SlideShare a Scribd company logo
1 of 5
Download to read offline
3 El - Israa St., Madinat El Sadat, Imbaba, Giza, Egypt
Phone : 02-33 51 92 93
Mobile : +20 122 242 5016
Email : Shaaban_ibr@yahoo.com
• Position in a multinational company enhances my skills and where I can use
Seeking a challenging my professional experience and personal interactions .
• Date of Birth : January 09, 1963
• Place of Birth : Cairo, Egypt
• Nationality : Egyptian
• Gender : Male
• Marital Status : Married
• Military Status : Completed
• Egypt Civil ID # : 0103278
Bachelor of Mechanical Power Engineering
• Mechanical department, Faculty of Engineering, Cairo University, Egypt
• In : June 1986
• Accumulative grade : Good
• Fabrication, and Installation of Steel Structure
• Installation and Dismantling of Break in and out bells for Tunnel boring machine
TBM
• Installation of Mechanical Equipment, Piping and Tanks
Personal Skills
• Team work
• Leadership
• Time management
• Presentation skills
Shaaban Ibrahim Ahmed Mechanical Engineer ..
Page 1 / 5, June 2014
Career Objective :
Personal Information :
Education :
Skills :
Language Skills
• Arabic: Mother Tongue
• English: Fluent (Read and write)
Computer Skills :
• Microsoft Office
• Internet Applications
Supervisor special safety training (BECHTEL)
• Supervising for Safety
• Fall Prevention and Protection
• Scaffolding Use
• Tool Box Talk and Communication
• Safe Access Means
• P.P.E Personal protection equipment
• Basic First Aid
• Fire Prevention and Protection
• From Oct. 2007 to May 2014
• From Oct. 2004 to Sep. 2007
Page 2 / 5, June 2014
• Electrical Safety
• Construction Environmental
Control Plan
• Risk Assessment
• Lock Out Tag Out
• Confined Space
• In An Emergency
• Hot Work Safety
Company Egyptian French JV
Vinci construction GP (France), Arab Contractor (Egypt),
Bouygues (France), Orascom Industries (Egypt)
Client National Authority for tunnels (Egypt)
Project Cairo Metro line 3 phase 1&2
Position Steel fabrication workshop manager
Responsibilities • Supervision of structure steel fabrication
• Installation and Dismantling of Break in and out bells for
Tunnel boring machine TBM
Company A Joint Venture
Vinci construction GP (France), Bilfinger Berger AG (Germany),
Orascom Industries (Egypt)
Client Ministry of Water Resources and Irrigation, MWRI
Project Naga Hammadi Barrage and Hydropower Plant
(Sluiceway - Navigation Lock - Hydropower Plant)
Position Steel fabrication workshop manager
Responsibilities • Supervision of structure steel fabrication
• Supervision of piles, mooring structure and fender wall
fabrication and installation
Certified Traning Courses :
Professional Experience :
• From Aug. 2003 to Oct. 2004
• From Jan. 2002 to Jul. 2003
Page 3 / 5, June 2014
Company Mitsubishi Heavy Industries
Client BECHTEL
Project Egyptian LNG Tanks
Position Mechanical Construction Engineer - Tank 01
Responsibilities All Mechanical activities in Tank 01 including but not limited
to:
• Installation of bottom plates and all relevant welding works
• Installation of steel structure for tank 01 roof and all relevant
welding works
• Installation of roof nozzles and sleeves
