INDUSTRIAL SUMMER TRAINING
At
NATIONAL THERMAL POWER CORPARATION
ANTA
Submitted in Partial Fulfillment of the Requirements for the Award of Degree of
Bachelor of Technology
In
Mechanical Engineering
By
NISHANT PAREEK
2013UME1791
Submitted By: Submitted To:
NISHANT PAREEK DR. GOPAL AGRAWAL
2013ume1791 Professor
Department of Mechanical Engineering
M.N.I.T. Jaipur, India
Mentor DR. G. D. AGRAWAL
Mr. Pankaj Vashistha Associate Professor
Assistant manager Department of Mechanical Engineering
NTPC ANTA M.N.I.T. Jaipur, India
DEPARTMENT OF MECHANICAL ENGINEERING
MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR
NOVEMBER 2016
i
DEPARTMENT OF MECHANICAL ENGINEERING
JAIPUR (RAJASTHAN)-302017
MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY
CERTIFICATE
This is certified that the training report entitled “Summer Training at NATIONAL THERMAL
POWER CORPORATION, ANTA” prepared by Nishant Pareek (ID-2013UME1791) in the partial
fulfillment of the award of the Degree Bachelor of Technology in Mechanical Engineering of Malaviya
National Institute of Technology, Jaipur is a record of bonafide summer training undertaken by him and
is hereby approved for submission. The contents of this training report, in full or in parts, have not been
submitted to any other Institute or University for the award of any degree or diploma.
Date: Dr. G. D. Agrawal
Associate Professor
Place: Department of Mechanical Engineering
MNIT, Jaipur, India
Dr. Gopal Agrawal
Professor
Department of Mechanical Engineering
MNIT, Jaipur, India
ii
DEPARTMENT OF MECHANICAL ENGINEERING
MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY
JAIPUR (RAJASTHAN)-302017
DECLARATION
I, Nishant Pareek, declare that the training report entitled “Summer Training at
NATIONAL THERMAL POWER CORPORATION, ANTA” being submitted by me in partial
fulfillment of the degree of B. Tech (Mechanical Engineering) is a summer training carried out
by and the contents of this training report, in full or in parts, have not been submitted to any other
Institute or University for the award of any degree or diploma. I also certify that no part of this
training report has been copied or borrowed from anyone else. In case any type of plagiarism is
found out, I will be solely and completely responsible for it.
Date: Nishant Pareek
B.Tech. (Mechanical Engg.)
Place: 2013UME1791
iii
ACKNOWLEDGEMENT
I take this opportunity to express my gratitude to everyone who supported me throughout
the course of this training. I am thankful for their inspiring guidance, invaluably
constructive criticism and friendly advice during the project work. I am sincerely
grateful to them for sharing their truthful and illuminating views on a number of issues
related to the company.
I wish to express my deep sense of gratitude to Mr. Pankaj Vashistha , who through his
benevolent guidance has enabled me to complete my project. He has been a great source
of inspiration to me all the way. Without his keen interest, incessant encouragement and
invaluable suggestions, this report could not have attained its present shape. I would also
like to thank entire NTPC staff for helping and supporting me in completing my project
work.
I would also like express my thanks to the entire shift in charges including workers and
engineers who listened to our problems and queries and helped us to sought it out. With
their guidance and advices, this training has become a memorable experience and helped
me to provide a partial insight of the industry.
.
(Nishant Pareek)
iv
ABSTRACT
NTPC is the name within Indian power sector established in 1975 with a contribution
of about 30% of Indian power sector today. NTPC is the 6th
largest thermal power
generating utility in capacity.
NTPC Limited, a premier Public Sector Enterprise of Navratna status, established in
1975 is the largest power utility with an installed capacity of 28,644 MW through 26
power stations including 4 stations operated under joint venture companies. NTPC
has emerged as an integrated Power Major with presence in Hydro Power, Coal
mining, Oil & Gas exploration, Power Distribution & Trading and also to enter into
Nuclear Power Development. NTPC contributed 15.00% of the total electricity
generated in the country during 2006-07 with 20.71% share of total installed capacity
of the nation.
NTPC Limited is the largest thermal power generating company of India. A public
sector company, it was incorporated in the year 1975 to accelerate power
development in the country as a wholly owned company of the Government of India.
At present, Government of India holds 89.5% of the total equity shares of the
company and the balance 10.5% is held by FIIs, Domestic Banks, Public and others.
Within a span of 31 years, NTPC has emerged as a truly national power company,
with power generating facilities in all the major regions of the country. NTPC’s core
business is engineering, construction and operation of power generating plants. It
also provides consultancy in the area of power plant constructions and power
generation to companies in India and abroad.
v
Table of Contents
Nomenclature........................................................................................................................................x
Abbreviations............................................................................................................................xi
Chapter 1 Introduction ...............................................................................................................1
1.1 Beginning of NTPC Limited...........................................................................................1
1.2 Power Generation in NTPC .............................................................................................1
1.3 Journey of NTPC ............................................................................................................2
1.4 NTPC Plants and their Capacity ......................................................................................3
1.4.1 Installed Capacity .....................................................................................................3
1.4.2 Coal Based Power Stations ........................................................................................3
1.4.3 Gas Based Power Stations. .........................................................................................5
1.4.4 Hydro Based Power Stations .....................................................................................5
x 1.4.5 Renewable Energy Projects.......................................................................................6
1.5 Technological Initiatives..................................................................................................6
