TAREK SAIED MOHAMED ISMAIL SHAHINPersonal             Marital status: Married.Information          Nationality: Egyptian...
transmission towers , telecommunication towers and steel                 structure from 2005 to august 2007               ...
SAMPLE OF THEPROJECTS IN     A-JOBS MADE OUT OF EGYPT (SULTANTE OFWHICH I              OMAN)PATICIPL                1-Solt...
Contact       EL MANSHIA – BELBIS - SHARKIAinformation   Egypt.              Mobile: +20 01282822640              E-mail: ...
Upcoming SlideShare
Loading in …5
×

Tarek sai dcv[2]

632 views

Published on

Published in: Design
  • Be the first to comment

  • Be the first to like this

Tarek sai dcv[2]

  1. 1. TAREK SAIED MOHAMED ISMAIL SHAHINPersonal  Marital status: Married.Information  Nationality: Egyptian.  Date of birth: 12/11/1968.  Military service: Completed.Objective Looking for a challenging position with development potential in the field of engineering. As work with your organization, I would bring a focus on quality and ease of use to your system development. Furthermore, I Like team work.Education Diploma of artistry & industrial institute (civil site) passed in 1989 Zagazig University.Languages  Arabic: Mother tongue.  English: good.Employment 1- FRIMS company (American Egyptian manufacture steelrecord str.) 2- Bilad Oman Company. 3- ARAB STEEL FAB. (A.S.F). 4- ARABIAN INTERNATIONAL COMPANY FOR STEEL CONSTRUCTION (AIC STEEL) www.aicsteel.com Cairo office & ksa. 5- ENERGYA STEEL FABRICATION COWork Experience Draftsman steel structure in : 1-FRIMS company (American Egyptian manufacture steel str.), from jan.90 to august 1994 as a full time draftsman for drawing the workshop of public projects and surveying the tender documents. 2-Bilad Oman Company, as a full time draftsman for preparing the workshop drawing for steel str. Projects. From august 94 to May 98. 3- ARAB STEEL FAB. (A.S.F), as a full time draftsman for making preparing the workshop drawings for steel str.project, plate works (tanks, ducts, Stack, etc) and communications towers, high masts from OCT.98 September 2005 4-ARABIAN INTERNATIONAL COMPANY FOR STEEL CONSTRUCTION (AIC STEEL) www.aicsteel.com Cairo office & ksa checker. Checking and preparing the shop drawing for steel
  2. 2. transmission towers , telecommunication towers and steel structure from 2005 to august 2007 5- ENERGYA STEEL FABRICATION CO checker. Checking and preparing the shop drawing for steel structure And transmission towers , telecommunication towers and structure from 2007 to NOW Able to check PEB & Structural Steel . • Shop Drawing , Raise RFI & Calculate BOM • Also co-ordinate with Factory. Examine drawings and specification of project. • Preparation of RFI & RFI response. • Coordination with clients. • Preparation of time schedule & coordinate with team leader. •Preparation & checking of G.A. & section drawings. • Checking of detail drawings. • Preparation of report along material list. • Checking of model and make the corrections. • Checking of detail & G.A. drawing. • Editing of the Structural drawing such as Beam, column, Bracing, truss, staircase and handrail.Daily Progress Setting up Steelwork shop Drawings (Fabrication Draw.)...And Steel Projects Detailed Material List. And Job Planning Limitation of Quantities And planning by using Excel program. I worked on all types of structural steel work.Professional Draw and prepare detail of Approval & shop drawing usingexperience most kind of engineering computer software as (AutoCAD 2010 / Strucad Ver. 11 & X-Steel Ver. 17 ) For most types of (industrial project, warehouses, conveyers, communications towers, high masts. Etc) and using most common computer software (Windows 2003 WinWord, Excel... etc) and preparing tenders for varies steel structure Projects. & .Project checker.
  3. 3. SAMPLE OF THEPROJECTS IN A-JOBS MADE OUT OF EGYPT (SULTANTE OFWHICH I OMAN)PATICIPL 1-Soltan Qabos University (700 ton) 2-Cement factory. Russell (2400 ton) 3-Liquidification of Natural Gas. (1200 ton) 4- Factory in U.A.E for El-Sawra.company (350 ton) 5-Main building for Megan glass factory. (450 ton) 6-Commerical building steel (300 ton) 7-Petroleum canopies for Shell (200 ton) 8-Mechanial-equipment petroleum (550 ton) B-Some OF PROJECT PERFORMED IN EGYPT - The covered hall for el-Ahly club (400 ton). 2-Main building for el-Dekhila steel factory (350 ton) 3-Some building and warehouse for Techno gas factory 10 of Ramadan city (350 ton). 4-Careales silos for Caned united (800 ton) 5-west Cairo electricity stations (950 ton). 6-Al oda factory Kuwait (700 ton) 7-Building for new ideal factory in 10th of Ramadan (1500 ton) 8- Sinai white & Sinai grey for Cement Company for Orascom. (1800 ton) 9-some building for united factory. (250 ton) 10-A new factory for assembling cars in Sudan. (600 ton) 11-Main building for galvanization & poles factory .for El- sewedy company (300 ton) 12-Some units from ABB Hi. Vol. company...(350 ton) 13-Some of towers for Communication. (50m, 60m, 65m, 70m, 75m…) 14-Some of high masts for Arab Contractors 20, 25,30m. 15-Sidi kirir electric power station (200 ton)
  4. 4. Contact EL MANSHIA – BELBIS - SHARKIAinformation Egypt. Mobile: +20 01282822640 E-mail: Tarek_said_68@hotmail.com E-mail: Tarek_said_68@yahoo.comReferences Furnished upon request.

×