• Installation of side liner plates and all relevant welding works
• Installation of aluminum suspended deck and all relevant
welding works
• Participation in roof air raising activities
• Installation of inner shell plates and all relevant welding works
• Installation of secondary bottom plates and all relevant welding
works
• Installation of tank inner bottom plates and all relevant welding
works
• Fabrication, Modifications and Installation of all the
scaffolding relevant to previous activities
Company Orascom Construction Industries
Client EDF French Company
Project Port said Power Station
Position Mechanical Engineer
Responsibilities • Preparation of all technical documents
• Supervision for piping and piping support
• Follow up out standing works and punch list
• From Nov. 1998 to Dec. 2000
• From Jun. 1996 to Sep. 1998
• From Nov. 1993 to May 1996
Page 4 / 5, June 2014
Company KOBE STEEL Ltd. of Japan
Client ANSDK, Alexandria National Iron and Steel
Project Third direct reduction steel making plant and mineral jetty
stacking reclaiming yard for raw material
Position Technical Office Engineer, Commissioning Engineer
Responsibilities Cairo Office
• Supervision for fabrication of steel structure
• Control local fabrication of steel structural at local factories
(Metal co and Arab Contractor)
• Inspection for fabricated materials to ensure compliance with
drawings and specifications
Site Office
• Supervision of steel structure erection
• Installation of equipment :
Belt Conveyers, Screens, Bucket Elevators, Weight Feeders,
Stacker Reclaimed, Vibrating feeders and relevant piping
• Supervision of piping installation and testing
Company Zaied Al Kazemi Sons Company in Kuwait
Position Construction Engineer
Responsibilities • Supervision of HVAC Systems
(chillers, air handling units, fancoil units, ducting works, pumps)
• Supervision of installation of fire fighting systems
• Preparation of all technical documents
• Supervision for piping and piping support
• Follow up out standing works and punch list
Company Khaled Al Kharafi Company in Kuwait
Position Construction Engineer
Responsibilities • Supervision of steel structure fabrication and installation.
• Making and preparation of as built drawings
• From May 1991 to Oct. 1993
• From Apr. 1989 to Apr. 1991
• From Oct. 1986 to Mar. 1989
Page 5 / 5, June 2014
Company KOBE STEEL Ltd. of Japan
Client National Cement Company of Egypt
Project Beni Suff Cement Factory
Position Technical Engineer
Responsibilities • Supervision of steel structure erection
• Supervision of equipment installation :
- Belt conveyers & Bucket elevators
- Air compressors & Roots blower
- Thermal oil heaters
- Dust Collection systems and relevant ducting
- Potable water treatment units and relevant piping
Equipment commissioning and start up
(Not loaded and loaded tests, dry run cold run, sequence test and
performance test)
Company The Technical Industrial Service and Trading Company
Position Maintenance and Seals Engineer
Responsibilities • Maintenance of different type of pumps
• Fabrication of mechanical seals and oil seals
Company EGYPTIAN Military
References :
• References are available on request ..

