SlideShare a Scribd company logo
1 of 19
Academic Qualifications
BSc. In Electrical Enginering
Yildiz Technical University

MBA – Master of Business Administration
University of Sakarya
Technical Experience
Technical Experience




 1- Viking Paper Ltd.                      2- Delphi Automotive Systems
Yaşar Holding 2001-2003                        Delphi Izmir Plant 2003-2007




                          3- Sicpa-Assan JV
       Joint Venture of Sicpa Security Solutions (Switzerland) and
                        Kibar Holding 2007-2012
In 2001, a big fire at the plant, destroyed the «Converting unit» and burned all the building
completely. All manufacturing equipments burned including the high voltage feeding units
like transformers, XLPE High Voltage cables and associated distribution boards.
As an electrical engineer, I was the main contact
communicating and managing the Contractor
which was responsible for re-building the High
and Low Voltage power systems of the new
converting unit.
After the construction of the new
   building and energy
   systems, installation of production
   equipment started.
A technical site visit was arranged to
   Italy to meet the team behind the
   manufacturing of the Converter
   unit.
Our team was trained on how to
   install and operate this complex
   device. I was responsible for
   installation and commissioning of
   this Converter unit back in Turkey.
The two burned ‘Z-fold’ Tissue
   machines’ were recovered and
   rebuilt by our team.
After the implementation stage, my duties included:

     •   All PLC programming and revision updates
     •   Solving All PLC faults
     •   Fixing sudden unexpected system failures,
         finding the root cause and developing
         solutions develop solutions for future error
         prevention and reduction
     •   Training the technician on duty about the
         error that occurred and ensure he/she is
         understand the malfunction and the
         resolution
     •   Adding and building new networks to
         Automation systems
     •   Writing new PLC programs from scratch
         related to minor projects
•   Participating to the Failure Modes and Effects Analysis (FMEA) meetings of all
    projects and following the FMEA items.
•   Designing the manufacturing equipments according to agreed FMEAs.
•   Getting in touch with the related global or local technical suppliers. Briefing the
    technical details and needs to the supplier.
•   Performing technical audit and controls during the equipment installation
    process
•   Participating to the functional tests and verifications of the technical equipment
    before taking in to manufacturing area.
•   Controlling the Project budget.
•   Monitoring the process, analysing the output, reporting performance
    at weekly progress meetings
•   Improving operational performance of the manufacturing systems
    by pareto analysis and FMEAs .
•   Designing new concepts for all equipment to improve quality
•   Providing support on HV systems.
•   Maintaining the production line at all stages
•   Troubleshooting all technical issues
Some examples of equipments an systems I dealt with on daily basis

• Post production test machines and testers.
• Thermal printer solutions.
• 2D Barcode reader solutions.
• Vision control systems solutions.
• Torque machine solutions and programming.
•   Input into the technical equipments design.
•   Finding and contacting with the relevant technical suppliers.
•   Briefing the technical details and needs to the supplier.
•   Creating an installation plan according to customer and
    participating to the installations and implementations of the
    equipments.
•   After installation, planning and carrying out the periodic
    maintenances according to customer tailored project
    implementation plan.
•   Troubleshooting of all technical issues
•   Making software improvements to machines according to the
    customer feedback
•   I participated to the various system installations in Morocco as
    ‘Systems expert’.
Some examples of equipments an systems I dealt with on daily basis :




                                                     DOMiNO Industrial inkjet
                                                     printing systems.
LABEL Aire barcode and labelling
systems.

*Participated to the installations in
Morocco as systems expert.
3D Barcode solutions.
COGNEX special programmable cameras and special
software to program and read the 3D Barcodes.
Why should you hire me?



