SlideShare a Scribd company logo
1 of 8
Munawar Islam
M: 0311 1515 971 / 0306 444 1920
E: munawarislam@ymail.com
Career Objective
To establish a career in geology where my organisational skills will be put to best use. I am
committed to continuous training and development, and would like to progress to
management level as a technical services manager or operations manager.
Education
Bachelor of Science (Applied Geology) – Honours
2005-2009
University of the Punjab
Lahore, Pakistan
Technical skills
 Drilling supervision (Coring & Non-coring)
o Logging
o Core Recovery
o Rock Quality Designation
o Core sample dressing & waxing
o Sampling and storing drill core
o Core box writing
o Core box photography
o Water Pressure Test
o Permeability test (Constant Head & falling Head)
o Standard Penetration Test For silt sand & clays
o Dynamic Cone Penetration Test for Gravels
o Use of Denison, Pitcher & Shelby sample tubes
o Sounding
o Water table check
o Installation & study of Piesometer
o Test Pits
 Grouting
o GIN Grouting(P*V)
o Consolidation grouting
o Conventional grouting
o Curtain grouting
o Get high pressure grouting
 Geological surface mapping
o Scan line survey
o Discontinuity survey
o Topographic survey
 Shotcrete, Rock bolting and anchoring
o Maintain cut slope stability
o Maintain Foundation stability
o Maintain tunnel & edit stability
o Aligning, cutting, measuring, orientating
Experience
Worked as Geologist with two companies for more than five years. Detail is as under
 Sinohydro Group Ltd (September 2014-Present)
 PioneerAssociates(June 2009-August2014)
Sinohydro Group Ltd (September 2014- Present)
Project: Tarbela 4th
ExtensionHydro PowerProject
Location: Tarbela Dam, Haripur
Designation: Engineering Geologist
Responsibilities:
 Detailed Geotechnical Investigation through Drilling & open Test Pits
 Detailed litho logical logging for soil and rock
 Detailed Surface Geological mapping
 Detailed scan line survey
 Detailed discontinuity survey
 Grouting (Consolidation Grouting through GIN Method, Conventional Grouting & Jet
Grouting)
 Conduct daily development checks
 Perform data collection and reporting To contractor & consultant
Pioneer Associates (June 2009-August 2014)
April 2014 – August 2014
Project: Tarbela 4th
ExtensionHPP
Location: Tarbela Dam, Haripur
Designation: Engineering Geologist
Responsibilities:
 Detailed Geotechnical Investigation through Drilling & open Test Pits
 Detailed litho logical logging for soil and rock
 Detailed scan line survey
 Detailed discontinuity survey
 Conduct daily development checks
 Perform data collection and reporting To contractor & consultant
 Completed sampling and storing for the drill core
 Managed core preparation, including marking measurements, photographing and
sampling
 Standard Penetration Test
 Dynamic Cone Penetration Test
 Permeability Test
 Preserved Core in the core boxes
June 2103 – March 2014
Designation: Engineering Geologist
Project:Koragh Parait Hydro PowerProject
Location: Chitral
Responsibilities:
 Detailed Geotechnical Investigation through Drilling & open Test Pits
 Detailed litho logical logging for soil and rock
 Detailed Surface Geological mapping
 Detailed scan line survey
 Detailed discontinuity survey
 Conduct daily development checks
 Perform data collection and reporting To contractor & consultant
 Completed sampling and storing for the drill core
 Managed core preparation, including marking measurements, photographing and
sampling
December2012 –June 2013
Designation: Engineering Geologist
