This document summarizes the development history of LM Wind Power's wind turbine blades, including their earliest 61.5m blade introduced in 2004 up to their most recent 88.4m blade. It discusses the challenges of developing an 88.4m blade and the technologies and validations needed, including optimized aerodynamics, loads, geometry, and structure as well as material and component testing. The document also covers standardization of processes and materials for industrialization and quality control plans to support manufacturing quality products.