Sejauhmana dampak dari events dapat mengganggu
objectives.



Menghitung Inherent maupun Residual risk



Events dianalisis dalam dua perspectives:
 Likelihood
 Impact
Risk = Likelihood * Consequence







Certain
Likely
Moderate
Unlikely
Rare








Catastrophic
Major
Moderate
Minor
Insignificant
Risks

Likelihood of Occurrence

Almost
Certain

Likely

S

S

fM

S

Moderate

L

L

1

Remote

e

H

a

M

M

Minor

H

H

S

L

Insignificant

dH

S

2
b

Unlikely

H

Moderate

Consequence

H

H

S

S

Major

H

c
3
Catastrophic
Mission Critical Risks

Probability of Occurrence

High

Your Risk Appetite
Medium

Low
Low

Medium

Magnitude of Impact

High
RISK MANAGEMENT PROCESS

RISK IDENTIFICATION

RISK MONITORING

RISK
MGT
PROCESS

RISK MEASUREMENT

RISK MITIGATION / CONTROL
RISK MEASUREMENT PROCESS

ABSOLUTE / INHERENT RISK MEASUREMENT

EXISTING RISK MITIGATION / CONTROL EVALUATION

RESIDUAL RISK MEASUREMENT
RISK MEASUREMENT – ADDITIONAL PROCESS

ADDITIONAL RISK MITIGATION / CONTROL
IMPLEMENTATION & EVALUATION

EXPECTED / TOLERABLE RISK MEASUREMENT
RISK MEASUREMENT – GENERAL FORMULA

INHERENT RISK – EXISTING RISK MITIGATION / CONTROL = RESIDUAL RISK

RESIDUAL RISK – ADDITIONAL RISK MITIGATION / CONTROL = EXPECTED /
TOLERABLE RISK
RISK MEASUREMENT – FORMULA VISUALIZATION

EXISTING
CONTROL
ADDITIONAL
CONTROL
INHERENT
RISK

RESIDUAL
RISK
EXPECTED
RISK
RISK MEASUREMENT – EXPECTED LOSS (ON ASSETS)

RISK OF LOOSING ASSETS
SMALL, PORTABLE, VALUABLE

STOLEN

BIG, PORTABLE, VALUABLE

STOLEN, FIRE

BIG, NOT PORTABLE, VALUABLE

FIRE

RISK OF DECREASING VALUE OF ASSETS
SMALL, PORTABLE, VALUABLE

POOR HANDLING

BIG, PORTABLE, VALUABLE

POOR MAINTENANCE

BIG, NOT PORTABLE, VALUABLE

POWER FAILURE
RISK MEASUREMENT – EXPECTED LOSS (ON ASSETS)
RISK PROFILE

ASSETS

CHARACTERISTICS

RISKS

RISK
EXPOSURES

RISK HANDLING
PRIORITY

A

SMALL,
PORTABLE,
VALUABLE

STOLEN, POOR
HANDLING

HIGH

1ST

B

BIG, PORTABLE,
VALUABLE

STOLEN, FIRE,
POOR
MAINTENANCE

MEDIUM

2ND

C

BIG, NOT
PORTABLE,
VALUABLE

FIRE, POWER
FAILURE

MEDIUM

2ND

D

SMALL,
PORTABLE,
VALUABLE

STOLEN, POOR
HANDLING

LOW

3RD
RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX)

RISK MEASUREMENT FORMULA
RISK = LIKELIHOOD X IMPACT

LIKELIHOOD

IMPACT

CERTAIN

CATASTROPHIC / EXTREME

LIKELY

MAJOR / HIGH

MODERATE

MODERATE / MEDIUM

UNLIKELY

MINOR / LOW

RARE

INSIGNIFICANT
RISK MEASUREMENT (LIKELIHOOD IMPACT MATRIX)

I
I=1

L=2

M=3

H=4

E=5

RISK SCALE

R=1

1

2

3

4

5

1–2=I

U=2

2

4

6

8

10

3–4=L

M=3

3

6

9

12

15

5–9=M

L=4

4

8

12

16

20

10 – 12 = H

C=5

5

10

15

20

25

15 – 25 = E

L
L
I
K
E
L
I
H
O
O
D

IMPACT
RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX)