Project:Munda Dam Hydro PowerProject
Location:Mohmand Agency, Peshawar, KPK
Responsibilities:
 Detailed Geotechnical Investigation through Drilling & open Test Pits
 Detailed litho logical logging for soil and rock
 Detailed Surface Geological mapping
 Detailed scan line survey
 Detailed discontinuity survey
 Conduct daily development checks
 Perform data collection and reporting To contractor & consultant
 Completed sampling and storing for the drill core
 Managed core preparation, including marking measurements, photographing and
sampling
Exploration Project
December2011–May2012
Designation: Engineering Geologist
Project: Coalexploration and estimation survey
Location:Chakwal, SaltRange, Punjab
Responsibilities:
 Coal exploration and estimation survey
 Drilling up to 300 meter depth to explore coal seam and estimation of existing
reservoir
 Geo litho logical logging, core preservation, labeling and sampling
 Special preservation of coal unit
Bridges and Water Heads
September 2009–February2011
Designation: Engineering Geologist
Location:Punjab, KPK and Kashmir
Feburary 2013
 Geotechnical Investigation of Sahuka Akuka connection Bridge Chishtian Punjab
with association of NHA
July 2012
 Geotechnical Investigation of Pusha Bridge D.I Khan with association of EGC
July 2012
 Geotechnical Investigation of Ghambela Bridge with association of AAA.
August 2012
 Geotechnical Investigation of Doaab Canal Head Okara, Punjab with association of
GRC & NESPAK
September – October 2012
 Geotechnical Investigation of Hullar Bridge District Bagh AJK with association of
CXB & NESPAK
October-November 2012
 Geotechnical Investigation of Naumanpura Bridge District Bagh AJK with
association of CXB & NESPAK
December 2012
Geotechnical Investigation of Neavy Colony Connection Bridge Phase I & II Islamabad
with association of SS & A
Responsibilities:
 Supervised drilling
 Standard Penetration Test
 Dynamic Cone Penetration Test
 Permeability Test
 Preserved Core in the core boxes
 Labeling core boxes and sampling
 Formation of litho logical logs
 Formation of daily progress report
 Daily check record provided to contractor & consultant
Multistory buildings, and Transmission Line
Designation: Engineering Geologist
Location:Punjab & KPK
August 2012
 Geotechnical Investigation of Multistory Tableeghi Markaz Naushera KPK with
association of AAA
August 2012
 Geotechnical Investigation of Multistory Islamic School Naushera KPK with
association of AAA
May-July 2012
 Geotechnical Investigation for 20 kv Transmission Line Multan with association of
BARQAAB
Responsibilities:
 Supervised drilling
 Standard Penetration Test
 Dynamic Cone Penetration Test
 Permeability Test
 Preserved Core in the core boxes
 Labeling core boxes and sampling
 Formation of litho logical logs
 Formation of daily progress report
 Daily check record provided to contractor & consultant
Courses
 A course attended and qualified on Wire line logging with Schlumberger May 2010
Interests
Geotech
Software knowledge
 AutoCAD
 Arc GIS
 Microsoft Word Excel & power point
 Operating System Window XP
Personal Profile
Date of birth: 02 March, 1982
Gender: Male
Nationality: Pakistani (CNIC # 1350427809139)
International Passport (Passport # BZ 1809131)
Availability: Immediately
References
Salman Ayub
Managing Director, Pioneer Associates
Mob: 0300 45 98 918
Email: pioneerassociates@hotmail.com
Muhammad Iqbal Qureshi
Ex Regional Manager Sperry Drilling Services
Mob: 0300 911 35 91
Email: qureshi1@hotmail.com

