7. Need for change Create a better way for evidence to be collected from a programme that was based on experiential learning. Introduce an e-portfolio Re invent assessments
13. Here we have the fasica nailed up and ready to get checked for straight.
14. Here we are pre drilling holes in the covering so it makes it faster to screw the roof down. We have a glut down under the wood because if we didn’t it would hit the concrete and break the drill.
15. Here we are putting down the underlay. We have the blue rope to help support the under lay. We then put the wood battens down as hold down before we get the covering on it.
16. Here we are fixing down the roof covering. Here we are making sure that it passes the fascia by 60mm and that the sheets are staying parrallel. This is because if it does not the screws will not be in a straight line.
17. Here we are turning up the covering so if the water gets up under the flashing it will not let the water pass.