SlideShare a Scribd company logo
1 of 5
Download to read offline
A.SRI GANESH
63 D/3, Kandasamy Puram,
Tuticorin, Tamil Nadu- 628002, E-Mail: a.srignsh@gmail.com
INDIA Contact No: +91-8056437479
O B J E C T I V E
An enthusiastic Pipeline AUT Lead Operator, Supervisor & AUT Inspector seeking position to
utilize skills and abilities in NDT sector. To achieve self-targets of growth and improvements by
being an important and reliable part in the associations progress. Prepared to relocate anywhere
to achieve the same.
K E Y T E C H N I C A L S K I L L S
A dedicated and self motivated with professional experience of more than 7 years with areas of
expertise including project management, supervision, AUT system operator, Procedure
qualification, Technique Validation, NDT instructor and senior technician utilizing all NDT
methods. Ability to adapt to any type of environment and situation. Skilled in providing technical
support for various technical issues. A team player with strong communication, leadership,
analytical, problem solver with strong work management skills. Able to grasp the essentials of
any situation quickly, think on feet, come up with workable ideas, and can communicate them
clearly and persuasively
P R O F E S S I O N A L E X P E R I E N C E
T E C H N I C A L Q U A L I F I C A T I O N
 AUT certification on PipeWizard Phased Array system by M/s Olympus NDT, Canada.
 AUT certification on Weldstar Phased Array system by M/s GE Inspection.
 ASNT Level III in Ultrasonic Testing : (Certificate No. 216886)
 PCN Level III in Ultrasonic Testing: (Certificate No. 328240)
P R O F E S S I O N A L E X P E R I E N C E
COMPANY : Bureau Veritas., SIEVERT GROUP OF COMPANIES.
India & UAE.
Position : AUT Lead Operator / Supervisor & AUT Inspector.
RESPONSIBILITIES:
 Developing Technique, procedure, Calibration Block Design, scan plan and Validation
of the procedures for AUT and Various NDT Methods.
 Interpret and Evaluate AUT Results as per the procedure / Specification / client
requirement.
 Monitoring AUT activities till final report submission according to the procedure and
specification.
 Trouble shooting the problems occur in the AUT System and maintain/repair the same
for the smooth functioning. If necessary get suggestions from the manufacturer to
solve the issue.
 Arranging the AUT Setup with required equipment into a transport vehicle for the
inspection of onshore of Cross Country Pipelines.
 Inspection, Supervision and Leading of AUT activities/personnel’s.
 Conversant with Codes & Standards, ASME SEC V, API 1104, ASTM E 1961, DNV-
OS-F101, BS 4515.
 Planning the inspection activities as per project scope and site condition to avoid waiting
& wastage of resources.
 Maintain standards of safety and comply with company's health safety as environment
management system requirement
 Evaluate new products, services and techniques as required by Clients.
 Originating ideas for the new services and modifications/updates of existing services
consistent with the development of a high profile.
 Witnessing the AUT activities, checking the AUT parameters, calibrations as from
client side.
Onshore AUT Experience
 Dabol Bangalore Pipeline Project, for M/S.Kazstroy Constructions Company Ltd,
under the inspection of M/S Gail India Ltd. using GE Weldstar Phased Array system
Dia / Thickness: 18” / 6.4 , 7.6 mm
Designation : AUT Operator
Duration : Feb 2011 to Jan 2012
 Dahej Vijaypur Pipeline Project , for M/S Fernas Costruction company Ltd, under
the inspection of M/S GAIL using GE Weldstar Phased Array system.
Dia / Thickness: 48” / 15.9 & 17.5 mm
Designation : AUT Operator
Duration : July 2010 to Oct 2010
 Vijaypur Dhadri Pipeline Project, Spread E, for M/S.Essar Constructions India Ltd,
under the inspection of M/S GAIL, using GE Weldstar Phased Array system.
Dia / Thickness : 48” / 17.5, 20.7 & 25mm
Designation : AUT Operator
Duration : Feb 2009 to Jan 2010
 Dhabol Panvel Pipeline Project, for M/s Kalpataru under the inspection of M/s GAIL
using GE Weldstar Phased Array system.
Dia / thickness : 32” / 11.9& 14.3 mm
Designation : AUT Technician
Duration : Aug 2008 to Oct 2008
 SCPX Pipeline Project, for M/s SAJV (Saipem Azfen Joint Venture) under the
inspection of M/s British Petroleum (BP) using Olympus Pipewizard system.
Dia / thickness: 48” / 16.7, 20.1 & 24.1mm.
Designation : AUT Supervisor.
Duration : April 2015 to Till Now.
Offshore AUT Experience
 Bahagansar /Soroosh Riser Pipeline project, for M/S SADAF under the inspection of
M/S.IOOC, using PipeWizard V4 Phased Array System.
Dia / Thickness : 6 & 8” / 14.3, & 18.3 mm.
Designation : AUT Supervisor
Duration : June 2013 to Aug 2013
 South Pars Gas Field Development, Phase 17,18,19,20, 21, 21A, 12A R, 15R, 16R, 22
& 24 Hengam & Soroosh Infield Pipeline, for M/S KITO Enterprises LLC under the
inspection of M/S.POGC, using PipeWizard V4 Phased Array System.
Dia / Thickness : 4.5, 14, 16, 18, 20 & 32” / 6.4, 7.1, 14.3, 15.88, 19.1, 20.6 & 28.8 mm.
Designation : AUT Lead Operator / Supervisor
Duration : Feb 2012 to Sept 2014
As AUT Inspector:
 Marlin Pipe Development Project, for FOXTROT International.
Responsibilities: To witness the AUT Inspection according to procedure
Designation : AUT Level III Inspector.
Duration : Jan 2015 to March 2015.
E Q U I P M E N T S U S E D
 Olympus OmniScan (Phased Array Ultrasonic Testing)
 Olympus PipeWizard (Automatic Ultrasonic Testing)
 GE Weldstar System (Automatic Ultrasonic Testing)
A D D I T I O N A L Q U A L I F I C A T I O N
 Basic Offshore Safety Induction & Emergency Training certificate (BOSIET)
P E R S O N A L D E T A I L S
Full Name : Sri Ganesh. A
Father : Ayyadurai. M
Permanent Address : # 63 D/3, Kandasamy puram,
Tuticorin– 628002,
Tamilnadu - India
Date of Birth : 17 April 1981.
Sex : Male.
Marital Status : Married.
Nationality : Indian.
Educational
Qualification : B.Sc., Physics.
Passport No. : L 6483540, Validity until 02 Jan 2024
Languages : English / Tamil / Hindi
I hereby declare that the information furnished by me are correct and true the best of
my knowledge.
Date: 17-08-2015. Sri Ganesh.A

