GEOTECHNICAL SLOPE STABILITY
                                                                       “Agreed” refers to a standard, level or criterion which if
1.0       SCOPE                                                        achieved ensures that no significant adverse
                                                                       environmental impact is likely to occur. Such standards,
This guideline provides advice on the geotechnical                     levels or criteria may be drawn from published sources or
aspects of designing for stable sloping post-mining land               proven practice but, in all cases, must be to the
forms. Such landforms include:                                         satisfaction of the relevant Responsible Authority;

      •   low wall spoil (strip mines),                                “Angle of repose” is the angle of steepest slope at
                                                                       which material will remain stable when loosely piled;
      •   out-of-pit dumps, waste rock dumps, reject or
          gangue dumps (strip, open pit and underground                “Cut slope” refers to a man-made slope created by
          mines),                                                      excavation into insitu material;

      •   haul ramp batters (strip mines),                             “Factor of Safety” (FOS), in relation to a slope or
                                                                       embankment, is the ratio of total force available to resist
      •   retaining embankments, and                                   sliding to the total force tending to induce sliding. When
                                                                       the slope or embankment is on the point of failure, the
      •   final void batters.                                          resisting and disturbing forces are equal and the FOS is
This guideline recognises the different resources                      1.0. An FOS greater than 1.0 indicates stability;
available to small scale miners and larger operators.                  “Fill slope” refers to a man-made slope formed at the
Accordingly, some generally acceptable geotechnical                    edge of material dumped or placed to create stockpiles,
slope stability criteria are described in Attachment 1.                dumps, retaining embankments or similar structures;
These criteria are intended to apply (subject to site-
specific conditions) to operations which are remote from               “Rehabilitation” refers to the measures and actions
population centres and involve pits:                                   used to remediate land disturbed by mining operations
                                                                       and/or exploration activities;
      •   having volumes not exceeding 100,000 m 3, and
                                                                       “Responsible Authority” means any State Government
      •   depths of not greater than 20 m.                             Department, corporation, statutory authority or local
                                                                       government empowered to determine an application for
                                                                       the granting of approval for a development proposal or
                                                                       any component of that proposal (by way of general
      This guideline is ADVISORY ONLY and is                           consent, licence or permit, etc.).
      not intended to prescribe mandatory
      standards and practices. This guideline is
      intended to assist the development of                            5.0        BACKGROUND
      project-specific environmental
      management practices.                                            The stability of the final land form left at the end of mining
                                                                       operations is critical to the successful rehabilitation of the
                                                                       site. There are significant advantages in taking this into
                                                                       account when selecting mining and spoil disposal
                                                                       methods to be used during the mining operation. Re-
2.0       OBJECTIVE                                                    shaping, draining and capping of slopes can incur
                                                                       significant costs. Spreading the cost of such work
To ensure the effective management of the risk of                      through the project life is to be preferred to one high cost
geotechnical instability in waste dumps, spoil piles and               clean-up event at the end of the project when cash flow is
abandoned open pit slopes in the final void.                           reduced.

                                                                       Hence working to plans of operation that take into
3.0       RELATED GUIDELINES                                           account the final land form, including final void and spoil
                                                                       tips, and provide for progressive rehabilitation of
      •   Tailings Management                                          exhausted and completed areas is to be encouraged.
      •   Open Pit Rehabilitation                                      The analyses and investigations of the geotechnical
                                                                       stability of slopes will incur costs which will normally have
      •   Minesite Decommissioning
                                                                       to be borne at project start-up.

                                                                       While geotechnical investigations can appear expensive
4.0       INTERPRETATION                                               in the short-term, they can save on the longer term costs
                                                                       of poor slope design. Poor design can lead to:
For the purposes of this guideline, unless the context
indicates otherwise:                                                         •    lost production and resources,

                                                                             •    reduced personal safety,

January 1995                                       Geotechnical Slope Stability                                               1
ĐƯỢC CHIA SẺ BỞI: WWW.GEOSOFTVN.COM
                       (Nếu thấy hữu ích hãy vote và chia sẻ nhé bạn)

                  SHARE BY: WWW.GEOSOFTVN.COM
                     (If you find useful, please vote and share other)

                ACTION PAR: WWW.GEOSOFTVN.COM
              (Si vous trouvez utiles, s'il vous plaît vote et d'actions, autres)

                  SHARE ПО: WWW.GEOSOFTVN.COM
(Если вы найдете полезную, пожалуйста, голосовать и обмениваться другой)

             シェア:WWW.GEOSOFTVN.COM
         (見つかった場合は、投票を共有、他のご便利です)

                  共享:WWW.GEOSOFTVN.COM
                (如果您发现有用,请投票和分享其他)
•     increased risk of equipment damage,                                  •      Low wall spoil

      •     damage to rehabilitated areas, and                                   •      Out of pit dumps, waste rock dumps, reject or
                                                                                        gangue dumps.
      •     unnecessary rehandling of materials during
            slope reshaping.
                                                                           6.4          Data Collection
                                                                           Data collection should be relevant to the type of slopes
6.0         MANAGEMENT STRATEGIES                                          required and should be directed to the relevant factors
                                                                           affecting geotechnical stability.
6.1         Geotechnical Stability
                                                                                 (1) Dumps and Stockpiles
Long term geotechnical stability should be maintained                                   Data for dumps and stockpiles is required for
within agreed standards dependent on the                                                assessing:
geomorphology of the surrounding landform and the
proposed post-mining land use. No landform is stable in                                     (a) the bearing capacity of the underlying
geological time. The design and safety of the final                                             foundation materials,
landform should be suitable for the agreed end land use.
                                                                                            (b) the stability of slopes formed in the
Geotechnical stability is defined as the stability of an                                        dumped material, and
excavated slope or spoil pile against mass failure.                                         (c) the permeability and drainage
Factors of Safety against failure are generally defined as                                      characteristics of the dump
the ratio between restoring forces and disturbing forces
                                                                                        Data collected should include:
within the slope. Restoring forces are dependent on the
available shear strength in the materials plus any                                          (a) A description of the soil profile below
introduced supports (such as anchors or rock bolts),                                            the dump/stockpile site in terms of:
while disturbing forces are a function of applied shear                                          •   soil type
stresses, pore pressures, surcharges and earthquake
loadings within the slope. Conventionally used safety                                            •   particle size distribution
factors for temporary and permanent slopes are 1.2 and
1.5 respectively. However, some Responsible Authorities                                          •   plasticity (Atterberg limits)
may specify different values and these should be
confirmed.                                                                                       •   moisture content

                                                                                                 •   density
6.2         Assessment Procedures
                                                                                                 •   shear strength (total and effective
The following steps are recommended in approaching the                                               stress angle of friction and
assessment of the geotechnical stability of slopes:                                                  cohesion)
      (a) Prepare conceptual mine layout and select                                              •   compressibility
          concept design for open pit and spoil slopes.
      (b) Collect geotechnical data.                                                             •   thickness and depth to rock.