More Related Content

What's hot

PetroReviewHighwaysAEG2015Pittsburgh
PetroReviewHighwaysAEG2015PittsburghPetroReviewHighwaysAEG2015Pittsburgh
PetroReviewHighwaysAEG2015PittsburghSteve Stokowski
 
Scullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesScullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesRobert Scullion
 
SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016John Tinucci
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Lori Robison
 
Joseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJoseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJOSEPH HART
 
How to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical EngineerHow to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical Engineerjbreedlove
 
The role of site investigation
The role of site investigationThe role of site investigation
The role of site investigationAngelo Indelicato
 
Evaluation of Flexible Pavement: Reviews
Evaluation of Flexible Pavement:  ReviewsEvaluation of Flexible Pavement:  Reviews
Evaluation of Flexible Pavement: ReviewsIRJET Journal
 
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Alan Mössinger
 
Engineers Club Of Memphis V2
Engineers Club Of Memphis V2Engineers Club Of Memphis V2
Engineers Club Of Memphis V2dgonano
 
ProResume-CV_7.0
ProResume-CV_7.0ProResume-CV_7.0
ProResume-CV_7.0Mark Travis
 

What's hot (20)

Resume Eng
Resume EngResume Eng
Resume Eng
 
PetroReviewHighwaysAEG2015Pittsburgh
PetroReviewHighwaysAEG2015PittsburghPetroReviewHighwaysAEG2015Pittsburgh
PetroReviewHighwaysAEG2015Pittsburgh
 
Scullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesScullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferences
 
SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016
 
SENIOR GEOLOGIST
SENIOR GEOLOGISTSENIOR GEOLOGIST
SENIOR GEOLOGIST
 
Resume_JHR
Resume_JHRResume_JHR
Resume_JHR
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison
 
Joseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJoseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTP
 
How to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical EngineerHow to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical Engineer
 
The role of site investigation
The role of site investigationThe role of site investigation
The role of site investigation
 
Evaluation of Flexible Pavement: Reviews
Evaluation of Flexible Pavement:  ReviewsEvaluation of Flexible Pavement:  Reviews
Evaluation of Flexible Pavement: Reviews
 
resume_2015
resume_2015resume_2015
resume_2015
 
Andrew Stone- Resume_041316
Andrew Stone- Resume_041316Andrew Stone- Resume_041316
Andrew Stone- Resume_041316
 
Ref#8.pdf
Ref#8.pdfRef#8.pdf
Ref#8.pdf
 
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
 
149-Uludag[1]
149-Uludag[1]149-Uludag[1]
149-Uludag[1]
 
D Lincicome resume
D Lincicome resumeD Lincicome resume
D Lincicome resume
 
Engineers Club Of Memphis V2
Engineers Club Of Memphis V2Engineers Club Of Memphis V2
Engineers Club Of Memphis V2
 
ProResume-CV_7.0
ProResume-CV_7.0ProResume-CV_7.0
ProResume-CV_7.0
 

Viewers also liked

Susham Roy_C.V.
Susham Roy_C.V.Susham Roy_C.V.
Susham Roy_C.V.SUSHAM ROY
 
Stability analysis of open pit slope by finite difference method
Stability analysis of open pit slope by finite difference methodStability analysis of open pit slope by finite difference method
Stability analysis of open pit slope by finite difference methodeSAT Publishing House
 
Dwdm chapter 5 data mining a closer look
Dwdm chapter 5  data mining a closer lookDwdm chapter 5  data mining a closer look
Dwdm chapter 5 data mining a closer lookShengyou Lin
 
Open Pit Design Analysis
Open Pit Design AnalysisOpen Pit Design Analysis
Open Pit Design AnalysisJames Dunford
 
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMSLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMRathin Biswas
 
Numerical analysis of block caving induced instability in large open pit slopes
Numerical analysis of block caving induced instability in large open pit slopesNumerical analysis of block caving induced instability in large open pit slopes
Numerical analysis of block caving induced instability in large open pit slopesDr. Alex Vyazmensky
 
Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012India Water Portal
 
Slope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilitySlope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilityNIRAJ6665
 
GEOTECHNICAL SLOPE STABILITY
GEOTECHNICAL SLOPE STABILITYGEOTECHNICAL SLOPE STABILITY
GEOTECHNICAL SLOPE STABILITYNgo Hung Long
 
Data Mining: Concepts and Techniques (3rd ed.) — Chapter 5
Data Mining:  Concepts and Techniques (3rd ed.)— Chapter 5 Data Mining:  Concepts and Techniques (3rd ed.)— Chapter 5
Data Mining: Concepts and Techniques (3rd ed.) — Chapter 5 Salah Amean
 