More Related Content

What's hot

vikas pant resume
vikas pant resumevikas pant resume
vikas pant resumevikas pant
 
Trecoil S.r.l. - Presentation (ENG)
Trecoil S.r.l. - Presentation (ENG)Trecoil S.r.l. - Presentation (ENG)
Trecoil S.r.l. - Presentation (ENG)Trecoil S.r.l.
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1Samuel Ekom
 
Wylie Fell - Resume 2016ssss6
Wylie Fell - Resume  2016ssss6Wylie Fell - Resume  2016ssss6
Wylie Fell - Resume 2016ssss6wylie fell
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza jayesh127
 
Anil uniyal c v latest
Anil uniyal c v latestAnil uniyal c v latest
Anil uniyal c v latestanil uniyal
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
IRUDAYASAMY -TECHNICIAN [CV]
IRUDAYASAMY -TECHNICIAN [CV]IRUDAYASAMY -TECHNICIAN [CV]
IRUDAYASAMY -TECHNICIAN [CV]IRUDAYA SAMY
 
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)Sara Pope
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspectorsantosh kumar
 
Vimalraj NDT CV
Vimalraj NDT CVVimalraj NDT CV
Vimalraj NDT CVVimalraj K
 

What's hot (20)

vikas pant resume
vikas pant resumevikas pant resume
vikas pant resume
 
VIKAS CV
VIKAS CVVIKAS CV
VIKAS CV
 
Trecoil S.r.l. - Presentation (ENG)
Trecoil S.r.l. - Presentation (ENG)Trecoil S.r.l. - Presentation (ENG)
Trecoil S.r.l. - Presentation (ENG)
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1
 
