ACI 318-19: What’s New for 2019
• New Shear Strength Equations;
including size-effect factor
• Higher Rebar Grades
• Updated Development Lengths
• New Effective Stiffness for Deflection
Calculations
• Seismic Design Details – Shear Walls
• Some Updates to Strut & Tie Method
Changes to the Concrete
Design Standard
ACI 318-19
Shear Modifications
Shear equation changes for one-
way and two-way shear
• Size Effect
• Low Flexural Reinforcement Ratio
• Axial load (prestress)
• Results gathered and vetted by ACI Comm. 445
Why one-way shear equations changed
in 318-19
5
Figure: Strength Ratio (Vtest/Vn)
d = 10 in. – λs, size effect factor
,min
v v
A A
≤
Why one-way shear equations changed
in 318-19
6
0.0018 – min. slab ρw
,min
v v
A A
≤
0.015 – ρw effect
Figure: Strength Ratio (Vtest/Vn)
Why one-way shear equations changed
in 318-19
7
d = 10 in. – λs, size effect factor
,min
v v
A A
>
Figure: Strength Ratio (Vtest/Vn)
One-way shear provision:
Modified goals
• Include nonprestressed and prestressed
• Include size effect and axial loading
• Include effect of (ρw)
• Continue to use 2√f’
c
• Reduce multiple empirical equations
• Easy to use
ACI 318-19 New one-way shear equations
Table 22.5.5.1 - Vc for nonprestressed
members
Criteria Vc
Av ≥ Av,min
Either
of:
2𝜆𝜆 𝑓𝑓𝑓𝑐𝑐 +
𝑁𝑁𝑢𝑢
6𝐴𝐴𝑔𝑔
𝑏𝑏𝑤𝑤𝑑𝑑 (a)
8𝜆𝜆 𝜌𝜌𝑤𝑤
⁄
1 3 𝑓𝑓𝑓𝑐𝑐 +
𝑁𝑁𝑢𝑢
6𝐴𝐴𝑔𝑔
𝑏𝑏𝑤𝑤𝑑𝑑 (b)
Av < Av,min 8𝜆𝜆𝑠𝑠𝜆𝜆 𝜌𝜌𝑤𝑤
⁄
1 3
𝑓𝑓𝑓𝑐𝑐 +
𝑁𝑁𝑢𝑢
6𝐴𝐴𝑔𝑔
𝑏𝑏𝑤𝑤𝑑𝑑 (c)
Notes:
1. Axial load, Nu, is positive for compression and negative for tension
2. Vc shall not be taken less than zero.
0
0.5
1
1.5
2
2.5
0.3%
0.4%
0.5%
0.6%
0.7%
0.8%
0.9%
1.0%
1.1%
1.2%
1.3%
1.4%
1.5%
1.6%
1.7%
1.8%
1.9%
2.0%
2.1%
2.2%
2.3%
2.4%
2.5%
Vn
/
sqrt(f’c)
Longitudinal Reinforcement Ratio (As/bd)
ACI 318-19 Shear Equation
8𝜆𝜆 𝜌𝜌𝑤𝑤
⁄
1 3
Effect of ρw
Size Effect: Value for λs?
0
0.2
0.4
0.6
0.8
1
1.2
0 12 24 36 48 60 72 84 96 108 120
λ
s
Depth in inches
2
1.0
1
10
s
d
λ
= ≤
+
Beam discussion
• Where Av,min installed and Nu ≈ 0, Vc≈ (2√f’
c)bwd,
– ACI 318-14 ~ ACI 318-19
• Provisions encourage use of Av,min
9.6.3.1 - Minimum shear
reinforcement
• ACI 318-14
• Av,min required if Vu > 0.5 φVc
• ACI 318-19
• Av,min required if Vu > φλ√f’
c bwd
Example: Foundation Shear Check
• ℓ = 12 ft
• h = 30 in.
• d~25.5 in.
• f’
c = 4000 psi
• 13-No. 8 bars
• b = 12 ft
• Av = 0 in.2
• As = 10.27 in.2
• Analysis Vu= 231 kip
3
ft
–
0
in.
Example: Foundation Shear Check
• ACI 318-14
'
2
(0.75)(2)(1) 4000 (144 .)(25.5 .)
348 kip 231 kip OK
c c
c
c
V f bd
V psi in in
V
φ φ λ
φ
φ
=
=
= > ∴
Example: Foundation Shear Check
• ACI 318-19
• Av ≤ Av,min
• Per ACI 318-19 (13.2.6.2), neglect size effect
for:
– One-way shallow foundations
– Two-way isolated footings
– Two-way combined and mat foundations
1
'
3
8 ( )
c w c
V f bd
φ φ λ ρ
=
Example: Foundation Shear Check
• ACI 318-19
( )
1
'
3
2
1
3
8 ( )
10.27 in.
0.0028
(144 in.)(25.5 in.)
(0.75)(8)(1) 0.0028 4000 (144 .)(25.5 .)
196 kip 231 kip NG
c w c
w
c
c
V f bd
V psi in in
V
φ φ λ ρ
ρ
φ
φ
=
=
=
= < ∴
Example: Foundation Shear Check
• ACI 318-19
• Add 6 in. thickness
( )
1
'
3
2
1
3
8 ( )
10.27 in.
0.0023
(144 in.)(31.5 in.)
(0.75)(8)(1) 0.0023 4000 psi(144 in.)(31.5 in.)
226 kip > 191 kip OK
c w c
w
c
c
V f bd
V
V
φ φ λ ρ
ρ
φ
φ
=
=
=
∴
Why two-way shear provisions changed in
318-19
• First Equation developed in 1963 for slabs with
t < 5 in. and ρ > 1%
• Two issues similar to one-way shear
• Size effect
• Low ρ
vc
Least of (a), (b),
and (c):
(a)
(b)
(c)
'
4 c
f
λ
'
4
2 c
f
 
+ λ
 
β
 
'
2 s
c
o
d
f
b
 
α
+ λ
 
 
bo
Vc = vc(bod)
Two-way shear: size effect
• Table 22.6.5.2—vc for two-way members without
shear reinforcement
vc
Least of (a), (b),
and (c):
(a)
(b)
(c)
'
4 c
s f
λ λ
'
4
2 c
s f
 