1.6 Corporate Social Responsibility.......................................................................................7
1.7 NTPC'S Core Values .............................................................................................................7
1.8 NTPC Vision and Mission ………………………………………………………………………………………………………...7
1.9 NTPC Environment Policy ..............................................................................................8
1.9.1 Environment Management System ............................................................................8
1.9.2 Pollution Control System ...........................................................................................8
Chapter 2 Anta Thermal Power GAS Station.................................................................................12
2.1Introduction ....................................................................................................................12
2.2 Location .........................................................................................................................12
2.3 Fuel Source ....................................................................................................................13
2.4 Project Profile.................................................................................................................13
2.5 Salient Feature of ANTA Plant.....................................................................................13
2.6 Allocation of Power to States.........................................................................................15
Chapter 3 Power Production at NTPC ANTA .......................................................................16
3.1 Power Production Layout ..............................................................................................16
3.2 Parts of Combined Cycle Power Plant ..........................................................................19
Chapter 4 Gas Turbine and Steam Turbine Unit ....................................................................29
4.1 Gas Turbine Unit..............................................................................................................30
vi
4.1.1 Introduction ..............................................................................................................30
4.1.2 Gas Turbine Specification ........................................................................................30
4.1.3 Feature of ABB 13D2 Type Gas Turbine ................................................................30
4.1.4 Other Characterstics of Gas Turbine ........................................................................31
4.1.5 Genral Descriptions of Gas Turbine.........................................................................31
4.2 Steam Turbine Unit.............................................................................................................39
4.2.1 Introduction .............................................................................................................39
4.2.2 Basic Part of Steam Turbine....................................................................................40
4.2.3 Specification of Steam Turbine...............................................................................42
4.2.4 Working of Steam Turbine......................................................................................42
4.2.5 Maintaiance of Steam Turbine ................................................................................43
4.3 Advantages over Gas Turbine Over Steam Turbine .......................................................45
4.4 Disadvantages ..................................................................................................................45
Chapter 5 Waste Heat Recovery Boiler..................................................................................46
5.1 Introduction....................................................................................................................46
5.2 Working of WHRB ........................................................................................................46
5.3 Various Accessories Used in WHRB....................................................................................50
5.4 WHRB Specification.......................................................................................................51
5.5 Maintaince of WHRB …………………………………………………………………..52
Conclusion…………………………………………………………………………….54
References……………………………………………………………………………55
vii
List of Figures
S.NO. FIGURE NO. TITLE PAGE NO.
1. 1.1 A TYPICAL POWER PLANT OF NTPC 1
2. 1.2 Electrostatic Precipitators 9
3. 1.3 Neutralization Pits 10
4. 1.4 Dry Ash Extraction System (DAES) 10
5. 2.1 Bird view of NTPC anta 12
6. 3.1 combined cycle power plant 16
7. 3.2 HEAT BALANCE DIAGRAM 17
8. 3.3 FLOW PROCESS CHART OF COMBINED CYCLE
POWER PLANT
18
9. 3.4 The view of air intake system 19
10. 3.5 A sectional view of an air compressor 20
11. 3.6 STANDERD COMBUSTTION CHAMBER 20
12. 3.7 Gas Turbine 21
13. 3.8 Turbine and the generator mounted on a single shaft 22
14. 3.9 Step Up Transformer 22
15. 3.10 waste heat recovery boiler 23
16. 3.11 A steam turbine 24
17. 3.12 Condenser 25
18. 3.13 A view of the steam turbine generator 25
19. 3.14 A typical step up transformer 26
20. 3.15 De-aerator 27
21. 3.16 Cooling towers 28
22. 4.1 GAS TURBINE ELECTRICITY PRODUCTION PROCESS 29
23. 4.2 Compressor 32
24. 4.3 STANDERD SILO COMBITION CHAMBER 33
viii
25. 4.4 COMBUSTION CHAMBER 34
26. 4.5 Pipelines of gas source 36
27. 4.6 Oil system overview 37
28. 4.7 A steam turbine 41
29. 5.1 WASTE HEAT RECOVERY BOILER 46
30. 5.2 schematic diagram of a superheater 48
31. 5.3 schematic diagram of a ECONOMIZER 49
32. 5.4 An air preheater 49
33. 5.5 A deaerator 50
34. 5.6 Desuperheater 50
ix
List of Tables
S.NO. TABLE NO. TITLE PAGE NO.
1. 1.1 INSTALLED CAPACITY 3
2. 1.2 Coal based power stations owned by NTPC 3
3. 1.3 Coal Based Joint Ventures/Subsidiaries 4
4. 1.4 gas based power stations owned by NTPC 5
5 1.5 Gas Based Joint Ventures/Subsidiaries 5
6 1.6 Hydro Based Power Projects 5
7 1.7 Solar Energy Projects Commissioned 6
8 2.1 Project profile of NTPC ANTA 13
9 2.2 ALLOCATION OF POWER TO STATES 15
10 4.1 GAS TURBINE SPECIFICATIONS 30
11 4.2 Specifications of HP Turbine 42
12 4.3 Specifications of LP Turbine 42
13 4.4 Wears out problems and their solutions 43
x
Nomenclature
AC Alternating Current
HP Horse Power
CC. Cubic Capacity
KVA Kilo Volt Ampere
KWH Kilo Watt Hour
RPM revolution per minute
xi
Abbreviations
DAES Dry Ash Extraction System
WHRB Waste Heat Recovery Boiler
GTG Gas Turbine unit
AWRS Ash Water Recycle System
IGCC Integrated Gasification Combined Cycle.
STG Steam Turbine Gas unit

