CV for Mechanical Engineer
AHMED SAMY SAID ABD EL ALEEM
TEL: 00201157054950
Email: ahmed.samy33@yahoo.com
Date of Birth : January 6th
, 1985
Marital Status : Single
Nationality : Egyptian
Religion : Muslim
EDUCATION:
BSc inMechanical PowerEngineering
Faculty of Engineering– Cairo University(Grade:Good)
Workingon Graduation Projectof Air ConditioningSystemand Control
(GraduationProject Grade:Excellent)
Graduation Year: June 2007
EXPERIENCE:
Work History
1. Company : ALHORAITY COMPANYLTD. FOR TRADING AND CONTRACTING.
Designation : Mechanical Site Engineer
Duration : January2012– up to May 2014
Project :
 GASTRIC ILLNESS LABORATORIES AT EL QASSIM
UNIVERSITY
 Main Contractor : ALHORAITY COMPANY LTD. FOR TRADING AND
CONTRACTING.
 Consultant : EL NAEEM
COLLEGE OF SOCIETY – FEMALE AT EL JOUF UNIVERSITY
 Main Contractor : ALHORAITY COMPANY LTD. FOR TRADING AND
CONTRACTING.
 Consultant : EL ARABY
Explainthe functionson my work:
1-A. Work inA/C Installing:
1-A1 Window,SplitandPackage Unit
1-A2 All watersystemchilledwater
1-A3 All AirSystemAHU
1-A4 GI Duct withInsulation
1-A5 GrillsandDiffusers
1-A6 PipingandFitting
1-A7 Pumpsand pressurizationUnit
1-B. PlumbingWorks:
1-B1 Drainage Works(Internal Drainage Network,External Drainage
Network,PipingandFitting)
1-B2 Water SupplyNetwork(Installationwaterpumps/watertank,Pipingand
Fitting)
1-C Work in Dry andwetFie FightingSystemsuchas:
1-C1 Manual Fire SystemEquipmentlike (CO2Extinguisher,DryPowder
Extinguisher,etc.)
1-C2 Fire HydrantsSystem
1-C3 SprinklerSystem
2. Company : Egyco Electromechanical Engineer - UAE
Designation : Mechanical Site Engineer
Duration : January2011– up to January2012
Project :
 Jumerah Park - Package 3 (110 Villas)
 Main Contractor : Al Huda Contracting Co.
 Consultant : Dar Al Handasah
 Block Factory, Ready Mix Concrete Factory & Office Building
 Main Contractor : New Valley
 Consultant : Michel Aziz
 Private Villa (B+G+1)
 Main Contractor : Construction & Reconstruction
Engineering
 Consultant : Eng. M. Al Sheikh Mubarak
Explainthe functionson my work:
2-A. Work inA/C Installing:
2-A1 Window, SplitandPackage Unit
2-A2 All watersystemchilledwater
2-A3 All AirSystemAHU
2-A4 GI Duct withInsulation
2-A5 GrillsandDiffusers
2-A6 PipingandFitting
2-A7 Pumpsand pressurizationUnit
2-B. PlumbingWorks:
2-B1 Drainage Works(Internal Drainage Network,External Drainage
Network,PipingandFitting)
2-B2 Water SupplyNetwork(Installationwaterpumps/watertank,Pipingand
Fitting)
3. Company : ARM International Group- UAE
Designation : Mechanical Site Engineer
Duration : February 2010 up to January2011
Project :
 2 No. Residential Building (G+4) @ Al Nahada
 Main Contractor : Al Huda Contracting Co.
 Consultant : Bel Yoha
Explainthe functionson my work:
3-A Responsible forthe Installationof total mechanical andplumbingworksinthe
undergroundstations.
3-B Responsible forthe completesite management,supervisionof works.
3-C Responsible forDesigncheckandplanningof mechanicalworksasperASHRAE,
SMACNA,ASTMBS & NFPA standards.
3-D Responsible formaterial submittalsanddrawing,mock-upapprovals.