Open pit mine geometry considerations
Open pit mine geometry considerationsOpen pit mine geometry considerations
Open pit mine geometry considerationsElmer Gomez Reyes
 
Mass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationMass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationAydar Kairbekov
 
Logging for Production Systems in The Container Era
Logging for Production Systems in The Container EraLogging for Production Systems in The Container Era
Logging for Production Systems in The Container EraSadayuki Furuhashi
 
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kamber
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & KamberChapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kamber
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kambererror007
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesMartin Preene
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavatorVivek Kumar
 
The 5 Levels of Talent Mining from SourceCon 2010 DC
The 5 Levels of Talent Mining from SourceCon 2010 DCThe 5 Levels of Talent Mining from SourceCon 2010 DC
The 5 Levels of Talent Mining from SourceCon 2010 DCGlen Cathey
 

Viewers also liked (20)

Susham Roy_C.V.
Susham Roy_C.V.Susham Roy_C.V.
Susham Roy_C.V.
 
Stability analysis of open pit slope by finite difference method
Stability analysis of open pit slope by finite difference methodStability analysis of open pit slope by finite difference method
Stability analysis of open pit slope by finite difference method
 
Dwdm chapter 5 data mining a closer look
Dwdm chapter 5  data mining a closer lookDwdm chapter 5  data mining a closer look
Dwdm chapter 5 data mining a closer look
 
Open Pit Design Analysis
Open Pit Design AnalysisOpen Pit Design Analysis
Open Pit Design Analysis
 
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMSLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
 
Numerical analysis of block caving induced instability in large open pit slopes
Numerical analysis of block caving induced instability in large open pit slopesNumerical analysis of block caving induced instability in large open pit slopes
Numerical analysis of block caving induced instability in large open pit slopes
 
Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012
 
Slope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilitySlope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stability
 
GEOTECHNICAL SLOPE STABILITY
GEOTECHNICAL SLOPE STABILITYGEOTECHNICAL SLOPE STABILITY
GEOTECHNICAL SLOPE STABILITY
 
Data Mining: Concepts and Techniques (3rd ed.) — Chapter 5
Data Mining:  Concepts and Techniques (3rd ed.)— Chapter 5 Data Mining:  Concepts and Techniques (3rd ed.)— Chapter 5
Data Mining: Concepts and Techniques (3rd ed.) — Chapter 5
 
Open pit mine geometry considerations
Open pit mine geometry considerationsOpen pit mine geometry considerations
Open pit mine geometry considerations
 
Mass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationMass Mining Services and Statement of Qualification
Mass Mining Services and Statement of Qualification
 
Logging for Production Systems in The Container Era
Logging for Production Systems in The Container EraLogging for Production Systems in The Container Era
Logging for Production Systems in The Container Era
 
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kamber
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & KamberChapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kamber
Chapter - 5 Data Mining Concepts and Techniques 2nd Ed slides Han & Kamber
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarries
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavator
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 
The 5 Levels of Talent Mining from SourceCon 2010 DC
The 5 Levels of Talent Mining from SourceCon 2010 DCThe 5 Levels of Talent Mining from SourceCon 2010 DC
The 5 Levels of Talent Mining from SourceCon 2010 DC
 

Similar to M Islam Photo C V (20)

Engineering Geologist
Engineering GeologistEngineering Geologist
Engineering Geologist
 
Muhammad Shahzad
Muhammad ShahzadMuhammad Shahzad
Muhammad Shahzad
 
haq_(3)
haq_(3)haq_(3)
haq_(3)
 
Rawat Rajendra (1)
Rawat Rajendra (1)Rawat Rajendra (1)
Rawat Rajendra (1)
 
my cv(update 20151001Eng)
my cv(update  20151001Eng)my cv(update  20151001Eng)
my cv(update 20151001Eng)
 
RESUME_KALAM
RESUME_KALAMRESUME_KALAM
RESUME_KALAM
 
Cv_Usman_Majeed_Geological_g
Cv_Usman_Majeed_Geological_gCv_Usman_Majeed_Geological_g
Cv_Usman_Majeed_Geological_g
 
