This document provides a summary of Romeo S. Verdejo's personal and employment information. It includes his educational background, work history spanning from 1995 to present in various roles such as pipe fitter and fabricator for companies in the Philippines, Papua New Guinea, Saudi Arabia, Qatar, and Angola. His duties and responsibilities in each role involved tasks like pipeline installation, maintenance, fabrication, and ensuring safety and cleanliness standards.
1. ROMEO S. VERDEJO
Manalupang, Bauan Batangas
Contact No.09266605837
PERSONAL INFORMATION
Birthplace : Cabawa, Dapa Surigao Del Norte
Birth date : September 7, 1967
Age : 47
Civil Status : Married
Religion : Roman Catholic
Nationality : Filipino
Sex : Male
Height : 5’1”
Weight : 60 kgs.
SSS no. : 0430138908
TIN : 175-939-120
Passport No. : EC3208111
: XX5336990
: PP0952221
: HH278747
: BB054038
EDUCATIONAL ATTAINMENT
School : Cabawa Elementary School
1981
High School : Sison Poblacion Brgy High School
1991
College : St. Jude Thaddeus Int. Of Tech Surigao City
1992
: Vocational Undergraduate
2. EMPLOYMENT RECORD
Name of Company : CJJV - CAPE
Location : P.O.Box 3019 Papa Lealea Road
Boroko National Capital District
Papua New Guinea
Position : Pipe Fitter (Process Area / Warranty)
Inclusive Dates : April 24, 2014 to June 29, 2014
Reason for Leaving : Phase Completion
Job Description : PNG LNG Project
DUTIES AND RESPONSIBILITIES
1. Demolition of temporary pipeline 10” inches width 3 kilometers long location in J.T. Area.
2. Open close the gate valve to the process area if have trouble or leaking the pipeline warning
alarm.
3. Assist the Operator up down to the P.R. 1 in train 1 to changed gasket every flanges which
damaged.
4. Maintain and monitoring the gauge of motor pump running in the pipeline process area and log
book every hour.
5. General assemble to the master point if have leak warning alarm.
6. Safety meeting and housekeeping everyday.
Name of Company : CJJV - CAPE
Location : P.O. Box 3019 Papalealea Road
Boroko National Capital Disrtict
Papua New Guinea
Position : Pipe Fitter (Pre – comm. & commissioning)
Inclusive Dates : July 3, 2013 –March 31, 2014
Reason for Leaving : Project Completion
Job Description : PNG LNG Project
DUTIES AND RESPONSIBILITIES
1. Line check the pipeline location from common area to train 1, train 2. Double check the blow
point of pipe activities.
2. Breakdown the globe valve & ball valve and installing a temporary pipe spool to avoid the
materials damaged. Also installing a butterfly valve 2”x150 to 32”x600 should be used a
blowpoint in a pipeline.
3. Installing red blind 2” x 1500 – 24”x900 and change every gasket from area. Fascination, common
train 1 train 2 going to flaire.
4. Activities, airblowing, hot – oil circulation, water flashing, nitrogen filling, leak test, airfreeying
all around it should be a barricade and put the warning signed.
5. Everyday have a toolbox talk for reminding to everyone workers about safety topic.
6. Every Saturday have a General Housekeeping
3. Name of Company : AG&P - Bechtel
Location : San Roque, Bauan, Batangas
Position : Pipe Fitter
Inclusive Dates : November 06, 2012 – June 28, 2013
Reason for Leaving : Resigned
Job Description : GLNG Module Yard
DUTIES AND RESPONSIBILITIES
1. Assemble the manifold and fit – up all fittings vent, coupling drain, pipe spool and end cap.
2. Prepare the materials and tools to install the hose 1x2000 PSI from module going to the pump.
3. 3 to 5 hours filling water to the pipeline and should be sweet water to be used.
4. Barricade the area and put the warning signed before hydrotesting start.
5. Water drain and airdrying proceed up to 2 – 3 hours.
6. Installed blind flange to prepare air blowing and leak test of the line
7. Line check of the pipe line until hydro testing.
8. Every day we have a safety meeting before start the work
9. Housekeeping 15 minutes before knock off the time every day.
10. Safety meeting and toolbox meeting everyday.
Name of Company : Bechtel International Inc.