More Related Content

What's hot

Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTAnubhav Ghosh
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpcLalitGoyal27
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power StationAyush Khare
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ankit Kumar
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingAbhitendra Singh
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurMadhur Sharma
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 

What's hot (20)

NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORT
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpc
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Vikas
VikasVikas
Vikas
 
ntpc
ntpcntpc
ntpc
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Summer training report on
Summer training report onSummer training report on
Summer training report on
 
NTPC Report
NTPC ReportNTPC Report
NTPC Report
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
 
Ntpc
NtpcNtpc
Ntpc
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 

Viewers also liked

My just right book
My just right bookMy just right book
My just right bookbobcatroom24
 
99 pledges official ppt pdf
99 pledges official ppt pdf99 pledges official ppt pdf
99 pledges official ppt pdfCyndy Patrick
 
Report About Eng. Materials
Report About Eng. MaterialsReport About Eng. Materials
Report About Eng. MaterialsAhmed Abdelwahed
 
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014KHADEIDRA LE GENDRE, M.A.
 
Cloud Computing Security
Cloud Computing SecurityCloud Computing Security
Cloud Computing SecurityAnshul Patel
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled PresentationPurushotham P
 
Ejercios resueltos analogik
Ejercios resueltos analogikEjercios resueltos analogik
Ejercios resueltos analogikorlifreitez
 
Manifesto Introduction
Manifesto IntroductionManifesto Introduction
Manifesto Introductionbobcatroom24
 
AWS ECS Meetup Talentica
AWS ECS Meetup TalenticaAWS ECS Meetup Talentica
AWS ECS Meetup TalenticaAnshul Patel
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc antanishant pareek
 
Reference check form (3)
Reference check form (3)Reference check form (3)
Reference check form (3)anne Mercie
 
Proposisi Logika Informatika
Proposisi Logika InformatikaProposisi Logika Informatika
Proposisi Logika InformatikaDeviGayatri
 