+ λ
 
β
λ
 
'
2 s
s
c
o
d
f
b
 
α
λ
+ λ

 
2
1
1
10
s
d
λ
= ≤
+
Two-way shear: Effect of low ρ
• Only vert. load, cracking ~2 𝒇𝒇𝒄𝒄
′
; punching 4 𝒇𝒇𝒄𝒄
′
• Aggregate interlock contributes to shear strength
• Low ρ  local bar yielding, crack width increase,
allows sliding along shear crack
• Punching loads < 4 𝒇𝒇𝒄𝒄
′
Source: Performance and design of
punching –shear reinforcing system, Ruiz et
al, fib 2010
New two-way slab reinforcement limits
• Need As,min ≥ 0.0018Ag
• If on the critical section
• Then
,min
5 uv slab o
s
s y
v b b
A
f
≥
φα
'
2
uv s c
v f
> φ λ λ
h
1.5h
Slab edge
bslab
h
1.5h
bslab
1.5h
Slab edge
Table 8.4.2.2.3
h
h
1.5 h
1.5 h
1.5 h
bslab bslab
Definition of bslab
Slab Edge
Changes to the Concrete
Design Standard
ACI 318-19
Development Length
Development Length
• Straight Deformed Bars and Deformed Wires in
Tension
• Simple modification to 318-14
• Accounts for Grade 80 and 100
• Standard Hooks and Headed Deformed Bars
• Substantial changes from 318-14
Straight Development Length of
Deformed Bars in Tension
ftest = reinforcement stress at the time of failure
fcalc = calculated stress: ACI 318-14
Unconfined
Straight Development Length of
Deformed Bars in Tension
• Modification in
simplified
provisions of Table
25.4.2.3
• Ψg : new
modification factor
based on grade of
reinforcement:
• Grade 80, 1.15
• Grade 100, 1.30
Straight Development Length of
Deformed Bars in Tension
• Modification in general development length
equation 25.4.2.4(a)
• Provision 25.4.2.2
Ktr ≥ 0.5db for fy ≥ 80,000 psi , if longitudinal bar
spacing < 6 in.
ℓ𝑑𝑑 =
3
40
𝑓𝑓𝑦𝑦
𝜆𝜆 𝑓𝑓𝑐𝑐
′
𝜓𝜓𝑡𝑡𝜓𝜓𝑒𝑒𝜓𝜓𝑠𝑠𝝍𝝍𝒈𝒈
𝑐𝑐𝑏𝑏 + 𝐾𝐾𝑡𝑡𝑡𝑡
𝑑𝑑𝑏𝑏
𝑑𝑑𝑏𝑏
Modification factors
λ : Lightweight
ψt : Casting position
ψe : Epoxy
ψs : Size
ψg : Reinforcement grade
40 tr
tr
A
K
s n
=
⋅
Development Length
• Deformed Bars and Deformed Wires in Tension
• Standard Hooks in Tension
• Headed Deformed Bars in Tension
Development Length of Std.
Hooks in Tension
• Failure Modes
• Mostly, front and side failures
• Dominant front failure (pullout and blowout)
• Blowouts were more sudden in nature
Front Pullout Front Blowout Side splitting Tail kickout
Side blowout
Development Length of Standard
Hooks in Tension
fsu = stress at anchorage failure for the hooked bar
fs,ACI = stress predicted by the ACI development length equation
Confined Test Results
Unconfined Test Results
Development Length of Standard
Hooks in Tension
- 25.4.3.1—Development length of standard hooks in
tension is the greater of (a) through (c):
(a)
(b) 8db
(c) 6 in
- Modification factors
𝝍𝝍𝒓𝒓 : Confining reinforcement (redefined)
𝝍𝝍𝒐𝒐 : Location (new)
𝝍𝝍𝒄𝒄 : Concrete strength (new)
𝑓𝑓𝑦𝑦𝜓𝜓𝑒𝑒𝝍𝝍𝒓𝒓𝝍𝝍𝒐𝒐𝝍𝝍𝒄𝒄
55𝜆𝜆 𝑓𝑓𝑐𝑐
′
𝑑𝑑𝑏𝑏
𝟏𝟏.𝟓𝟓
ACI 318- 14
ℓ𝑑𝑑𝑑 =
𝑓𝑓𝑦𝑦𝜓𝜓𝑒𝑒𝝍𝝍𝒄𝒄𝝍𝝍𝒓𝒓
50𝜆𝜆 𝑓𝑓𝑐𝑐
′
𝑑𝑑𝑏𝑏
Development Length of Standard Hooks
in Tension
Modification
factor
Condition Value of
factor
318-14
Confining
reinforcement,
ψr
For 90-degree hooks of No. 11 and smaller
bars
(1) enclosed along ℓdh within ties or stirrups
perpendicular to ℓdh at s ≤ 3db, or
(2) enclosed along the bar extension
beyond hook including the bend within ties
or stirrups perpendicular to ℓext at s ≤ 3db
0.8
Other 1.0
318-19
Confining
reinforcement,
ψr
For No.11 and smaller bars with
Ath ≥ 0.4Ahs or s ≥ 6db
1.0
Other 1.6
Table 25.4.3.2: Modification factors for development of hooked bars in
tension
Development Length of Standard
Hooks in Tension
• (1) Confining reinforcement
placed parallel to the bar
(Typical in beam-column joint)
• Two or more ties or stirrups
parallel to ℓdh enclosing the
hooks
• Evenly distributed with a
center-to-center spacing ≤
8db
• within 15db of the centerline
of the straight portion of the
hooked bars
Fig. R25.4.3.3a
Development Length of Standard
Hooks in Tension
• (2) Confining reinforcement
placed perpendicular to the
bar
• Two or more ties or stirrups
perpendicular to ℓdh enclosing
the hooks
• Evenly distributed with a
center-to-center spacing ≤ 8db
Fig. R25.4.3.3b
Development Length of Std. Hooks in
Tension
Modification
factor
