SlideShare a Scribd company logo
1 of 12
GUIDELINES FOR 
CONSTRUCTION OF 
MASONRY WITH 
SIPOREX BLOCKS 
271246 Puppala Vamsee 
271247 Helen Anitha R 
271248 SRINAATH R 
271249 Priya Rajeev 
271250 Vikhyat Ramachandran 
271251 Chinmai G Rao 
271253 Nirman Rathi 
271254 Riv Mahesh
SIPOREX UNREINFORCED BLOCKS 
Available in the following dimensions 
Oven dry density 
-450 Kg/Cum 
Thk X Height X Length 
075 x 240 x 650 mm 
100 x 240 x 650 mm 
Oven dry density 
-600 Kg/Cum 
Thk X Height X Length 
125 x 240 x 650 mm 
150 x 240 x 650 mm 
200 x 240 x 650 mm
GENERAL 
1. Details of sizes of blocks for walling, partitions & cladding are given in the price list. 
2. Blocks should be stacked in dry, well ventilated areas on a level ground. 
Block should be placed on edges (in the direction of 240 mm height) 
not on flat (in the direction of the thickness). Different stacks should be 
maintained for different sizes of blocks. 
3. Siporex blocks should not be used below ground level or in plinth. 
4. Damp-proof course should be provided before starting superstructure masonry. 
5. Generally, load bearing structures using 20 cm (8”) Siporex blocks can be 
constructed up to two storeys, i.e. G + 1 Buildings. Over G+2, will be a “Framed” 
structure. 
However, it is necessary to design load bearing / partition wall as per relevant IS 
specifications. 
6. Siporex blocks and slabs are highly suitable for extension or addition of floors to 
existing old or new buildings because of their lightweight characteristics
MASONRY WITH SIPOREX BLOCKS 
1. Cement mortar 1 : 6 using Portland cement should be used. 
2. Blocks shall be placed in the direction of 240 mm height in the masonry. 
3. It is not necessary to soak the Siporex blocks before their use in masonry. Their 
surface should be wetted sparingly and afterwards water should be sprinkled for 
curing of masonry joints. 
4. For breaking of joints in the masonry, specifications for brick masonry work shall 
be adopted for guidance. 
5. At door and window openings, 2 nos. 6 mm dia bars should be provided at the top 
of the openings to avoid cracks on plaster. The bars should be provided in the 
course immediately above the lintel and bar should be extended 0.6 m on both 
sides. 
6. Inter-locking should not be done at junctions of load bearing and non-load bearing 
partition walls. Connections between these walls can be achieved by: 
a) Nailing galvanized strips across every third joint with 12 mm galvanized or 
aluminum nails, or 
b) By providing 6 mm dia bars 200 mm long at the Junction.
Siporex blocks are wetted before being 
laid in construction of walls. 
Top: A wall built using siporex blocks 
Bottom: Stacking blocks, on site
MASONRY WITH SIPOREX BLOCKS 
7. Inter-locking at junction of 2 load bearing walls should be done as in brick masonry. 
At the junction between conventional and Siporex block masonry, chicken mesh 
should be provided in the plaster to avoid cracking at the corners and junctions. 
8. Bond beams, 200 x 100 mm (8" x 4") should be provided throughout the load bearing 
walls below the Siporex slabs for floors and roofs, e.g. if there are three rooms with 
continuous wall, bond beam should be continuous with 12 mm dia bars. 2 Nos. and 6 
mm dia bar stirrups of 175 mm (7") centre to centre shall be provided as 
reinforcement. 
9. For Unsupported Siporex: Walling height ≤ height 18 times the thk of wall and 
……………………… horizontally ≤ 24 times thk of wall for load bearing walls. 
For partition or non load bearing walls unsupported length and height should be: 
≤ 30 times the thickness of walls. 
In cases where the length of wall exceeds these limits, Siporex pillars can be 
constructed. If height exceeds the prescribed limit, bond beams at a suitable height 
in the wall should be provided (IS-6041 and IS 1905) . 
10. The work of concealed plumbing & concealed electrical wiring fittings, etc., should 
be decided in advance. Work of chasing should be done in Siporex blocks with 
proper tools to avoid damage to blocks & to prevent cracks in plaster.
INTERNAL AND EXTERNAL PLASTER 
a) Siporex walls should generally be plastered on both sides in two coats. 
Internal walls in industrial buildings may be left unplastered if so desired 
and joints should be properly finished. 