IMPACT
LIKELIHOOD
FIN

NON FIN
INT’L

CERTAIN = MORE THAN 5 TIMES A YEAR

EXTREME

USD. > 1000 T

LIKELY = 3 – 5 TIMES A YEAR

HIGH

USD.>500–1000T NATIONAL

MODERATE = 2 TIMES A YEAR

MEDIUM

USD.>100–500 T ORG

UNLIKELY = ONCE IN A YEAR

LOW

USD.1 – 100 T

DEPT

RARE = ONCE IN MORE THAN A YEAR

INSIGN

< USD.1 T

SECT
RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX)
RISK PROFILE

RISK VALUE
LH

IP

TV

RISK
EXPOSURES

A

5

1

5

M

3RD

B

2

5

10

H

2ND

A

3

1

3

L

4TH

A

2

1

2

I

5TH

C

ACTIVITIES

4

5

20

E

1ST

RISKS

RISK HANDLING
PRIORITY

1
2
3

NOTES :
LH = LIKELIHOOD

I = INSIGNIFICANT

H = HIGH

IP = IMPACT

L = LOW

E = EXTREME

TV = TOTAL VALUE

M = MEDIUM
RISK MEASUREMENT – RISK FACTORS

FACTORS  INCREASE / DECREASE RISK EXPOSURE

VALUE OF ASSETS
LIQUIDITY OF ASSETS
COMPLEXITY OF ACTIVITY
VOLUME OF ACTIVITY
RISK MEASUREMENT – RISK FACTORS
RISK PROFILE – ACTIVITY A

1

2ND

1

3RD

1ST

20%

1
B

2

80%

A

1

100%

A

2

RISK VALUE

0,4 + 1,8 = 2,2

RISK FACTOR
WEIGHT

RISK
HANDLING
PRIORITY

0,2 + 1,6 = 1,8

RISK FACTOR
SCORE

A

RISKS

RISK
FACTORS

1

40%

3
C

3

60%
UNSUR RISIKO - KEMUNGKINAN (PROBABILITY)
Code
Risiko

A

B

C

D

E

F

G

H

I Rata-2

1 Bahan baku tidak tersedia dipasar

#1

2

3

3

8

2

3

5

3

3

3.6

2 Penunjukkan langsung rekanan tanpa proses tender

#2

3

4

4

8

9

7

4

3

4

5.1

3 Bahan baku yang diterima tidak sesuai spesifikasi.

#3

6

6

9

8

6

5

7

9

6

6.9

Rekanan wanprestasi (tidak mampu memenuhi
4 pesanan)

#4

2

2

4

8

2

5

3

2

2

3.3

5 Pembelian bahan baku tanpa otorisasi

#5

2

5

5

7

8

5

3

1

5

4.6

Terjadi gempa bumi yang menghambat pengiriman
6 bahan.

#6

1

1

7

3

2

1

3

1

1

2.2

7 Kapal laut pengangkut bahan baku tenggelam di laut

#7

1

1

5

5

2

1

3

1

5

2.7

8 PO diterbitkan tanpa adanya PR

#8

2

2

7

7

7

5

3

1

7

4.6

9 Terjadi perampokan bahan baku dalam perjalanan.

#9

2

2

4

7

4

5

6

4

2

4.0

Tidak ada performance evaluation yang standar
10 terhadap rekanan

#10

5

4

5

6

3

5

2

2

2

3.8

11 Fluktuasi harga bahan baku yang tidak stabil

#11

3

7

8

9

7

5

4

5

7

6.1

Otorisasi purchasing dilakukan oleh petugas yang
12 tidak berwenang

#12

2

4

7

7

7

5

2

2

4

4.4

Adanya kebijakan pemerintah yang mengatur masalah
13 purchasing

#13

1

2

7

8

2

7

3

1

2

3.7

Harga bahan baku di atas patokan harga dasar
14 pembelian

#14

3

3

1

9

5

5

3

1

5

3.9

15 Fluktuasi nilai mata uang asing (kurs mata uang)

#15

9

7

6

9

7

5

3

5

5

6.2

No

RISIKO (EVENT)
UNSUR RISIKO - DAMPAK (IMPACT)
No
RISIKO (EVENT)
1 Bahan baku tidak tersedia dipasar

Code A
Resiko
#1
9

B

C

D

E

F

G

H

I

6

8

10

9

10

6

2

Rata-2
9
7.7

2 Penunjukkan langsung rekanan tanpa proses tender

#2

7

6

2

9

5

10

5

2

10

6.2

3 Bahan baku yang diterima tidak sesuai spesifikasi.
Rekanan wanprestasi (tidak mampu memenuhi
4 pesanan)
5 Pembelian bahan baku tanpa otorisasi
Terjadi gempa bumi yang menghambat pengiriman
6 bahan.