Condition Value of
factor
318-14
Cover
ψc
For No. 11 bar and smaller hooks with side
cover (normal to plane of hook) ≥ 2-1/2 in.
and for 90-degree hook with cover on bar
extension beyond hook ≥ 2 in.
0.7
Other 1.0
318-19
Location, ψo
For No.11 and smaller diameter hooked bars
(1) Terminating inside column core w/ side
cover normal to plane of hook ≥ 2.5 in., or
(2) with side cover normal to plane of hook ≥
6db
1.0
Other 1.25
Table 25.4.3.2: Modification factors for development of hooked bars in
tension
Development Length of Std. Hooks in
Tension
Modification
factor
Condition Value of factor
Concrete
strength, ψc
For f’c < 6000 psi f’c/15,000 +0.6
For f’c ≥ 6000 psi 1.0
Changes to the Concrete
Design Standard
ACI 318-19
Deflection Equations
Concerns about deflection
calculations
• Service level deflections based on Branson’s
equation underpredicted deflections for ρ below ≈
0.8%
• Reports of excessive slab deflections (Kopczynski,
Stivaros)
• High-strength reinforcement may result in lower
reinforcement ratios
𝑰𝑰𝒆𝒆 =
𝑴𝑴𝒄𝒄𝒄𝒄
𝑴𝑴𝒂𝒂
𝟑𝟑
𝑰𝑰𝒈𝒈 + 𝟏𝟏 −
𝑴𝑴𝒄𝒄𝒄𝒄
𝑴𝑴𝒂𝒂
𝟑𝟑
𝑰𝑰𝒄𝒄𝒄𝒄
Ie should be the average of flexibilities
• Branson
• Bischoff
Branson combines stiffnesses. Bischoff combines flexibilities.
Comparison of Branson’s and
Bischoff’s Ie
𝐼𝐼𝑒𝑒 =
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑔𝑔 + 1 −
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔
1
𝐼𝐼𝑒𝑒
=
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2 1
𝐼𝐼𝑔𝑔
+ 1 −
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2 1
𝐼𝐼𝑐𝑐𝑐𝑐
≤
1
𝐼𝐼𝑔𝑔
𝐼𝐼𝑒𝑒 =
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑔𝑔 + 1 −
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔
𝐼𝐼𝑒𝑒 =
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑔𝑔 + 1 −
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
3
𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔
1
𝐼𝐼𝑒𝑒
=
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2 1
𝐼𝐼𝑔𝑔
+ 1 −
𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2 1
𝐼𝐼𝑐𝑐𝑐𝑐
≤
1
𝐼𝐼𝑔𝑔
Lightly reinforced
Midspan deflection
Midspan
moment
Experimental
Branson’s Eq.
Bischoff’s Eq.
• Table 24.2.3.5 ~ Inverse of Bischoff Eqn.
• 2/3 factor added to account for:
• restraint that reduces effective cracking moment
• reduced concrete tensile strength during construction
• Prestressed concrete maintains use of Branson’s Eq.
and 1.0 Ma.
Effective Moment of Inertia
𝑀𝑀𝑎𝑎 > ⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 =
𝐼𝐼𝑐𝑐𝑐𝑐
1 −
⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2
1 −
𝐼𝐼𝑐𝑐𝑐𝑐
𝐼𝐼𝑔𝑔
𝑀𝑀𝑎𝑎 ≤ ⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑔𝑔
𝑀𝑀𝑎𝑎 > ⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 =
𝐼𝐼𝑐𝑐𝑐𝑐
1 −
⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐
𝑀𝑀𝑎𝑎
2
1 −
𝐼𝐼𝑐𝑐𝑐𝑐
𝐼𝐼𝑔𝑔
𝑀𝑀𝑎𝑎 ≤ ⁄
2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑔𝑔
Changes to the Concrete
Design Standard
ACI 318-19
Special Structural
Walls
18.10.2.4—Longitudinal
reinforcement ratio at ends of walls
hw/ℓw ≥ 2.0
• Failures in Chile and New
Zealand
• 1 or 2 large cracks
• Minor secondary cracks
18.10.2.4—Longitudinal
reinforcement ratio at ends of walls
New edge reinforcement ratio
• Well distributed cracks
• Flexure yielding over longer
length
'
6 c
y
f
f
ρ =
18.10.2.4—Longitudinal
reinforcement ratio at ends of walls
18.10.6.4(f)—Special Boundary
Elements Longitudinal bars
supported by a seismic
hook or corner of a hoop
0.025 w
b c
≥ 
Changes to the Concrete
Design Standard
ACI 318-19
Strut-and-Tie Method
23.10 Curved-bar Nodes
Nodal zones are
generally too small to
allow development
Dapped-end T-beam
23.10 Curved-bar Nodes
Two issues that need to
be addressed:
1. Slipping of bar
2. Concrete crushing
Circumferential stress
Radial stress
T1
T2
23.10 Curved-bar Nodes
≥
ts y
b '
s c
A f
r
b f
2
C-T-T
T
T
C
C
but not less than half bend
diameter of Table 25.3
θ < 180 degree bend
23.10 Curved-bar Nodes
23.10.6 The curved bar must
have sufficient to develop
difference in force
ℓcb > ℓd(1 – tan θc)
In terms of rb
2 (1 tan )
2
d c b
b
d
r
− θ
> −
π