Lucky seven game using 7 segment display in fpga
Lucky seven game using 7 segment display in fpgaLucky seven game using 7 segment display in fpga
Lucky seven game using 7 segment display in fpgaDhruv Agarwal
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 

Viewers also liked (20)

My just right book
My just right bookMy just right book
My just right book
 
Global Artists
Global Artists Global Artists
Global Artists
 
99 pledges official ppt pdf
99 pledges official ppt pdf99 pledges official ppt pdf
99 pledges official ppt pdf
 
Report About Eng. Materials
Report About Eng. MaterialsReport About Eng. Materials
Report About Eng. Materials
 
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014
ASTD to ATD- The Five Characteristics of an Adaptive Culture-Blog Post 2014
 
Cloud Computing Security
Cloud Computing SecurityCloud Computing Security
Cloud Computing Security
 
Cost average efekt
Cost average efektCost average efekt
Cost average efekt
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Ejercios resueltos analogik
Ejercios resueltos analogikEjercios resueltos analogik
Ejercios resueltos analogik
 
Doodling graphic recording
Doodling graphic recordingDoodling graphic recording
Doodling graphic recording
 
Tutorial Slideshare
Tutorial SlideshareTutorial Slideshare
Tutorial Slideshare
 
Manifesto Introduction
Manifesto IntroductionManifesto Introduction
Manifesto Introduction
 
Why not you(1)
Why not you(1)Why not you(1)
Why not you(1)
 
AWS ECS Meetup Talentica
AWS ECS Meetup TalenticaAWS ECS Meetup Talentica
AWS ECS Meetup Talentica
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc anta
 
Reference check form (3)
Reference check form (3)Reference check form (3)
Reference check form (3)
 
Proposisi Logika Informatika
Proposisi Logika InformatikaProposisi Logika Informatika
Proposisi Logika Informatika
 
Lucky seven game using 7 segment display in fpga
Lucky seven game using 7 segment display in fpgaLucky seven game using 7 segment display in fpga
Lucky seven game using 7 segment display in fpga
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
Zaman Mesolitikum
Zaman MesolitikumZaman Mesolitikum
Zaman Mesolitikum
 

Similar to Summer traininig-report ntpc anta content

Training & devlopment shreya gupta
Training & devlopment shreya guptaTraining & devlopment shreya gupta
Training & devlopment shreya guptaTarun Aggarwal
 
Major research project Alstom T&D India ltd
Major research project Alstom T&D India ltdMajor research project Alstom T&D India ltd
Major research project Alstom T&D India ltdasha meena
 
Studies on Fuel Cell Vehicles & Their Scopes in India
Studies on Fuel Cell Vehicles & Their Scopes in IndiaStudies on Fuel Cell Vehicles & Their Scopes in India
Studies on Fuel Cell Vehicles & Their Scopes in IndiaHarsh Gupta
 
Lalit Anjum_Resume_LinledIn
Lalit Anjum_Resume_LinledInLalit Anjum_Resume_LinledIn
Lalit Anjum_Resume_LinledInLalit Anjum
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report Study Hub
 
Vikas ntpc report complete
Vikas ntpc report completeVikas ntpc report complete
Vikas ntpc report completeVikas Singh
 
combine cycle diesel power plant
combine cycle diesel power plantcombine cycle diesel power plant
combine cycle diesel power plantJawad Ali
 
2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Trainingahmadravian317
 
asad report final
asad report finalasad report final
asad report finalAsad Nauman
 
Industrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectIndustrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectMohamed Juzaafi
 
Techno-Economics of Rooftop Solar Photovoltaic Systems in India
Techno-Economics of Rooftop Solar Photovoltaic Systems in IndiaTechno-Economics of Rooftop Solar Photovoltaic Systems in India
Techno-Economics of Rooftop Solar Photovoltaic Systems in IndiaShailesh Mishra
 
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCIL
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCILPERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCIL
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCILSAURABH MITTAL
 
Automation of needle stacking in pinion gear
Automation of needle stacking in pinion gearAutomation of needle stacking in pinion gear
Automation of needle stacking in pinion gearAaron Eapen
 
Winter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfWinter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfAnant938795
 

Similar to Summer traininig-report ntpc anta content (20)

Power plant overview_2
Power plant overview_2Power plant overview_2
Power plant overview_2
 
