OSH 4308 Unit IV Project
Acme Manufacturing Co. has contracted Be Safe
Consulting Inc. again to conduct another evaluation on the
hazardous noises that that employees are susceptible to during
their day of work. The first portion of this report is evaluating
the machine shop #1 and the employee’s individual exposures.
Machine Shop #1
Stationary Grinding Wheel (Robert Jones):
Sample 1:
Sample 2:
Sample 3:
Drill Press # 4 (Clara Tucker):
Sample 1:
Sample 2:
Sample 3:
Metal Shear # 2 (Rick Starnes):
Sample 1:
Sample 2:
Sample 3:
Metal Shear # 3 (Jennie Gump):
Sample 1:
Sample 2:
Sample 3:
Bench Press # 7 (Bernie Edwards):
Sample 1:
Sample 2:
Sample 3:
Carpentry Shop #2
Within this next portion, I calculated the combined exposure of
the six different pieces of machinery that put off serious noise
hazards.
This combined level of noise is a huge indication of adequate
hearing protecting within this area.
Electric Communication Repair Shop
Within this next portion of the report, I was asked to
convert the SPL N/m2 to W/m2.
East Wall:
West Wall:
South Wall:
North Wall:
References
Yates, W. D. (2015). Safety professional’s reference and study
guide (2nd ed.). Boca Raton, FL: CRC Press.
1. Provide a brief introduction focusing on your education,
career, and decision to apply to University of the Cumberland’s.
2. In relation to your doctoral program application, what area of
recent research in the field would you want to study, and why?
3. How does your current vocation relate to your application to
the doctoral program?
4. How will your experiences and personal skills help you to be
successful in your program?
5. What long-term goals do you have for applying your learning
from your doctoral program?
1
OSH 4308 Unit IV Project
2
OSH 4308 Unit IV Project
OSH 4308 Unit IV Project
Michael Miranda
Columbia Southern University
Be safe consulting Inc. was tasked to work for Acme
manufacturing Co. to evaluate the noise levels and if they were
or are hazardous. Also, to identify employees that could be
affected by the noise levels during their shift. Acme must do
this in order to ensure that they can mitigate employee hearing
loss. through hearing conservation programs and training
We will be evaluating the Machine shop using the samples
that were collected during our sample testing. Although we will
not be combining noise levels to get a more accurate reading of
the machine shop.
Machine Shop #1
Location
Employee
Sample #1
Sample Time #1
Stationary Grinding Wheel
Robert Jones
82 dBA
90 min
Drill Press #4
Clara Tucker
89 dBA
135 min
Metal Shear #2
Rick Starnes
75 dBA
283 min
Metal Shear #3
Jennie Gump
83 dBA
114 min
Bench Press #7
Bernie Edwards
73 dBA
203 min
Sample #2
Sample Time #2
Stationary Grinding Wheel
Robert Jones
91 dBA
125 min
Drill Press #4
Clara Tucker
79 dBA
249 min
Metal Shear #2
Rick Starnes
94 dBA
39 min
Metal Shear #3
Jennie Gump
73 dBA
239 min
Bench Press #7
Bernie Edwards
79 dBA
172 min
Sample #3
Sample Time #3
Stationary Grinding Wheel
Robert Jones
83 dBA
265 min
Drill Press #4
Clara Tucker
81 dBA
96 min
Metal Shear #2
Rick Starnes
84 dBA
158 min
Metal Shear #3
Jennie Gump
95 dBA
127 min
Bench Press #7
Bernie Edwards
83 dBA
105 min
Unit IV given values
Sample
Location
Employee
Sample dBA
Sample time
Max Exposure time
Dosage
1
Stationary Grinding Wheel
Robert Jones
82 dBA
90 min
24.25147hrs.
6.20%
2
Stationary Grinding Wheel
Robert Jones
91 dBA
125 min
6.9644hrs.
29.90%
3
Stationary Grinding Wheel
Robert Jones
83 dBA
265 min
21.11213hrs.
20.90%
Appendices A-B
Sample
Location
Employee
Sample dBA
Sample time
Max Exposure time
Dosage
1
Drill Press # 4
Clara Tucker
89 dBA
135 min
8.11hrs.
27.44%
2
Drill Press # 4
Clara Tucker
79 dBA
249 min
36.76hrs.
11.3%
3
Drill Press # 4
Clara Tucker
81 dBA
96 min
19.43hrs.
8.24%
Appendices C-D
Sample
Location
Employee
Sample dBA
Sample time
Max Exposure time
Dosage
1
Metal Shear # 2
Rick Starnes
75dBA
283 min
64hrs
7.37%
2
Metal Shear # 2
Rick Starnes
94 dBA
39 min
4.5948hrs
14.1%
3
Metal Shear # 2
Rick Starnes
84 dBA
84 min
18.379hrs
7.6%
Appendices E-F
Sample
Location
Employee
Sample dBA
Sample time
Max Exposure time
Dosage
1
Metal Shear # 3
Jennie Gump
83dBA
114 min
21.1hrs
8.9%
2
Metal Shear # 3
Jennie Gump
73 dBA
239 min
5066hrs
4.7%
3
Metal Shear # 3
Jennie Gump
95 dBA
127 min
4hrs
52.9%
Appendices G-H
Sample
Location
Employee
Sample dBA
Sample time
Max Exposure time
Dosage
1
Bench Press #7
Bernie Edwards
73dBA
203 min
5066.910min
4%
2
Bench Press #7
Bernie Edwards
79 dBA
172 min
2205.48min
7.8%
3
Bench Press #7
Bernie Edwards
83 dBA
105 min
1266.7278Min
8.3%
Appendices I-J
Taking into consideration all of the results from the sampling
all process could use hearing protection or be part of a hearing
conservation program. when doing the work that reaches over
90dBA. But without combining dBA level we cannot determine
if it is necessary all of the time or only partially.
Carpentry shop #2
Next, we will be tasked to study the #2 Carpentry shop
containing these six machines running constantly table saws,
jointers, planners, drill press and the exhaust systems. A
determination must be made if the shop is a hazardous noise
area since there are 10 employees working in the area. there is
some importance to doing this since the employees may need to
be also added to the hearing protection program (Unit IV)
Machine
Noise Level (dBA)
Table Saw #3
92 dBA
Jointer #4
87 dBA
Table Saw #5
90 dBA
Exhaust Ventilation System
80 dBA
Planer #2
84 dBA
Drill Press #1
79 dBA
Unit IV given values
Formula for analysis from (Yates 2015)
