SlideShare a Scribd company logo
1 of 4
Page 1 of 4
Remon Rezek Ghaly
17 Abo hayan eltawhedy –Nasr city-Cairo-Egypt
Mobile (Egypt ): +2 012 253 544 81
Home: +2 0226713768
E-mail: remon.resek@armaniousgroup.com
 Summary & Objectives:
Civil / Structural Engineer (Site Engineer) with more than nine years experience in
Hotel, real estate projects and towers. Seeking a challenging an interesting job where
My academic Background, skills is utilized & developed.
 Education:
 Bachelor of Civil Engineering,
 Faculty of Engineering South Valley University
 Graduated: May 2004
 Grade: Good. (66.72%)
 Graduation Project: Survey
 Project Grade: Very good.
 Skills:
Computerskill :
Administrative: Computer Courses: Good (Win XP – Win Vista – Win 7
– Office 2003 – Internet)
Engineering: Excellent in Auto Cad.
The Language:
 Good Command in English ( Reading and Writing )
Page 2 of 4
 Experience:
 from 25/12/2012up to now
 Working at Eva Pharma co as senior site engineer in laps building project , Cars
maintenance building project and as senior maintenance engineer in Buildings
pharmaceutical industry .
And at the present time I create a Pharmaceutical Factory in favor of Eva Pharma
Company in the State of Sudan and job duties require supervision on the
construction works and the termination of contracts and extracts and official papers
to set up a factory as an owner engineer.
 from 21/1/2010 to 1/12/2012
 Working at Orascom hotels and development(OHD) as a Senior site Engineer in
hotel project Club Med Taba with overall 324000 m2 areas and estimated cost
350 million pounds.
 Job duties during this 35 month are concrete works substructures and
superstructure for the following …..
 Main building :
1- Main bar.
2- Restaurant.
3- Guest facilities.
4- Night bar.
5- Theater.
 Kids club (four building – kids pool 300m2 area).
 Most of pump rooms lift station and manholes for electric and mechanical works.
 And there are building established concrete, building and finishing.
 Club house building with five tennis court, football field five and archery stock
playground.
 Guest rooms (zoon 2 with 102 rooms).
 Staff house with 130 rooms.
 Sewage treatment plant.
 25% of landscape in all project.
 from 2/12/2007 to 1/9/2009
 Working at "El Rajhi Company" in Saudi Arabia as Senior site Engineer in
school project model 5/8 and 5/21 project (concrete and finishing work) the
work include :
Page 3 of 4
1-School building (4 floors with 17classroom,4 lab, a library and administrative
offices)
2- External metal canopy.
3- Internal metal canopy.
4- Ground tank.
5- Upper tank.
6- The fences.
7-The guard house.
8- Landscape.
 from 1/8/2004 to1/11/2007
 Working at "Land mark contracting Co" as aSite Engineer in 26 residential
building project in Maadi -Cairo .
Project was at area of 10,000 m2 at cost of 36 million pounds and the work
includes concrete works for foundation and building and delivered half
finishing addition to landscape work.
 Working at " Land mark contracting Co " in Nubian museum project and
Electricity transformer station project (concrete and finishing work)in Luxor
city .
 Personal skills:
 Excellent communication skills.
 Ability and flexible to work under pressure and in Groups.
 Self-motivation, excellent ability to learn.
 Cooperative.
 Achieving required goals.
 Ability to work part-time or full-time.
 Personal Info:
 Date of Birth – 7th August. 1982
 Nationality – Egyptian
 Marital Status – married
 Military Status –Not Required
Page 4 of 4
 References
E / Khaled Farid – Construction Projects Manager- Dr. Armanious Group
E-mail: khaled.farid@armaniousgroup.com

More Related Content

What's hot (20)

EVON ABDELBASET Cv
EVON ABDELBASET CvEVON ABDELBASET Cv
EVON ABDELBASET Cv
 
Mahmoud Abo Elmaaty
Mahmoud  Abo ElmaatyMahmoud  Abo Elmaaty
Mahmoud Abo Elmaaty
 
Engineer Mokhtar
Engineer Mokhtar Engineer Mokhtar
Engineer Mokhtar
 
Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1
 
C V ENG MAHMOUD SALAH ENGLISH FORM 2
C V ENG      MAHMOUD SALAH ENGLISH FORM 2  C V ENG      MAHMOUD SALAH ENGLISH FORM 2
C V ENG MAHMOUD SALAH ENGLISH FORM 2
 
beshoy tharwat 2015
beshoy tharwat 2015beshoy tharwat 2015
beshoy tharwat 2015
 
Bahaa-Yehia-Sayed-CV
Bahaa-Yehia-Sayed-CVBahaa-Yehia-Sayed-CV
Bahaa-Yehia-Sayed-CV
 