b) Block walls should be wetted sparingly before plaster. 
c) Method of plaster is similar to that of plaster on brick1 concrete walls. 
d) Internal plaster should be carried out in 2 coats with cement mortar 1 : 3 
(One part of Portland cement and 3 parts of screened and washed sand). 
First coat may be of 4 to 6 mm thick and the second coat (finishing coat) 
e) External plaster should be carried out in 2 coats with cement mortar 1 : 3 
(One part of Portland . cement and 3 parts of screened and washed sand.) 
First coat may be of 8 to 10 mm thickness and the second coat (finishing 
coat) may be about 10 mm thick. 
f)Plastered surfaces should be watered for at least one week.
PAINTING 
a) INTERNAL PAINTING 
• For plastered walls the method employed is the same as for other plastered walls. 
• For unplastered walls in industrial buildings, berating paints such as acrylic 
emulsion can be applied. They provide a more impermeable surface and are often 
washable. 
b) EXTERNAL PAINTING 
• For exterior painting of plastered walls, where whitewash is the most common 
method. Longer life and better weather protection is obtained with a cement 
paint. Better moisture protection is obtained with all cement paints by application 
with a stiff brush raher than by spraying
FIXTURES IN SIPOREX 
a) DOOR AND WINDOW FRAMES: 
Door and window frames are attached in the surrounding masonry with 7" aluminum or 
galvanized iron cut nails hammered directly into the Siporex blocks. The nails should be spaced 
at a maximum 40 cm and the first nail should not be farther than 20 cm from a corner. 14 
gauge screws may be used. They should penetrate at least 50 mm into the Siporex blocks and 
should preferable be driven into raw plugs. ALL NAILS AND SCREWS SHALL BE INSERTED INTO 
THE BLOCKS AND NOT ALONG JOINTS. 
b) WASH BASINS: 
Pedestal type wash basins are fixed to the wall using 3" x 14 gauge screws in raw1 plugs. Where 
wash basins are mounted on brackets, use of 4" x 14 gauge screws in raw1 plugs will give 
sufficient strength and rigidity. 
c) CUPBOARDS: 
For most purposes, 3" x 14 gauge screws in raw1 plugs should prove satisfactory. For heavily 
loaded cupboards, timber connector should be used between cupboards and Siporex walls, in 
addition to screws in raw1 plugs.
FIXTURES IN SIPOREX 
d) ELECTRICAL FITTINGS: 
-Light fuse boxes and switch boxes should be fixed using 3" x 10 gauge 
screws in raw1 plugs. 
-Heavier fittings should preferably be mounted on the floor or fixed with 
through bolts. 
-Wall brackets, light switches, should be fixed using 8 to 10 gauge screws, 
not less than 3" long in raw1 plugs. 
-Where conduit runs are made on surface the supporting saddles may be 
fixed with 2" x 10 gauge screws directly into Siporex or where the conduit is 
likely to be subjected to loads during erection, by 811 0 gauge screws in 
raw1 plugs. 
e) HANDRAILS: 
Wherever possible these should be through-bolts. Failing this, use 4" x 14 
gauge screws in raw plugs. 
f) HOT AND COLD WATER PIPES: 
The supporting brackets or holderbats should be fixed to walls using 2"x 10 
gauge screws in raw1 plugs.
PRECAUTIONS 
AGAINST CRACKING IN BLOCKWORK 
1. Limit the cracking to the joints, so that it can be repaired easily. Hence, mortars 
weaker than the blocks are always recommended. 
2. Where uneven settlement of foundations is feared, proper bonding and the use of 
reinforcement in horizontal joints will tend to reduce risks of cracking by 
distributing stresses throughout the wall. 
3. In block walls abutting against columns and beams of load bearing frame, 
differential movements can be caused by settlement, variable loading conditions 
and changes in temperature and humidity. 
4. For blockwork partitions, care should be taken to limit deflection of floors or 
partitions should be strengthened by use of bond beams or reinforcement in the 
lower courses. 
5. Use resilient material stoppers between door shutter and wall at one or two points 
or use door closer to avoid cracking in walls by impact of slamming of doors, etc., 
particularly in these rigid partitions. 
6. Alleviate temperature & shrinkage stresses in the wall by incorporating control 
joints at appropriate intervals and locations.
Guidelines for construction of masonry with siporex