(Unfortunately, I did not know how to use this method to
calculate the dBA so I used the lengthier method I did want to
include what the formula should look like so as to calculate it
properly )
Or alternately you can subtract dBA reading on machine1 from
machine2 and look at the table on page 277of our text book
Yates 2015. We then add that number to the higher decibel level
and we continue this through all machines.
Machine
Noise Level (dBA)
Table Saw #3
92 dBA
Jointer #4
87 dBA
92-87=5
92+1.2=93.2
Table Saw #5
90 dBA
93.2-90=3.2
93.2+1.8=95
Exhaust Ventilation System
80 dBA
95-80=15
0+95=95
Planer #2
84 dBA
95-84=9
.5+95=95.5
Drill Press #1
79 dBA
79-95.5=16.5
95.5-0=95.5
The total for all of the machines combined is equal to 95.5 dBA
combined would require to be part of a hearing conservation
program and hearing protection worn when working or entering
this area.
Lastly, we will be looking at the Electronic repair shop.
converting the SPL to W/ as requested by the project engineer.
Since they are considering remodeling and installing noise
insulation in the shop. All of the noise history is given in N/
Electric Communication Repair Shop
Location
SPL (N/m²)
East Wall
0.0683 N/m²
North Wall
0.0699 N/m²
South Wall
0.0813 N/m²
West Wall
0.0742 N/m²
Given Values
Formula for conversion
I=
Location
Formula
W/m2
East
North
South
West
In conclusion the two initial assessments done in the machine
shop and in the carpentry shop I have concluded that both of
those areas need to be a part of the hearing conservation
program. The machine shop depending on the process could not
be required to wear hearing protection continuously, but
employees in this area should be trained and monitored in the
hearing conservation program. Hearing protection should be
available to them and in close proximity or worn on the
employee to be used as needed.
The carpentry shop is in definite need of hearing conservation
programs. since the average combined dBA in the shop is 95.5
dBA. this should be done as soon as possible and all employees
in the shop should be trained on the proper wear of PPE.
Appendices
Sample 1
T1=
=
=
= 24.25147Hrs x 60Min
=1455.0882min
Sample 2
T2=
=
=
= 6.9644Hrs x 60Min
= 417.864 Min
Sample 3
T3=
=
=
= 21.11213Hrs x 60Min
=1266.7278Min
Appendix A
Sample 1
6.2%
Sample 2
29.9%
Sample 3
20.9%
Appendix B
Sample1
Sample 2
=2205.48min
Sample 3
=
=1165.62min
Appendix C
Sample1
27.44%
Sample2
=11.2902%
11.3%
Sample3
=8.23596%
8.24%
Appendix D
Sample 1
T1=
=
=
= 64hrs x 60Min
=3840min
Sample 2
T2=
=
=
= 4.5948hrs x 60Min
= 275.688min
Sample 3
T3=
=
=
= 18.37917hrs x 60Min
=1102.74min
Appendix E
Sample1
7.37%
Sample2
=14.1464%
14.1%
Sample3
=7.61739%
7.6%
Appendix F
Sample 1
T1=
=
=
= 21.11213hrs x 60Min
=1266.7278min
Sample 2
T2=
=
=
= 84.44851hrs x 60Min
= 5066.910min
Sample 3
T3=
=
=
= 4hrs x 60Min
=240 min
Appendix G
Sample1
8.9%
Sample2
=4.71689%%
4.7%
Sample3
=52.916%
52.9%
Appendix H
Sample 1
T1=
=
=
= 84.44851hrs x 60Min
= 5066.910min
Sample 2
T2=
=
=
= 2205.48min
Sample 3
T3=
=
=
= 21.11213Hrs x 60Min
=1266.7278Min
Appendix I
Sample1
4%
203Sample2
=7.79876%
7.8%
Sample3
=8.28907%
8.3%
Appendix J
References
Yates, W. D. (2015). Safety professional’s reference and study
guide (2nd ed.). Boca Raton, FL: CRC Press.
UNIT IV PROJECT OSH4308
Instructions
Hazardous Noises Report
After receiving good remarks from your previous work, you
hear that Acme Manufacturing Co. has asked you and BSCI to
return for some additional work. BSCI has been contracted by
Acme Manufacturing Co. to conduct a study to determine
employee exposures to noise. In addition, Acme Manufacturing
Co. has requested that, while on site, you conduct a needs
analysis to determine the development of a new safety training
program, exhibiting training and management techniques.
Explain your methodology and the steps in conducting this
needs analysis. After conducting a field assessment, prepare a
written report for Bob Sanders (CSP) to present to the Board of
Directors. During your field investigation, you find the
following field observations:
Machine Shop #1
The company has an on-site maintenance and repair facility.
Inside Machine Shop #1, there are five employees that operate a
variety of machines, ranging from stationary and portable
grinders, drill presses, and metal shearers. Based on the
information provided in the following table, determine the
individual employee’s exposure: (DO NOT COMBINE NOISE
LEVELS)
Location
Employee
Sample #1
Sample Time #1
Sample #2
Sample Time #2
Sample #3
Sample Time #3
Stationary Grinding Wheel
Robert Jones
82 dBA
90 min
91 dBA
125 min
83 dBA
265 min
Drill Press #4
Clara Tucker
89 dBA
135 min
79 dBA
249 min
81 dBA
96 min
Metal Shear #2
Rick Starnes
75 dBA
283 min
94 dBA
39 min
84 dBA
158 min
Metal Shear #3
Jennie Gump
83 dBA
114 min
73 dBA
239 min
95 dBA
127 min
Bench Press #7
Bernie Edwards
73 dBA
203 min
79 dBA
172 min
83 dBA
105 min
Carpentry Shop #2
Inside Carpentry Shop #2, there are six machines operating
almost continuously, including table saws, planers, exhaust
systems, jointers, with 10 employees working in this area. To
determine whether this table should be designated as a
hazardous noise environment, thus requiring employees to be
entered into the hearing conservation program, you must
calculate combined exposures and treat the entire area as one
noise source. The following table indicates the recorded
measurements that you collected during your on-site
assessment. Does the data from this table indicate a hazardous
