Gopalpur Industrial Park is a 2970-acre Industrial City consisting of Multi-Product Special Economic Zone, Domestic Tariff Area and Social Infrastructure. The Industrial Park is located at 170 kms South of Bhubaneswar, on National Highway 16.
The industrial park will host one of the best industrial infrastructure that facilitates uninterrupted manufacturing. The salient features of the infrastructure include Well planned wide road network, Robust power infrastructure, Complete water management from supply of treated water to waste water management, Complete Drainage System and Solid waste disposal system.
9. About Odisha
RICH MINERAL
RESOURCES
ROBUST INDUSTRIAL
INFRASTRUCTURE
EASE OF DOING BUSINESS
O DI S HA – N E W O PPO R T U N I T I E S
Leader In Steel
Manufacturing
97% of
Chromite in
India
50% Aluminum
Smelting Capacity
33% of Indian
Iron Ore
Part of Golden
Quadrilateral SEZ Policy
2015
Stable Political &
Economic Situation
Attractive Incentives
Through IPR 2015
Lowest Electricity
Costs In India
Abundant Manpower
at Competitive Rates
LOW COST MFG.
DESTINATION
Easy Availability of Raw
Materials – Metals &
Petrochemical`
Low Cost of
Living
Good Rail Connectivity
With East Coast Rlwys
Good Expat
Living Conditions
Long Coastal Line of 484
Kms With3 Ports
Single Window
Clearance
13. Robust Infrastructure
Internal Roads
- 80mtr wide spine road
- Total road network of
45kms
- Plot sizes varying from 2
acres to 50 acres. Can
be merged together for
bigger requirements
- Provision for utilities,
landscaping, cycle track
etc
Water
- Complete infrastructure
from water sourcing to
treatment to supply to
the units
- The facility also includes
collecting treated waste
water and recycling
- 10 MLD from Perennial
water source
- Additional water source
of 15 MLD Desalination
Plant is proposed
Drainage
- State-of-the-art
underground collection
system
- Sewerage collected
from units are treated
in sewerage treatment
plant and used for
horticulture purposes
Electricity
- Power supply at 11/33
KV
- Modular substations
placed at strategic
locations to optimize
the efficiency of power
supply
- The connections come
right up to the battery
limits of the plots
JUST PLUG & PLAY!
15. Fast Forward Environment Clearance
Hearing
Hearing will be done based on thesolutions
provided and necessary changes are conveyed
for thenext meeting (Generally these meetings
are held every month)
Public Hearing
• Public hearing is to be organized
• Should incorporateobjections and
solutions
Environment Impact Assessment (EIA)
Based on TOR, EIA is required to be done
EIA to be submitted along with the
management plan
Terms of Reference (TOR)
• TOR to be approved
• Depending on the scale of
investment, TOR needs to be submitted to
State Govt./Central Govt. for approval
HASSLE-FREE EC
Save 12 to 14 months (approx.)
of time.