More Related Content

What's hot

Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
Minh Bui Si
 
curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)
Ahmed Hassan
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
saeed981
 
john-ingham_nov2016_cv-library
john-ingham_nov2016_cv-libraryjohn-ingham_nov2016_cv-library
john-ingham_nov2016_cv-library
John Ingham
 
john-ingham_august2016_cv-library
john-ingham_august2016_cv-libraryjohn-ingham_august2016_cv-library
john-ingham_august2016_cv-library
John Ingham
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
Pieter Manders
 

What's hot (17)

Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
IRJET- Investigation of Microstructural Features and Mechanical Propertie...
IRJET-  	  Investigation of Microstructural Features and Mechanical Propertie...IRJET-  	  Investigation of Microstructural Features and Mechanical Propertie...
IRJET- Investigation of Microstructural Features and Mechanical Propertie...
 
Final Fully integrated presentation for JSPL SSD products
Final Fully integrated presentation for JSPL SSD productsFinal Fully integrated presentation for JSPL SSD products
Final Fully integrated presentation for JSPL SSD products
 
curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
cv_resume_
cv_resume_cv_resume_
cv_resume_
 
R&d precision exports pvt ltd-Export Processing Zones Pakistan
R&d precision exports pvt ltd-Export Processing Zones PakistanR&d precision exports pvt ltd-Export Processing Zones Pakistan
R&d precision exports pvt ltd-Export Processing Zones Pakistan
 
Safwan-CV
Safwan-CVSafwan-CV
Safwan-CV
 
Ramakrishnan-Resume
Ramakrishnan-ResumeRamakrishnan-Resume
Ramakrishnan-Resume
 
Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...
 
john-ingham_nov2016_cv-library
john-ingham_nov2016_cv-libraryjohn-ingham_nov2016_cv-library
john-ingham_nov2016_cv-library
 
john-ingham_august2016_cv-library
john-ingham_august2016_cv-libraryjohn-ingham_august2016_cv-library
john-ingham_august2016_cv-library
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANT
 
Ahmed Rezk
Ahmed RezkAhmed Rezk
Ahmed Rezk
 
CV ENG Ahmed
CV ENG AhmedCV ENG Ahmed
CV ENG Ahmed
 
Resume
ResumeResume
Resume
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 

Similar to Shaaban Ibrahim (20)

Ahmad Naser CV
Ahmad Naser CVAhmad Naser CV
Ahmad Naser CV
 
السيرة الذاتية
السيرة الذاتيةالسيرة الذاتية
السيرة الذاتية
 
Nazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil Nazmy
Nazmy Nabil Nazmy
 
CV -Engineer-Volkan Sen
CV -Engineer-Volkan SenCV -Engineer-Volkan Sen
CV -Engineer-Volkan Sen
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
reda cv EN
reda cv ENreda cv EN
reda cv EN
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
CV:Resume
CV:ResumeCV:Resume
CV:Resume
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)
 
Sayed Resume
Sayed ResumeSayed Resume
Sayed Resume
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
Alaa CV
Alaa CVAlaa CV
Alaa CV
 