My CV Piping
My CV PipingMy CV Piping
My CV Piping
 
Wylie Fell - Resume 2016ssss6
Wylie Fell - Resume  2016ssss6Wylie Fell - Resume  2016ssss6
Wylie Fell - Resume 2016ssss6
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
 
Anil uniyal c v latest
Anil uniyal c v latestAnil uniyal c v latest
Anil uniyal c v latest
 
VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
EDWIN'S FINISHED RESUME
EDWIN'S FINISHED RESUMEEDWIN'S FINISHED RESUME
EDWIN'S FINISHED RESUME
 
IRUDAYASAMY -TECHNICIAN [CV]
IRUDAYASAMY -TECHNICIAN [CV]IRUDAYASAMY -TECHNICIAN [CV]
IRUDAYASAMY -TECHNICIAN [CV]
 
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
 
Resume
ResumeResume
Resume
 
NDI Technician Resume
NDI Technician ResumeNDI Technician Resume
NDI Technician Resume
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspector
 
API_CV (1)
API_CV (1)API_CV (1)
API_CV (1)
 
Vimalraj NDT CV
Vimalraj NDT CVVimalraj NDT CV
Vimalraj NDT CV
 
Qa,qc
Qa,qcQa,qc
Qa,qc
 

Similar to Sriganesh-Resume (20)

CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)
 
Vikas cv
Vikas cvVikas cv
Vikas cv
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
 
Resume
ResumeResume
Resume
 
R BALAJI - JUNE 2016
R BALAJI - JUNE 2016R BALAJI - JUNE 2016
R BALAJI - JUNE 2016
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
Murugan Resume
Murugan ResumeMurugan Resume
Murugan Resume
 
Quality Engineer CV
Quality Engineer CVQuality Engineer CV
Quality Engineer CV
 
CV-Aji Varghese.,
CV-Aji Varghese.,CV-Aji Varghese.,
CV-Aji Varghese.,
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
CV_PARTHA_ROY DTD 27th july 2016
CV_PARTHA_ROY DTD 27th july  2016CV_PARTHA_ROY DTD 27th july  2016
CV_PARTHA_ROY DTD 27th july 2016
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 

