1. Richa Adlakha
richaadlakha@gmail.com
Contact No. 8802336157
Experience Summary:
• 8 years of Experience in Software Testing.
• 6 months of onshore experience (in UK and Finland) in client facing role.
• Good understanding of various testing levels like System Testing and User Acceptance
Testing.
• Good Knowledge on Bug Tracking Tools (Gnats,Webpronto,Bugzilla) and HP Quality
Centre.
• Strong experience in preparing test plan and test report.
• Experience in reviewing and approving test plan and report.
• Experience in preparing, executing, approving test scripts.
• Knowledge of Perl, shell scripting, UNIX fundamentals.
• Good understanding of Datacom Layer2/Layer3 switching.
• Good knowledge of OSPF, BGP, RSVP TE, LDP, VPLS and L2VPN technologies.
• Configuration and working of various Juniper M & T series routers, DASAN v5848G, v8272
routers.
• Experience in preparing test bed.
• Experience in 2G BTS testing.
• Good understanding of Nokia 2G Flexiedge, Fleximulti Radio and FSM BTS.
• 6 years of experience in Datacom Testing.
• 2 years of experience in 2G BTS Testing.
Employment:
Organization Duration Role
Ciena Corporation 08/16/16-till date Module lead
Aricent Technologies From 01/24/2011-7/29/16 Technical leader
Wipro Technology From 03/31/2008 –01/19/2011 Software Engineer
Skill Set :
Domain Datacom
Operating Systems ISS, Juniper OS
Automation Tools AFW frame work,Jbatch,Regression Manager
Bug Tracking Tools Bugzilla,Gnats,web pronto
Network/Telecom BGP, OSPF,MPLS
protocols(LDP,
RSVP TE,VPLS,HVPLS,VPWS,VPLS resiliency using erps)
Telecom Tools used for testing Agilent, Smartbits
2. Projects:
Functional testing of HVPLS,VPLS Resiliency and RSVP TE features over LAG
Period Jan 2015-July 2016
Team-size 8
Environment Linux ip
Client Hitachi Metals Limited
Hardware Routers
Language / Tools used AFW framework/Bug Tracking Tool(Bugzilla)
Domain Network Protocol Testing
Project Description The project includes functional testing of Static VPLS,
HVPLS, VPLS resiliency and RSVP TE features over LAG.
Tools Used
Agilent tools for traffic generation.
Gnats tool for bug logging.
Role As a Test Lead, responsible for
Preparing test plan.
Preparing test bed.
Automation of test cases.
Test execution.
Logging Bugs in Bug Tracking Tool (Bugzilla).
Reviewing of test plan and report prepared by team.
Approving test plan, report and test scripts.
Preparing estimates and schedule.
Getting quality audit for testing documents.
Functional testing of VPLS ADS and graceful restart and HA mechanism for VPLS ADS
Period May 2014 –December 2014
Team-size 8
Environment Free BSD
Client SEI
Hardware Routers
Language / Tools used Shell scripting/Bug Tracking Tool(Bugzilla),Agilent for traffic
generator
3. Domain Network Protocol Testing
Project Description The project includes functional testing router for the ISS
software which includes preparing test plan and results,
automation of test cases, test execution and raising bugs and
preparing test reports.
Tools Used
Agilent tools for traffic generation.
Gnats tool for bug logging.
Jdebug tool for cores analysis.
Role As a Test Engineer, responsible for
Preparing test plan.
Preparing testbed.
Automation test cases.
Test execution
Logging Bugs in Bug Tracking Tool (Bugzilla).
Verification of PRs for ensuring quality release
Validation and fixing of new scripts.
Test Coverage
System Testing for OSPF and
OSPF_HA
Period Jan 24 20011-August 2011
Environment Linux, Windows
Client DASAN
Tools Smart bits for emulating OSPF router and sending
traffic,vm-ware
, Gnats (bug tracking tool).