3-E Responsible forclarifyingtechnical issuesonsubmittal &manufacturing
clearance to procurementforapprovedmaterials.
3-F Site co-ordination,supervisionandinsure toprogressof work.
3-G Arranging material andnecessarymanpowerwell inadvance (M&P)
3-H Ensuringwork isexecutedinaccordance withthe contract specification,design
approveddrawings.
3-I Planningthe material requirementandprocurementof the same.
3-J Ensuringthat safetyrulesandregulationsare strictlyflowedatsite.
4. Company : Gas Tec. Company EgyptianpetroleumMinistry.
Designation : Mechanical Engineer
Duration : March 2009 Up to February 2010
Explainthe functionson my work:
Work in Convert cars instead of gasoline to work by natural gas or gasoline.
1- Programming cars to work with natural gas or gasoline
2- Supervise the installation of natural gas kit
3- Supervise on the natural gas compression station (Operating and Maintenance)
Operating Pressure (from 4 bar to 300bar)
5 Company : EL MUSTAFA FOR GENERAL CONTRACTING COMPANY – Egypt.
Designation : Mechanical Site Engineer
Duration : August 2007 Up to March 2009
Explainthe functionson my work:
The follow-upof Fire Fighting,Fire AlarmSystemandAirConditioningSystemProjects
5-A. Work inDry and wetFie FightingSystemsuchas:
5-A1 Manual Fire SystemEquipmentlike (CO2Extinguisher,Dry Powder
Extinguisher,etc.)
5-A2 Fire HydrantsSystem
5-A3 SprinklerSystem
5-A4 Fire alarmSystem(conventional andaddressable system)
5-B. Work as a cost EngineerforFire Alarm, FirefightingSystemandAirConditioning
SystemProjects.
COMPUTER SKILLS:
 ProgrammingLanguages - introductionVisualBasic
 Software Package - IBM compatible PCsrunningMicrosoftwindows
MS-DOS
- MS-Office (word-excel-powerpoint)
- AutoCAD 2D

CV ahmed12

  • 1.
    CV for MechanicalEngineer AHMED SAMY SAID ABD EL ALEEM TEL: 00201157054950 Email: ahmed.samy33@yahoo.com Date of Birth : January 6th , 1985 Marital Status : Single Nationality : Egyptian Religion : Muslim EDUCATION: BSc inMechanical PowerEngineering Faculty of Engineering– Cairo University(Grade:Good) Workingon Graduation Projectof Air ConditioningSystemand Control (GraduationProject Grade:Excellent) Graduation Year: June 2007 EXPERIENCE: Work History 1. Company : ALHORAITY COMPANYLTD. FOR TRADING AND CONTRACTING. Designation : Mechanical Site Engineer Duration : January2012– up to May 2014 Project :  GASTRIC ILLNESS LABORATORIES AT EL QASSIM UNIVERSITY  Main Contractor : ALHORAITY COMPANY LTD. FOR TRADING AND CONTRACTING.  Consultant : EL NAEEM COLLEGE OF SOCIETY – FEMALE AT EL JOUF UNIVERSITY  Main Contractor : ALHORAITY COMPANY LTD. FOR TRADING AND CONTRACTING.  Consultant : EL ARABY
  • 2.