noise environment, and do you recommend entering employees
into a hearing conservation program?
Machine
Noise Level (dBA)
Table Saw #3
92 dBA
Jointer #4
87 dBA
Table Saw #5
90 dBA
Exhaust Ventilation System
80 dBA
Planer #2
84 dBA
Drill Press #1
79 dBA
Electronic Communication Repair Shop
Acme Manufacturing is currently considering remodeling this
shop in order to install a new noise absorbing wall and floor
insulation. They have asked that you review the previous
history of noise level exposures in this area and provide your
recommendations. However, this data is given in measurements
of N/m², but the Project Engineer is requesting the information
in W/m². Given the following data, convert N/m² to W/m² and
include it in your report:
Date
Location
SPL (N/m²)
4/12/10
East Wall
0.0683 N/m²
4/12/10
West Wall
0.0742 N/m²
4/12/10
South Wall
0.0813 N/m²
4/12/10
North Wall
0.0699 N/m²
Respond to the details in each section, and format your report in
APA style. Include at least each of the following in your report
for this unit:
· Introduction-briefly describe why the studies were performed
(why you started the study).
· Report details-briefly discuss the details of the scenario (what
you found from the study).
· Conclusions and recommendations-briefly describe your
recommendations based on your findings (what you recommend
to resolve any deficiencies).
· Appendix-Measurements and calculations (show your work).
· At least 4 page (double-spaced) in length (not including the
reference page and appendices).
Prepare your report in a word-processing application (i.e.,
Word) using APA formatting for all references and in-text
citations.
UNIT IV PROJECT OSH4308
Instructions
Hazardous Noises Report
After receiving good remarks from your previous work, you
hear that Acme Manufacturing Co.
has asked you and BSCI to return for some additional work.
BSCI has been contracted by Acme
Manufacturing Co. to conduct a study to determine employee
exposures to n
oise. In addition,
Acme Manufacturing Co. has requested that, while on site, you
conduct a needs analysis to
determine the development of a new safety training program,
exhibiting training and
management techniques. Explain your methodology and the
steps i
n conducting this needs
analysis. After conducting a field assessment, prepare a written
report for Bob Sanders (CSP) to
present to the Board of Directors. During your field
investigation, you find the following field
observations:
Machine Shop #1
The
company has an on
-
site maintenance and repair facility. Inside Machine Shop #1,
there are
five employees that operate a variety of machines, ranging from
stationary and portable grinders,
drill presses, and metal shearers. Based on the information
provided
in the following table,
determine the individual employee’s exposure: (DO NOT
COMBINE NOISE LEVELS)
Location
Employee
Sample
#1
Sample
Time #1
Sample
#2
Sample
Time #2
Sample
#3
Sample
Time #3
Stationary
Grinding
Wheel
Robert
Jones
82 dBA
90 min
91 dBA
125 min
83 dBA
265 min
Drill Press #4
Clara
Tucker
89 dBA
135 min
79 dBA
249 min
81 dBA
96 min
Metal Shear
#2
Rick
Starnes
75 dBA
283 min
94 dBA
39 min
84 dBA
158 min
Metal Shear
#3
Jennie
Gump
83 dBA
114 min
73 dBA
239 min
95 dBA
127 min
Bench Press
#7
Bernie
Edwards
73 dBA
203 min
79 dBA
172 min
83 dBA
105 min
Carpentry Shop #2
Inside Carpentry Shop #2, there are six machines operating
almost continuously, including table
saws, planers, exhaust systems, jointers, with 10 employees
working in this area. To determine
whether this table should be designated as a hazardous noise
envi
ronment, thus requiring
UNIT IV PROJECT OSH4308
Instructions
Hazardous Noises Report
After receiving good remarks from your previous work, you
hear that Acme Manufacturing Co.
has asked you and BSCI to return for some additional work.
BSCI has been contracted by Acme
Manufacturing Co. to conduct a study to determine employee
exposures to noise. In addition,
Acme Manufacturing Co. has requested that, while on site, you
conduct a needs analysis to
determine the development of a new safety training program,
exhibiting training and
management techniques. Explain your methodology and the
steps in conducting this needs
analysis. After conducting a field assessment, prepare a written
report for Bob Sanders (CSP) to
present to the Board of Directors. During your field
investigation, you find the following field
observations:
Machine Shop #1
The company has an on-site maintenance and repair facility.
Inside Machine Shop #1, there are
five employees that operate a variety of machines, ranging from
stationary and portable grinders,
drill presses, and metal shearers. Based on the information
provided in the following table,
determine the individual employee’s exposure: (DO NOT
COMBINE NOISE LEVELS)
Location Employee
Sample
#1
Sample
Time #1
Sample
#2
Sample
Time #2
Sample
#3
Sample
Time #3
Stationary
Grinding
Wheel
Robert
Jones
82 dBA 90 min 91 dBA 125 min 83 dBA 265 min
Drill Press #4
Clara
Tucker
89 dBA 135 min 79 dBA 249 min 81 dBA 96 min
Metal Shear
#2
Rick
Starnes
75 dBA 283 min 94 dBA 39 min 84 dBA 158 min
Metal Shear
#3
Jennie
Gump
83 dBA 114 min 73 dBA 239 min 95 dBA 127 min
Bench Press
#7
Bernie
Edwards
73 dBA 203 min 79 dBA 172 min 83 dBA 105 min
Carpentry Shop #2
Inside Carpentry Shop #2, there are six machines operating
almost continuously, including table
saws, planers, exhaust systems, jointers, with 10 employees
working in this area. To determine
whether this table should be designated as a hazardous noise
environment, thus requiring