James Wight - ACI Building Code-01-54.pdf

More Related Content

What's hot

Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Sarmed Shukur
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresTimóteo Rocha
 
Reinforced concrete beams
Reinforced concrete beamsReinforced concrete beams
Reinforced concrete beamsShivkumar Yadav
 
Tower design using etabs- Nada Zarrak
Tower design using etabs- Nada Zarrak Tower design using etabs- Nada Zarrak
Tower design using etabs- Nada Zarrak Nada Zarrak
 
232992075-SAP2000-Shell.pptx
232992075-SAP2000-Shell.pptx232992075-SAP2000-Shell.pptx
232992075-SAP2000-Shell.pptxCamiloTerceros1
 
Stress Analysis Using Caesar II
Stress Analysis Using Caesar IIStress Analysis Using Caesar II
Stress Analysis Using Caesar IIPatel-mm Jayesh
 
CE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and TorsionCE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and TorsionFawad Najam
 
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarCost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarAIT Solutions
 
4830 vulcraft steel deck
4830 vulcraft steel deck4830 vulcraft steel deck
4830 vulcraft steel deckcacostae111
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compressionSaleem Malik
 
Memoria de calculo estructural metalica
Memoria de calculo estructural metalicaMemoria de calculo estructural metalica
Memoria de calculo estructural metalicaOlmerJobaldoJaraChih
 
Special moment frames aci 318 - اطارات مقاومة للعزوم
Special moment frames aci   318 - اطارات مقاومة للعزوم Special moment frames aci   318 - اطارات مقاومة للعزوم
Special moment frames aci 318 - اطارات مقاومة للعزوم Dr.Youssef Hammida
 

What's hot (20)

Two Pile Group.pdf
Two Pile Group.pdfTwo Pile Group.pdf
Two Pile Group.pdf
 
Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings
 
ETABS Modelling
ETABS ModellingETABS Modelling
ETABS Modelling
 
Seismic assessment of buildings accordance to Eurocode 8 Part 3
Seismic assessment of buildings accordance to Eurocode 8 Part 3Seismic assessment of buildings accordance to Eurocode 8 Part 3
Seismic assessment of buildings accordance to Eurocode 8 Part 3
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structures
 
Reinforced concrete beams
Reinforced concrete beamsReinforced concrete beams
Reinforced concrete beams
 
Tower design using etabs- Nada Zarrak
Tower design using etabs- Nada Zarrak Tower design using etabs- Nada Zarrak
Tower design using etabs- Nada Zarrak
 
Design and analysis of slabs
Design and analysis of slabsDesign and analysis of slabs
Design and analysis of slabs
 
232992075-SAP2000-Shell.pptx
232992075-SAP2000-Shell.pptx232992075-SAP2000-Shell.pptx
232992075-SAP2000-Shell.pptx
 
Manual Sap
Manual SapManual Sap
Manual Sap
 
Stress Analysis Using Caesar II
Stress Analysis Using Caesar IIStress Analysis Using Caesar II
Stress Analysis Using Caesar II
 
CE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and TorsionCE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
 
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarCost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
 
Ccl perú presentación
Ccl perú presentaciónCcl perú presentación
Ccl perú presentación
 
4830 vulcraft steel deck
4830 vulcraft steel deck4830 vulcraft steel deck
4830 vulcraft steel deck
 
Plate notes
Plate notes Plate notes
Plate notes
 
Etabs steel-design
Etabs steel-designEtabs steel-design
Etabs steel-design
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compression
 
Memoria de calculo estructural metalica
Memoria de calculo estructural metalicaMemoria de calculo estructural metalica
Memoria de calculo estructural metalica
 
Special moment frames aci 318 - اطارات مقاومة للعزوم
Special moment frames aci   318 - اطارات مقاومة للعزوم Special moment frames aci   318 - اطارات مقاومة للعزوم
Special moment frames aci 318 - اطارات مقاومة للعزوم
 

Similar to James Wight - ACI Building Code-01-54.pdf

Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...Eva Lantsoght
 
RCC column_Shortly Axially Loaded column.pptx
RCC column_Shortly Axially Loaded column.pptxRCC column_Shortly Axially Loaded column.pptx
RCC column_Shortly Axially Loaded column.pptxHaswanthKollu
 
IS800-2007 Plate Girder.ppt
IS800-2007 Plate Girder.pptIS800-2007 Plate Girder.ppt
IS800-2007 Plate Girder.pptPradeepPandya1
 
1st block_BIM+NEWS in IDEA StatiCa Steel v22.0
1st block_BIM+NEWS in IDEA StatiCa Steel v22.01st block_BIM+NEWS in IDEA StatiCa Steel v22.0
1st block_BIM+NEWS in IDEA StatiCa Steel v22.0Jo Gijbels
 
Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsTeja Ande
 
AITC Shear Wall Design Procedure (20151106)
AITC Shear Wall Design Procedure (20151106)AITC Shear Wall Design Procedure (20151106)
AITC Shear Wall Design Procedure (20151106)Fawad Najam
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)sufiyan shaikh
 
Sd i-module2- rajesh sir
Sd i-module2- rajesh sirSd i-module2- rajesh sir
Sd i-module2- rajesh sirSHAMJITH KM
 
Design of torsion reinforcement
 Design of torsion reinforcement Design of torsion reinforcement
Design of torsion reinforcementMuskanDeura
 
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...Hossam Shafiq II
 
Optimization of steel plate Girder Bridge with web openings and Stiffeners
Optimization of steel plate Girder Bridge with web openings and StiffenersOptimization of steel plate Girder Bridge with web openings and Stiffeners
Optimization of steel plate Girder Bridge with web openings and StiffenersIRJET Journal
 
Koppolu abishek prying action
Koppolu abishek   prying actionKoppolu abishek   prying action
Koppolu abishek prying actionKoppolu Abishek
 
moving displacement based seismic design
moving displacement based seismic designmoving displacement based seismic design
moving displacement based seismic designShakars1
 

Similar to James Wight - ACI Building Code-01-54.pdf (20)

Chapter4b
Chapter4bChapter4b
Chapter4b
 
Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...
 