      (c) Define design parameters.                                                         (b) Hydrogeological conditions below the
      (d) Define Factors of Safety.                                                             dump/stockpile site including:

      (e) Analyse geotechnical slope stability.                                                  •   groundwater levels
      (f)   Refine slope geometries to conform with agreed                                       •   permeability.
            Factors of Safety.
                                                                                            (c) Geotechnical properties of the
During mining operations, slope stability performance
                                                                                                dump/stockpile materials including:
should be reviewed and designs amended as necessary.
When developing concept designs and amending                                                     •   particle size distribution
designs, the possibility of future extensions or deepening
of the pit should be taken into account.                                                         •   density

                                                                                                 •   anticipated compacted density
6.3         Concept Slope Design
                                                                                                 •   plasticity (Atterberg limits)
At concept design stage, slope geometries should be
based on local experience and with similar materials in                                          •   dispersion index
similar environments. All slopes should be identified and
categorised with respect to consequence of slope failure                                         •   mineralogy
and type of slope. Types of slope may include:
                                                                                                 •   shear strength
      •     Abandoned slopes in final void
                                                                                                 •   permeability
      •     Haul ramp batters (strip mines)

      •     Retaining embankments

2                                                        Geotechnical Slope Stability                                       January 1995
and any variations of the above if the                6.6        Stability Analysis - Detailed Design
                     material is expected to weather or
                     deteriorate.                                          Typical types of failure that can occur include:

               (d) Any other relevant data such as                               (a) Earth, rock fill and spoil dumps and
                   earthquake loadings and surcharges.                               embankments
      (2) Open Pit Slopes                                                             •   circular

          Data for final slopes and batters remaining                                 •   non-circular semi-infinite slope
          within the open pit is required for:
                                                                                      •   multiple block plane wedge
               (a) designing long term pit slopes,
                                                                                      •   log spiral (bearing capacity of foundations)
               (b) assessing long term slope deterioration,
                   and                                                                •   flow slides.
               (c) determining hydrogeological effects on
                   the local groundwater.                                        (b) Final void slopes in earth and rock

          Data collected should include:                                              •   block slide

               (a) a description of soil and rock profile                             •   wedge
                   through the slope,
                                                                                      •   toppling
               (b) soil parameters as listed above for
                   dumps and stockpiles,                                              •   circular (normally earth slopes only).
               (c) rock density and uniaxial compressive                   Stability analysis and slope design is an iterative process
                   strength,                                               of successive trials whereby potential sliding surfaces are
               (d) rock structure including orientation,                   chosen and the Factor of Safety determined. This is
                   occurrence and spacing of bedding,                      continued for all kinematically possible surfaces until the
                   joints, faults and other discontinuities,               critical surface is found. The critical surface is the one
               (e) shear strength along discontinuities,                   with the lowest Factor of Safety. If this is below the
                                                                           minimum design Factor of Safety for the project, the
               (f) groundwater levels,                                     slope geometry, drainage, or construction materials need
               (g) permeabilities,                                         to be varied until the minimum Factor of Safety is
                                                                           achieved or exceeded.
               (h) depth of weathering,
               (i)   depth of soil cover and                               Computer programs are commercially available to
                     paleotopography (eg. buried channels),                perform most stability analyses but personnel
                                                                           experienced in their operation, particularly in the
               (j)   surcharges (during and after mining                   particular project environment, should be employed to
                     operations), and                                      facilitate the analyses.
               (k) earthquake loadings.
                                                                           For preliminary and conceptual design purposes use can
                                                                           be made of stability charts published in readily available
6.5       Design Parameters                                                texts (see references). However, these designs need to
Design parameters should be selected to represent the                      be confirmed and refined by detailed analysis at final
characteristics of the slope forming materials. Measured                   design stage.
values of soil parameters may show a scatter both locally
and spatially. For example, insitu bulk density
measurements of one particular spoil pile may vary from
                                                                           6.7        Performance and Feedback
          3           3
15 kN/m to 18 kN/m (local scatter). However, due to                        Progressive rehabilitation of completed or exhausted
different dumping methods a second spoil pile of the                       areas allows the performance of early areas to be used in
same material might vary from 17 kN/m3 to 20 kN/m3                         modifying designs for subsequent areas. This can
(spatial scatter between dumps).                                           achieve more effective designs that are suitable for the
                                                                           particular project environment and that can reduce
Any scatter in raw data may be due to any one of the                       rehabilitation costs.
following:
                                                                           Slope performance monitoring generally includes:
      •   a real natural variation of the parameter,
                                                                                 •    Selecting several typical profiles normal to the
      •   measurement errors or inaccuracies, or                                      slope contours.
      •   spatial variation, such as in the bulk density                         •    Driving or concreting-in survey levelling points
          example given above.                                                        along the profile.
All new data must therefore be carefully examined and                            •    Photographing and surveying the profiles once
filtered before being grouped for statistical analysis.                               or twice a year - say at the start and finish of the
In addition to material parameters it is very important to                            wet season.
select the correct groundwater and pore pressure
distribution for the slope.

January 1995                                           Geotechnical Slope Stability                                                3
•   Installing standpipes and measuring water levels                              i)   spoil piles, and
          on a similar basis.
                                                                                        j)   compaction trials for engineered
      •   Comparing surveys cumulatively and assessing                                       embankments, roadways, causeways.
          slope degradation.
                                                                           Much of the fieldwork for such data gathering can be
      •   Keeping a record book of any slips and slope                     carried out as a small extension to an exploration
          failures that occur on any slope (not necessarily                programme. Mobilisation costs can be minimised if the
          along profile lines).                                            two activities are carried out together.


                                                                           7.3          Geotechnical Analysis and Design
7.0       IMPLEMENTATION STRATEGIES
                                                                           (1)          Open Pits
7.1       General                                                          Analytical methods for cut slopes have been well
Geotechnical investigation, data assessment, analysis                      documented in published texts ( Reference 1) and these
and design is a specialised discipline. Depending on the                   methods include:
size of the project, geotechnical input may only be
required at specific and infrequent times. Consideration                         •      Stereographic projection graphical techniques
should be given to employing geotechnical consultants                                   for the analysis of discontinuity data
for this work.
                                                                                 •      Plane failure analysis
More detailed guidance on geotechnical slope stability
applicable to small scale mining operations remote from                          •      Wedge failure techniques
population centres is given in Attachment 1.                                     •      Toppling failure analysis

                                                                                 •      Circular and non-circular analysis by the method
7.2       Data Gathering                                                                of slices
Methods of data gathering include:
                                                                                 •      Finite element and finite difference computer
      •   surface mapping and sampling                                                  techniques.

      •   test pitting and costeans                                        A typical design implementation would be:

      •   borehole sampling of soils, either undisturbed or                      •      Divide the pit into areas of similar material
          disturbed                                                                     ground properties, geological structure,
                                                                                        stratigraphy, grade of weathering etc.
      •   continuous rock coring, core orientation,
          geomechanical logging                                                  •      Select a typical cross section for each area

      •   downhole geophysical methods                                           •      Assess discontinuity data and rock mass
                                                                                        strength data and decide on likely failure modes
      •   groundwater sampling                                                          (there may be more than one)

      •   insitu testing in boreholes including                                  •      Select groundwater levels in the slope
           a)   permeability tests,                                              •      Perform stability analyses
           b)   pressuremeter tests for elastic moduli                           •      Re-configure slope geometry if Factor of Safety
                determinations,                                                         is unacceptable.
           c)   insitu stress measurement,
                                                                           (2)          Dumps and Stockpiles
           d)   standard penetration test (SPT) for relative
                                                                           Analytical methods for dumps and stockpiles include:
                density of soils,
                                                                                 •      the method of slices, circular or non-circular
           e)   insitu vane shear test for undrained strength
                of soft clays, and                                               •      multiple wedge/sliding block analyses.
           f)   pumping/dewatering tests,                                  A typical design implementation would include:
      •   electric friction core profiling                                       •      Group together all slopes that comprise similar
                                                                                        dump/stockpile material, similar foundations and
      •   laboratory tests on rock, soil materials and water
                                                                                        water pressures, and similar geometry
          according to Australian Standards (AS) or
          international rock testing standards (ISRMS)                           •      Select a representative typical cross section
                                                                                        through each group.
      •   Field trials of the proposed works, eg.

           g)   trial mine pits,                                                 •      Assign material parameters and groundwater
                                                                                        levels
           h)   stockpiles,
4                                                        Geotechnical Slope Stability                                        January 1995
•        Perform stability analyses to determine the                      8.0        REFERENCES
               required slope angles to ensure Factors of
               Safety are acceptable.                                                 1.   Hoek, E., and Bray, J.W. (1981). Rock Slope
                                                                                           Engineering, IMM, London.
As a general guide, circular stability analysis should
                                                                                      2.   Department of Mines, Western Australia.
always be carried out. If the foundations soils below the
                                                                                           (1991). Guidelines on Safety Bund Walls Around
dump or stockpile contain soft or weak layers sandwiched
                                                                                           Abandoned Open Pits, Perth.
between stronger layers, then multiple wedge/sliding
block type analyses should also be carried out to assess                              3.   International Committee on Large Dams.
sliding along these weak layers.                                                           (1982). Manual on Tailings Dams and Dumps.
                                                                                           ICOLD Bulletin No.45.
Short term slope stability can be assessed using the
                                                                                      4.   Australian Standard AS 1289. (1991).
undrained total stress shear strength parameters of the
                                                                                           “Methods of Testing Soils for Engineering
soils (Cu, φu). However, since slopes must be stable in
                                                                                           Purposes”.
the long term, an effective stress analysis using effective
stress parameters (c’and φ’) and pore water pressures
should be used for final design.