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfQUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resume
 
ResumeBogdanGBarbu
ResumeBogdanGBarbu ResumeBogdanGBarbu
ResumeBogdanGBarbu
 
Muhammad Nafees Abbasi
Muhammad Nafees AbbasiMuhammad Nafees Abbasi
Muhammad Nafees Abbasi
 
Saravanan CV 2015.1
Saravanan CV 2015.1Saravanan CV 2015.1
Saravanan CV 2015.1
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01
 
Samuel Edmonds - Resume
Samuel Edmonds - ResumeSamuel Edmonds - Resume
Samuel Edmonds - Resume
 
1-_introduction_to_formation_evaluation.pdf
1-_introduction_to_formation_evaluation.pdf1-_introduction_to_formation_evaluation.pdf
1-_introduction_to_formation_evaluation.pdf
 
Johar Ali CV1
Johar Ali CV1Johar Ali CV1
Johar Ali CV1
 
Nirala_CV (1)
Nirala_CV (1)Nirala_CV (1)
Nirala_CV (1)
 
muhammad resume
muhammad resumemuhammad resume
muhammad resume
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 

M Islam Photo C V

  • 1. Munawar Islam M: 0311 1515 971 / 0306 444 1920 E: munawarislam@ymail.com Career Objective To establish a career in geology where my organisational skills will be put to best use. I am committed to continuous training and development, and would like to progress to management level as a technical services manager or operations manager. Education Bachelor of Science (Applied Geology) – Honours 2005-2009 University of the Punjab Lahore, Pakistan Technical skills  Drilling supervision (Coring & Non-coring) o Logging o Core Recovery o Rock Quality Designation o Core sample dressing & waxing o Sampling and storing drill core o Core box writing o Core box photography o Water Pressure Test o Permeability test (Constant Head & falling Head) o Standard Penetration Test For silt sand & clays o Dynamic Cone Penetration Test for Gravels o Use of Denison, Pitcher & Shelby sample tubes o Sounding o Water table check o Installation & study of Piesometer o Test Pits
  • 2.  Grouting o GIN Grouting(P*V) o Consolidation grouting o Conventional grouting o Curtain grouting o Get high pressure grouting  Geological surface mapping o Scan line survey o Discontinuity survey o Topographic survey  Shotcrete, Rock bolting and anchoring o Maintain cut slope stability o Maintain Foundation stability o Maintain tunnel & edit stability o Aligning, cutting, measuring, orientating Experience Worked as Geologist with two companies for more than five years. Detail is as under  Sinohydro Group Ltd (September 2014-Present)  PioneerAssociates(June 2009-August2014) Sinohydro Group Ltd (September 2014- Present) Project: Tarbela 4th ExtensionHydro PowerProject Location: Tarbela Dam, Haripur Designation: Engineering Geologist Responsibilities:  Detailed Geotechnical Investigation through Drilling & open Test Pits  Detailed litho logical logging for soil and rock  Detailed Surface Geological mapping  Detailed scan line survey
  • 3.  Detailed discontinuity survey  Grouting (Consolidation Grouting through GIN Method, Conventional Grouting & Jet Grouting)  Conduct daily development checks  Perform data collection and reporting To contractor & consultant Pioneer Associates (June 2009-August 2014) April 2014 – August 2014 Project: Tarbela 4th ExtensionHPP Location: Tarbela Dam, Haripur Designation: Engineering Geologist Responsibilities:  Detailed Geotechnical Investigation through Drilling & open Test Pits  Detailed litho logical logging for soil and rock  Detailed scan line survey  Detailed discontinuity survey  Conduct daily development checks  Perform data collection and reporting To contractor & consultant  Completed sampling and storing for the drill core  Managed core preparation, including marking measurements, photographing and sampling  Standard Penetration Test  Dynamic Cone Penetration Test  Permeability Test  Preserved Core in the core boxes June 2103 – March 2014 Designation: Engineering Geologist