Shaaban Ibrahim

  • 1. 3 El - Israa St., Madinat El Sadat, Imbaba, Giza, Egypt Phone : 02-33 51 92 93 Mobile : +20 122 242 5016 Email : Shaaban_ibr@yahoo.com • Position in a multinational company enhances my skills and where I can use Seeking a challenging my professional experience and personal interactions . • Date of Birth : January 09, 1963 • Place of Birth : Cairo, Egypt • Nationality : Egyptian • Gender : Male • Marital Status : Married • Military Status : Completed • Egypt Civil ID # : 0103278 Bachelor of Mechanical Power Engineering • Mechanical department, Faculty of Engineering, Cairo University, Egypt • In : June 1986 • Accumulative grade : Good • Fabrication, and Installation of Steel Structure • Installation and Dismantling of Break in and out bells for Tunnel boring machine TBM • Installation of Mechanical Equipment, Piping and Tanks Personal Skills • Team work • Leadership • Time management • Presentation skills Shaaban Ibrahim Ahmed Mechanical Engineer .. Page 1 / 5, June 2014 Career Objective : Personal Information : Education : Skills : Language Skills • Arabic: Mother Tongue • English: Fluent (Read and write) Computer Skills : • Microsoft Office • Internet Applications
  • 2. Supervisor special safety training (BECHTEL) • Supervising for Safety • Fall Prevention and Protection • Scaffolding Use • Tool Box Talk and Communication • Safe Access Means • P.P.E Personal protection equipment • Basic First Aid • Fire Prevention and Protection • From Oct. 2007 to May 2014 • From Oct. 2004 to Sep. 2007 Page 2 / 5, June 2014 • Electrical Safety • Construction Environmental Control Plan • Risk Assessment • Lock Out Tag Out • Confined Space • In An Emergency • Hot Work Safety Company Egyptian French JV Vinci construction GP (France), Arab Contractor (Egypt), Bouygues (France), Orascom Industries (Egypt) Client National Authority for tunnels (Egypt) Project Cairo Metro line 3 phase 1&2 Position Steel fabrication workshop manager Responsibilities • Supervision of structure steel fabrication • Installation and Dismantling of Break in and out bells for Tunnel boring machine TBM Company A Joint Venture Vinci construction GP (France), Bilfinger Berger AG (Germany), Orascom Industries (Egypt) Client Ministry of Water Resources and Irrigation, MWRI Project Naga Hammadi Barrage and Hydropower Plant (Sluiceway - Navigation Lock - Hydropower Plant) Position Steel fabrication workshop manager Responsibilities • Supervision of structure steel fabrication • Supervision of piles, mooring structure and fender wall fabrication and installation Certified Traning Courses : Professional Experience :
  • 3. • From Aug. 2003 to Oct. 2004 • From Jan. 2002 to Jul. 2003 Page 3 / 5, June 2014 Company Mitsubishi Heavy Industries Client BECHTEL Project Egyptian LNG Tanks Position Mechanical Construction Engineer - Tank 01 Responsibilities All Mechanical activities in Tank 01 including but not limited to: • Installation of bottom plates and all relevant welding works • Installation of steel structure for tank 01 roof and all relevant welding works • Installation of roof nozzles and sleeves • Installation of side liner plates and all relevant welding works • Installation of aluminum suspended deck and all relevant welding works • Participation in roof air raising activities • Installation of inner shell plates and all relevant welding works • Installation of secondary bottom plates and all relevant welding works • Installation of tank inner bottom plates and all relevant welding works • Fabrication, Modifications and Installation of all the scaffolding relevant to previous activities Company Orascom Construction Industries Client EDF French Company Project Port said Power Station Position Mechanical Engineer Responsibilities • Preparation of all technical documents • Supervision for piping and piping support • Follow up out standing works and punch list
  • 4. • From Nov. 1998 to Dec. 2000 • From Jun. 1996 to Sep. 1998 • From Nov. 1993 to May 1996 Page 4 / 5, June 2014 Company KOBE STEEL Ltd. of Japan Client ANSDK, Alexandria National Iron and Steel Project Third direct reduction steel making plant and mineral jetty stacking reclaiming yard for raw material Position Technical Office Engineer, Commissioning Engineer Responsibilities Cairo Office • Supervision for fabrication of steel structure • Control local fabrication of steel structural at local factories (Metal co and Arab Contractor) • Inspection for fabricated materials to ensure compliance with drawings and specifications Site Office • Supervision of steel structure erection • Installation of equipment : Belt Conveyers, Screens, Bucket Elevators, Weight Feeders, Stacker Reclaimed, Vibrating feeders and relevant piping • Supervision of piping installation and testing Company Zaied Al Kazemi Sons Company in Kuwait Position Construction Engineer Responsibilities • Supervision of HVAC Systems (chillers, air handling units, fancoil units, ducting works, pumps) • Supervision of installation of fire fighting systems • Preparation of all technical documents • Supervision for piping and piping support • Follow up out standing works and punch list Company Khaled Al Kharafi Company in Kuwait Position Construction Engineer Responsibilities • Supervision of steel structure fabrication and installation. • Making and preparation of as built drawings
  • 5. • From May 1991 to Oct. 1993 • From Apr. 1989 to Apr. 1991 • From Oct. 1986 to Mar. 1989 Page 5 / 5, June 2014 Company KOBE STEEL Ltd. of Japan Client National Cement Company of Egypt Project Beni Suff Cement Factory Position Technical Engineer Responsibilities • Supervision of steel structure erection • Supervision of equipment installation : - Belt conveyers & Bucket elevators - Air compressors & Roots blower - Thermal oil heaters - Dust Collection systems and relevant ducting - Potable water treatment units and relevant piping Equipment commissioning and start up (Not loaded and loaded tests, dry run cold run, sequence test and performance test) Company The Technical Industrial Service and Trading Company Position Maintenance and Seals Engineer Responsibilities • Maintenance of different type of pumps • Fabrication of mechanical seals and oil seals Company EGYPTIAN Military References : • References are available on request ..