These stress parameters are referred to as follows:

          Cu     =     cohesion intercept for undrained, total
                       stress conditions,

          c’     =     cohesion intercept for effective stresses,

          φu     =     internal angle of friction for undrained,
                       total stress conditions, and

          φ’     =     internal angle of friction for effective
                       stresses.


7.4            Construction
The construction programme should minimise the need
to return to an area more than once. Within the open pit
or quarry distinguish between production faces and final
slopes. A production face does not need to fulfil the
stability requirements of a final slope and should be
designed to maximise mine productivity.

As a production face approaches the limits of the mine,
the mining method may have to be modified to form the
final slope. Modifications may include reducing the
height between benches, or using smooth blasting
techniques as the final round. Returning to an area to
clean up final slopes is expensive since it often requires
activities outside of the normal mine operation. Hence
progressive formation of final slopes is considered most
desirable.




January 1995                                                Geotechnical Slope Stability                                               5
ATTACHMENT 1

SOME GEOTECHNICAL SLOPE STABILITY CRITERIA FOR SMALL-SCALE MINING OPERATIONS IN
AREAS REMOTE FROM POPULATION CENTRES


(1)       APPLICATION OF CRITERIA
For small scale mining operations in Queensland, certain generalised criteria can be provided to assist the selection of
acceptable slope angles. The conditions controlling stability will always be site specific, hence due care should be taken
when applying these criteria. In particular, if there is a history of unstable slopes in the area, particularly during mining
operations, then specific geotechnical studies should be carried out.

These criteria are intended to apply to operations which are remote from population centres and involve pits:
      •   having volumes not exceeding 100,000 m 3, and
      •   depths of not greater than 20 m.

(2)       GEOTECHNICAL SLOPE STABILITY
A slope is geotechnically stable if it does not physically collapse. The Factor of Safety is a measure of the confidence that
collapse will not occur.

(3)       SITE CLASSIFICATION
Any mine operation will contain several types of slope, eg. cut pit slopes and waste dumps slopes. The first step in ensuring
stable slopes is to categorise areas on the mine site according to slope type.

Groups of similar slope types can then be assessed separately. The procedure is as follows:

          (a) Prepare a site plan indicating all areas of excavation (pits), filling, stockpiles, dumps, and dams.
          (b) Allocate to each area one of the slope classifications given in Table 1.1.
          (c) For each slope classification, refer to the guidelines given in the following sections.

                            TABLE 1.1
                            SLOPE TYPE CLASSIFICATION

                                Slope Type                               Description

                                     C1            Cut slopes above areas which will be open to
                                                   access by the public and by stock.
                                     C2            Cut slopes above areas where access is
                                                   prohibited.

                                     F1            Slopes to dumps and other stockpiles.
                                     F2            Low wall spoil slopes (strip mines).
                                     F3            Fill slopes to retaining embankments (eg.
                                                   tailings dams, water dams).

(4)       CUT SLOPES

General
The two main cut slope categories depend on whether access is allowed below the slope. Where access is prohibited,
allowing gradual collapse to a stable state may be acceptable and feasible, and hence initial steeper slopes may be
permitted. This approach needs to incorporate barriers above and behind the cut slopes to physically prevent access to the
potentially unstable pit edge zone. More severe restrictions are required for cut slopes which remain above areas freely
accessible to people and stock.

Type C1 Slopes
Generally, overall slope angles in unweathered (unoxidised) rock should not be steeper than 1 vertical to 1 horizontal
(1V:1H), with individual bench faces no steeper than 2V:1H. If there is a history of stable slopes at steeper angles supported
by documented evidence and, (preferably), still standing old and abandoned faces, then steeper slopes may be acceptable.

If the rock slopes are cut by unfavourable geological features such as weak fault zones or joints (or bedding planes dipping
steeply out of the face), and along which the overlying rock could slide, then the slopes should be assessed on a case by
case basis. Unstable slopes will require battering back to a safe angle or made inaccessible and treated as if a Type C2
Slope.
6                                                      Geotechnical Slope Stability                                  January 1995
Slopes cut in weathered (oxidised) rock, overburden or soil should not be steeper than the following:

      •   1 (V) : 1.5 (H)       for slopes less than 5 m high and without groundwater seepage.

      •   1 (V) : 2.5 (H)       for all other slope conditions.

For slopes which cut through a mixed profile, (for example, of weathered rock/overburden overlying unweathered rock), the
above maximum angles should be applied to each relevant material. These slope angles assume that no instability
problems have been previously experienced in the area or during operations.

Type C2 Slopes
For cut slopes to which access will be prevented, bund walls should be provided which:

      •   are located at least 10 m outside the area overlying the potentially unstable rock mass, ie. the total of the width of
          the “potentially unstable pit edge zone” plus 10 m away from the existing pit edge (Figure 1.1);

      •   have a minimum height of 2 m and a minimum base width of 4 m; and

      •   wherever possible, are constructed from unweathered, freely draining, end dumped rockfill. When only oxidised
          rock is available for construction of the safety bund wall, the least weathered or hardest material should be used. In
          these cases, the bund wall may need to be supplemented by a properly constructed fence.

Suitable signs, clearly stating public safety risk and prohibiting public access, should be erected outside the safety bund
wall. Additionally, shrub and/or tree planting at the outside edge of the bund wall should be implemented where practicable,
to lessen the visual impact of the wall.

(5)       FILL SLOPES

Type F1 Slopes
Dumps and stockpiles tend to be constructed by end tipping, hence operating slope angles approximate the angle of repose
of the dumped material. Coarse rock dumps will have side slopes steeper than dumps of finer grained and clayey materials
such as soil and (oxidised) weathered rock.

In many situations, desired end landform and other environmental requirements will determine the final slope angle. Such
requirements generally involve flatter slopes than those needed to ensure geotechnical stability.

Where geotechnical stability is the determining requirement, two options are available:

      (a) Long term steep side slopes can be developed by constructing a perimeter bund of compacted waste or stockpile
          material within which the bulk of the dump or stockpile can be end tipped or placed in the usual mine operation
          method. Typical compacted bund slopes would be:
               (i)     unweathered rock       1 (V) : 1.75 (H)

               (ii)    weathered rock, overburden, up to 15 m high -            1 (V) : 2.5 (H)

               (iii)   weathered rock, overburden, greater than 15 m high-              1 (V) : 3 (H)

      These maximum slope angles apply to relatively level sites (ie. with ground slope less than 10%), with stable foundation
      soil and rock materials. Sites that are steeper or have weak foundation conditions should be individually assessed by
      geotechnical investigation.

      (b) Alternatively, end tipped and hence poorly compacted materials can be dozed and graded out to flatter slopes at
          the end of operations. As a general guide, final slopes should be no greater than half the angle of repose of the end
          tipped material as measured on-site. Since most materials have angles of repose of less than or equal to
          1(V):1.5(H), final graded slopes should not exceed 1(V):3(H).
          Again, dumps and stockpiles on sites which are steep or have weak foundation conditions should be individually
          assessed.