#3

9

8

6

7

8

7

8

8

9

7.8

#4
#5

7
8

5
6

3
5

10
9

9
4

5
5

4
5

1
1

3
5

5.2
5.3

#6

7

6

8

10

9

10

5

1

6

6.9

7 Kapal laut pengangkut bahan baku tenggelam di laut
8 PO diterbitkan tanpa adanya PR

#7
#8

5
5

6
7

9
5

10
8

9
2

10
5

5
6

1
1

8
5

7.0
4.9

9 Terjadi perampokan bahan baku dalam perjalanan.
Tidak ada performance evaluation yang standar
10 terhadap rekanan
11 Fluktuasi harga bahan baku yang tidak stabil
Otorisasi purchasing dilakukan oleh petugas yang
12 tidak berwenang
Adanya kebijakan pemerintah yang mengatur masalah
13 purchasing
Harga bahan baku di atas patokan harga dasar
14 pembelian
15 Fluktuasi nilai mata uang asing (kurs mata uang)

#9

4

8

5

10

8

10

8

8

10

7.9

#10
#11

5
5

6
7

5
6

8
9

2
7

5
7

4
6

1
10

5
7

4.6
7.1

#12

5

6

6

8

2

5

3

1

6

4.7

#13

7

5

8

10

8

10

6

1

8

7.0

#14
#15

8
9

6
6

3
5

9
9

7
5

5
5

4
7

1
10

3
5

5.1
6.8
Risiko

Kemungkinan

10.00

5.00

0.00
0.00

5.00
Dampak

10.00
RISK MAPPING IN RISK ASSESSMENT PROCESS
Code
Risiko

Likelihood

Impact

1 Bahan baku tidak tersedia dipasar

#1

3.56

7.67

2 Penunjukkan langsung rekanan tanpa proses tender

#2

5.11

6.22

3 Bahan baku yang diterima tidak sesuai spesifikasi.

#3

6.89

7.78

4 Rekanan wanprestasi (tidak mampu memenuhi pesanan)

#4

3.33

5.22

5 Pembelian bahan baku tanpa otorisasi

#5

4.56

5.33

6 Terjadi gempa bumi yang menghambat pengiriman bahan.

#6

2.22

6.89

7 Kapal laut pengangkut bahan baku tenggelam di laut

#7

2.67

7.00

8 PO diterbitkan tanpa adanya PR

#8

4.56

4.89

9 Terjadi perampokan bahan baku dalam perjalanan.

#9

4.00

7.89

10 Tidak ada performance evaluation yang standar terhadap rekanan

#10

3.78

4.56

11 Fluktuasi harga bahan baku yang tidak stabil

#11

6.11

7.11

12 Otorisasi purchasing dilakukan oleh petugas yang tidak berwenang

#12

4.44

4.67

13 Adanya kebijakan pemerintah yang mengatur masalah purchasing

#13

3.67

7.00

14 Harga bahan baku di atas patokan harga dasar pembelian

#14

3.89

5.11

15 Fluktuasi nilai mata uang asing (kurs mata uang)

#15

6.22

6.78

No

RISIKO (EVENT)

More Related Content

Viewers also liked

Sociology - Groups
Sociology - GroupsSociology - Groups
Sociology - Groups
shoetzlein
 
Aos Amigos Especiais
Aos Amigos EspeciaisAos Amigos Especiais
Aos Amigos Especiais
Rosa Silva
 
Banner - rollup
Banner - rollupBanner - rollup
Banner - rollup
Guy Voet
 
Corpo Docente
Corpo DocenteCorpo Docente
Corpo Docente
btizatto1
 
Texto Final "Ley Reformatoria a la "
Texto Final "Ley Reformatoria a la  "Texto Final "Ley Reformatoria a la  "
Texto Final "Ley Reformatoria a la "
FONCEJU
 

Viewers also liked (18)