Location : Angola Lng Project
Soyo Zaire Province Republic of Angola
Position : PIPE FITTER
Inclusive Date : August 28, 2011 - January 19, 2012
Reason for Leaving : Contract Completion
Job Description : Angola Lng Project
DUTIES AND RESPONSIBILITIES
1. Pipe line checking if have a punch list remaining
2. Cleaning inside the vessel and external tray Alignment
3. Assist to the millwright works, motor and pump alignment
4. Loading of ceramic ball to the vessel with measure 6,12,20,50 mm
5. Every day we have a safety meeting before start the work
6. Housekeeping 15 minutes before knock off the time every day.
7. Attending training with (lock-out)(tag-out)(confine space)(respiratory full mash) air breathing.
Name of Company : BILFAL HEAVY INDUSTRIES Ltd
Location : P.O. Box 10138 AL Jubail Ind City 31961 KSA
Position : Pipe Fitter
Inclusive Date : August 21, 2003 – March 02, 2011
Reason for Leaving : Final exit
Job Description : Fabrication Shop
DUTIES AND RESPONSIBILITIES
1. Fabrication and lay-out of nozzle in column w/ 9 meters in diameter 70 to 100 meter long
2. Fabrication and lay-out of whole flat forms.
3. Fabrication Pressure Vessel heat exchanges and column.
4. Unity and teamwork to the group.
4. 5. Every Wednesday we have tool box meeting and everyday cleanliness before knock off of time.
6. SADAF shutdown 45 days in 9 unit of furnace tube replacement.
7. Saudi Aramco shutdown 2 months with 6 unit of vessel removing and changing of the strainer.
Name of Company : MANNAI MARINE Co. WLL
Location : P.O. BOX 8776 DOHA, QATAR
Position : Fabricator
Inclusive Dates : April 8, 2002 – November 16, 2002
Reason for Leaving : Surplus of Manpower
Job Description : Off Shore and Fabrication Shop
DUTIES AND RESPONSIBILITIES
1. Fabrication and lay-out of flat form.
2. Fabrication of all needed Rig Repair.
3. Fabrication and erection of Heledic.
4. Fabrication of 6”inch. Pipe with 30 branches.
5. Erection and installation of platform in off shore.
6. Unity and teamwork to the group.
7. Every Saturday we have tool box meeting and cleanliness everyday before knock off of time in
the afternoon.
Name of Company : GULF ENGINEERING CO. FOR HEAT
EXCHANGERS LTD.
Location : P.O. Box 342 Jubail 31951 Saudi Arabia
Position : Fabricator
Inclusive Dates : June 15, 1996 – June 15, 2000
Reason for Leaving : Project Completion
Job Description : Fabrication Shop
DUTIES AND RESPONSIBILITIES
1. Fabrication and lay-out of shell with 1meters to 10 meters in diameters.
2. Fabrication of all parts of tanks.
3. Lay-out of external hole of tanks.
4. Material classification of grade.
5. Housekeeping with 15 minutes before knock off time in the afternoon before leaving
Name of Company : ECCO-ASIA FABRICATION SHOP
Location : Brgy. Sto. Domingo Bay Laguna
Position : Fitter “A”
Inclusive Dates : May 23, 1995 – May 31, 1996
Job Description : Shop Fabrication
DUTIES AND RESPONSIBILITIES
1. Lay-out of bolt hole an angle bars, gusset plates, ladders for towers bracing, etc.
2. Fit-up of towers accessories and ladders, etc.
3. Lay-out, cutting, grinding, beveling, trucking and assembly of towers.
4. House keeping 15 minutes before knock off time in every afternoon.
5. Name of Company : AG&P CALACA POWER PLANTS II
Location : San Rafael, Calaca, Batangas
Position : Pipe Fitter
Inclusive Dates : November 16, 1994 – May 5, 1995
Reason for Leaving : Project Completion
Job Description : NPC-CONSTRUCTION PROJECT
DUTIES AND RESPONSIBILITIES
1. Fabrication of pipe spool with elbow 90 degrees long radius and short radius and 45 degrees
elbow.
2. Fabrication of lateral branches 45 degrees equal or an equal size diameter of header and branch.
3. Fabrication of spool with concentric and eccentric reducer diameter size 2 inches up to 24 inches
diameter.
4. Installation of pipe spool and fitting connection to equipment or joint connection.
5. Installation and assemble with 10 person capacity in elevator
I hereby certify that the above information are true and correct to the best of my knowledge and belief.
ROMEO S. VERDEJO
Applicant Signature