Type F2 Slopes
Low wall spoil slopes commonly adopted in Queensland coal fields are generally in the order of 1(V):1.5(H). However,
actual slopes depend on the nature of the spoil and its degree of compaction. Poorly compacted mudstone/shale spoils can
become saturated and breakdown after repeated wet season exposure. Flatter slopes will result.

Type F3 Slopes
All embankments retaining lagoons of tailings, water or other materials should be designed and constructed using sound
engineering practice. As a general guide, slopes of 1(V):2.5(H) are commonly adopted for embankments up to about 15 m
in height and which also incorporate internal drainage blankets.


January 1995                                             Geotechnical Slope Stability                                       7
FIGURE 1.1
EXAMPLES OF PREFERRED SAFETY BUND WALL LOCATIONS (from Reference 2)

8                                  Geotechnical Slope Stability       January 1995

More Related Content

What's hot

Lecture-4 Slope stability Analysis.pptx
Lecture-4 Slope stability Analysis.pptxLecture-4 Slope stability Analysis.pptx
Lecture-4 Slope stability Analysis.pptxGetahunTadesse5
 
R16 41013.2 stability analysis of slopes
R16 41013.2 stability analysis of slopesR16 41013.2 stability analysis of slopes
R16 41013.2 stability analysis of slopesPoorna Nagidi
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2IDHAMUKI
 
Rock mass properties
Rock mass propertiesRock mass properties
Rock mass propertiesakash yadav
 
Rock mechanics
Rock mechanicsRock mechanics
Rock mechanicsZeomSlim
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabiltyRiyaz Bhat
 
Slope stability analysis
Slope stability analysisSlope stability analysis
Slope stability analysissaurabh kumar
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Make Mannan
 
Rock slope stability analysis lec 1
Rock slope stability analysis lec 1Rock slope stability analysis lec 1
Rock slope stability analysis lec 1aquarius123
 
MOHR COULOMB FAILURE CRITERION
MOHR COULOMB FAILURE CRITERIONMOHR COULOMB FAILURE CRITERION
MOHR COULOMB FAILURE CRITERIONShah Naseer
 
Fault, Fold, Dip, Strike, Joint (Geology)
Fault, Fold, Dip, Strike, Joint (Geology) Fault, Fold, Dip, Strike, Joint (Geology)
Fault, Fold, Dip, Strike, Joint (Geology) JEEVAN CHANDRA PANDEY
 

What's hot (20)

SLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURESLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURE
 
Lecture-4 Slope stability Analysis.pptx
Lecture-4 Slope stability Analysis.pptxLecture-4 Slope stability Analysis.pptx
Lecture-4 Slope stability Analysis.pptx
 
R16 41013.2 stability analysis of slopes
R16 41013.2 stability analysis of slopesR16 41013.2 stability analysis of slopes
R16 41013.2 stability analysis of slopes
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2
 
Permeability
PermeabilityPermeability
Permeability
 
Rock mass properties
Rock mass propertiesRock mass properties
Rock mass properties
 
Rock failure criteria
Rock failure criteriaRock failure criteria
Rock failure criteria
 
Rock mechanics
Rock mechanicsRock mechanics
Rock mechanics
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabilty
 
Engineering geology of dam
Engineering geology of damEngineering geology of dam
Engineering geology of dam
 
Insitu stresses and measurement
Insitu stresses and measurementInsitu stresses and measurement
Insitu stresses and measurement
 
5 rock properties
5 rock properties5 rock properties
5 rock properties
 
Slope stability analysis
Slope stability analysisSlope stability analysis
Slope stability analysis
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Aquifer types
Aquifer typesAquifer types
Aquifer types
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
 
Rock slope stability analysis lec 1
Rock slope stability analysis lec 1Rock slope stability analysis lec 1
Rock slope stability analysis lec 1
 
MOHR COULOMB FAILURE CRITERION
MOHR COULOMB FAILURE CRITERIONMOHR COULOMB FAILURE CRITERION
MOHR COULOMB FAILURE CRITERION
 
Fault, Fold, Dip, Strike, Joint (Geology)
Fault, Fold, Dip, Strike, Joint (Geology) Fault, Fold, Dip, Strike, Joint (Geology)
Fault, Fold, Dip, Strike, Joint (Geology)
 

Viewers also liked

Slope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilitySlope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilityNIRAJ6665
 
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)Subterra Ingenieria S.L.
 
Slope monitoring & instrumentation
Slope monitoring & instrumentationSlope monitoring & instrumentation
Slope monitoring & instrumentationRathin Biswas
 
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMSLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMRathin Biswas
 
Monitoring 2012 odd
Monitoring 2012 oddMonitoring 2012 odd
Monitoring 2012 oddFaisal Akbar
 
Slope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologySlope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologyRussellCrue
 
Slope Stability by GeoMads
Slope Stability by GeoMadsSlope Stability by GeoMads
Slope Stability by GeoMadsMary Yeoba Diaz
 
Slope stability ii 2
Slope stability ii 2Slope stability ii 2
Slope stability ii 2Tanveer Wani
 
New design approach on rockfall Embankment
New design approach on rockfall Embankment New design approach on rockfall Embankment
New design approach on rockfall Embankment Thomas Frenez
 
Injury prevention and control
Injury prevention and controlInjury prevention and control
Injury prevention and controlMarion Sills
 
Barriere Paramassi Etag027 e Norme Tecniche delle Cstruzioni
Barriere Paramassi Etag027 e Norme Tecniche delle CstruzioniBarriere Paramassi Etag027 e Norme Tecniche delle Cstruzioni
Barriere Paramassi Etag027 e Norme Tecniche delle CstruzioniRockfall Defence
 
Slope stability
Slope stabilitySlope stability
Slope stabilityyoohannis
 
Rockyfor3D - Rockfall simulation program
Rockyfor3D - Rockfall simulation programRockyfor3D - Rockfall simulation program
Rockyfor3D - Rockfall simulation programThomas Frenez
 
8 slope stability
8 slope stability8 slope stability
8 slope stabilityKetan Bajaj
 

Viewers also liked (20)

Slope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stabilitySlope stability radar a need for open pit mines stability
Slope stability radar a need for open pit mines stability
 
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)
Subterra Projects - Slope Stability in Cobre Las Cruces Mine (Spain)
 
Slope monitoring & instrumentation
Slope monitoring & instrumentationSlope monitoring & instrumentation
Slope monitoring & instrumentation
 
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEMSLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
SLOPE STABILITY RADAR-AN ADVANCED SLOPE MOVEMENT MONITORING SYSTEM
 
Monitoring 2012 odd
Monitoring 2012 oddMonitoring 2012 odd
Monitoring 2012 odd
 
Slope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologySlope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing Geotechnology
 
Slope Stability by GeoMads
Slope Stability by GeoMadsSlope Stability by GeoMads
Slope Stability by GeoMads
 
Slope stability ii 2
Slope stability ii 2Slope stability ii 2
Slope stability ii 2
 
New design approach on rockfall Embankment
New design approach on rockfall Embankment New design approach on rockfall Embankment
New design approach on rockfall Embankment
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Rockyfor3 software
Rockyfor3 softwareRockyfor3 software
Rockyfor3 software
 
Injury prevention and control
Injury prevention and controlInjury prevention and control
Injury prevention and control
 
1 Macro Intro 2008
1  Macro Intro 20081  Macro Intro 2008
1 Macro Intro 2008
 
Barriere Paramassi Etag027 e Norme Tecniche delle Cstruzioni
Barriere Paramassi Etag027 e Norme Tecniche delle CstruzioniBarriere Paramassi Etag027 e Norme Tecniche delle Cstruzioni
Barriere Paramassi Etag027 e Norme Tecniche delle Cstruzioni
 
slope stability and computers
 slope stability and computers slope stability and computers
slope stability and computers
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Rockyfor3D - Rockfall simulation program
Rockyfor3D - Rockfall simulation programRockyfor3D - Rockfall simulation program
Rockyfor3D - Rockfall simulation program
 
4 Barrier Design 2008
4   Barrier Design 20084   Barrier Design 2008
4 Barrier Design 2008
 
Soil slope stability
Soil slope stabilitySoil slope stability
Soil slope stability
 
8 slope stability
8 slope stability8 slope stability
8 slope stability
 

Similar to GEOTECHNICAL SLOPE STABILITY

VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration Patrick McPartland, E.I.T.
 
Hydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionHydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionAndy Varoshiotis
 
Management and control of gully erosion ppt
Management and control of gully erosion pptManagement and control of gully erosion ppt
Management and control of gully erosion pptwajahatkhan155621
 
General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile designRizwan Khurram
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field developmentHamid S
 
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptx
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptxdeep-foundation-selection-driven-pile-or-drilled good for presentation.pptx
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptxvalter gentile
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...Dan Brown and Associates, PC
 
Pumice Products and LEED Certification
Pumice Products and LEED CertificationPumice Products and LEED Certification
Pumice Products and LEED CertificationHess Pumice Products
 
Laubsher cave mining handbook de beers version
Laubsher  cave mining handbook de beers versionLaubsher  cave mining handbook de beers version
Laubsher cave mining handbook de beers versionJULIO QUISPE
 
Building technology.pptx
Building technology.pptxBuilding technology.pptx
Building technology.pptxNeha569445
 
ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8Anusha Nandavaram
 
Extension of Metro's Purple line.
Extension of Metro's Purple line.Extension of Metro's Purple line.
Extension of Metro's Purple line.Eric Christenson
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniquesAHMED NADIM JILANI
 
Module- 3 Subsurface Investigation.pptx
Module- 3 Subsurface Investigation.pptxModule- 3 Subsurface Investigation.pptx
Module- 3 Subsurface Investigation.pptxSilasChaudhari
 
F0373040048
F0373040048F0373040048
F0373040048theijes
 
Types Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their UsesTypes Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their Usesiratequarrel2587
 
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...jerianasmith
 

Similar to GEOTECHNICAL SLOPE STABILITY (20)

VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration
 
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
 
Hydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionHydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well construction
 
Management and control of gully erosion ppt
Management and control of gully erosion pptManagement and control of gully erosion ppt
Management and control of gully erosion ppt
 
General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile design
 
Blast Design-2.pdf
Blast Design-2.pdfBlast Design-2.pdf
Blast Design-2.pdf
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field development
 
P3X9gnDpdCnTCJYY336.pptx
P3X9gnDpdCnTCJYY336.pptxP3X9gnDpdCnTCJYY336.pptx
P3X9gnDpdCnTCJYY336.pptx
 
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptx
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptxdeep-foundation-selection-driven-pile-or-drilled good for presentation.pptx
deep-foundation-selection-driven-pile-or-drilled good for presentation.pptx
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
 
Pumice Products and LEED Certification
Pumice Products and LEED CertificationPumice Products and LEED Certification
Pumice Products and LEED Certification
 
Laubsher cave mining handbook de beers version
Laubsher  cave mining handbook de beers versionLaubsher  cave mining handbook de beers version
Laubsher cave mining handbook de beers version
 
Building technology.pptx
Building technology.pptxBuilding technology.pptx
Building technology.pptx
 
ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8
 
Extension of Metro's Purple line.
Extension of Metro's Purple line.Extension of Metro's Purple line.
Extension of Metro's Purple line.
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniques
 
Module- 3 Subsurface Investigation.pptx
Module- 3 Subsurface Investigation.pptxModule- 3 Subsurface Investigation.pptx
Module- 3 Subsurface Investigation.pptx
 
F0373040048
F0373040048F0373040048
F0373040048
 
Types Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their UsesTypes Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their Uses
 
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
 

More from Ngo Hung Long

Facebook message marketing help
Facebook message marketing helpFacebook message marketing help
Facebook message marketing helpNgo Hung Long
 
Chapter 17 Of Rock Engineering
Chapter 17 Of  Rock  EngineeringChapter 17 Of  Rock  Engineering
Chapter 17 Of Rock EngineeringNgo Hung Long
 
Chapter 16 Of Rock Engineering
Chapter 16 Of  Rock  EngineeringChapter 16 Of  Rock  Engineering
Chapter 16 Of Rock EngineeringNgo Hung Long
 
Chapter 15 Of Rock Engineering
Chapter 15 Of  Rock  EngineeringChapter 15 Of  Rock  Engineering
Chapter 15 Of Rock EngineeringNgo Hung Long
 
Chapter 13 Of Rock Engineering
Chapter 13 Of  Rock  EngineeringChapter 13 Of  Rock  Engineering
Chapter 13 Of Rock EngineeringNgo Hung Long
 
Chapter 11 Of Rock Engineering
Chapter 11 Of  Rock  EngineeringChapter 11 Of  Rock  Engineering
Chapter 11 Of Rock EngineeringNgo Hung Long
 
Chapter 9 Of Rock Engineering
Chapter 9 Of  Rock  EngineeringChapter 9 Of  Rock  Engineering
Chapter 9 Of Rock EngineeringNgo Hung Long
 
Chapter 8 Of Rock Engineering
Chapter 8 Of  Rock  EngineeringChapter 8 Of  Rock  Engineering
Chapter 8 Of Rock EngineeringNgo Hung Long
 
Chapter 7 Of Rock Engineering
Chapter 7 Of  Rock  EngineeringChapter 7 Of  Rock  Engineering
Chapter 7 Of Rock EngineeringNgo Hung Long
 
Chapter 6 Of Rock Engineering
Chapter 6 Of  Rock  EngineeringChapter 6 Of  Rock  Engineering
Chapter 6 Of Rock EngineeringNgo Hung Long
 
Chapter 4 Of Rock Engineering
Chapter 4 Of  Rock  EngineeringChapter 4 Of  Rock  Engineering
Chapter 4 Of Rock EngineeringNgo Hung Long
 
Chapter 2 Of Rock Engineering
Chapter 2 Of  Rock  EngineeringChapter 2 Of  Rock  Engineering
Chapter 2 Of Rock EngineeringNgo Hung Long
 
Chapter 1 Of Rock Engineering
Chapter 1 Of  Rock  EngineeringChapter 1 Of  Rock  Engineering
Chapter 1 Of Rock EngineeringNgo Hung Long
 
Bai Giang Dia Thong Ke
Bai  Giang Dia Thong KeBai  Giang Dia Thong Ke
Bai Giang Dia Thong KeNgo Hung Long
 
Bai Giang T T A P G 5
Bai Giang T T A  P G 5Bai Giang T T A  P G 5
Bai Giang T T A P G 5Ngo Hung Long
 
Bai Giang T T A P G 2
Bai Giang T T A  P G 2Bai Giang T T A  P G 2
Bai Giang T T A P G 2Ngo Hung Long
 

More from Ngo Hung Long (20)

Facebook message marketing help
Facebook message marketing helpFacebook message marketing help
Facebook message marketing help
 
A G S3 1a May2005
A G S3 1a  May2005A G S3 1a  May2005
A G S3 1a May2005
 
Giao Trinh A R C U
Giao Trinh  A R C  UGiao Trinh  A R C  U
Giao Trinh A R C U
 
Chapter 17 Of Rock Engineering
Chapter 17 Of  Rock  EngineeringChapter 17 Of  Rock  Engineering
Chapter 17 Of Rock Engineering
 
Chapter 16 Of Rock Engineering
Chapter 16 Of  Rock  EngineeringChapter 16 Of  Rock  Engineering
Chapter 16 Of Rock Engineering
 