IntroPolicyProcedure
IntroPolicyProcedureIntroPolicyProcedure
IntroPolicyProcedure
 
Erm tm 12
Erm tm 12Erm tm 12
Erm tm 12
 
Qualities of a good leader and filipino values
Qualities of a good leader and filipino valuesQualities of a good leader and filipino values
Qualities of a good leader and filipino values
 
Sociology - Groups
Sociology - GroupsSociology - Groups
Sociology - Groups
 
Carta oficial sobre a COMJUCASE
Carta oficial sobre a COMJUCASECarta oficial sobre a COMJUCASE
Carta oficial sobre a COMJUCASE
 
Mckinsey kominfo
Mckinsey kominfoMckinsey kominfo
Mckinsey kominfo
 
Aos Amigos Especiais
Aos Amigos EspeciaisAos Amigos Especiais
Aos Amigos Especiais
 
Banner - rollup
Banner - rollupBanner - rollup
Banner - rollup
 
Unisa Results
Unisa ResultsUnisa Results
Unisa Results
 
Guia E-commerce - APADI e SEBRAE 2014
Guia E-commerce - APADI e SEBRAE 2014Guia E-commerce - APADI e SEBRAE 2014
Guia E-commerce - APADI e SEBRAE 2014
 
Speed Info
Speed InfoSpeed Info
Speed Info
 
Almas Gemeas2
Almas Gemeas2Almas Gemeas2
Almas Gemeas2
 
2016-2017
2016-20172016-2017
2016-2017
 
Corpo Docente
Corpo DocenteCorpo Docente
Corpo Docente
 
Texto Final "Ley Reformatoria a la "
Texto Final "Ley Reformatoria a la  "Texto Final "Ley Reformatoria a la  "
Texto Final "Ley Reformatoria a la "
 
Imagem dos ginásios aos olhos dos Portugueses
Imagem dos ginásios aos olhos dos PortuguesesImagem dos ginásios aos olhos dos Portugueses
Imagem dos ginásios aos olhos dos Portugueses
 
Organismo humano
Organismo humanoOrganismo humano
Organismo humano
 
Com31 Calificador
Com31 CalificadorCom31 Calificador
Com31 Calificador
 

More from Mulyadi Yusuf

Paper mssp analisis renstra dan capaian kinerja ditjen perhubungan udara
Paper mssp   analisis renstra dan capaian kinerja ditjen perhubungan udaraPaper mssp   analisis renstra dan capaian kinerja ditjen perhubungan udara
Paper mssp analisis renstra dan capaian kinerja ditjen perhubungan udara
Mulyadi Yusuf
 
10. kertas kerja it audit
10. kertas kerja it audit10. kertas kerja it audit
10. kertas kerja it audit
Mulyadi Yusuf
 
09.2 audit siklus pembelian dan pembayaran
09.2 audit siklus pembelian dan pembayaran09.2 audit siklus pembelian dan pembayaran
09.2 audit siklus pembelian dan pembayaran
Mulyadi Yusuf
 
05.1 auditing procedure general controls
05.1 auditing procedure   general controls05.1 auditing procedure   general controls
05.1 auditing procedure general controls
Mulyadi Yusuf
 
03.2 application control
03.2 application control03.2 application control
03.2 application control
Mulyadi Yusuf
 
02. cobit5 introduction
02. cobit5 introduction02. cobit5 introduction
02. cobit5 introduction
Mulyadi Yusuf
 
02. cobit 41 dan iso 17799
02. cobit 41 dan iso 1779902. cobit 41 dan iso 17799
02. cobit 41 dan iso 17799
Mulyadi Yusuf
 

More from Mulyadi Yusuf (20)

Paper seminar akuntansi pemerintah kel 1--sap berbasis akrual
Paper seminar akuntansi pemerintah kel 1--sap berbasis akrualPaper seminar akuntansi pemerintah kel 1--sap berbasis akrual
Paper seminar akuntansi pemerintah kel 1--sap berbasis akrual
 
Paper mssp analisis renstra dan capaian kinerja kemenhub (1)
Paper mssp   analisis renstra dan capaian kinerja kemenhub (1)Paper mssp   analisis renstra dan capaian kinerja kemenhub (1)
Paper mssp analisis renstra dan capaian kinerja kemenhub (1)
 