Eng.Waseem -CV
Eng.Waseem -CVEng.Waseem -CV
Eng.Waseem -CV
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
Mahmoud_Emera_CV
Mahmoud_Emera_CVMahmoud_Emera_CV
Mahmoud_Emera_CV
 
Curriculum vitae rana
Curriculum vitae ranaCurriculum vitae rana
Curriculum vitae rana
 
merna
mernamerna
merna
 
C V
C VC V
C V
 
ahamd ezz eng cv 2015
ahamd ezz eng cv 2015ahamd ezz eng cv 2015
ahamd ezz eng cv 2015
 
merihan cv
merihan cvmerihan cv
merihan cv
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 
Mohammed zaky
Mohammed zaky  Mohammed zaky
Mohammed zaky
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)
 
amir cv
amir cvamir cv
amir cv
 
C.V. small size
C.V. small sizeC.V. small size
C.V. small size
 

Viewers also liked

Finance manager & export Manager
Finance manager & export ManagerFinance manager & export Manager
Finance manager & export ManagerOsama Nahas
 
marketing campaign presentation
marketing campaign presentationmarketing campaign presentation
marketing campaign presentationTucker Dana
 
Если хочешь быть здоров
Если хочешь быть здоровЕсли хочешь быть здоров
Если хочешь быть здоровhelen_2015
 
Powercacereskatia
PowercacereskatiaPowercacereskatia
Powercacereskatiakatyaselene
 
ThinkGRC Introduction to Business Continuity for Middle Management
ThinkGRC Introduction to Business Continuity for Middle ManagementThinkGRC Introduction to Business Continuity for Middle Management
ThinkGRC Introduction to Business Continuity for Middle ManagementThinkGRC
 
The New Normal: A shared purpose in Canadian Sport
The New Normal: A shared purpose in Canadian SportThe New Normal: A shared purpose in Canadian Sport
The New Normal: A shared purpose in Canadian SportActiveforLife
 
Development+of+South+Korea+-+Final+Paper-+Wynn (2)
Development+of+South+Korea+-+Final+Paper-+Wynn (2)Development+of+South+Korea+-+Final+Paper-+Wynn (2)
Development+of+South+Korea+-+Final+Paper-+Wynn (2)Wynn Wang, MA
 

Viewers also liked (10)

TIK BAB 3 KELAS 9
TIK BAB 3 KELAS 9TIK BAB 3 KELAS 9
TIK BAB 3 KELAS 9
 
Finance manager & export Manager
Finance manager & export ManagerFinance manager & export Manager
Finance manager & export Manager
 
joe -new c.v
joe -new c.vjoe -new c.v
joe -new c.v
 
marketing campaign presentation
marketing campaign presentationmarketing campaign presentation
marketing campaign presentation
 
Douglas 2015-catalog
Douglas 2015-catalogDouglas 2015-catalog
Douglas 2015-catalog
 
Если хочешь быть здоров
Если хочешь быть здоровЕсли хочешь быть здоров
Если хочешь быть здоров
 
Powercacereskatia
PowercacereskatiaPowercacereskatia
Powercacereskatia
 
ThinkGRC Introduction to Business Continuity for Middle Management
ThinkGRC Introduction to Business Continuity for Middle ManagementThinkGRC Introduction to Business Continuity for Middle Management
ThinkGRC Introduction to Business Continuity for Middle Management
 
The New Normal: A shared purpose in Canadian Sport
The New Normal: A shared purpose in Canadian SportThe New Normal: A shared purpose in Canadian Sport
The New Normal: A shared purpose in Canadian Sport
 
Development+of+South+Korea+-+Final+Paper-+Wynn (2)
Development+of+South+Korea+-+Final+Paper-+Wynn (2)Development+of+South+Korea+-+Final+Paper-+Wynn (2)
Development+of+South+Korea+-+Final+Paper-+Wynn (2)
 