More Related Content

Similar to 1Running head OSH 4308 Unit IV Project 2OSH 4308 Unit I.docx

Factory Tour Report 120309
Factory Tour Report 120309Factory Tour Report 120309
Factory Tour Report 120309
wangyangzhong
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
Vinoth Axus
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
Julian Kalac P.Eng
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
shashank tiwari
 
Presentation final (1)
Presentation final (1)Presentation final (1)
Presentation final (1)
Sharan Elemech
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Ryder- Final Presentation
Ryder- Final PresentationRyder- Final Presentation
Ryder- Final Presentation
Narayan Manivannan
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Eylül Ceren Altın
 
4th year thesis Microbiological assessment of a cleanroom
4th year thesis Microbiological assessment of a cleanroom4th year thesis Microbiological assessment of a cleanroom
4th year thesis Microbiological assessment of a cleanroom
Shane Kearney
 
Practical Use of Stress-Strength Models to develop Specifications
Practical Use of Stress-Strength Models to develop SpecificationsPractical Use of Stress-Strength Models to develop Specifications
Practical Use of Stress-Strength Models to develop Specifications
Rob Schubert
 
Preparation Of Hearing Conservation Program For Stone Crushing Industry Yup...
Preparation Of Hearing Conservation Program For Stone Crushing Industry   Yup...Preparation Of Hearing Conservation Program For Stone Crushing Industry   Yup...
Preparation Of Hearing Conservation Program For Stone Crushing Industry Yup...
Global Risk Forum GRFDavos
 
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
IRJET Journal
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Project
tabyrnes
 
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
CountryJackG
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
Vibra
 
Problem 6-2A manager wants to assign tasks to workstations as .docx
Problem 6-2A manager wants to assign tasks to workstations as .docxProblem 6-2A manager wants to assign tasks to workstations as .docx
Problem 6-2A manager wants to assign tasks to workstations as .docx
sleeperharwell
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
Larry Whitmarsh
 
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACESDETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
Aquib Rahman
 
Implimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDMImplimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDM
kiranhg
 
The Engineer’s Rosemount Temperature Guide 2013.pdf
The Engineer’s Rosemount Temperature Guide 2013.pdfThe Engineer’s Rosemount Temperature Guide 2013.pdf
The Engineer’s Rosemount Temperature Guide 2013.pdf
RicardoHernanGomezB
 

Similar to 1Running head OSH 4308 Unit IV Project 2OSH 4308 Unit I.docx (20)

Factory Tour Report 120309
Factory Tour Report 120309Factory Tour Report 120309
Factory Tour Report 120309
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
 
Presentation final (1)
Presentation final (1)Presentation final (1)
Presentation final (1)
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
 
Ryder- Final Presentation
Ryder- Final PresentationRyder- Final Presentation
Ryder- Final Presentation
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
 
4th year thesis Microbiological assessment of a cleanroom
4th year thesis Microbiological assessment of a cleanroom4th year thesis Microbiological assessment of a cleanroom
4th year thesis Microbiological assessment of a cleanroom
 
Practical Use of Stress-Strength Models to develop Specifications
Practical Use of Stress-Strength Models to develop SpecificationsPractical Use of Stress-Strength Models to develop Specifications
Practical Use of Stress-Strength Models to develop Specifications
 
Preparation Of Hearing Conservation Program For Stone Crushing Industry Yup...
Preparation Of Hearing Conservation Program For Stone Crushing Industry   Yup...Preparation Of Hearing Conservation Program For Stone Crushing Industry   Yup...
Preparation Of Hearing Conservation Program For Stone Crushing Industry Yup...
 
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Project
 
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
Jack Griffes - Cleanliness Testing to ISO 16232 and OEM Specifications_Engine...
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
Problem 6-2A manager wants to assign tasks to workstations as .docx
Problem 6-2A manager wants to assign tasks to workstations as .docxProblem 6-2A manager wants to assign tasks to workstations as .docx
Problem 6-2A manager wants to assign tasks to workstations as .docx
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
 
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACESDETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
DETERMINATION OF SOUND LEVEL IN DIFFERENT WORKPLACES
 
Implimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDMImplimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDM
 
The Engineer’s Rosemount Temperature Guide 2013.pdf
The Engineer’s Rosemount Temperature Guide 2013.pdfThe Engineer’s Rosemount Temperature Guide 2013.pdf
The Engineer’s Rosemount Temperature Guide 2013.pdf
 

More from novabroom

3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
3 pagesAfter reading the Cybersecurity Act of 2015, address .docx3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
novabroom
 
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
novabroom
 
3 pagesThis paper should describe, as well as compare and contra.docx
3 pagesThis paper should describe, as well as compare and contra.docx3 pagesThis paper should describe, as well as compare and contra.docx
3 pagesThis paper should describe, as well as compare and contra.docx
novabroom
 
3 assignments listed below1.  In a 350 word essay, compare a.docx
3 assignments listed below1.  In a 350 word essay, compare a.docx3 assignments listed below1.  In a 350 word essay, compare a.docx
3 assignments listed below1.  In a 350 word essay, compare a.docx
novabroom
 
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
novabroom
 
2Women with a Parasol-Madame Monet and Her SonClau.docx
2Women with a Parasol-Madame Monet and Her SonClau.docx2Women with a Parasol-Madame Monet and Her SonClau.docx
2Women with a Parasol-Madame Monet and Her SonClau.docx
novabroom
 