Paper mssp analisis renstra dan capaian kinerja kemenpan rb
Paper mssp   analisis renstra dan capaian kinerja kemenpan rb Paper mssp   analisis renstra dan capaian kinerja kemenpan rb
Paper mssp analisis renstra dan capaian kinerja kemenpan rb
 
Paper menstra kemenkes final-sapce
Paper menstra kemenkes final-sapcePaper menstra kemenkes final-sapce
Paper menstra kemenkes final-sapce
 
Peta strategi kementan
Peta strategi kementanPeta strategi kementan
Peta strategi kementan
 
Mssp analisis renstra ditjen ppi
Mssp analisis renstra ditjen ppiMssp analisis renstra ditjen ppi
Mssp analisis renstra ditjen ppi
 
Manstrapem bina upaya kesehatan final
Manstrapem bina upaya kesehatan finalManstrapem bina upaya kesehatan final
Manstrapem bina upaya kesehatan final
 
Paper mssp analisis renstra dan capaian kinerja ditjen perhubungan udara
Paper mssp   analisis renstra dan capaian kinerja ditjen perhubungan udaraPaper mssp   analisis renstra dan capaian kinerja ditjen perhubungan udara
Paper mssp analisis renstra dan capaian kinerja ditjen perhubungan udara
 
Balanced scorecard amin subiyakto
Balanced scorecard   amin subiyaktoBalanced scorecard   amin subiyakto
Balanced scorecard amin subiyakto
 
10. kertas kerja it audit
10. kertas kerja it audit10. kertas kerja it audit
10. kertas kerja it audit
 
09.2 audit siklus pembelian dan pembayaran
09.2 audit siklus pembelian dan pembayaran09.2 audit siklus pembelian dan pembayaran
09.2 audit siklus pembelian dan pembayaran
 
05.1 auditing procedure general controls
05.1 auditing procedure   general controls05.1 auditing procedure   general controls
05.1 auditing procedure general controls
 
03.2 application control
03.2 application control03.2 application control
03.2 application control
 
02. cobit5 introduction
02. cobit5 introduction02. cobit5 introduction
02. cobit5 introduction
 
02. cobit 41 dan iso 17799
02. cobit 41 dan iso 1779902. cobit 41 dan iso 17799
02. cobit 41 dan iso 17799
 
Erm tm 11
Erm tm 11Erm tm 11
Erm tm 11
 
Erm tm 10
Erm tm 10Erm tm 10
Erm tm 10
 
Erm tm 9
Erm tm 9Erm tm 9
Erm tm 9
 
2. erm tm 2
2. erm tm 22. erm tm 2
2. erm tm 2
 
1. erm tm 1
1. erm tm 11. erm tm 1
1. erm tm 1
 

Recently uploaded

Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdfAksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
JarzaniIsmail
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
ssuser35630b
 
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
pipinafindraputri1
 

Recently uploaded (20)

Modul Projek - Batik Ecoprint - Fase B.pdf
Modul Projek  - Batik Ecoprint - Fase B.pdfModul Projek  - Batik Ecoprint - Fase B.pdf
Modul Projek - Batik Ecoprint - Fase B.pdf
 
Sosialisasi PPDB SulSel tahun 2024 di Sulawesi Selatan
Sosialisasi PPDB SulSel tahun 2024 di Sulawesi SelatanSosialisasi PPDB SulSel tahun 2024 di Sulawesi Selatan
Sosialisasi PPDB SulSel tahun 2024 di Sulawesi Selatan
 
Membaca dengan Metode Fonik - Membuat Rancangan Pembelajaran dengan Metode Fo...
Membaca dengan Metode Fonik - Membuat Rancangan Pembelajaran dengan Metode Fo...Membaca dengan Metode Fonik - Membuat Rancangan Pembelajaran dengan Metode Fo...
Membaca dengan Metode Fonik - Membuat Rancangan Pembelajaran dengan Metode Fo...
 