Training & devlopment shreya gupta
Training & devlopment shreya guptaTraining & devlopment shreya gupta
Training & devlopment shreya gupta
 
Basic Industrial Training Report
Basic Industrial Training ReportBasic Industrial Training Report
Basic Industrial Training Report
 
project_001.docx
project_001.docxproject_001.docx
project_001.docx
 
Major research project Alstom T&D India ltd
Major research project Alstom T&D India ltdMajor research project Alstom T&D India ltd
Major research project Alstom T&D India ltd
 
Studies on Fuel Cell Vehicles & Their Scopes in India
Studies on Fuel Cell Vehicles & Their Scopes in IndiaStudies on Fuel Cell Vehicles & Their Scopes in India
Studies on Fuel Cell Vehicles & Their Scopes in India
 
Lalit Anjum_Resume_LinledIn
Lalit Anjum_Resume_LinledInLalit Anjum_Resume_LinledIn
Lalit Anjum_Resume_LinledIn
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report
 
Vikas ntpc report complete
Vikas ntpc report completeVikas ntpc report complete
Vikas ntpc report complete
 
combine cycle diesel power plant
combine cycle diesel power plantcombine cycle diesel power plant
combine cycle diesel power plant
 
2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training
 
asad report final
asad report finalasad report final
asad report final
 
Industrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectIndustrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development Project
 
Techno-Economics of Rooftop Solar Photovoltaic Systems in India
Techno-Economics of Rooftop Solar Photovoltaic Systems in IndiaTechno-Economics of Rooftop Solar Photovoltaic Systems in India
Techno-Economics of Rooftop Solar Photovoltaic Systems in India
 
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCIL
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCILPERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCIL
PERFORMANCE APPRAISAL IN NARORA ATOMIC POWER SATATION A UNIT OF NPCIL
 
Automation of needle stacking in pinion gear
Automation of needle stacking in pinion gearAutomation of needle stacking in pinion gear
Automation of needle stacking in pinion gear
 
REPORT-NIRUPAMA
REPORT-NIRUPAMAREPORT-NIRUPAMA
REPORT-NIRUPAMA
 
Winter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfWinter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdf
 