Description This project includes development and testing of OSPF and
high availability Feature in OSPF for ZebOS software used
in V5848G router.
4. Role Preparing test plan and results.
Test bed setup.
Executing test cases.
Logging bugs.
Preparing test report.
Performance testing of OSPF and high availability
feature using Agilent traffic generator.
Service Release: Regression Testing of Junos M&T series router.
Period July 2008 –March 2010
Team-size 11
Environment Free BSD
Client Juniper Networks
Hardware Juniper Routers
Language / Tools used Perl/Bug Tracking Tool(Gnats)
Domain Network Protocol Testing
Project Description The project includes regression testing of m and t series router
for the junos software as per the customer requirements which
includes preparing test plan and results, automation of test
cases, debugging of scripts which are failed in automation
regression run and raising bugs, verifying bugs fixed in the
release and failure analysis.
Tools Used
Regression manager tool to run the automation
regression.
Agilent tools for traffic generation.
Gnats tool for bug logging.
Jdebug tool for cores analysis.
Role and Responsibilities As a Test Engineer, responsible for
Preparing Test Plan and Results.
Analyzing and debugging failed scripts in the
régression automation run.
Executing Regression Testing using Regression
Manager Tool.
Logging Bugs in Bug Tracking Tool (Gnats).
Maintenance Release : Regression Testing of Junos M&T series router.
Period April 2010 –September 2010
Team-size 8
Environment Free BSD
5. Client Juniper Networks
Hardware Juniper Routers
Language / Tools used Perl/Bug Tracking Tool(Gnats)
Domain Network Protocol Testing
Project Description The project includes regression testing of m and t series router
for the junos software which includes preparing test plan and
results, automation of test cases, debugging of scripts which
are failed in automation regression run and raising bugs,
verifying bugs fixed in the release, script review, modification
of scripts, failure analysis.
Tools Used
E-trans tool to verify the new scripts that are not in
production and create the new scenario.
Regression manager tool to run the automation
regression.
Agilent tools for traffic generation.
Gnats tool for bug logging.
Jdebug tool for cores analysis.
Role As a Test Engineer, responsible for
Analyzing and debugging failed scripts in the
régression.
Automation test script execution.
Analyzing cores using Jdebug tool.
Logging Bugs in Bug Tracking Tool (Gnats).
Verification of PRs for ensuring quality release.
Verification of new scripts which are not in
production.
Executing Regression Testing using Regression
Manager Tool.
Test Coverage.
Maintenance and troubleshooting of Juniper routers.
System Testing of Flexi multi
radio and FSM BTS
Period March 2012-April 2014
Environment Windows
Client NSN
6. Tools Web pronto (Bug tracking tool), HP quality centre, Mobile
call generator, Spectrum analyzer, signal generator, BTS test
automation.
Description This project includes system, regression and release testing
of various features like 2G-3G RF sharing,2G-LTE RF
sharing, Packet abis over Packet switched network, Time
Division Multiplexing, handover, other operation and
maintenance testing etc. for BTS software used in flexi
edge,fleximulti radio and FSM bts for NSN.
Role Preparing test plan and report.
Test bed setup.
Executing test cases.
Logging bugs.
Preparing test report.
Preparing and presenting RCAs to NSN customers
and implementing action plan.
7. Tools Web pronto (Bug tracking tool), HP quality centre, Mobile
call generator, Spectrum analyzer, signal generator, BTS test
automation.
Description This project includes system, regression and release testing
of various features like 2G-3G RF sharing,2G-LTE RF
sharing, Packet abis over Packet switched network, Time
Division Multiplexing, handover, other operation and
maintenance testing etc. for BTS software used in flexi
edge,fleximulti radio and FSM bts for NSN.
Role Preparing test plan and report.
Test bed setup.
Executing test cases.
Logging bugs.
Preparing test report.
Preparing and presenting RCAs to NSN customers
and implementing action plan.