Sesi 1_PPT Ruang Kolaborasi Modul 1.3 _ ke 1_PGP Angkatan 10.pptx
Sesi 1_PPT Ruang Kolaborasi Modul 1.3 _ ke 1_PGP Angkatan 10.pptxSesi 1_PPT Ruang Kolaborasi Modul 1.3 _ ke 1_PGP Angkatan 10.pptx
Sesi 1_PPT Ruang Kolaborasi Modul 1.3 _ ke 1_PGP Angkatan 10.pptx
 
PPT Mean Median Modus data tunggal .pptx
PPT Mean Median Modus data tunggal .pptxPPT Mean Median Modus data tunggal .pptx
PPT Mean Median Modus data tunggal .pptx
 
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdfSalinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
 
PELAKSANAAN (dgn PT SBI) + Link2 Materi Pelatihan _"Teknik Perhitungan TKDN, ...
PELAKSANAAN (dgn PT SBI) + Link2 Materi Pelatihan _"Teknik Perhitungan TKDN, ...PELAKSANAAN (dgn PT SBI) + Link2 Materi Pelatihan _"Teknik Perhitungan TKDN, ...
PELAKSANAAN (dgn PT SBI) + Link2 Materi Pelatihan _"Teknik Perhitungan TKDN, ...
 
RENCANA & Link2 Materi Pelatihan_ "Teknik Perhitungan TKDN, BMP, Preferensi H...
RENCANA & Link2 Materi Pelatihan_ "Teknik Perhitungan TKDN, BMP, Preferensi H...RENCANA & Link2 Materi Pelatihan_ "Teknik Perhitungan TKDN, BMP, Preferensi H...
RENCANA & Link2 Materi Pelatihan_ "Teknik Perhitungan TKDN, BMP, Preferensi H...
 
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.pptLATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
 
power point bahasa indonesia "Karya Ilmiah"
power point bahasa indonesia "Karya Ilmiah"power point bahasa indonesia "Karya Ilmiah"
power point bahasa indonesia "Karya Ilmiah"
 
Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdfAksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
Aksi Nyata Sosialisasi Profil Pelajar Pancasila.pdf
 
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKAMODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
 
DEMONSTRASI KONTEKSTUAL MODUL 1.3 CGP 10.pptx
DEMONSTRASI KONTEKSTUAL MODUL 1.3 CGP 10.pptxDEMONSTRASI KONTEKSTUAL MODUL 1.3 CGP 10.pptx
DEMONSTRASI KONTEKSTUAL MODUL 1.3 CGP 10.pptx
 
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
 
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
Modul 2 - Bagaimana membangun lingkungan belajar yang mendukung transisi PAUD...
 
PELAKSANAAN + Link2 Materi BimTek _PTK 007 Rev-5 Thn 2023 (PENGADAAN) & Perhi...
PELAKSANAAN + Link2 Materi BimTek _PTK 007 Rev-5 Thn 2023 (PENGADAAN) & Perhi...PELAKSANAAN + Link2 Materi BimTek _PTK 007 Rev-5 Thn 2023 (PENGADAAN) & Perhi...
PELAKSANAAN + Link2 Materi BimTek _PTK 007 Rev-5 Thn 2023 (PENGADAAN) & Perhi...
 
SOAL PUBLIC SPEAKING UNTUK PEMULA PG & ESSAY
SOAL PUBLIC SPEAKING UNTUK PEMULA PG & ESSAYSOAL PUBLIC SPEAKING UNTUK PEMULA PG & ESSAY
SOAL PUBLIC SPEAKING UNTUK PEMULA PG & ESSAY
 
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptxPPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
 
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKAKELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
 