Sriganesh-Resume

  • 1. A.SRI GANESH 63 D/3, Kandasamy Puram, Tuticorin, Tamil Nadu- 628002, E-Mail: a.srignsh@gmail.com INDIA Contact No: +91-8056437479 O B J E C T I V E An enthusiastic Pipeline AUT Lead Operator, Supervisor & AUT Inspector seeking position to utilize skills and abilities in NDT sector. To achieve self-targets of growth and improvements by being an important and reliable part in the associations progress. Prepared to relocate anywhere to achieve the same. K E Y T E C H N I C A L S K I L L S A dedicated and self motivated with professional experience of more than 7 years with areas of expertise including project management, supervision, AUT system operator, Procedure qualification, Technique Validation, NDT instructor and senior technician utilizing all NDT methods. Ability to adapt to any type of environment and situation. Skilled in providing technical support for various technical issues. A team player with strong communication, leadership, analytical, problem solver with strong work management skills. Able to grasp the essentials of any situation quickly, think on feet, come up with workable ideas, and can communicate them clearly and persuasively P R O F E S S I O N A L E X P E R I E N C E T E C H N I C A L Q U A L I F I C A T I O N  AUT certification on PipeWizard Phased Array system by M/s Olympus NDT, Canada.  AUT certification on Weldstar Phased Array system by M/s GE Inspection.  ASNT Level III in Ultrasonic Testing : (Certificate No. 216886)  PCN Level III in Ultrasonic Testing: (Certificate No. 328240)
  • 2. P R O F E S S I O N A L E X P E R I E N C E COMPANY : Bureau Veritas., SIEVERT GROUP OF COMPANIES. India & UAE. Position : AUT Lead Operator / Supervisor & AUT Inspector. RESPONSIBILITIES:  Developing Technique, procedure, Calibration Block Design, scan plan and Validation of the procedures for AUT and Various NDT Methods.  Interpret and Evaluate AUT Results as per the procedure / Specification / client requirement.  Monitoring AUT activities till final report submission according to the procedure and specification.  Trouble shooting the problems occur in the AUT System and maintain/repair the same for the smooth functioning. If necessary get suggestions from the manufacturer to solve the issue.  Arranging the AUT Setup with required equipment into a transport vehicle for the inspection of onshore of Cross Country Pipelines.  Inspection, Supervision and Leading of AUT activities/personnel’s.  Conversant with Codes & Standards, ASME SEC V, API 1104, ASTM E 1961, DNV- OS-F101, BS 4515.  Planning the inspection activities as per project scope and site condition to avoid waiting & wastage of resources.  Maintain standards of safety and comply with company's health safety as environment management system requirement  Evaluate new products, services and techniques as required by Clients.  Originating ideas for the new services and modifications/updates of existing services consistent with the development of a high profile.
  • 3.  Witnessing the AUT activities, checking the AUT parameters, calibrations as from client side. Onshore AUT Experience  Dabol Bangalore Pipeline Project, for M/S.Kazstroy Constructions Company Ltd, under the inspection of M/S Gail India Ltd. using GE Weldstar Phased Array system Dia / Thickness: 18” / 6.4 , 7.6 mm Designation : AUT Operator Duration : Feb 2011 to Jan 2012  Dahej Vijaypur Pipeline Project , for M/S Fernas Costruction company Ltd, under the inspection of M/S GAIL using GE Weldstar Phased Array system. Dia / Thickness: 48” / 15.9 & 17.5 mm Designation : AUT Operator Duration : July 2010 to Oct 2010  Vijaypur Dhadri Pipeline Project, Spread E, for M/S.Essar Constructions India Ltd, under the inspection of M/S GAIL, using GE Weldstar Phased Array system. Dia / Thickness : 48” / 17.5, 20.7 & 25mm Designation : AUT Operator Duration : Feb 2009 to Jan 2010  Dhabol Panvel Pipeline Project, for M/s Kalpataru under the inspection of M/s GAIL using GE Weldstar Phased Array system. Dia / thickness : 32” / 11.9& 14.3 mm Designation : AUT Technician Duration : Aug 2008 to Oct 2008  SCPX Pipeline Project, for M/s SAJV (Saipem Azfen Joint Venture) under the inspection of M/s British Petroleum (BP) using Olympus Pipewizard system. Dia / thickness: 48” / 16.7, 20.1 & 24.1mm. Designation : AUT Supervisor. Duration : April 2015 to Till Now.
  • 4. Offshore AUT Experience  Bahagansar /Soroosh Riser Pipeline project, for M/S SADAF under the inspection of M/S.IOOC, using PipeWizard V4 Phased Array System. Dia / Thickness : 6 & 8” / 14.3, & 18.3 mm. Designation : AUT Supervisor Duration : June 2013 to Aug 2013  South Pars Gas Field Development, Phase 17,18,19,20, 21, 21A, 12A R, 15R, 16R, 22 & 24 Hengam & Soroosh Infield Pipeline, for M/S KITO Enterprises LLC under the inspection of M/S.POGC, using PipeWizard V4 Phased Array System. Dia / Thickness : 4.5, 14, 16, 18, 20 & 32” / 6.4, 7.1, 14.3, 15.88, 19.1, 20.6 & 28.8 mm. Designation : AUT Lead Operator / Supervisor Duration : Feb 2012 to Sept 2014 As AUT Inspector:  Marlin Pipe Development Project, for FOXTROT International. Responsibilities: To witness the AUT Inspection according to procedure Designation : AUT Level III Inspector. Duration : Jan 2015 to March 2015. E Q U I P M E N T S U S E D  Olympus OmniScan (Phased Array Ultrasonic Testing)  Olympus PipeWizard (Automatic Ultrasonic Testing)  GE Weldstar System (Automatic Ultrasonic Testing) A D D I T I O N A L Q U A L I F I C A T I O N  Basic Offshore Safety Induction & Emergency Training certificate (BOSIET)
  • 5. P E R S O N A L D E T A I L S Full Name : Sri Ganesh. A Father : Ayyadurai. M Permanent Address : # 63 D/3, Kandasamy puram, Tuticorin– 628002, Tamilnadu - India Date of Birth : 17 April 1981. Sex : Male. Marital Status : Married. Nationality : Indian. Educational Qualification : B.Sc., Physics. Passport No. : L 6483540, Validity until 02 Jan 2024 Languages : English / Tamil / Hindi I hereby declare that the information furnished by me are correct and true the best of my knowledge. Date: 17-08-2015. Sri Ganesh.A