    Explainthe functionson mywork: 1-A. Work inA/C Installing: 1-A1 Window,SplitandPackage Unit 1-A2 All watersystemchilledwater 1-A3 All AirSystemAHU 1-A4 GI Duct withInsulation 1-A5 GrillsandDiffusers 1-A6 PipingandFitting 1-A7 Pumpsand pressurizationUnit 1-B. PlumbingWorks: 1-B1 Drainage Works(Internal Drainage Network,External Drainage Network,PipingandFitting) 1-B2 Water SupplyNetwork(Installationwaterpumps/watertank,Pipingand Fitting) 1-C Work in Dry andwetFie FightingSystemsuchas: 1-C1 Manual Fire SystemEquipmentlike (CO2Extinguisher,DryPowder Extinguisher,etc.) 1-C2 Fire HydrantsSystem 1-C3 SprinklerSystem 2. Company : Egyco Electromechanical Engineer - UAE Designation : Mechanical Site Engineer Duration : January2011– up to January2012 Project :  Jumerah Park - Package 3 (110 Villas)  Main Contractor : Al Huda Contracting Co.  Consultant : Dar Al Handasah  Block Factory, Ready Mix Concrete Factory & Office Building  Main Contractor : New Valley  Consultant : Michel Aziz  Private Villa (B+G+1)  Main Contractor : Construction & Reconstruction Engineering  Consultant : Eng. M. Al Sheikh Mubarak Explainthe functionson my work: 2-A. Work inA/C Installing: 2-A1 Window, SplitandPackage Unit 2-A2 All watersystemchilledwater 2-A3 All AirSystemAHU 2-A4 GI Duct withInsulation 2-A5 GrillsandDiffusers 2-A6 PipingandFitting 2-A7 Pumpsand pressurizationUnit 2-B. PlumbingWorks: 2-B1 Drainage Works(Internal Drainage Network,External Drainage Network,PipingandFitting) 2-B2 Water SupplyNetwork(Installationwaterpumps/watertank,Pipingand Fitting)
  • 3.
    3. Company :ARM International Group- UAE Designation : Mechanical Site Engineer Duration : February 2010 up to January2011 Project :  2 No. Residential Building (G+4) @ Al Nahada  Main Contractor : Al Huda Contracting Co.  Consultant : Bel Yoha Explainthe functionson my work: 3-A Responsible forthe Installationof total mechanical andplumbingworksinthe undergroundstations. 3-B Responsible forthe completesite management,supervisionof works. 3-C Responsible forDesigncheckandplanningof mechanicalworksasperASHRAE, SMACNA,ASTMBS & NFPA standards. 3-D Responsible formaterial submittalsanddrawing,mock-upapprovals. 3-E Responsible forclarifyingtechnical issuesonsubmittal &manufacturing clearance to procurementforapprovedmaterials. 3-F Site co-ordination,supervisionandinsure toprogressof work. 3-G Arranging material andnecessarymanpowerwell inadvance (M&P) 3-H Ensuringwork isexecutedinaccordance withthe contract specification,design approveddrawings. 3-I Planningthe material requirementandprocurementof the same. 3-J Ensuringthat safetyrulesandregulationsare strictlyflowedatsite. 4. Company : Gas Tec. Company EgyptianpetroleumMinistry. Designation : Mechanical Engineer Duration : March 2009 Up to February 2010 Explainthe functionson my work: Work in Convert cars instead of gasoline to work by natural gas or gasoline. 1- Programming cars to work with natural gas or gasoline 2- Supervise the installation of natural gas kit 3- Supervise on the natural gas compression station (Operating and Maintenance) Operating Pressure (from 4 bar to 300bar)
  • 4.
    5 Company :EL MUSTAFA FOR GENERAL CONTRACTING COMPANY – Egypt. Designation : Mechanical Site Engineer Duration : August 2007 Up to March 2009 Explainthe functionson my work: The follow-upof Fire Fighting,Fire AlarmSystemandAirConditioningSystemProjects 5-A. Work inDry and wetFie FightingSystemsuchas: 5-A1 Manual Fire SystemEquipmentlike (CO2Extinguisher,Dry Powder Extinguisher,etc.) 5-A2 Fire HydrantsSystem 5-A3 SprinklerSystem 5-A4 Fire alarmSystem(conventional andaddressable system) 5-B. Work as a cost EngineerforFire Alarm, FirefightingSystemandAirConditioning SystemProjects. COMPUTER SKILLS:  ProgrammingLanguages - introductionVisualBasic  Software Package - IBM compatible PCsrunningMicrosoftwindows MS-DOS - MS-Office (word-excel-powerpoint) - AutoCAD 2D