3. erm tm 3

  • 1. MOHAMAD HASSAN AK., MAFIS, QIA, CRMP, CRMA
  • 2.
  • 3.  Sejauhmana dampak dari events dapat mengganggu objectives.  Menghitung Inherent maupun Residual risk  Events dianalisis dalam dua perspectives:  Likelihood  Impact
  • 4. Risk = Likelihood * Consequence      Certain Likely Moderate Unlikely Rare      Catastrophic Major Moderate Minor Insignificant
  • 6. Mission Critical Risks Probability of Occurrence High Your Risk Appetite Medium Low Low Medium Magnitude of Impact High
  • 7. RISK MANAGEMENT PROCESS RISK IDENTIFICATION RISK MONITORING RISK MGT PROCESS RISK MEASUREMENT RISK MITIGATION / CONTROL
  • 8. RISK MEASUREMENT PROCESS ABSOLUTE / INHERENT RISK MEASUREMENT EXISTING RISK MITIGATION / CONTROL EVALUATION RESIDUAL RISK MEASUREMENT
  • 9. RISK MEASUREMENT – ADDITIONAL PROCESS ADDITIONAL RISK MITIGATION / CONTROL IMPLEMENTATION & EVALUATION EXPECTED / TOLERABLE RISK MEASUREMENT
  • 10. RISK MEASUREMENT – GENERAL FORMULA INHERENT RISK – EXISTING RISK MITIGATION / CONTROL = RESIDUAL RISK RESIDUAL RISK – ADDITIONAL RISK MITIGATION / CONTROL = EXPECTED / TOLERABLE RISK
  • 11. RISK MEASUREMENT – FORMULA VISUALIZATION EXISTING CONTROL ADDITIONAL CONTROL INHERENT RISK RESIDUAL RISK EXPECTED RISK
  • 12. RISK MEASUREMENT – EXPECTED LOSS (ON ASSETS) RISK OF LOOSING ASSETS SMALL, PORTABLE, VALUABLE STOLEN BIG, PORTABLE, VALUABLE STOLEN, FIRE BIG, NOT PORTABLE, VALUABLE FIRE RISK OF DECREASING VALUE OF ASSETS SMALL, PORTABLE, VALUABLE POOR HANDLING BIG, PORTABLE, VALUABLE POOR MAINTENANCE BIG, NOT PORTABLE, VALUABLE POWER FAILURE
  • 13. RISK MEASUREMENT – EXPECTED LOSS (ON ASSETS) RISK PROFILE ASSETS CHARACTERISTICS RISKS RISK EXPOSURES RISK HANDLING PRIORITY A SMALL, PORTABLE, VALUABLE STOLEN, POOR HANDLING HIGH 1ST B BIG, PORTABLE, VALUABLE STOLEN, FIRE, POOR MAINTENANCE MEDIUM 2ND C BIG, NOT PORTABLE, VALUABLE FIRE, POWER FAILURE MEDIUM 2ND D SMALL, PORTABLE, VALUABLE STOLEN, POOR HANDLING LOW 3RD
  • 14. RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX) RISK MEASUREMENT FORMULA RISK = LIKELIHOOD X IMPACT LIKELIHOOD IMPACT CERTAIN CATASTROPHIC / EXTREME LIKELY MAJOR / HIGH MODERATE MODERATE / MEDIUM UNLIKELY MINOR / LOW RARE INSIGNIFICANT
  • 15. RISK MEASUREMENT (LIKELIHOOD IMPACT MATRIX) I I=1 L=2 M=3 H=4 E=5 RISK SCALE R=1 1 2 3 4 5 1–2=I U=2 2 4 6 8 10 3–4=L M=3 3 6 9 12 15 5–9=M L=4 4 8 12 16 20 10 – 12 = H C=5 5 10 15 20 25 15 – 25 = E L L I K E L I H O O D IMPACT
  • 16. RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX) IMPACT LIKELIHOOD FIN NON FIN INT’L CERTAIN = MORE THAN 5 TIMES A YEAR EXTREME USD. > 1000 T LIKELY = 3 – 5 TIMES A YEAR HIGH USD.>500–1000T NATIONAL MODERATE = 2 TIMES A YEAR MEDIUM USD.>100–500 T ORG UNLIKELY = ONCE IN A YEAR LOW USD.1 – 100 T DEPT RARE = ONCE IN MORE THAN A YEAR INSIGN < USD.1 T SECT
  • 17. RISK MEASUREMENT (LIKELIHOOD – IMPACT MATRIX) RISK PROFILE RISK VALUE LH IP TV RISK EXPOSURES A 5 1 5 M 3RD B 2 5 10 H 2ND A 3 1 3 L 4TH A 2 1 2 I 5TH C ACTIVITIES 4 5 20 E 1ST RISKS RISK HANDLING PRIORITY 1 2 3 NOTES : LH = LIKELIHOOD I = INSIGNIFICANT H = HIGH IP = IMPACT L = LOW E = EXTREME TV = TOTAL VALUE M = MEDIUM