Ch 4.pdf
Ch 4.pdfCh 4.pdf
Ch 4.pdf
 
RCC column_Shortly Axially Loaded column.pptx
RCC column_Shortly Axially Loaded column.pptxRCC column_Shortly Axially Loaded column.pptx
RCC column_Shortly Axially Loaded column.pptx
 
IS800-2007 Plate Girder.ppt
IS800-2007 Plate Girder.pptIS800-2007 Plate Girder.ppt
IS800-2007 Plate Girder.ppt
 
1st block_BIM+NEWS in IDEA StatiCa Steel v22.0
1st block_BIM+NEWS in IDEA StatiCa Steel v22.01st block_BIM+NEWS in IDEA StatiCa Steel v22.0
1st block_BIM+NEWS in IDEA StatiCa Steel v22.0
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear Walls
 
Rc detailing-to-ec2
Rc detailing-to-ec2Rc detailing-to-ec2
Rc detailing-to-ec2
 
pipe-stress-analysis-work.ppt
pipe-stress-analysis-work.pptpipe-stress-analysis-work.ppt
pipe-stress-analysis-work.ppt
 
AITC Shear Wall Design Procedure (20151106)
AITC Shear Wall Design Procedure (20151106)AITC Shear Wall Design Procedure (20151106)
AITC Shear Wall Design Procedure (20151106)
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
 
Sd i-module2- rajesh sir
Sd i-module2- rajesh sirSd i-module2- rajesh sir
Sd i-module2- rajesh sir
 
Design of torsion reinforcement
 Design of torsion reinforcement Design of torsion reinforcement
Design of torsion reinforcement
 
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...
Lec04 Analysis of Rectangular RC Beams (Reinforced Concrete Design I & Prof. ...
 
Ch 8.pdf
Ch 8.pdfCh 8.pdf
Ch 8.pdf
 
Optimization of steel plate Girder Bridge with web openings and Stiffeners
Optimization of steel plate Girder Bridge with web openings and StiffenersOptimization of steel plate Girder Bridge with web openings and Stiffeners
Optimization of steel plate Girder Bridge with web openings and Stiffeners
 
Connections
Connections Connections
Connections
 
Koppolu abishek prying action
Koppolu abishek   prying actionKoppolu abishek   prying action
Koppolu abishek prying action
 
moving displacement based seismic design
moving displacement based seismic designmoving displacement based seismic design
moving displacement based seismic design
 

More from sandipanpaul16

Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfMathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfsandipanpaul16
 
Flood Handbook Analysis and Modeling Eslamian 2022.pdf
Flood Handbook Analysis and Modeling Eslamian 2022.pdfFlood Handbook Analysis and Modeling Eslamian 2022.pdf
Flood Handbook Analysis and Modeling Eslamian 2022.pdfsandipanpaul16
 
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdf
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdfFluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdf
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdfsandipanpaul16
 
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdf
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdfSurvey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdf
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdfsandipanpaul16
 
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfMathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfsandipanpaul16
 
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdf
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdfASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdf
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdfsandipanpaul16
 
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdfsandipanpaul16
 
indian polity ghatna chakra.pdf
indian polity ghatna chakra.pdfindian polity ghatna chakra.pdf
indian polity ghatna chakra.pdfsandipanpaul16
 
Surveying by Sandeep Jyani Sir _ Complete PDF.pdf
Surveying by Sandeep Jyani Sir _ Complete PDF.pdfSurveying by Sandeep Jyani Sir _ Complete PDF.pdf
Surveying by Sandeep Jyani Sir _ Complete PDF.pdfsandipanpaul16
 
Steel Structures by Vivek Gupta Sir Civil Junction.pdf
Steel Structures by Vivek Gupta Sir Civil Junction.pdfSteel Structures by Vivek Gupta Sir Civil Junction.pdf
Steel Structures by Vivek Gupta Sir Civil Junction.pdfsandipanpaul16
 
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfImprovements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfsandipanpaul16
 
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdf
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdfACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdf
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdfsandipanpaul16
 
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdf
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdfRapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdf
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdfsandipanpaul16
 
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfImprovements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfsandipanpaul16
 
estimate costing with detailed questions.pdf
estimate costing with detailed questions.pdfestimate costing with detailed questions.pdf
estimate costing with detailed questions.pdfsandipanpaul16
 
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdf
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdfEnvironment Engg Vol-1 Jaspal Sir (civilenggpdf).pdf
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdfsandipanpaul16
 
Environment Engg. Vol-I , Jaspal sir.pdf
Environment Engg. Vol-I , Jaspal sir.pdfEnvironment Engg. Vol-I , Jaspal sir.pdf
Environment Engg. Vol-I , Jaspal sir.pdfsandipanpaul16
 
PPI SE Structural Engineering Reference Manual, 9th Edition.pdf
PPI SE Structural Engineering Reference Manual, 9th Edition.pdfPPI SE Structural Engineering Reference Manual, 9th Edition.pdf
PPI SE Structural Engineering Reference Manual, 9th Edition.pdfsandipanpaul16
 
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdf
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdfFundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdf
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdfsandipanpaul16
 

More from sandipanpaul16 (20)

Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfMathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
 
Flood Handbook Analysis and Modeling Eslamian 2022.pdf
Flood Handbook Analysis and Modeling Eslamian 2022.pdfFlood Handbook Analysis and Modeling Eslamian 2022.pdf
Flood Handbook Analysis and Modeling Eslamian 2022.pdf
 
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdf
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdfFluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdf
Fluid Mechanics in SI Units 2nd Edition hibbeler 2021.pdf
 
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdf
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdfSurvey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdf
Survey_and_Assessment_of_Traditionally_Constructed_Brickwork_Jenkins.pdf
 
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdfMathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
Mathematical_Analysis_of_Groundwater_Flow_Models_Atangana_2022.pdf
 
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdf
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdfASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdf
ASCE_7_22_Minimum_Design_Loads_and_Associated_Criteria_for_Buildings.pdf
 
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf
12th_PhD_Symposium_in_Prague,_Czech_Republic_–_FIB_Proceedings_2018.pdf
 
Surveying Notes .pdf
Surveying Notes .pdfSurveying Notes .pdf
Surveying Notes .pdf
 
indian polity ghatna chakra.pdf
indian polity ghatna chakra.pdfindian polity ghatna chakra.pdf
indian polity ghatna chakra.pdf
 
Surveying by Sandeep Jyani Sir _ Complete PDF.pdf
Surveying by Sandeep Jyani Sir _ Complete PDF.pdfSurveying by Sandeep Jyani Sir _ Complete PDF.pdf
Surveying by Sandeep Jyani Sir _ Complete PDF.pdf
 
Steel Structures by Vivek Gupta Sir Civil Junction.pdf
Steel Structures by Vivek Gupta Sir Civil Junction.pdfSteel Structures by Vivek Gupta Sir Civil Junction.pdf
Steel Structures by Vivek Gupta Sir Civil Junction.pdf
 