2The following is a list of some of the resources availabl.docx
2The following is a list of some of the resources availabl.docx2The following is a list of some of the resources availabl.docx
2The following is a list of some of the resources availabl.docx
novabroom
 
3 If you like to develop a computer-based DAQ measurement syst.docx
3  If you like to develop a computer-based DAQ measurement syst.docx3  If you like to develop a computer-based DAQ measurement syst.docx
3 If you like to develop a computer-based DAQ measurement syst.docx
novabroom
 
2BackgroundThe research focuses on investigating leaders fro.docx
2BackgroundThe research focuses on investigating leaders fro.docx2BackgroundThe research focuses on investigating leaders fro.docx
2BackgroundThe research focuses on investigating leaders fro.docx
novabroom
 
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
novabroom
 
2To ADD names From ADD name Date ADD date Subject ADD ti.docx
2To  ADD names From  ADD name Date  ADD date Subject  ADD ti.docx2To  ADD names From  ADD name Date  ADD date Subject  ADD ti.docx
2To ADD names From ADD name Date ADD date Subject ADD ti.docx
novabroom
 
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
novabroom
 
2From On the Advantage and Disadvantage of History for L.docx
2From On the Advantage and Disadvantage of History for L.docx2From On the Advantage and Disadvantage of History for L.docx
2From On the Advantage and Disadvantage of History for L.docx
novabroom
 
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
novabroom
 
2Fifth Edition COMMUNITY PSYCHOLOGY.docx
2Fifth Edition   COMMUNITY PSYCHOLOGY.docx2Fifth Edition   COMMUNITY PSYCHOLOGY.docx
2Fifth Edition COMMUNITY PSYCHOLOGY.docx
novabroom
 
257Speaking of researchGuidelines for evaluating resea.docx
257Speaking of researchGuidelines for evaluating resea.docx257Speaking of researchGuidelines for evaluating resea.docx
257Speaking of researchGuidelines for evaluating resea.docx
novabroom
 
2800 word count.APA formatplagiarism free paperThe paper.docx
2800 word count.APA formatplagiarism free paperThe paper.docx2800 word count.APA formatplagiarism free paperThe paper.docx
2800 word count.APA formatplagiarism free paperThe paper.docx
novabroom
 
28 CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY Wha.docx
28  CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY  Wha.docx28  CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY  Wha.docx
28 CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY Wha.docx
novabroom
 
261Megaregion Planningand High-Speed RailPetra Tod.docx
261Megaregion Planningand High-Speed RailPetra Tod.docx261Megaregion Planningand High-Speed RailPetra Tod.docx
261Megaregion Planningand High-Speed RailPetra Tod.docx
novabroom
 
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
novabroom
 

More from novabroom (20)

3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
3 pagesAfter reading the Cybersecurity Act of 2015, address .docx3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
3 pagesAfter reading the Cybersecurity Act of 2015, address .docx
 
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
3 pages, 4 sourcesPaper detailsNeed a full retirement plan p.docx
 
3 pagesThis paper should describe, as well as compare and contra.docx
3 pagesThis paper should describe, as well as compare and contra.docx3 pagesThis paper should describe, as well as compare and contra.docx
3 pagesThis paper should describe, as well as compare and contra.docx
 
3 assignments listed below1.  In a 350 word essay, compare a.docx
3 assignments listed below1.  In a 350 word essay, compare a.docx3 assignments listed below1.  In a 350 word essay, compare a.docx
3 assignments listed below1.  In a 350 word essay, compare a.docx
 
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
3 CommunicationChallengesinaDiverse,GlobalMarketpl.docx
 
2Women with a Parasol-Madame Monet and Her SonClau.docx
2Women with a Parasol-Madame Monet and Her SonClau.docx2Women with a Parasol-Madame Monet and Her SonClau.docx
2Women with a Parasol-Madame Monet and Her SonClau.docx
 
2The following is a list of some of the resources availabl.docx
2The following is a list of some of the resources availabl.docx2The following is a list of some of the resources availabl.docx
2The following is a list of some of the resources availabl.docx
 
3 If you like to develop a computer-based DAQ measurement syst.docx
3  If you like to develop a computer-based DAQ measurement syst.docx3  If you like to develop a computer-based DAQ measurement syst.docx
3 If you like to develop a computer-based DAQ measurement syst.docx
 
2BackgroundThe research focuses on investigating leaders fro.docx
2BackgroundThe research focuses on investigating leaders fro.docx2BackgroundThe research focuses on investigating leaders fro.docx
2BackgroundThe research focuses on investigating leaders fro.docx
 
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
2TITLE OF PAPERDavid B. JonesColumbia Southe.docx
 
2To ADD names From ADD name Date ADD date Subject ADD ti.docx
2To  ADD names From  ADD name Date  ADD date Subject  ADD ti.docx2To  ADD names From  ADD name Date  ADD date Subject  ADD ti.docx
2To ADD names From ADD name Date ADD date Subject ADD ti.docx
 
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
2Megan Bowen02042020 Professor Cozen Comm 146Int.docx
 
2From On the Advantage and Disadvantage of History for L.docx
2From On the Advantage and Disadvantage of History for L.docx2From On the Advantage and Disadvantage of History for L.docx
2From On the Advantage and Disadvantage of History for L.docx
 
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
28 jOURNAL Of MULTICULTURAL COUNSELING AND DEVELOpMENT • Janua.docx
 
2Fifth Edition COMMUNITY PSYCHOLOGY.docx
2Fifth Edition   COMMUNITY PSYCHOLOGY.docx2Fifth Edition   COMMUNITY PSYCHOLOGY.docx
2Fifth Edition COMMUNITY PSYCHOLOGY.docx
 
257Speaking of researchGuidelines for evaluating resea.docx
257Speaking of researchGuidelines for evaluating resea.docx257Speaking of researchGuidelines for evaluating resea.docx
257Speaking of researchGuidelines for evaluating resea.docx
 