More Related Content

What's hot

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSjagrutib22
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid shaikh khalid
 
Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
TYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSTYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSMaharshi Dave
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Deepak Verma
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 

What's hot (20)

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Timber roof
Timber roofTimber roof
Timber roof
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid
 
Masonry arches
Masonry archesMasonry arches
Masonry arches
 
Long span structures
Long span structures  Long span structures
Long span structures
 
TYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSTYPE OF STEEL TRUSS
TYPE OF STEEL TRUSS
 
Specifications for rcc
Specifications for rcc Specifications for rcc
Specifications for rcc
 
Shoring
ShoringShoring
Shoring
 
Ar. Laurie baker
Ar. Laurie bakerAr. Laurie baker
Ar. Laurie baker
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Tile Flooring
Tile FlooringTile Flooring
Tile Flooring
 
TYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSTYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONS
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 
Building construction
Building constructionBuilding construction
Building construction
 
7.rat trap bonds
7.rat trap bonds7.rat trap bonds
7.rat trap bonds
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 

Viewers also liked

Autoclaved aerated concrete
Autoclaved aerated concreteAutoclaved aerated concrete
Autoclaved aerated concreteAyushi Mehrotra
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concreteFrahim Akhtar
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Materialindiablockmachine
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksThaju Zaman
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Zelkhan
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concreteSIVA Aruna
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bondingRAHUL SINHA
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringAbontee
 
Siporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenSiporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenHouseofPR
 
Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]Rahul Dasgupta
 
Autoclaved Aerated Concrete - Jun'14
Autoclaved Aerated Concrete - Jun'14Autoclaved Aerated Concrete - Jun'14
Autoclaved Aerated Concrete - Jun'14Shushmul Maheshwari
 

Viewers also liked (20)

Autoclaved aerated concrete
Autoclaved aerated concreteAutoclaved aerated concrete
Autoclaved aerated concrete
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 
AAC Blocks Vs. Red Bricks
AAC Blocks Vs. Red BricksAAC Blocks Vs. Red Bricks
AAC Blocks Vs. Red Bricks
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Material
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete Blocks
 
Plastering
PlasteringPlastering
Plastering
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
Bricks
BricksBricks
Bricks
 
5.plastering
5.plastering5.plastering
5.plastering
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
Unit plan
Unit planUnit plan
Unit plan
 
Sharmishtha Salunke
Sharmishtha SalunkeSharmishtha Salunke
Sharmishtha Salunke
 
Siporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenSiporex Portaiden Rakentaminen
Siporex Portaiden Rakentaminen
 
From Sieve to Silver
From Sieve to SilverFrom Sieve to Silver
From Sieve to Silver
 
Aac advantage
Aac advantageAac advantage
Aac advantage
 
Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]
 
Autoclaved Aerated Concrete - Jun'14
Autoclaved Aerated Concrete - Jun'14Autoclaved Aerated Concrete - Jun'14
Autoclaved Aerated Concrete - Jun'14
 

Similar to Guidelines for construction of masonry with siporex

Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall tiesSaratMishra4
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsKHUSHBU SHAH
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksKumarS250747
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationKumarS250747
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Luke D'Arcy
 
Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer lineRAMPRASAD KUMAWAT
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxswethasekhar5
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallZulaiha Amaria
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special featuresJitesh Dhule
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESVenkateswaran S
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfAnmolSharma668762
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdfwoanumberdar
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 

Similar to Guidelines for construction of masonry with siporex (20)

Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall ties
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
Form Work
Form Work Form Work
Form Work
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity walls
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
 
All about decking
All about deckingAll about decking
All about decking
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2
 
Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer line
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special features
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 
All about decking
All about deckingAll about decking
All about decking
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdf
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdf
 
IS 4326
IS 4326IS 4326
IS 4326
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 

More from Priya Raj

The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel TunnelPriya Raj
 
Management Education: Flip sides of the coin
Management Education: Flip sides of the coinManagement Education: Flip sides of the coin
Management Education: Flip sides of the coinPriya Raj
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supplyPriya Raj
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutionsPriya Raj
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problemsPriya Raj
 

