This document summarizes three quality improvement projects at Al-Ahsa Hospital's CQI Department:
1. The Emergency Room project aimed to reduce boarding times over 3 hours by redesigning the ER structure and adding beds. After expansion, waiting times decreased by half.
2. The Troponin I project implemented point-of-care testing in the ER to reduce turnaround times for troponin results to under 1 hour as required. Technicians were trained to prioritize troponin samples.
3. The Fall Prevention project identified issues with risk assessment tools and a lack of clear interventions. A new comprehensive program was implemented using the Johns Hopkins Fall Risk Assessment Tool along with staff education and equipment check