2800 word count.APA formatplagiarism free paperThe paper.docx
2800 word count.APA formatplagiarism free paperThe paper.docx2800 word count.APA formatplagiarism free paperThe paper.docx
2800 word count.APA formatplagiarism free paperThe paper.docx
 
28 CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY Wha.docx
28  CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY  Wha.docx28  CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY  Wha.docx
28 CHAPTER 4 THE CARBON FOOTPRINT CONTROVERSY Wha.docx
 
261Megaregion Planningand High-Speed RailPetra Tod.docx
261Megaregion Planningand High-Speed RailPetra Tod.docx261Megaregion Planningand High-Speed RailPetra Tod.docx
261Megaregion Planningand High-Speed RailPetra Tod.docx
 
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
250 WORDS Moyer Instruments is a rapidly growing manufacturer .docx
 

Recently uploaded

spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
ssuser13ffe4
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
dot55audits
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
Amin Marwan
 

Recently uploaded (20)

spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
 

1Running head OSH 4308 Unit IV Project 2OSH 4308 Unit I.docx

  • 1. 1 Running head: OSH 4308 Unit IV Project 2 OSH 4308 Unit IV Project OSH 4308 Unit IV Project Travis Painter Columbia Southern University OSH 4308 Unit IV Project Acme Manufacturing Co. has contracted Be Safe Consulting Inc. again to conduct another evaluation on the hazardous noises that that employees are susceptible to during their day of work. The first portion of this report is evaluating the machine shop #1 and the employee’s individual exposures. Machine Shop #1 Stationary Grinding Wheel (Robert Jones): Sample 1:
  • 2. Sample 2: Sample 3: Drill Press # 4 (Clara Tucker): Sample 1: Sample 2: Sample 3:
  • 3. Metal Shear # 2 (Rick Starnes): Sample 1: Sample 2: Sample 3: Metal Shear # 3 (Jennie Gump): Sample 1:
  • 4. Sample 2: Sample 3: Bench Press # 7 (Bernie Edwards): Sample 1: Sample 2:
  • 5. Sample 3: Carpentry Shop #2 Within this next portion, I calculated the combined exposure of the six different pieces of machinery that put off serious noise hazards. This combined level of noise is a huge indication of adequate hearing protecting within this area. Electric Communication Repair Shop Within this next portion of the report, I was asked to convert the SPL N/m2 to W/m2. East Wall: West Wall: South Wall:
  • 6. North Wall: References Yates, W. D. (2015). Safety professional’s reference and study guide (2nd ed.). Boca Raton, FL: CRC Press. 1. Provide a brief introduction focusing on your education, career, and decision to apply to University of the Cumberland’s. 2. In relation to your doctoral program application, what area of recent research in the field would you want to study, and why? 3. How does your current vocation relate to your application to the doctoral program? 4. How will your experiences and personal skills help you to be successful in your program? 5. What long-term goals do you have for applying your learning from your doctoral program? 1 OSH 4308 Unit IV Project 2
  • 7. OSH 4308 Unit IV Project OSH 4308 Unit IV Project Michael Miranda Columbia Southern University Be safe consulting Inc. was tasked to work for Acme manufacturing Co. to evaluate the noise levels and if they were or are hazardous. Also, to identify employees that could be affected by the noise levels during their shift. Acme must do this in order to ensure that they can mitigate employee hearing loss. through hearing conservation programs and training We will be evaluating the Machine shop using the samples that were collected during our sample testing. Although we will not be combining noise levels to get a more accurate reading of the machine shop. Machine Shop #1 Location Employee Sample #1 Sample Time #1 Stationary Grinding Wheel Robert Jones 82 dBA 90 min Drill Press #4 Clara Tucker 89 dBA
  • 8. 135 min Metal Shear #2 Rick Starnes 75 dBA 283 min Metal Shear #3 Jennie Gump 83 dBA 114 min Bench Press #7 Bernie Edwards 73 dBA 203 min Sample #2 Sample Time #2 Stationary Grinding Wheel Robert Jones 91 dBA 125 min Drill Press #4 Clara Tucker 79 dBA 249 min Metal Shear #2 Rick Starnes 94 dBA 39 min Metal Shear #3 Jennie Gump 73 dBA 239 min Bench Press #7 Bernie Edwards 79 dBA 172 min
  • 9. Sample #3 Sample Time #3 Stationary Grinding Wheel Robert Jones 83 dBA 265 min Drill Press #4 Clara Tucker 81 dBA 96 min Metal Shear #2 Rick Starnes 84 dBA 158 min Metal Shear #3 Jennie Gump 95 dBA 127 min Bench Press #7 Bernie Edwards 83 dBA 105 min Unit IV given values Sample Location Employee Sample dBA Sample time Max Exposure time Dosage 1 Stationary Grinding Wheel Robert Jones 82 dBA 90 min
  • 10. 24.25147hrs. 6.20% 2 Stationary Grinding Wheel Robert Jones 91 dBA 125 min 6.9644hrs. 29.90% 3 Stationary Grinding Wheel Robert Jones 83 dBA 265 min 21.11213hrs. 20.90% Appendices A-B Sample Location Employee Sample dBA Sample time Max Exposure time Dosage 1 Drill Press # 4 Clara Tucker 89 dBA 135 min 8.11hrs. 27.44% 2 Drill Press # 4 Clara Tucker 79 dBA
  • 11. 249 min 36.76hrs. 11.3% 3 Drill Press # 4 Clara Tucker 81 dBA 96 min 19.43hrs. 8.24% Appendices C-D Sample Location Employee Sample dBA Sample time Max Exposure time Dosage 1 Metal Shear # 2 Rick Starnes 75dBA 283 min 64hrs 7.37% 2 Metal Shear # 2 Rick Starnes 94 dBA 39 min 4.5948hrs 14.1% 3 Metal Shear # 2 Rick Starnes 84 dBA
  • 12. 84 min 18.379hrs 7.6% Appendices E-F Sample Location Employee Sample dBA Sample time Max Exposure time Dosage 1 Metal Shear # 3 Jennie Gump 83dBA 114 min 21.1hrs 8.9% 2 Metal Shear # 3 Jennie Gump 73 dBA 239 min 5066hrs 4.7% 3 Metal Shear # 3 Jennie Gump 95 dBA 127 min 4hrs 52.9% Appendices G-H