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfImprovements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
 
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdf
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdfACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdf
ACI_materials_journal_November_2021_V_118_No_6_SPECIAL_ISSUE_ADVANCES.pdf
 
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdf
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdfRapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdf
Rapid_Excavation_and_Tunneling_Conference_2017_Proceedings_Lawrence.pdf
 
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdfImprovements_in_reservoir_construction,_operation_and_maintenance.pdf
Improvements_in_reservoir_construction,_operation_and_maintenance.pdf
 
estimate costing with detailed questions.pdf
estimate costing with detailed questions.pdfestimate costing with detailed questions.pdf
estimate costing with detailed questions.pdf
 
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdf
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdfEnvironment Engg Vol-1 Jaspal Sir (civilenggpdf).pdf
Environment Engg Vol-1 Jaspal Sir (civilenggpdf).pdf
 
Environment Engg. Vol-I , Jaspal sir.pdf
Environment Engg. Vol-I , Jaspal sir.pdfEnvironment Engg. Vol-I , Jaspal sir.pdf
Environment Engg. Vol-I , Jaspal sir.pdf
 
PPI SE Structural Engineering Reference Manual, 9th Edition.pdf
PPI SE Structural Engineering Reference Manual, 9th Edition.pdfPPI SE Structural Engineering Reference Manual, 9th Edition.pdf
PPI SE Structural Engineering Reference Manual, 9th Edition.pdf
 
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdf
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdfFundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdf
Fundamentals_of_Mobile_Heavy_Equipment_Wright_Heard_Duffy_2019.pdf
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