1.Relevant past experience in the field
2.Knowledge of Automations System and PLC
3.Experience in automation design, purchase and installation.
4.Experience in trade in Aegean free zone
5.Experience in development of engineering systems
6.Up to date with latest technology systems used in the industry




Best Regards
Murat Su

More Related Content

What's hot

Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plandeanhofer
 
Portfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENGPortfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENGClaudio Romano
 
Jimmy A. Jimenez Resume
Jimmy A. Jimenez ResumeJimmy A. Jimenez Resume
Jimmy A. Jimenez ResumeJimmy Jimenez
 
Programmable logic controller
Programmable logic controllerProgrammable logic controller
Programmable logic controllerAtul Wadhai
 
CV of M.Saad Khan
CV of M.Saad KhanCV of M.Saad Khan
CV of M.Saad KhanSaad Khan
 
Matt's offshore wind technician resume
Matt's offshore wind technician resumeMatt's offshore wind technician resume
Matt's offshore wind technician resumeMatthew Mavis
 
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam SinghSatnam Singh
 

What's hot (19)

The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
resumeaugust2014
resumeaugust2014resumeaugust2014
resumeaugust2014
 
KahsayResume (1)
KahsayResume (1)KahsayResume (1)
KahsayResume (1)
 
CV - Sherwin Tupas
CV - Sherwin TupasCV - Sherwin Tupas
CV - Sherwin Tupas
 
Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plan
 
IITP Automation
IITP AutomationIITP Automation
IITP Automation
 
Portfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENGPortfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENG
 
Lori
LoriLori
Lori
 
AVP
AVPAVP
AVP
 
6 Month Industrial Automation Training
6 Month Industrial Automation Training6 Month Industrial Automation Training
6 Month Industrial Automation Training
 
Jimmy A. Jimenez Resume
Jimmy A. Jimenez ResumeJimmy A. Jimenez Resume
Jimmy A. Jimenez Resume
 
Programmable logic controller
Programmable logic controllerProgrammable logic controller
Programmable logic controller
 
raymundo froyalde 1
raymundo froyalde 1raymundo froyalde 1
raymundo froyalde 1
 
Industrial automation
Industrial automationIndustrial automation
Industrial automation
 
CV of M.Saad Khan
CV of M.Saad KhanCV of M.Saad Khan
CV of M.Saad Khan
 
vlad2 resume updated
vlad2 resume updatedvlad2 resume updated
vlad2 resume updated
 
Matt's offshore wind technician resume
Matt's offshore wind technician resumeMatt's offshore wind technician resume
Matt's offshore wind technician resume
 
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam Singh
 

Similar to Murat Su

Similar to Murat Su (20)

xinyuan resume
xinyuan resumexinyuan resume
xinyuan resume
 
Mohamed Elwardany's resume
Mohamed Elwardany's resumeMohamed Elwardany's resume
Mohamed Elwardany's resume
 
robert calleja (2)
robert calleja (2)robert calleja (2)
robert calleja (2)
 
S m umer wasi
S m umer wasiS m umer wasi
S m umer wasi
 
inroduction of embedded system.pptx
inroduction of embedded system.pptxinroduction of embedded system.pptx
inroduction of embedded system.pptx
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Vinay Resume
Vinay ResumeVinay Resume
Vinay Resume
 
DonLewandosk_Resume 2015
DonLewandosk_Resume 2015DonLewandosk_Resume 2015
DonLewandosk_Resume 2015
 
Field Service Engineer Job Description
Field Service Engineer Job DescriptionField Service Engineer Job Description
Field Service Engineer Job Description
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
CV.PDF
CV.PDFCV.PDF
CV.PDF
 
Resume
ResumeResume
Resume
 
A_Brief_Summary_on_Summer_Courses[1]
A_Brief_Summary_on_Summer_Courses[1]A_Brief_Summary_on_Summer_Courses[1]
A_Brief_Summary_on_Summer_Courses[1]
 
Duane martin 11 21 14 resume
Duane martin 11 21 14 resumeDuane martin 11 21 14 resume
Duane martin 11 21 14 resume
 
Ghulam Murtaza
Ghulam Murtaza Ghulam Murtaza
Ghulam Murtaza
 
Marc's Resume - Updated 0316
Marc's Resume - Updated 0316Marc's Resume - Updated 0316
Marc's Resume - Updated 0316
 