  • 13. Sample Location Employee Sample dBA Sample time Max Exposure time Dosage 1 Bench Press #7 Bernie Edwards 73dBA 203 min 5066.910min 4% 2 Bench Press #7 Bernie Edwards 79 dBA 172 min 2205.48min 7.8% 3 Bench Press #7 Bernie Edwards 83 dBA 105 min 1266.7278Min 8.3% Appendices I-J Taking into consideration all of the results from the sampling all process could use hearing protection or be part of a hearing conservation program. when doing the work that reaches over 90dBA. But without combining dBA level we cannot determine if it is necessary all of the time or only partially.
  • 14. Carpentry shop #2 Next, we will be tasked to study the #2 Carpentry shop containing these six machines running constantly table saws, jointers, planners, drill press and the exhaust systems. A determination must be made if the shop is a hazardous noise area since there are 10 employees working in the area. there is some importance to doing this since the employees may need to be also added to the hearing protection program (Unit IV) Machine Noise Level (dBA) Table Saw #3 92 dBA Jointer #4 87 dBA Table Saw #5 90 dBA Exhaust Ventilation System 80 dBA
  • 15. Planer #2 84 dBA Drill Press #1 79 dBA Unit IV given values Formula for analysis from (Yates 2015) (Unfortunately, I did not know how to use this method to calculate the dBA so I used the lengthier method I did want to include what the formula should look like so as to calculate it properly ) Or alternately you can subtract dBA reading on machine1 from machine2 and look at the table on page 277of our text book Yates 2015. We then add that number to the higher decibel level and we continue this through all machines. Machine Noise Level (dBA) Table Saw #3 92 dBA Jointer #4 87 dBA 92-87=5 92+1.2=93.2 Table Saw #5 90 dBA 93.2-90=3.2 93.2+1.8=95 Exhaust Ventilation System
  • 16. 80 dBA 95-80=15 0+95=95 Planer #2 84 dBA 95-84=9 .5+95=95.5 Drill Press #1 79 dBA 79-95.5=16.5 95.5-0=95.5 The total for all of the machines combined is equal to 95.5 dBA combined would require to be part of a hearing conservation program and hearing protection worn when working or entering this area. Lastly, we will be looking at the Electronic repair shop. converting the SPL to W/ as requested by the project engineer. Since they are considering remodeling and installing noise insulation in the shop. All of the noise history is given in N/ Electric Communication Repair Shop Location SPL (N/m²) East Wall 0.0683 N/m² North Wall 0.0699 N/m² South Wall 0.0813 N/m²
  • 17. West Wall 0.0742 N/m² Given Values Formula for conversion I= Location Formula W/m2 East North South West
  • 18. In conclusion the two initial assessments done in the machine shop and in the carpentry shop I have concluded that both of those areas need to be a part of the hearing conservation program. The machine shop depending on the process could not be required to wear hearing protection continuously, but employees in this area should be trained and monitored in the hearing conservation program. Hearing protection should be available to them and in close proximity or worn on the employee to be used as needed. The carpentry shop is in definite need of hearing conservation programs. since the average combined dBA in the shop is 95.5 dBA. this should be done as soon as possible and all employees in the shop should be trained on the proper wear of PPE.
  • 19. Appendices Sample 1 T1= = = = 24.25147Hrs x 60Min =1455.0882min Sample 2 T2= = = = 6.9644Hrs x 60Min = 417.864 Min Sample 3 T3= = = = 21.11213Hrs x 60Min =1266.7278Min Appendix A Sample 1 6.2% Sample 2 29.9% Sample 3
  • 20. 20.9% Appendix B Sample1 Sample 2 =2205.48min Sample 3 = =1165.62min Appendix C Sample1 27.44%
  • 21. Sample2 =11.2902% 11.3% Sample3 =8.23596% 8.24% Appendix D Sample 1 T1= = = = 64hrs x 60Min =3840min Sample 2 T2= = = = 4.5948hrs x 60Min = 275.688min Sample 3 T3= = =
  • 22. = 18.37917hrs x 60Min =1102.74min Appendix E Sample1 7.37% Sample2 =14.1464% 14.1% Sample3 =7.61739% 7.6% Appendix F Sample 1 T1= = = = 21.11213hrs x 60Min =1266.7278min Sample 2 T2=
  • 23. = = = 84.44851hrs x 60Min = 5066.910min Sample 3 T3= = = = 4hrs x 60Min =240 min Appendix G Sample1 8.9% Sample2 =4.71689%% 4.7% Sample3 =52.916% 52.9% Appendix H Sample 1 T1=
  • 24. = = = 84.44851hrs x 60Min = 5066.910min Sample 2 T2= = = = 2205.48min Sample 3 T3= = = = 21.11213Hrs x 60Min =1266.7278Min Appendix I Sample1 4% 203Sample2 =7.79876% 7.8% Sample3 =8.28907% 8.3% Appendix J
  • 25. References Yates, W. D. (2015). Safety professional’s reference and study guide (2nd ed.). Boca Raton, FL: CRC Press. UNIT IV PROJECT OSH4308 Instructions Hazardous Noises Report After receiving good remarks from your previous work, you hear that Acme Manufacturing Co. has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme Manufacturing Co. to conduct a study to determine employee exposures to noise. In addition, Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to determine the development of a new safety training program, exhibiting training and management techniques. Explain your methodology and the steps in conducting this needs analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to present to the Board of Directors. During your field investigation, you find the following field observations: Machine Shop #1 The company has an on-site maintenance and repair facility. Inside Machine Shop #1, there are five employees that operate a variety of machines, ranging from stationary and portable grinders, drill presses, and metal shearers. Based on the information provided in the following table, determine the
  • 26. individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS) Location Employee Sample #1 Sample Time #1 Sample #2 Sample Time #2 Sample #3 Sample Time #3 Stationary Grinding Wheel Robert Jones 82 dBA 90 min 91 dBA 125 min 83 dBA 265 min Drill Press #4 Clara Tucker 89 dBA 135 min 79 dBA 249 min 81 dBA 96 min Metal Shear #2 Rick Starnes 75 dBA 283 min 94 dBA 39 min 84 dBA 158 min Metal Shear #3 Jennie Gump