More from Priya Raj (7)

Jeff bezos
Jeff bezosJeff bezos
Jeff bezos
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
Management Education: Flip sides of the coin
Management Education: Flip sides of the coinManagement Education: Flip sides of the coin
Management Education: Flip sides of the coin
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supply
 
Zion ppt
Zion pptZion ppt
Zion ppt
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutions
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problems
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Guidelines for construction of masonry with siporex

  • 1. GUIDELINES FOR CONSTRUCTION OF MASONRY WITH SIPOREX BLOCKS 271246 Puppala Vamsee 271247 Helen Anitha R 271248 SRINAATH R 271249 Priya Rajeev 271250 Vikhyat Ramachandran 271251 Chinmai G Rao 271253 Nirman Rathi 271254 Riv Mahesh
  • 2. SIPOREX UNREINFORCED BLOCKS Available in the following dimensions Oven dry density -450 Kg/Cum Thk X Height X Length 075 x 240 x 650 mm 100 x 240 x 650 mm Oven dry density -600 Kg/Cum Thk X Height X Length 125 x 240 x 650 mm 150 x 240 x 650 mm 200 x 240 x 650 mm
  • 3. GENERAL 1. Details of sizes of blocks for walling, partitions & cladding are given in the price list. 2. Blocks should be stacked in dry, well ventilated areas on a level ground. Block should be placed on edges (in the direction of 240 mm height) not on flat (in the direction of the thickness). Different stacks should be maintained for different sizes of blocks. 3. Siporex blocks should not be used below ground level or in plinth. 4. Damp-proof course should be provided before starting superstructure masonry. 5. Generally, load bearing structures using 20 cm (8”) Siporex blocks can be constructed up to two storeys, i.e. G + 1 Buildings. Over G+2, will be a “Framed” structure. However, it is necessary to design load bearing / partition wall as per relevant IS specifications. 6. Siporex blocks and slabs are highly suitable for extension or addition of floors to existing old or new buildings because of their lightweight characteristics
  • 4. MASONRY WITH SIPOREX BLOCKS 1. Cement mortar 1 : 6 using Portland cement should be used. 2. Blocks shall be placed in the direction of 240 mm height in the masonry. 3. It is not necessary to soak the Siporex blocks before their use in masonry. Their surface should be wetted sparingly and afterwards water should be sprinkled for curing of masonry joints. 4. For breaking of joints in the masonry, specifications for brick masonry work shall be adopted for guidance. 5. At door and window openings, 2 nos. 6 mm dia bars should be provided at the top of the openings to avoid cracks on plaster. The bars should be provided in the course immediately above the lintel and bar should be extended 0.6 m on both sides. 6. Inter-locking should not be done at junctions of load bearing and non-load bearing partition walls. Connections between these walls can be achieved by: a) Nailing galvanized strips across every third joint with 12 mm galvanized or aluminum nails, or b) By providing 6 mm dia bars 200 mm long at the Junction.
  • 5. Siporex blocks are wetted before being laid in construction of walls. Top: A wall built using siporex blocks Bottom: Stacking blocks, on site
  • 6. MASONRY WITH SIPOREX BLOCKS 7. Inter-locking at junction of 2 load bearing walls should be done as in brick masonry. At the junction between conventional and Siporex block masonry, chicken mesh should be provided in the plaster to avoid cracking at the corners and junctions. 8. Bond beams, 200 x 100 mm (8" x 4") should be provided throughout the load bearing walls below the Siporex slabs for floors and roofs, e.g. if there are three rooms with continuous wall, bond beam should be continuous with 12 mm dia bars. 2 Nos. and 6 mm dia bar stirrups of 175 mm (7") centre to centre shall be provided as reinforcement. 9. For Unsupported Siporex: Walling height ≤ height 18 times the thk of wall and ……………………… horizontally ≤ 24 times thk of wall for load bearing walls. For partition or non load bearing walls unsupported length and height should be: ≤ 30 times the thickness of walls. In cases where the length of wall exceeds these limits, Siporex pillars can be constructed. If height exceeds the prescribed limit, bond beams at a suitable height in the wall should be provided (IS-6041 and IS 1905) . 10. The work of concealed plumbing & concealed electrical wiring fittings, etc., should be decided in advance. Work of chasing should be done in Siporex blocks with proper tools to avoid damage to blocks & to prevent cracks in plaster.