James Wight - ACI Building Code-01-54.pdf

  • 1. James K. Wight, Past ACI President, Former Chair of Comm. 318 F.E. Richart, Jr. Collegiate Professor of Civil & Env. Engineering University of Michigan ACI 318-19: What’s New for 2019
  • 2. ACI 318-19: What’s New for 2019 • New Shear Strength Equations; including size-effect factor • Higher Rebar Grades • Updated Development Lengths • New Effective Stiffness for Deflection Calculations • Seismic Design Details – Shear Walls • Some Updates to Strut & Tie Method
  • 3. Changes to the Concrete Design Standard ACI 318-19 Shear Modifications
  • 4. Shear equation changes for one- way and two-way shear • Size Effect • Low Flexural Reinforcement Ratio • Axial load (prestress) • Results gathered and vetted by ACI Comm. 445
  • 5. Why one-way shear equations changed in 318-19 5 Figure: Strength Ratio (Vtest/Vn) d = 10 in. – λs, size effect factor ,min v v A A ≤
  • 6. Why one-way shear equations changed in 318-19 6 0.0018 – min. slab ρw ,min v v A A ≤ 0.015 – ρw effect Figure: Strength Ratio (Vtest/Vn)
  • 7. Why one-way shear equations changed in 318-19 7 d = 10 in. – λs, size effect factor ,min v v A A > Figure: Strength Ratio (Vtest/Vn)
  • 8. One-way shear provision: Modified goals • Include nonprestressed and prestressed • Include size effect and axial loading • Include effect of (ρw) • Continue to use 2√f’ c • Reduce multiple empirical equations • Easy to use
  • 9. ACI 318-19 New one-way shear equations Table 22.5.5.1 - Vc for nonprestressed members Criteria Vc Av ≥ Av,min Either of: 2𝜆𝜆 𝑓𝑓𝑓𝑐𝑐 + 𝑁𝑁𝑢𝑢 6𝐴𝐴𝑔𝑔 𝑏𝑏𝑤𝑤𝑑𝑑 (a) 8𝜆𝜆 𝜌𝜌𝑤𝑤 ⁄ 1 3 𝑓𝑓𝑓𝑐𝑐 + 𝑁𝑁𝑢𝑢 6𝐴𝐴𝑔𝑔 𝑏𝑏𝑤𝑤𝑑𝑑 (b) Av < Av,min 8𝜆𝜆𝑠𝑠𝜆𝜆 𝜌𝜌𝑤𝑤 ⁄ 1 3 𝑓𝑓𝑓𝑐𝑐 + 𝑁𝑁𝑢𝑢 6𝐴𝐴𝑔𝑔 𝑏𝑏𝑤𝑤𝑑𝑑 (c) Notes: 1. Axial load, Nu, is positive for compression and negative for tension 2. Vc shall not be taken less than zero.
  • 11. Size Effect: Value for λs? 0 0.2 0.4 0.6 0.8 1 1.2 0 12 24 36 48 60 72 84 96 108 120 λ s Depth in inches 2 1.0 1 10 s d λ = ≤ +
  • 12. Beam discussion • Where Av,min installed and Nu ≈ 0, Vc≈ (2√f’ c)bwd, – ACI 318-14 ~ ACI 318-19 • Provisions encourage use of Av,min
  • 13. 9.6.3.1 - Minimum shear reinforcement • ACI 318-14 • Av,min required if Vu > 0.5 φVc • ACI 318-19 • Av,min required if Vu > φλ√f’ c bwd
  • 14. Example: Foundation Shear Check • ℓ = 12 ft • h = 30 in. • d~25.5 in. • f’ c = 4000 psi • 13-No. 8 bars • b = 12 ft • Av = 0 in.2 • As = 10.27 in.2 • Analysis Vu= 231 kip 3 ft – 0 in.
  • 15. Example: Foundation Shear Check • ACI 318-14 ' 2 (0.75)(2)(1) 4000 (144 .)(25.5 .) 348 kip 231 kip OK c c c c V f bd V psi in in V φ φ λ φ φ = = = > ∴
  • 16. Example: Foundation Shear Check • ACI 318-19 • Av ≤ Av,min • Per ACI 318-19 (13.2.6.2), neglect size effect for: – One-way shallow foundations – Two-way isolated footings – Two-way combined and mat foundations 1 ' 3 8 ( ) c w c V f bd φ φ λ ρ =
  • 17. Example: Foundation Shear Check • ACI 318-19 ( ) 1 ' 3 2 1 3 8 ( ) 10.27 in. 0.0028 (144 in.)(25.5 in.) (0.75)(8)(1) 0.0028 4000 (144 .)(25.5 .) 196 kip 231 kip NG c w c w c c V f bd V psi in in V φ φ λ ρ ρ φ φ = = = = < ∴
  • 18. Example: Foundation Shear Check • ACI 318-19 • Add 6 in. thickness ( ) 1 ' 3 2 1 3 8 ( ) 10.27 in. 0.0023 (144 in.)(31.5 in.) (0.75)(8)(1) 0.0023 4000 psi(144 in.)(31.5 in.) 226 kip > 191 kip OK c w c w c c V f bd V V φ φ λ ρ ρ φ φ = = = ∴
  • 19. Why two-way shear provisions changed in 318-19 • First Equation developed in 1963 for slabs with t < 5 in. and ρ > 1% • Two issues similar to one-way shear • Size effect • Low ρ vc Least of (a), (b), and (c): (a) (b) (c) ' 4 c f λ ' 4 2 c f   + λ   β   ' 2 s c o d f b   α + λ     bo Vc = vc(bod)
  • 20. Two-way shear: size effect • Table 22.6.5.2—vc for two-way members without shear reinforcement vc Least of (a), (b), and (c): (a) (b) (c) ' 4 c s f λ λ ' 4 2 c s f   + λ   β λ   ' 2 s s c o d f b   α λ + λ    2 1 1 10 s d λ = ≤ +
  • 21. Two-way shear: Effect of low ρ • Only vert. load, cracking ~2 𝒇𝒇𝒄𝒄 ′ ; punching 4 𝒇𝒇𝒄𝒄 ′ • Aggregate interlock contributes to shear strength • Low ρ  local bar yielding, crack width increase, allows sliding along shear crack • Punching loads < 4 𝒇𝒇𝒄𝒄 ′ Source: Performance and design of punching –shear reinforcing system, Ruiz et al, fib 2010
  • 22. New two-way slab reinforcement limits • Need As,min ≥ 0.0018Ag • If on the critical section • Then ,min 5 uv slab o s s y v b b A f ≥ φα ' 2 uv s c v f > φ λ λ
  • 23. h 1.5h Slab edge bslab h 1.5h bslab 1.5h Slab edge Table 8.4.2.2.3 h h 1.5 h 1.5 h 1.5 h bslab bslab Definition of bslab Slab Edge
  • 24. Changes to the Concrete Design Standard ACI 318-19 Development Length
  • 25. Development Length • Straight Deformed Bars and Deformed Wires in Tension • Simple modification to 318-14 • Accounts for Grade 80 and 100 • Standard Hooks and Headed Deformed Bars • Substantial changes from 318-14
  • 26. Straight Development Length of Deformed Bars in Tension ftest = reinforcement stress at the time of failure fcalc = calculated stress: ACI 318-14 Unconfined
  • 27. Straight Development Length of Deformed Bars in Tension • Modification in simplified provisions of Table 25.4.2.3 • Ψg : new modification factor based on grade of reinforcement: • Grade 80, 1.15 • Grade 100, 1.30
  • 28. Straight Development Length of Deformed Bars in Tension • Modification in general development length equation 25.4.2.4(a) • Provision 25.4.2.2 Ktr ≥ 0.5db for fy ≥ 80,000 psi , if longitudinal bar spacing < 6 in. ℓ𝑑𝑑 = 3 40 𝑓𝑓𝑦𝑦 𝜆𝜆 𝑓𝑓𝑐𝑐 ′ 𝜓𝜓𝑡𝑡𝜓𝜓𝑒𝑒𝜓𝜓𝑠𝑠𝝍𝝍𝒈𝒈 𝑐𝑐𝑏𝑏 + 𝐾𝐾𝑡𝑡𝑡𝑡 𝑑𝑑𝑏𝑏 𝑑𝑑𝑏𝑏 Modification factors λ : Lightweight ψt : Casting position ψe : Epoxy ψs : Size ψg : Reinforcement grade 40 tr tr A K s n = ⋅
  • 29. Development Length • Deformed Bars and Deformed Wires in Tension • Standard Hooks in Tension • Headed Deformed Bars in Tension
  • 30. Development Length of Std. Hooks in Tension • Failure Modes • Mostly, front and side failures • Dominant front failure (pullout and blowout) • Blowouts were more sudden in nature Front Pullout Front Blowout Side splitting Tail kickout Side blowout