Chapter 15 Of Rock Engineering
Chapter 15 Of  Rock  EngineeringChapter 15 Of  Rock  Engineering
Chapter 15 Of Rock Engineering
 
Chapter 13 Of Rock Engineering
Chapter 13 Of  Rock  EngineeringChapter 13 Of  Rock  Engineering
Chapter 13 Of Rock Engineering
 
Chapter 11 Of Rock Engineering
Chapter 11 Of  Rock  EngineeringChapter 11 Of  Rock  Engineering
Chapter 11 Of Rock Engineering
 
Chapter 9 Of Rock Engineering
Chapter 9 Of  Rock  EngineeringChapter 9 Of  Rock  Engineering
Chapter 9 Of Rock Engineering
 
Chapter 8 Of Rock Engineering
Chapter 8 Of  Rock  EngineeringChapter 8 Of  Rock  Engineering
Chapter 8 Of Rock Engineering
 
Chapter 7 Of Rock Engineering
Chapter 7 Of  Rock  EngineeringChapter 7 Of  Rock  Engineering
Chapter 7 Of Rock Engineering
 
Chapter 6 Of Rock Engineering
Chapter 6 Of  Rock  EngineeringChapter 6 Of  Rock  Engineering
Chapter 6 Of Rock Engineering
 
Chapter 4 Of Rock Engineering
Chapter 4 Of  Rock  EngineeringChapter 4 Of  Rock  Engineering
Chapter 4 Of Rock Engineering
 
Chapter 2 Of Rock Engineering
Chapter 2 Of  Rock  EngineeringChapter 2 Of  Rock  Engineering
Chapter 2 Of Rock Engineering
 
Chapter 1 Of Rock Engineering
Chapter 1 Of  Rock  EngineeringChapter 1 Of  Rock  Engineering
Chapter 1 Of Rock Engineering
 
G I N Dec08
G I N  Dec08G I N  Dec08
G I N Dec08
 
Bai Giang Dia Thong Ke
Bai  Giang Dia Thong KeBai  Giang Dia Thong Ke
Bai Giang Dia Thong Ke
 
Chay Rung
Chay RungChay Rung
Chay Rung
 
Bai Giang T T A P G 5
Bai Giang T T A  P G 5Bai Giang T T A  P G 5
Bai Giang T T A P G 5
 
Bai Giang T T A P G 2
Bai Giang T T A  P G 2Bai Giang T T A  P G 2
Bai Giang T T A P G 2
 