  • 7. INTERNAL AND EXTERNAL PLASTER a) Siporex walls should generally be plastered on both sides in two coats. Internal walls in industrial buildings may be left unplastered if so desired and joints should be properly finished. b) Block walls should be wetted sparingly before plaster. c) Method of plaster is similar to that of plaster on brick1 concrete walls. d) Internal plaster should be carried out in 2 coats with cement mortar 1 : 3 (One part of Portland cement and 3 parts of screened and washed sand). First coat may be of 4 to 6 mm thick and the second coat (finishing coat) e) External plaster should be carried out in 2 coats with cement mortar 1 : 3 (One part of Portland . cement and 3 parts of screened and washed sand.) First coat may be of 8 to 10 mm thickness and the second coat (finishing coat) may be about 10 mm thick. f)Plastered surfaces should be watered for at least one week.
  • 8. PAINTING a) INTERNAL PAINTING • For plastered walls the method employed is the same as for other plastered walls. • For unplastered walls in industrial buildings, berating paints such as acrylic emulsion can be applied. They provide a more impermeable surface and are often washable. b) EXTERNAL PAINTING • For exterior painting of plastered walls, where whitewash is the most common method. Longer life and better weather protection is obtained with a cement paint. Better moisture protection is obtained with all cement paints by application with a stiff brush raher than by spraying
  • 9. FIXTURES IN SIPOREX a) DOOR AND WINDOW FRAMES: Door and window frames are attached in the surrounding masonry with 7" aluminum or galvanized iron cut nails hammered directly into the Siporex blocks. The nails should be spaced at a maximum 40 cm and the first nail should not be farther than 20 cm from a corner. 14 gauge screws may be used. They should penetrate at least 50 mm into the Siporex blocks and should preferable be driven into raw plugs. ALL NAILS AND SCREWS SHALL BE INSERTED INTO THE BLOCKS AND NOT ALONG JOINTS. b) WASH BASINS: Pedestal type wash basins are fixed to the wall using 3" x 14 gauge screws in raw1 plugs. Where wash basins are mounted on brackets, use of 4" x 14 gauge screws in raw1 plugs will give sufficient strength and rigidity. c) CUPBOARDS: For most purposes, 3" x 14 gauge screws in raw1 plugs should prove satisfactory. For heavily loaded cupboards, timber connector should be used between cupboards and Siporex walls, in addition to screws in raw1 plugs.
  • 10. FIXTURES IN SIPOREX d) ELECTRICAL FITTINGS: -Light fuse boxes and switch boxes should be fixed using 3" x 10 gauge screws in raw1 plugs. -Heavier fittings should preferably be mounted on the floor or fixed with through bolts. -Wall brackets, light switches, should be fixed using 8 to 10 gauge screws, not less than 3" long in raw1 plugs. -Where conduit runs are made on surface the supporting saddles may be fixed with 2" x 10 gauge screws directly into Siporex or where the conduit is likely to be subjected to loads during erection, by 811 0 gauge screws in raw1 plugs. e) HANDRAILS: Wherever possible these should be through-bolts. Failing this, use 4" x 14 gauge screws in raw plugs. f) HOT AND COLD WATER PIPES: The supporting brackets or holderbats should be fixed to walls using 2"x 10 gauge screws in raw1 plugs.
  • 11. PRECAUTIONS AGAINST CRACKING IN BLOCKWORK 1. Limit the cracking to the joints, so that it can be repaired easily. Hence, mortars weaker than the blocks are always recommended. 2. Where uneven settlement of foundations is feared, proper bonding and the use of reinforcement in horizontal joints will tend to reduce risks of cracking by distributing stresses throughout the wall. 3. In block walls abutting against columns and beams of load bearing frame, differential movements can be caused by settlement, variable loading conditions and changes in temperature and humidity. 4. For blockwork partitions, care should be taken to limit deflection of floors or partitions should be strengthened by use of bond beams or reinforcement in the lower courses. 5. Use resilient material stoppers between door shutter and wall at one or two points or use door closer to avoid cracking in walls by impact of slamming of doors, etc., particularly in these rigid partitions. 6. Alleviate temperature & shrinkage stresses in the wall by incorporating control joints at appropriate intervals and locations.