  • 4. Project:Koragh Parait Hydro PowerProject Location: Chitral Responsibilities:  Detailed Geotechnical Investigation through Drilling & open Test Pits  Detailed litho logical logging for soil and rock  Detailed Surface Geological mapping  Detailed scan line survey  Detailed discontinuity survey  Conduct daily development checks  Perform data collection and reporting To contractor & consultant  Completed sampling and storing for the drill core  Managed core preparation, including marking measurements, photographing and sampling December2012 –June 2013 Designation: Engineering Geologist Project:Munda Dam Hydro PowerProject Location:Mohmand Agency, Peshawar, KPK Responsibilities:  Detailed Geotechnical Investigation through Drilling & open Test Pits  Detailed litho logical logging for soil and rock  Detailed Surface Geological mapping  Detailed scan line survey  Detailed discontinuity survey  Conduct daily development checks  Perform data collection and reporting To contractor & consultant  Completed sampling and storing for the drill core  Managed core preparation, including marking measurements, photographing and sampling
  • 5. Exploration Project December2011–May2012 Designation: Engineering Geologist Project: Coalexploration and estimation survey Location:Chakwal, SaltRange, Punjab Responsibilities:  Coal exploration and estimation survey  Drilling up to 300 meter depth to explore coal seam and estimation of existing reservoir  Geo litho logical logging, core preservation, labeling and sampling  Special preservation of coal unit Bridges and Water Heads September 2009–February2011 Designation: Engineering Geologist Location:Punjab, KPK and Kashmir Feburary 2013  Geotechnical Investigation of Sahuka Akuka connection Bridge Chishtian Punjab with association of NHA July 2012  Geotechnical Investigation of Pusha Bridge D.I Khan with association of EGC July 2012
  • 6.  Geotechnical Investigation of Ghambela Bridge with association of AAA. August 2012  Geotechnical Investigation of Doaab Canal Head Okara, Punjab with association of GRC & NESPAK September – October 2012  Geotechnical Investigation of Hullar Bridge District Bagh AJK with association of CXB & NESPAK October-November 2012  Geotechnical Investigation of Naumanpura Bridge District Bagh AJK with association of CXB & NESPAK December 2012 Geotechnical Investigation of Neavy Colony Connection Bridge Phase I & II Islamabad with association of SS & A Responsibilities:  Supervised drilling  Standard Penetration Test  Dynamic Cone Penetration Test  Permeability Test  Preserved Core in the core boxes  Labeling core boxes and sampling  Formation of litho logical logs  Formation of daily progress report  Daily check record provided to contractor & consultant Multistory buildings, and Transmission Line Designation: Engineering Geologist Location:Punjab & KPK August 2012
  • 7.  Geotechnical Investigation of Multistory Tableeghi Markaz Naushera KPK with association of AAA August 2012  Geotechnical Investigation of Multistory Islamic School Naushera KPK with association of AAA May-July 2012  Geotechnical Investigation for 20 kv Transmission Line Multan with association of BARQAAB Responsibilities:  Supervised drilling  Standard Penetration Test  Dynamic Cone Penetration Test  Permeability Test  Preserved Core in the core boxes  Labeling core boxes and sampling  Formation of litho logical logs  Formation of daily progress report  Daily check record provided to contractor & consultant Courses  A course attended and qualified on Wire line logging with Schlumberger May 2010 Interests Geotech Software knowledge  AutoCAD  Arc GIS  Microsoft Word Excel & power point  Operating System Window XP
  • 8. Personal Profile Date of birth: 02 March, 1982 Gender: Male Nationality: Pakistani (CNIC # 1350427809139) International Passport (Passport # BZ 1809131) Availability: Immediately References Salman Ayub Managing Director, Pioneer Associates Mob: 0300 45 98 918 Email: pioneerassociates@hotmail.com Muhammad Iqbal Qureshi Ex Regional Manager Sperry Drilling Services Mob: 0300 911 35 91 Email: qureshi1@hotmail.com