Recently uploaded

How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

GEOTECHNICAL SLOPE STABILITY

  • 1. GEOTECHNICAL SLOPE STABILITY “Agreed” refers to a standard, level or criterion which if 1.0 SCOPE achieved ensures that no significant adverse environmental impact is likely to occur. Such standards, This guideline provides advice on the geotechnical levels or criteria may be drawn from published sources or aspects of designing for stable sloping post-mining land proven practice but, in all cases, must be to the forms. Such landforms include: satisfaction of the relevant Responsible Authority; • low wall spoil (strip mines), “Angle of repose” is the angle of steepest slope at which material will remain stable when loosely piled; • out-of-pit dumps, waste rock dumps, reject or gangue dumps (strip, open pit and underground “Cut slope” refers to a man-made slope created by mines), excavation into insitu material; • haul ramp batters (strip mines), “Factor of Safety” (FOS), in relation to a slope or embankment, is the ratio of total force available to resist • retaining embankments, and sliding to the total force tending to induce sliding. When the slope or embankment is on the point of failure, the • final void batters. resisting and disturbing forces are equal and the FOS is This guideline recognises the different resources 1.0. An FOS greater than 1.0 indicates stability; available to small scale miners and larger operators. “Fill slope” refers to a man-made slope formed at the Accordingly, some generally acceptable geotechnical edge of material dumped or placed to create stockpiles, slope stability criteria are described in Attachment 1. dumps, retaining embankments or similar structures; These criteria are intended to apply (subject to site- specific conditions) to operations which are remote from “Rehabilitation” refers to the measures and actions population centres and involve pits: used to remediate land disturbed by mining operations and/or exploration activities; • having volumes not exceeding 100,000 m 3, and “Responsible Authority” means any State Government • depths of not greater than 20 m. Department, corporation, statutory authority or local government empowered to determine an application for the granting of approval for a development proposal or any component of that proposal (by way of general This guideline is ADVISORY ONLY and is consent, licence or permit, etc.). not intended to prescribe mandatory standards and practices. This guideline is intended to assist the development of 5.0 BACKGROUND project-specific environmental management practices. The stability of the final land form left at the end of mining operations is critical to the successful rehabilitation of the site. There are significant advantages in taking this into account when selecting mining and spoil disposal methods to be used during the mining operation. Re- 2.0 OBJECTIVE shaping, draining and capping of slopes can incur significant costs. Spreading the cost of such work To ensure the effective management of the risk of through the project life is to be preferred to one high cost geotechnical instability in waste dumps, spoil piles and clean-up event at the end of the project when cash flow is abandoned open pit slopes in the final void. reduced. Hence working to plans of operation that take into 3.0 RELATED GUIDELINES account the final land form, including final void and spoil tips, and provide for progressive rehabilitation of • Tailings Management exhausted and completed areas is to be encouraged. • Open Pit Rehabilitation The analyses and investigations of the geotechnical stability of slopes will incur costs which will normally have • Minesite Decommissioning to be borne at project start-up. While geotechnical investigations can appear expensive 4.0 INTERPRETATION in the short-term, they can save on the longer term costs of poor slope design. Poor design can lead to: For the purposes of this guideline, unless the context indicates otherwise: • lost production and resources, • reduced personal safety, January 1995 Geotechnical Slope Stability 1
  • 2. ĐƯỢC CHIA SẺ BỞI: WWW.GEOSOFTVN.COM (Nếu thấy hữu ích hãy vote và chia sẻ nhé bạn) SHARE BY: WWW.GEOSOFTVN.COM (If you find useful, please vote and share other) ACTION PAR: WWW.GEOSOFTVN.COM (Si vous trouvez utiles, s'il vous plaît vote et d'actions, autres) SHARE ПО: WWW.GEOSOFTVN.COM (Если вы найдете полезную, пожалуйста, голосовать и обмениваться другой) シェア:WWW.GEOSOFTVN.COM (見つかった場合は、投票を共有、他のご便利です) 共享:WWW.GEOSOFTVN.COM (如果您发现有用,请投票和分享其他)
  • 3. increased risk of equipment damage, • Low wall spoil • damage to rehabilitated areas, and • Out of pit dumps, waste rock dumps, reject or gangue dumps. • unnecessary rehandling of materials during slope reshaping. 6.4 Data Collection Data collection should be relevant to the type of slopes 6.0 MANAGEMENT STRATEGIES required and should be directed to the relevant factors affecting geotechnical stability. 6.1 Geotechnical Stability (1) Dumps and Stockpiles Long term geotechnical stability should be maintained Data for dumps and stockpiles is required for within agreed standards dependent on the assessing: geomorphology of the surrounding landform and the proposed post-mining land use. No landform is stable in (a) the bearing capacity of the underlying geological time. The design and safety of the final foundation materials, landform should be suitable for the agreed end land use. (b) the stability of slopes formed in the Geotechnical stability is defined as the stability of an dumped material, and excavated slope or spoil pile against mass failure. (c) the permeability and drainage Factors of Safety against failure are generally defined as characteristics of the dump the ratio between restoring forces and disturbing forces Data collected should include: within the slope. Restoring forces are dependent on the available shear strength in the materials plus any (a) A description of the soil profile below introduced supports (such as anchors or rock bolts), the dump/stockpile site in terms of: while disturbing forces are a function of applied shear • soil type stresses, pore pressures, surcharges and earthquake loadings within the slope. Conventionally used safety • particle size distribution factors for temporary and permanent slopes are 1.2 and 1.5 respectively. However, some Responsible Authorities • plasticity (Atterberg limits) may specify different values and these should be confirmed. • moisture content • density 6.2 Assessment Procedures • shear strength (total and effective The following steps are recommended in approaching the stress angle of friction and assessment of the geotechnical stability of slopes: cohesion) (a) Prepare conceptual mine layout and select • compressibility concept design for open pit and spoil slopes. (b) Collect geotechnical data. • thickness and depth to rock. (c) Define design parameters. (b) Hydrogeological conditions below the (d) Define Factors of Safety. dump/stockpile site including: (e) Analyse geotechnical slope stability. • groundwater levels (f) Refine slope geometries to conform with agreed • permeability. Factors of Safety. (c) Geotechnical properties of the During mining operations, slope stability performance dump/stockpile materials including: should be reviewed and designs amended as necessary. When developing concept designs and amending • particle size distribution designs, the possibility of future extensions or deepening of the pit should be taken into account. • density • anticipated compacted density 6.3 Concept Slope Design • plasticity (Atterberg limits) At concept design stage, slope geometries should be based on local experience and with similar materials in • dispersion index similar environments. All slopes should be identified and categorised with respect to consequence of slope failure • mineralogy and type of slope. Types of slope may include: • shear strength • Abandoned slopes in final void • permeability • Haul ramp batters (strip mines) • Retaining embankments 2 Geotechnical Slope Stability January 1995
  • 4. and any variations of the above if the 6.6 Stability Analysis - Detailed Design material is expected to weather or deteriorate. Typical types of failure that can occur include: (d) Any other relevant data such as (a) Earth, rock fill and spoil dumps and earthquake loadings and surcharges. embankments (2) Open Pit Slopes • circular Data for final slopes and batters remaining • non-circular semi-infinite slope within the open pit is required for: • multiple block plane wedge (a) designing long term pit slopes, • log spiral (bearing capacity of foundations) (b) assessing long term slope deterioration, and • flow slides. (c) determining hydrogeological effects on the local groundwater. (b) Final void slopes in earth and rock Data collected should include: • block slide (a) a description of soil and rock profile • wedge through the slope, • toppling (b) soil parameters as listed above for dumps and stockpiles, • circular (normally earth slopes only). (c) rock density and uniaxial compressive Stability analysis and slope design is an iterative process strength, of successive trials whereby potential sliding surfaces are (d) rock structure including orientation, chosen and the Factor of Safety determined. This is occurrence and spacing of bedding, continued for all kinematically possible surfaces until the joints, faults and other discontinuities, critical surface is found. The critical surface is the one (e) shear strength along discontinuities, with the lowest Factor of Safety. If this is below the minimum design Factor of Safety for the project, the (f) groundwater levels, slope geometry, drainage, or construction materials need (g) permeabilities, to be varied until the minimum Factor of Safety is achieved or exceeded. (h) depth of weathering, (i) depth of soil cover and Computer programs are commercially available to paleotopography (eg. buried channels), perform most stability analyses but personnel experienced in their operation, particularly in the (j) surcharges (during and after mining particular project environment, should be employed to operations), and facilitate the analyses. (k) earthquake loadings. For preliminary and conceptual design purposes use can be made of stability charts published in readily available 6.5 Design Parameters texts (see references). However, these designs need to Design parameters should be selected to represent the be confirmed and refined by detailed analysis at final characteristics of the slope forming materials. Measured design stage. values of soil parameters may show a scatter both locally and spatially. For example, insitu bulk density measurements of one particular spoil pile may vary from 6.7 Performance and Feedback 3 3 15 kN/m to 18 kN/m (local scatter). However, due to Progressive rehabilitation of completed or exhausted different dumping methods a second spoil pile of the areas allows the performance of early areas to be used in same material might vary from 17 kN/m3 to 20 kN/m3 modifying designs for subsequent areas. This can (spatial scatter between dumps). achieve more effective designs that are suitable for the particular project environment and that can reduce Any scatter in raw data may be due to any one of the rehabilitation costs. following: Slope performance monitoring generally includes: • a real natural variation of the parameter, • Selecting several typical profiles normal to the • measurement errors or inaccuracies, or slope contours. • spatial variation, such as in the bulk density • Driving or concreting-in survey levelling points example given above. along the profile. All new data must therefore be carefully examined and • Photographing and surveying the profiles once filtered before being grouped for statistical analysis. or twice a year - say at the start and finish of the In addition to material parameters it is very important to wet season. select the correct groundwater and pore pressure distribution for the slope. January 1995 Geotechnical Slope Stability 3