Jason Lowe I_C HMI Devloper
Jason Lowe I_C HMI DevloperJason Lowe I_C HMI Devloper
Jason Lowe I_C HMI Devloper
 
CV_JANA
CV_JANACV_JANA
CV_JANA
 
John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)
 

Murat Su

  • 2. BSc. In Electrical Enginering Yildiz Technical University MBA – Master of Business Administration University of Sakarya
  • 4. Technical Experience 1- Viking Paper Ltd. 2- Delphi Automotive Systems Yaşar Holding 2001-2003 Delphi Izmir Plant 2003-2007 3- Sicpa-Assan JV Joint Venture of Sicpa Security Solutions (Switzerland) and Kibar Holding 2007-2012
  • 5.
  • 6. In 2001, a big fire at the plant, destroyed the «Converting unit» and burned all the building completely. All manufacturing equipments burned including the high voltage feeding units like transformers, XLPE High Voltage cables and associated distribution boards.
  • 7. As an electrical engineer, I was the main contact communicating and managing the Contractor which was responsible for re-building the High and Low Voltage power systems of the new converting unit.
  • 8. After the construction of the new building and energy systems, installation of production equipment started. A technical site visit was arranged to Italy to meet the team behind the manufacturing of the Converter unit. Our team was trained on how to install and operate this complex device. I was responsible for installation and commissioning of this Converter unit back in Turkey. The two burned ‘Z-fold’ Tissue machines’ were recovered and rebuilt by our team.
  • 9. After the implementation stage, my duties included: • All PLC programming and revision updates • Solving All PLC faults • Fixing sudden unexpected system failures, finding the root cause and developing solutions develop solutions for future error prevention and reduction • Training the technician on duty about the error that occurred and ensure he/she is understand the malfunction and the resolution • Adding and building new networks to Automation systems • Writing new PLC programs from scratch related to minor projects
  • 10.
  • 11. Participating to the Failure Modes and Effects Analysis (FMEA) meetings of all projects and following the FMEA items. • Designing the manufacturing equipments according to agreed FMEAs. • Getting in touch with the related global or local technical suppliers. Briefing the technical details and needs to the supplier. • Performing technical audit and controls during the equipment installation process • Participating to the functional tests and verifications of the technical equipment before taking in to manufacturing area. • Controlling the Project budget.
  • 12. Monitoring the process, analysing the output, reporting performance at weekly progress meetings • Improving operational performance of the manufacturing systems by pareto analysis and FMEAs . • Designing new concepts for all equipment to improve quality • Providing support on HV systems. • Maintaining the production line at all stages • Troubleshooting all technical issues
  • 13. Some examples of equipments an systems I dealt with on daily basis • Post production test machines and testers. • Thermal printer solutions. • 2D Barcode reader solutions.
  • 14. • Vision control systems solutions. • Torque machine solutions and programming.
  • 15. Input into the technical equipments design. • Finding and contacting with the relevant technical suppliers. • Briefing the technical details and needs to the supplier. • Creating an installation plan according to customer and participating to the installations and implementations of the equipments. • After installation, planning and carrying out the periodic maintenances according to customer tailored project implementation plan. • Troubleshooting of all technical issues • Making software improvements to machines according to the customer feedback • I participated to the various system installations in Morocco as ‘Systems expert’.
  • 16. Some examples of equipments an systems I dealt with on daily basis : DOMiNO Industrial inkjet printing systems.
  • 17. LABEL Aire barcode and labelling systems. *Participated to the installations in Morocco as systems expert.
  • 18. 3D Barcode solutions. COGNEX special programmable cameras and special software to program and read the 3D Barcodes.
  • 19. Why should you hire me? 1.Relevant past experience in the field 2.Knowledge of Automations System and PLC 3.Experience in automation design, purchase and installation. 4.Experience in trade in Aegean free zone 5.Experience in development of engineering systems 6.Up to date with latest technology systems used in the industry Best Regards Murat Su