  • 27. 83 dBA 114 min 73 dBA 239 min 95 dBA 127 min Bench Press #7 Bernie Edwards 73 dBA 203 min 79 dBA 172 min 83 dBA 105 min Carpentry Shop #2 Inside Carpentry Shop #2, there are six machines operating almost continuously, including table saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine whether this table should be designated as a hazardous noise environment, thus requiring employees to be entered into the hearing conservation program, you must calculate combined exposures and treat the entire area as one noise source. The following table indicates the recorded measurements that you collected during your on-site assessment. Does the data from this table indicate a hazardous noise environment, and do you recommend entering employees into a hearing conservation program? Machine Noise Level (dBA) Table Saw #3 92 dBA Jointer #4 87 dBA Table Saw #5 90 dBA
  • 28. Exhaust Ventilation System 80 dBA Planer #2 84 dBA Drill Press #1 79 dBA Electronic Communication Repair Shop Acme Manufacturing is currently considering remodeling this shop in order to install a new noise absorbing wall and floor insulation. They have asked that you review the previous history of noise level exposures in this area and provide your recommendations. However, this data is given in measurements of N/m², but the Project Engineer is requesting the information in W/m². Given the following data, convert N/m² to W/m² and include it in your report: Date Location SPL (N/m²) 4/12/10 East Wall 0.0683 N/m² 4/12/10 West Wall 0.0742 N/m² 4/12/10 South Wall 0.0813 N/m² 4/12/10 North Wall 0.0699 N/m² Respond to the details in each section, and format your report in APA style. Include at least each of the following in your report for this unit:
  • 29. · Introduction-briefly describe why the studies were performed (why you started the study). · Report details-briefly discuss the details of the scenario (what you found from the study). · Conclusions and recommendations-briefly describe your recommendations based on your findings (what you recommend to resolve any deficiencies). · Appendix-Measurements and calculations (show your work). · At least 4 page (double-spaced) in length (not including the reference page and appendices). Prepare your report in a word-processing application (i.e., Word) using APA formatting for all references and in-text citations. UNIT IV PROJECT OSH4308 Instructions Hazardous Noises Report After receiving good remarks from your previous work, you hear that Acme Manufacturing Co. has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme Manufacturing Co. to conduct a study to determine employee exposures to n oise. In addition, Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to determine the development of a new safety training program, exhibiting training and management techniques. Explain your methodology and the steps i n conducting this needs
  • 30. analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to present to the Board of Directors. During your field investigation, you find the following field observations: Machine Shop #1 The company has an on - site maintenance and repair facility. Inside Machine Shop #1, there are five employees that operate a variety of machines, ranging from stationary and portable grinders, drill presses, and metal shearers. Based on the information provided in the following table, determine the individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS) Location Employee Sample #1 Sample Time #1 Sample
  • 31. #2 Sample Time #2 Sample #3 Sample Time #3 Stationary Grinding Wheel Robert Jones 82 dBA 90 min 91 dBA 125 min 83 dBA 265 min Drill Press #4 Clara Tucker 89 dBA
  • 32. 135 min 79 dBA 249 min 81 dBA 96 min Metal Shear #2 Rick Starnes 75 dBA 283 min 94 dBA 39 min 84 dBA 158 min Metal Shear #3 Jennie Gump 83 dBA
  • 33. 114 min 73 dBA 239 min 95 dBA 127 min Bench Press #7 Bernie Edwards 73 dBA 203 min 79 dBA 172 min 83 dBA 105 min Carpentry Shop #2 Inside Carpentry Shop #2, there are six machines operating
  • 34. almost continuously, including table saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine whether this table should be designated as a hazardous noise envi ronment, thus requiring UNIT IV PROJECT OSH4308 Instructions Hazardous Noises Report After receiving good remarks from your previous work, you hear that Acme Manufacturing Co. has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme Manufacturing Co. to conduct a study to determine employee exposures to noise. In addition, Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to determine the development of a new safety training program, exhibiting training and management techniques. Explain your methodology and the steps in conducting this needs analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to present to the Board of Directors. During your field investigation, you find the following field observations: Machine Shop #1 The company has an on-site maintenance and repair facility. Inside Machine Shop #1, there are five employees that operate a variety of machines, ranging from stationary and portable grinders, drill presses, and metal shearers. Based on the information provided in the following table,
  • 35. determine the individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS) Location Employee Sample #1 Sample Time #1 Sample #2 Sample Time #2 Sample #3 Sample Time #3 Stationary Grinding Wheel Robert Jones 82 dBA 90 min 91 dBA 125 min 83 dBA 265 min Drill Press #4 Clara Tucker 89 dBA 135 min 79 dBA 249 min 81 dBA 96 min Metal Shear #2 Rick Starnes 75 dBA 283 min 94 dBA 39 min 84 dBA 158 min Metal Shear #3 Jennie Gump 83 dBA 114 min 73 dBA 239 min 95 dBA 127 min Bench Press
  • 36. #7 Bernie Edwards 73 dBA 203 min 79 dBA 172 min 83 dBA 105 min Carpentry Shop #2 Inside Carpentry Shop #2, there are six machines operating almost continuously, including table saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine whether this table should be designated as a hazardous noise environment, thus requiring