  • 5. Installing standpipes and measuring water levels i) spoil piles, and on a similar basis. j) compaction trials for engineered • Comparing surveys cumulatively and assessing embankments, roadways, causeways. slope degradation. Much of the fieldwork for such data gathering can be • Keeping a record book of any slips and slope carried out as a small extension to an exploration failures that occur on any slope (not necessarily programme. Mobilisation costs can be minimised if the along profile lines). two activities are carried out together. 7.3 Geotechnical Analysis and Design 7.0 IMPLEMENTATION STRATEGIES (1) Open Pits 7.1 General Analytical methods for cut slopes have been well Geotechnical investigation, data assessment, analysis documented in published texts ( Reference 1) and these and design is a specialised discipline. Depending on the methods include: size of the project, geotechnical input may only be required at specific and infrequent times. Consideration • Stereographic projection graphical techniques should be given to employing geotechnical consultants for the analysis of discontinuity data for this work. • Plane failure analysis More detailed guidance on geotechnical slope stability applicable to small scale mining operations remote from • Wedge failure techniques population centres is given in Attachment 1. • Toppling failure analysis • Circular and non-circular analysis by the method 7.2 Data Gathering of slices Methods of data gathering include: • Finite element and finite difference computer • surface mapping and sampling techniques. • test pitting and costeans A typical design implementation would be: • borehole sampling of soils, either undisturbed or • Divide the pit into areas of similar material disturbed ground properties, geological structure, stratigraphy, grade of weathering etc. • continuous rock coring, core orientation, geomechanical logging • Select a typical cross section for each area • downhole geophysical methods • Assess discontinuity data and rock mass strength data and decide on likely failure modes • groundwater sampling (there may be more than one) • insitu testing in boreholes including • Select groundwater levels in the slope a) permeability tests, • Perform stability analyses b) pressuremeter tests for elastic moduli • Re-configure slope geometry if Factor of Safety determinations, is unacceptable. c) insitu stress measurement, (2) Dumps and Stockpiles d) standard penetration test (SPT) for relative Analytical methods for dumps and stockpiles include: density of soils, • the method of slices, circular or non-circular e) insitu vane shear test for undrained strength of soft clays, and • multiple wedge/sliding block analyses. f) pumping/dewatering tests, A typical design implementation would include: • electric friction core profiling • Group together all slopes that comprise similar dump/stockpile material, similar foundations and • laboratory tests on rock, soil materials and water water pressures, and similar geometry according to Australian Standards (AS) or international rock testing standards (ISRMS) • Select a representative typical cross section through each group. • Field trials of the proposed works, eg. g) trial mine pits, • Assign material parameters and groundwater levels h) stockpiles, 4 Geotechnical Slope Stability January 1995
  • 6. Perform stability analyses to determine the 8.0 REFERENCES required slope angles to ensure Factors of Safety are acceptable. 1. Hoek, E., and Bray, J.W. (1981). Rock Slope Engineering, IMM, London. As a general guide, circular stability analysis should 2. Department of Mines, Western Australia. always be carried out. If the foundations soils below the (1991). Guidelines on Safety Bund Walls Around dump or stockpile contain soft or weak layers sandwiched Abandoned Open Pits, Perth. between stronger layers, then multiple wedge/sliding block type analyses should also be carried out to assess 3. International Committee on Large Dams. sliding along these weak layers. (1982). Manual on Tailings Dams and Dumps. ICOLD Bulletin No.45. Short term slope stability can be assessed using the 4. Australian Standard AS 1289. (1991). undrained total stress shear strength parameters of the “Methods of Testing Soils for Engineering soils (Cu, φu). However, since slopes must be stable in Purposes”. the long term, an effective stress analysis using effective stress parameters (c’and φ’) and pore water pressures should be used for final design. These stress parameters are referred to as follows: Cu = cohesion intercept for undrained, total stress conditions, c’ = cohesion intercept for effective stresses, φu = internal angle of friction for undrained, total stress conditions, and φ’ = internal angle of friction for effective stresses. 7.4 Construction The construction programme should minimise the need to return to an area more than once. Within the open pit or quarry distinguish between production faces and final slopes. A production face does not need to fulfil the stability requirements of a final slope and should be designed to maximise mine productivity. As a production face approaches the limits of the mine, the mining method may have to be modified to form the final slope. Modifications may include reducing the height between benches, or using smooth blasting techniques as the final round. Returning to an area to clean up final slopes is expensive since it often requires activities outside of the normal mine operation. Hence progressive formation of final slopes is considered most desirable. January 1995 Geotechnical Slope Stability 5
  • 7. ATTACHMENT 1 SOME GEOTECHNICAL SLOPE STABILITY CRITERIA FOR SMALL-SCALE MINING OPERATIONS IN AREAS REMOTE FROM POPULATION CENTRES (1) APPLICATION OF CRITERIA For small scale mining operations in Queensland, certain generalised criteria can be provided to assist the selection of acceptable slope angles. The conditions controlling stability will always be site specific, hence due care should be taken when applying these criteria. In particular, if there is a history of unstable slopes in the area, particularly during mining operations, then specific geotechnical studies should be carried out. These criteria are intended to apply to operations which are remote from population centres and involve pits: • having volumes not exceeding 100,000 m 3, and • depths of not greater than 20 m. (2) GEOTECHNICAL SLOPE STABILITY A slope is geotechnically stable if it does not physically collapse. The Factor of Safety is a measure of the confidence that collapse will not occur. (3) SITE CLASSIFICATION Any mine operation will contain several types of slope, eg. cut pit slopes and waste dumps slopes. The first step in ensuring stable slopes is to categorise areas on the mine site according to slope type. Groups of similar slope types can then be assessed separately. The procedure is as follows: (a) Prepare a site plan indicating all areas of excavation (pits), filling, stockpiles, dumps, and dams. (b) Allocate to each area one of the slope classifications given in Table 1.1. (c) For each slope classification, refer to the guidelines given in the following sections. TABLE 1.1 SLOPE TYPE CLASSIFICATION Slope Type Description C1 Cut slopes above areas which will be open to access by the public and by stock. C2 Cut slopes above areas where access is prohibited. F1 Slopes to dumps and other stockpiles. F2 Low wall spoil slopes (strip mines). F3 Fill slopes to retaining embankments (eg. tailings dams, water dams). (4) CUT SLOPES General The two main cut slope categories depend on whether access is allowed below the slope. Where access is prohibited, allowing gradual collapse to a stable state may be acceptable and feasible, and hence initial steeper slopes may be permitted. This approach needs to incorporate barriers above and behind the cut slopes to physically prevent access to the potentially unstable pit edge zone. More severe restrictions are required for cut slopes which remain above areas freely accessible to people and stock. Type C1 Slopes Generally, overall slope angles in unweathered (unoxidised) rock should not be steeper than 1 vertical to 1 horizontal (1V:1H), with individual bench faces no steeper than 2V:1H. If there is a history of stable slopes at steeper angles supported by documented evidence and, (preferably), still standing old and abandoned faces, then steeper slopes may be acceptable. If the rock slopes are cut by unfavourable geological features such as weak fault zones or joints (or bedding planes dipping steeply out of the face), and along which the overlying rock could slide, then the slopes should be assessed on a case by case basis. Unstable slopes will require battering back to a safe angle or made inaccessible and treated as if a Type C2 Slope. 6 Geotechnical Slope Stability January 1995
  • 8. Slopes cut in weathered (oxidised) rock, overburden or soil should not be steeper than the following: • 1 (V) : 1.5 (H) for slopes less than 5 m high and without groundwater seepage. • 1 (V) : 2.5 (H) for all other slope conditions. For slopes which cut through a mixed profile, (for example, of weathered rock/overburden overlying unweathered rock), the above maximum angles should be applied to each relevant material. These slope angles assume that no instability problems have been previously experienced in the area or during operations. Type C2 Slopes For cut slopes to which access will be prevented, bund walls should be provided which: • are located at least 10 m outside the area overlying the potentially unstable rock mass, ie. the total of the width of the “potentially unstable pit edge zone” plus 10 m away from the existing pit edge (Figure 1.1); • have a minimum height of 2 m and a minimum base width of 4 m; and • wherever possible, are constructed from unweathered, freely draining, end dumped rockfill. When only oxidised rock is available for construction of the safety bund wall, the least weathered or hardest material should be used. In these cases, the bund wall may need to be supplemented by a properly constructed fence. Suitable signs, clearly stating public safety risk and prohibiting public access, should be erected outside the safety bund wall. Additionally, shrub and/or tree planting at the outside edge of the bund wall should be implemented where practicable, to lessen the visual impact of the wall. (5) FILL SLOPES Type F1 Slopes Dumps and stockpiles tend to be constructed by end tipping, hence operating slope angles approximate the angle of repose of the dumped material. Coarse rock dumps will have side slopes steeper than dumps of finer grained and clayey materials such as soil and (oxidised) weathered rock. In many situations, desired end landform and other environmental requirements will determine the final slope angle. Such requirements generally involve flatter slopes than those needed to ensure geotechnical stability. Where geotechnical stability is the determining requirement, two options are available: (a) Long term steep side slopes can be developed by constructing a perimeter bund of compacted waste or stockpile material within which the bulk of the dump or stockpile can be end tipped or placed in the usual mine operation method. Typical compacted bund slopes would be: (i) unweathered rock 1 (V) : 1.75 (H) (ii) weathered rock, overburden, up to 15 m high - 1 (V) : 2.5 (H) (iii) weathered rock, overburden, greater than 15 m high- 1 (V) : 3 (H) These maximum slope angles apply to relatively level sites (ie. with ground slope less than 10%), with stable foundation soil and rock materials. Sites that are steeper or have weak foundation conditions should be individually assessed by geotechnical investigation. (b) Alternatively, end tipped and hence poorly compacted materials can be dozed and graded out to flatter slopes at the end of operations. As a general guide, final slopes should be no greater than half the angle of repose of the end tipped material as measured on-site. Since most materials have angles of repose of less than or equal to 1(V):1.5(H), final graded slopes should not exceed 1(V):3(H). Again, dumps and stockpiles on sites which are steep or have weak foundation conditions should be individually assessed. Type F2 Slopes Low wall spoil slopes commonly adopted in Queensland coal fields are generally in the order of 1(V):1.5(H). However, actual slopes depend on the nature of the spoil and its degree of compaction. Poorly compacted mudstone/shale spoils can become saturated and breakdown after repeated wet season exposure. Flatter slopes will result. Type F3 Slopes All embankments retaining lagoons of tailings, water or other materials should be designed and constructed using sound engineering practice. As a general guide, slopes of 1(V):2.5(H) are commonly adopted for embankments up to about 15 m in height and which also incorporate internal drainage blankets. January 1995 Geotechnical Slope Stability 7
  • 9. FIGURE 1.1 EXAMPLES OF PREFERRED SAFETY BUND WALL LOCATIONS (from Reference 2) 8 Geotechnical Slope Stability January 1995