Final Report
Final ReportFinal Report
Final Report
 
Print
PrintPrint
Print
 

Recently uploaded

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 

Recently uploaded (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 

Summer traininig-report ntpc anta content

  • 1. INDUSTRIAL SUMMER TRAINING At NATIONAL THERMAL POWER CORPARATION ANTA Submitted in Partial Fulfillment of the Requirements for the Award of Degree of Bachelor of Technology In Mechanical Engineering By NISHANT PAREEK 2013UME1791 Submitted By: Submitted To: NISHANT PAREEK DR. GOPAL AGRAWAL 2013ume1791 Professor Department of Mechanical Engineering M.N.I.T. Jaipur, India Mentor DR. G. D. AGRAWAL Mr. Pankaj Vashistha Associate Professor Assistant manager Department of Mechanical Engineering NTPC ANTA M.N.I.T. Jaipur, India DEPARTMENT OF MECHANICAL ENGINEERING MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR NOVEMBER 2016
  • 2. i DEPARTMENT OF MECHANICAL ENGINEERING JAIPUR (RAJASTHAN)-302017 MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY CERTIFICATE This is certified that the training report entitled “Summer Training at NATIONAL THERMAL POWER CORPORATION, ANTA” prepared by Nishant Pareek (ID-2013UME1791) in the partial fulfillment of the award of the Degree Bachelor of Technology in Mechanical Engineering of Malaviya National Institute of Technology, Jaipur is a record of bonafide summer training undertaken by him and is hereby approved for submission. The contents of this training report, in full or in parts, have not been submitted to any other Institute or University for the award of any degree or diploma. Date: Dr. G. D. Agrawal Associate Professor Place: Department of Mechanical Engineering MNIT, Jaipur, India Dr. Gopal Agrawal Professor Department of Mechanical Engineering MNIT, Jaipur, India
  • 3. ii DEPARTMENT OF MECHANICAL ENGINEERING MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY JAIPUR (RAJASTHAN)-302017 DECLARATION I, Nishant Pareek, declare that the training report entitled “Summer Training at NATIONAL THERMAL POWER CORPORATION, ANTA” being submitted by me in partial fulfillment of the degree of B. Tech (Mechanical Engineering) is a summer training carried out by and the contents of this training report, in full or in parts, have not been submitted to any other Institute or University for the award of any degree or diploma. I also certify that no part of this training report has been copied or borrowed from anyone else. In case any type of plagiarism is found out, I will be solely and completely responsible for it. Date: Nishant Pareek B.Tech. (Mechanical Engg.) Place: 2013UME1791
  • 4. iii ACKNOWLEDGEMENT I take this opportunity to express my gratitude to everyone who supported me throughout the course of this training. I am thankful for their inspiring guidance, invaluably constructive criticism and friendly advice during the project work. I am sincerely grateful to them for sharing their truthful and illuminating views on a number of issues related to the company. I wish to express my deep sense of gratitude to Mr. Pankaj Vashistha , who through his benevolent guidance has enabled me to complete my project. He has been a great source of inspiration to me all the way. Without his keen interest, incessant encouragement and invaluable suggestions, this report could not have attained its present shape. I would also like to thank entire NTPC staff for helping and supporting me in completing my project work. I would also like express my thanks to the entire shift in charges including workers and engineers who listened to our problems and queries and helped us to sought it out. With their guidance and advices, this training has become a memorable experience and helped me to provide a partial insight of the industry. . (Nishant Pareek)
  • 5. iv ABSTRACT NTPC is the name within Indian power sector established in 1975 with a contribution of about 30% of Indian power sector today. NTPC is the 6th largest thermal power generating utility in capacity. NTPC Limited, a premier Public Sector Enterprise of Navratna status, established in 1975 is the largest power utility with an installed capacity of 28,644 MW through 26 power stations including 4 stations operated under joint venture companies. NTPC has emerged as an integrated Power Major with presence in Hydro Power, Coal mining, Oil & Gas exploration, Power Distribution & Trading and also to enter into Nuclear Power Development. NTPC contributed 15.00% of the total electricity generated in the country during 2006-07 with 20.71% share of total installed capacity of the nation. NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. At present, Government of India holds 89.5% of the total equity shares of the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and others. Within a span of 31 years, NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country. NTPC’s core business is engineering, construction and operation of power generating plants. It also provides consultancy in the area of power plant constructions and power generation to companies in India and abroad.
  • 6. v Table of Contents Nomenclature........................................................................................................................................x Abbreviations............................................................................................................................xi Chapter 1 Introduction ...............................................................................................................1 1.1 Beginning of NTPC Limited...........................................................................................1 1.2 Power Generation in NTPC .............................................................................................1 1.3 Journey of NTPC ............................................................................................................2 1.4 NTPC Plants and their Capacity ......................................................................................3 1.4.1 Installed Capacity .....................................................................................................3 1.4.2 Coal Based Power Stations ........................................................................................3 1.4.3 Gas Based Power Stations. .........................................................................................5 1.4.4 Hydro Based Power Stations .....................................................................................5 x 1.4.5 Renewable Energy Projects.......................................................................................6 1.5 Technological Initiatives..................................................................................................6 1.6 