Similar to remon rezek c.v

Similar to remon rezek c.v (20)

c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References)
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
eslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - Meslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - M
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
CV Osama Salah Aug 2015
CV Osama Salah Aug 2015CV Osama Salah Aug 2015
CV Osama Salah Aug 2015
 
cv بدون
cv بدونcv بدون
cv بدون
 
mohamed mohsen
mohamed mohsenmohamed mohsen
mohamed mohsen
 
Eng Hisham cv
Eng Hisham cvEng Hisham cv
Eng Hisham cv
 
Ahmed Jamal 2
Ahmed Jamal 2Ahmed Jamal 2
Ahmed Jamal 2
 
mona
monamona
mona
 
M.Salamony's_updated 2016
M.Salamony's_updated 2016M.Salamony's_updated 2016
M.Salamony's_updated 2016
 
EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016
 
1-Ahmed Amin's C.V
1-Ahmed Amin's C.V1-Ahmed Amin's C.V
1-Ahmed Amin's C.V
 
Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )
 
mohamed solyman Cv22
mohamed solyman Cv22 mohamed solyman Cv22
mohamed solyman Cv22
 
Mahmoud CV 11-2015
Mahmoud CV 11-2015Mahmoud CV 11-2015
Mahmoud CV 11-2015
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
mohamed dakrory cv
mohamed dakrory cvmohamed dakrory cv
mohamed dakrory cv
 

remon rezek c.v

  • 1. Page 1 of 4 Remon Rezek Ghaly 17 Abo hayan eltawhedy –Nasr city-Cairo-Egypt Mobile (Egypt ): +2 012 253 544 81 Home: +2 0226713768 E-mail: remon.resek@armaniousgroup.com  Summary & Objectives: Civil / Structural Engineer (Site Engineer) with more than nine years experience in Hotel, real estate projects and towers. Seeking a challenging an interesting job where My academic Background, skills is utilized & developed.  Education:  Bachelor of Civil Engineering,  Faculty of Engineering South Valley University  Graduated: May 2004  Grade: Good. (66.72%)  Graduation Project: Survey  Project Grade: Very good.  Skills: Computerskill : Administrative: Computer Courses: Good (Win XP – Win Vista – Win 7 – Office 2003 – Internet) Engineering: Excellent in Auto Cad. The Language:  Good Command in English ( Reading and Writing )
  • 2. Page 2 of 4  Experience:  from 25/12/2012up to now  Working at Eva Pharma co as senior site engineer in laps building project , Cars maintenance building project and as senior maintenance engineer in Buildings pharmaceutical industry . And at the present time I create a Pharmaceutical Factory in favor of Eva Pharma Company in the State of Sudan and job duties require supervision on the construction works and the termination of contracts and extracts and official papers to set up a factory as an owner engineer.  from 21/1/2010 to 1/12/2012  Working at Orascom hotels and development(OHD) as a Senior site Engineer in hotel project Club Med Taba with overall 324000 m2 areas and estimated cost 350 million pounds.  Job duties during this 35 month are concrete works substructures and superstructure for the following …..  Main building : 1- Main bar. 2- Restaurant. 3- Guest facilities. 4- Night bar. 5- Theater.  Kids club (four building – kids pool 300m2 area).  Most of pump rooms lift station and manholes for electric and mechanical works.  And there are building established concrete, building and finishing.  Club house building with five tennis court, football field five and archery stock playground.  Guest rooms (zoon 2 with 102 rooms).  Staff house with 130 rooms.  Sewage treatment plant.  25% of landscape in all project.  from 2/12/2007 to 1/9/2009  Working at "El Rajhi Company" in Saudi Arabia as Senior site Engineer in school project model 5/8 and 5/21 project (concrete and finishing work) the work include :
  • 3. Page 3 of 4 1-School building (4 floors with 17classroom,4 lab, a library and administrative offices) 2- External metal canopy. 3- Internal metal canopy. 4- Ground tank. 5- Upper tank. 6- The fences. 7-The guard house. 8- Landscape.  from 1/8/2004 to1/11/2007  Working at "Land mark contracting Co" as aSite Engineer in 26 residential building project in Maadi -Cairo . Project was at area of 10,000 m2 at cost of 36 million pounds and the work includes concrete works for foundation and building and delivered half finishing addition to landscape work.  Working at " Land mark contracting Co " in Nubian museum project and Electricity transformer station project (concrete and finishing work)in Luxor city .  Personal skills:  Excellent communication skills.  Ability and flexible to work under pressure and in Groups.  Self-motivation, excellent ability to learn.  Cooperative.  Achieving required goals.  Ability to work part-time or full-time.  Personal Info:  Date of Birth – 7th August. 1982  Nationality – Egyptian  Marital Status – married  Military Status –Not Required
  • 4. Page 4 of 4  References E / Khaled Farid – Construction Projects Manager- Dr. Armanious Group E-mail: khaled.farid@armaniousgroup.com