Report on Concrete Mix Design of Grade M35
Project Report on Concrete Mix Design of Grade M35Project Report on Concrete Mix Design of Grade M35
Project Report on Concrete Mix Design of Grade M35Gyan Prakash
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concreteGaurang Kakadiya
 
High strength concrete
High strength concreteHigh strength concrete
High strength concreteDr K M SONI
 

What's hot (20)

Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 
Properties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteProperties of fresh and Hardened Concrete
Properties of fresh and Hardened Concrete
 
Rehabilitation of structure
Rehabilitation of structureRehabilitation of structure
Rehabilitation of structure
 
Aggregates of Concrete
Aggregates of ConcreteAggregates of Concrete
Aggregates of Concrete
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
 
Fresh and harden properties of concrete
Fresh and harden properties of concreteFresh and harden properties of concrete
Fresh and harden properties of concrete
 
Recycled Aggregate Concrete
Recycled Aggregate Concrete  Recycled Aggregate Concrete
Recycled Aggregate Concrete
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
lightweight concrete
lightweight concretelightweight concrete
lightweight concrete
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
Project Report on Concrete Mix Design of Grade M35
Project Report on Concrete Mix Design of Grade M35Project Report on Concrete Mix Design of Grade M35
Project Report on Concrete Mix Design of Grade M35
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Placing of concrete
Placing of concretePlacing of concrete
Placing of concrete
 
Vacuum concrete
Vacuum concreteVacuum concrete
Vacuum concrete
 

Similar to Pumped Concrete

A Seminar on Under Water Concreting
A Seminar on Under Water ConcretingA Seminar on Under Water Concreting
A Seminar on Under Water ConcretingSanjan Banerjee
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentationRahul bhatnagar
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting ConcreteAhsan Rabbani
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter iiGTVT
 
Under water concrete
Under water concreteUnder water concrete
Under water concreteMuftah Aljoat
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction MethodsDavid H Moloney
 
Shotcrete types and application - university of Halabja
Shotcrete types and application - university of HalabjaShotcrete types and application - university of Halabja
Shotcrete types and application - university of HalabjaHussein Abbas
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPrerak Ka.Patel
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsAreej Al-Azzawi
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxDP NITHIN
 
How Concrete was Transported in Construction of Burj Khalifa
How Concrete was Transported in Construction of Burj KhalifaHow Concrete was Transported in Construction of Burj Khalifa
How Concrete was Transported in Construction of Burj KhalifaJustin
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfAbishekKumar81
 

Similar to Pumped Concrete (20)

Methods of concreting
Methods of concretingMethods of concreting
Methods of concreting
 
A Seminar on Under Water Concreting
A Seminar on Under Water ConcretingA Seminar on Under Water Concreting
A Seminar on Under Water Concreting
 
Board pile method
Board pile methodBoard pile method
Board pile method
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting Concrete
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter ii
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
Under water concrete
Under water concreteUnder water concrete
Under water concrete
 
Site Report
Site ReportSite Report
Site Report
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction Methods
 
Shotcrete types and application - university of Halabja
Shotcrete types and application - university of HalabjaShotcrete types and application - university of Halabja
Shotcrete types and application - university of Halabja
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptx
 
How Concrete was Transported in Construction of Burj Khalifa
How Concrete was Transported in Construction of Burj KhalifaHow Concrete was Transported in Construction of Burj Khalifa
How Concrete was Transported in Construction of Burj Khalifa
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdf
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 

Pumped Concrete

  • 1. CONCRETE TECHNOLOGY UNIT 6(CH:6)SPECIAL CONCRETE & CONCRETING TECHNIQUES TOPIC:PUMPED CONCRETE BY MISS.BHAVIKA H.PATEL LECTURER AT V.B.POLYTECHNIC,NAVSARI
  • 2. WHAT IS PUMPED CONCRETE? Pumped concrete is the concrete which is transported to heights by means of pumping using concrete pumps. This method is used where large quantity of concrete work is involved at greater height, where other means of transporting is not easy to do.
  • 3.
  • 4. The system for pumping concrete essentially consists of a hopper into which the concrete is discharged from the mixer, which in turn, feeds the concrete pump itself and finally the delivery pipelines through which the concrete is delivered.
  • 5. PROPERTIES OF PUMPED CONCRETE Its slump value of 50mm to 100 mm or more. Materials bind under pump pressure. There is no segregation and bleeding due to concreting.
  • 6. VIDEO CLIP OF PUMPED CONCRET
  • 7. CAUSES OF BLOCKAGE IN PIPELINES Operator’s errors High temperatures Pipelines & joint deficiencies Too many & too sharp bends Not well cleaned pipeline.
  • 8. MEASURES TO CLEAR BLOCKAGE Careful design of concrete mix Shortning the pipeline Continuous pumping operations Time to time washout