Corporate Social Responsibility.......................................................................................7 1.7 NTPC'S Core Values .............................................................................................................7 1.8 NTPC Vision and Mission ………………………………………………………………………………………………………...7 1.9 NTPC Environment Policy ..............................................................................................8 1.9.1 Environment Management System ............................................................................8 1.9.2 Pollution Control System ...........................................................................................8 Chapter 2 Anta Thermal Power GAS Station.................................................................................12 2.1Introduction ....................................................................................................................12 2.2 Location .........................................................................................................................12 2.3 Fuel Source ....................................................................................................................13 2.4 Project Profile.................................................................................................................13 2.5 Salient Feature of ANTA Plant.....................................................................................13 2.6 Allocation of Power to States.........................................................................................15 Chapter 3 Power Production at NTPC ANTA .......................................................................16 3.1 Power Production Layout ..............................................................................................16 3.2 Parts of Combined Cycle Power Plant ..........................................................................19 Chapter 4 Gas Turbine and Steam Turbine Unit ....................................................................29 4.1 Gas Turbine Unit..............................................................................................................30
  • 7. vi 4.1.1 Introduction ..............................................................................................................30 4.1.2 Gas Turbine Specification ........................................................................................30 4.1.3 Feature of ABB 13D2 Type Gas Turbine ................................................................30 4.1.4 Other Characterstics of Gas Turbine ........................................................................31 4.1.5 Genral Descriptions of Gas Turbine.........................................................................31 4.2 Steam Turbine Unit.............................................................................................................39 4.2.1 Introduction .............................................................................................................39 4.2.2 Basic Part of Steam Turbine....................................................................................40 4.2.3 Specification of Steam Turbine...............................................................................42 4.2.4 Working of Steam Turbine......................................................................................42 4.2.5 Maintaiance of Steam Turbine ................................................................................43 4.3 Advantages over Gas Turbine Over Steam Turbine .......................................................45 4.4 Disadvantages ..................................................................................................................45 Chapter 5 Waste Heat Recovery Boiler..................................................................................46 5.1 Introduction....................................................................................................................46 5.2 Working of WHRB ........................................................................................................46 5.3 Various Accessories Used in WHRB....................................................................................50 5.4 WHRB Specification.......................................................................................................51 5.5 Maintaince of WHRB …………………………………………………………………..52 Conclusion…………………………………………………………………………….54 References……………………………………………………………………………55
  • 8. vii List of Figures S.NO. FIGURE NO. TITLE PAGE NO. 1. 1.1 A TYPICAL POWER PLANT OF NTPC 1 2. 1.2 Electrostatic Precipitators 9 3. 1.3 Neutralization Pits 10 4. 1.4 Dry Ash Extraction System (DAES) 10 5. 2.1 Bird view of NTPC anta 12 6. 3.1 combined cycle power plant 16 7. 3.2 HEAT BALANCE DIAGRAM 17 8. 3.3 FLOW PROCESS CHART OF COMBINED CYCLE POWER PLANT 18 9. 3.4 The view of air intake system 19 10. 3.5 A sectional view of an air compressor 20 11. 3.6 STANDERD COMBUSTTION CHAMBER 20 12. 3.7 Gas Turbine 21 13. 3.8 Turbine and the generator mounted on a single shaft 22 14. 3.9 Step Up Transformer 22 15. 3.10 waste heat recovery boiler 23 16. 3.11 A steam turbine 24 17. 3.12 Condenser 25 18. 3.13 A view of the steam turbine generator 25 19. 3.14 A typical step up transformer 26 20. 3.15 De-aerator 27 21. 3.16 Cooling towers 28 22. 4.1 GAS TURBINE ELECTRICITY PRODUCTION PROCESS 29 23. 4.2 Compressor 32 24. 4.3 STANDERD SILO COMBITION CHAMBER 33
  • 9. viii 25. 4.4 COMBUSTION CHAMBER 34 26. 4.5 Pipelines of gas source 36 27. 4.6 Oil system overview 37 28. 4.7 A steam turbine 41 29. 5.1 WASTE HEAT RECOVERY BOILER 46 30. 5.2 schematic diagram of a superheater 48 31. 5.3 schematic diagram of a ECONOMIZER 49 32. 5.4 An air preheater 49 33. 5.5 A deaerator 50 34. 5.6 Desuperheater 50
  • 10. ix List of Tables S.NO. TABLE NO. TITLE PAGE NO. 1. 1.1 INSTALLED CAPACITY 3 2. 1.2 Coal based power stations owned by NTPC 3 3. 1.3 Coal Based Joint Ventures/Subsidiaries 4 4. 1.4 gas based power stations owned by NTPC 5 5 1.5 Gas Based Joint Ventures/Subsidiaries 5 6 1.6 Hydro Based Power Projects 5 7 1.7 Solar Energy Projects Commissioned 6 8 2.1 Project profile of NTPC ANTA 13 9 2.2 ALLOCATION OF POWER TO STATES 15 10 4.1 GAS TURBINE SPECIFICATIONS 30 11 4.2 Specifications of HP Turbine 42 12 4.3 Specifications of LP Turbine 42 13 4.4 Wears out problems and their solutions 43
  • 11. x Nomenclature AC Alternating Current HP Horse Power CC. Cubic Capacity KVA Kilo Volt Ampere KWH Kilo Watt Hour RPM revolution per minute
  • 12. xi Abbreviations DAES Dry Ash Extraction System WHRB Waste Heat Recovery Boiler GTG Gas Turbine unit AWRS Ash Water Recycle System IGCC Integrated Gasification Combined Cycle. STG Steam Turbine Gas unit