  • 31. Development Length of Standard Hooks in Tension fsu = stress at anchorage failure for the hooked bar fs,ACI = stress predicted by the ACI development length equation Confined Test Results Unconfined Test Results
  • 32. Development Length of Standard Hooks in Tension - 25.4.3.1—Development length of standard hooks in tension is the greater of (a) through (c): (a) (b) 8db (c) 6 in - Modification factors 𝝍𝝍𝒓𝒓 : Confining reinforcement (redefined) 𝝍𝝍𝒐𝒐 : Location (new) 𝝍𝝍𝒄𝒄 : Concrete strength (new) 𝑓𝑓𝑦𝑦𝜓𝜓𝑒𝑒𝝍𝝍𝒓𝒓𝝍𝝍𝒐𝒐𝝍𝝍𝒄𝒄 55𝜆𝜆 𝑓𝑓𝑐𝑐 ′ 𝑑𝑑𝑏𝑏 𝟏𝟏.𝟓𝟓 ACI 318- 14 ℓ𝑑𝑑𝑑 = 𝑓𝑓𝑦𝑦𝜓𝜓𝑒𝑒𝝍𝝍𝒄𝒄𝝍𝝍𝒓𝒓 50𝜆𝜆 𝑓𝑓𝑐𝑐 ′ 𝑑𝑑𝑏𝑏
  • 33. Development Length of Standard Hooks in Tension Modification factor Condition Value of factor 318-14 Confining reinforcement, ψr For 90-degree hooks of No. 11 and smaller bars (1) enclosed along ℓdh within ties or stirrups perpendicular to ℓdh at s ≤ 3db, or (2) enclosed along the bar extension beyond hook including the bend within ties or stirrups perpendicular to ℓext at s ≤ 3db 0.8 Other 1.0 318-19 Confining reinforcement, ψr For No.11 and smaller bars with Ath ≥ 0.4Ahs or s ≥ 6db 1.0 Other 1.6 Table 25.4.3.2: Modification factors for development of hooked bars in tension
  • 34. Development Length of Standard Hooks in Tension • (1) Confining reinforcement placed parallel to the bar (Typical in beam-column joint) • Two or more ties or stirrups parallel to ℓdh enclosing the hooks • Evenly distributed with a center-to-center spacing ≤ 8db • within 15db of the centerline of the straight portion of the hooked bars Fig. R25.4.3.3a
  • 35. Development Length of Standard Hooks in Tension • (2) Confining reinforcement placed perpendicular to the bar • Two or more ties or stirrups perpendicular to ℓdh enclosing the hooks • Evenly distributed with a center-to-center spacing ≤ 8db Fig. R25.4.3.3b
  • 36. Development Length of Std. Hooks in Tension Modification factor Condition Value of factor 318-14 Cover ψc For No. 11 bar and smaller hooks with side cover (normal to plane of hook) ≥ 2-1/2 in. and for 90-degree hook with cover on bar extension beyond hook ≥ 2 in. 0.7 Other 1.0 318-19 Location, ψo For No.11 and smaller diameter hooked bars (1) Terminating inside column core w/ side cover normal to plane of hook ≥ 2.5 in., or (2) with side cover normal to plane of hook ≥ 6db 1.0 Other 1.25 Table 25.4.3.2: Modification factors for development of hooked bars in tension
  • 37. Development Length of Std. Hooks in Tension Modification factor Condition Value of factor Concrete strength, ψc For f’c < 6000 psi f’c/15,000 +0.6 For f’c ≥ 6000 psi 1.0
  • 38. Changes to the Concrete Design Standard ACI 318-19 Deflection Equations
  • 39. Concerns about deflection calculations • Service level deflections based on Branson’s equation underpredicted deflections for ρ below ≈ 0.8% • Reports of excessive slab deflections (Kopczynski, Stivaros) • High-strength reinforcement may result in lower reinforcement ratios 𝑰𝑰𝒆𝒆 = 𝑴𝑴𝒄𝒄𝒄𝒄 𝑴𝑴𝒂𝒂 𝟑𝟑 𝑰𝑰𝒈𝒈 + 𝟏𝟏 − 𝑴𝑴𝒄𝒄𝒄𝒄 𝑴𝑴𝒂𝒂 𝟑𝟑 𝑰𝑰𝒄𝒄𝒄𝒄
  • 40. Ie should be the average of flexibilities
  • 41. • Branson • Bischoff Branson combines stiffnesses. Bischoff combines flexibilities. Comparison of Branson’s and Bischoff’s Ie 𝐼𝐼𝑒𝑒 = 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑔𝑔 + 1 − 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔 1 𝐼𝐼𝑒𝑒 = 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 𝐼𝐼𝑔𝑔 + 1 − 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 1 𝐼𝐼𝑔𝑔 𝐼𝐼𝑒𝑒 = 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑔𝑔 + 1 − 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔 𝐼𝐼𝑒𝑒 = 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑔𝑔 + 1 − 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 3 𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 𝐼𝐼𝑔𝑔 1 𝐼𝐼𝑒𝑒 = 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 𝐼𝐼𝑔𝑔 + 1 − 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 𝐼𝐼𝑐𝑐𝑐𝑐 ≤ 1 𝐼𝐼𝑔𝑔
  • 43. • Table 24.2.3.5 ~ Inverse of Bischoff Eqn. • 2/3 factor added to account for: • restraint that reduces effective cracking moment • reduced concrete tensile strength during construction • Prestressed concrete maintains use of Branson’s Eq. and 1.0 Ma. Effective Moment of Inertia 𝑀𝑀𝑎𝑎 > ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑐𝑐𝑐𝑐 1 − ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 − 𝐼𝐼𝑐𝑐𝑐𝑐 𝐼𝐼𝑔𝑔 𝑀𝑀𝑎𝑎 ≤ ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑔𝑔 𝑀𝑀𝑎𝑎 > ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑐𝑐𝑐𝑐 1 − ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐 𝑀𝑀𝑎𝑎 2 1 − 𝐼𝐼𝑐𝑐𝑐𝑐 𝐼𝐼𝑔𝑔 𝑀𝑀𝑎𝑎 ≤ ⁄ 2 3 𝑀𝑀𝑐𝑐𝑐𝑐, 𝐼𝐼𝑒𝑒 = 𝐼𝐼𝑔𝑔
  • 44. Changes to the Concrete Design Standard ACI 318-19 Special Structural Walls
  • 45. 18.10.2.4—Longitudinal reinforcement ratio at ends of walls hw/ℓw ≥ 2.0 • Failures in Chile and New Zealand • 1 or 2 large cracks • Minor secondary cracks
  • 46. 18.10.2.4—Longitudinal reinforcement ratio at ends of walls New edge reinforcement ratio • Well distributed cracks • Flexure yielding over longer length ' 6 c y f f ρ =
  • 48. 18.10.6.4(f)—Special Boundary Elements Longitudinal bars supported by a seismic hook or corner of a hoop 0.025 w b c ≥ 
  • 49. Changes to the Concrete Design Standard ACI 318-19 Strut-and-Tie Method
  • 50. 23.10 Curved-bar Nodes Nodal zones are generally too small to allow development Dapped-end T-beam
  • 51. 23.10 Curved-bar Nodes Two issues that need to be addressed: 1. Slipping of bar 2. Concrete crushing Circumferential stress Radial stress T1 T2
  • 52. 23.10 Curved-bar Nodes ≥ ts y b ' s c A f r b f 2 C-T-T T T C C but not less than half bend diameter of Table 25.3 θ < 180 degree bend
  • 53. 23.10 Curved-bar Nodes 23.10.6 The curved bar must have sufficient to develop difference in force ℓcb > ℓd(1 – tan θc) In terms of rb 2 (1 tan ) 2 d c b b d r − θ > − π 