  • 18. RISK MEASUREMENT – RISK FACTORS FACTORS  INCREASE / DECREASE RISK EXPOSURE VALUE OF ASSETS LIQUIDITY OF ASSETS COMPLEXITY OF ACTIVITY VOLUME OF ACTIVITY
  • 19. RISK MEASUREMENT – RISK FACTORS RISK PROFILE – ACTIVITY A 1 2ND 1 3RD 1ST 20% 1 B 2 80% A 1 100% A 2 RISK VALUE 0,4 + 1,8 = 2,2 RISK FACTOR WEIGHT RISK HANDLING PRIORITY 0,2 + 1,6 = 1,8 RISK FACTOR SCORE A RISKS RISK FACTORS 1 40% 3 C 3 60%
  • 20. UNSUR RISIKO - KEMUNGKINAN (PROBABILITY) Code Risiko A B C D E F G H I Rata-2 1 Bahan baku tidak tersedia dipasar #1 2 3 3 8 2 3 5 3 3 3.6 2 Penunjukkan langsung rekanan tanpa proses tender #2 3 4 4 8 9 7 4 3 4 5.1 3 Bahan baku yang diterima tidak sesuai spesifikasi. #3 6 6 9 8 6 5 7 9 6 6.9 Rekanan wanprestasi (tidak mampu memenuhi 4 pesanan) #4 2 2 4 8 2 5 3 2 2 3.3 5 Pembelian bahan baku tanpa otorisasi #5 2 5 5 7 8 5 3 1 5 4.6 Terjadi gempa bumi yang menghambat pengiriman 6 bahan. #6 1 1 7 3 2 1 3 1 1 2.2 7 Kapal laut pengangkut bahan baku tenggelam di laut #7 1 1 5 5 2 1 3 1 5 2.7 8 PO diterbitkan tanpa adanya PR #8 2 2 7 7 7 5 3 1 7 4.6 9 Terjadi perampokan bahan baku dalam perjalanan. #9 2 2 4 7 4 5 6 4 2 4.0 Tidak ada performance evaluation yang standar 10 terhadap rekanan #10 5 4 5 6 3 5 2 2 2 3.8 11 Fluktuasi harga bahan baku yang tidak stabil #11 3 7 8 9 7 5 4 5 7 6.1 Otorisasi purchasing dilakukan oleh petugas yang 12 tidak berwenang #12 2 4 7 7 7 5 2 2 4 4.4 Adanya kebijakan pemerintah yang mengatur masalah 13 purchasing #13 1 2 7 8 2 7 3 1 2 3.7 Harga bahan baku di atas patokan harga dasar 14 pembelian #14 3 3 1 9 5 5 3 1 5 3.9 15 Fluktuasi nilai mata uang asing (kurs mata uang) #15 9 7 6 9 7 5 3 5 5 6.2 No RISIKO (EVENT)
  • 21. UNSUR RISIKO - DAMPAK (IMPACT) No RISIKO (EVENT) 1 Bahan baku tidak tersedia dipasar Code A Resiko #1 9 B C D E F G H I 6 8 10 9 10 6 2 Rata-2 9 7.7 2 Penunjukkan langsung rekanan tanpa proses tender #2 7 6 2 9 5 10 5 2 10 6.2 3 Bahan baku yang diterima tidak sesuai spesifikasi. Rekanan wanprestasi (tidak mampu memenuhi 4 pesanan) 5 Pembelian bahan baku tanpa otorisasi Terjadi gempa bumi yang menghambat pengiriman 6 bahan. #3 9 8 6 7 8 7 8 8 9 7.8 #4 #5 7 8 5 6 3 5 10 9 9 4 5 5 4 5 1 1 3 5 5.2 5.3 #6 7 6 8 10 9 10 5 1 6 6.9 7 Kapal laut pengangkut bahan baku tenggelam di laut 8 PO diterbitkan tanpa adanya PR #7 #8 5 5 6 7 9 5 10 8 9 2 10 5 5 6 1 1 8 5 7.0 4.9 9 Terjadi perampokan bahan baku dalam perjalanan. Tidak ada performance evaluation yang standar 10 terhadap rekanan 11 Fluktuasi harga bahan baku yang tidak stabil Otorisasi purchasing dilakukan oleh petugas yang 12 tidak berwenang Adanya kebijakan pemerintah yang mengatur masalah 13 purchasing Harga bahan baku di atas patokan harga dasar 14 pembelian 15 Fluktuasi nilai mata uang asing (kurs mata uang) #9 4 8 5 10 8 10 8 8 10 7.9 #10 #11 5 5 6 7 5 6 8 9 2 7 5 7 4 6 1 10 5 7 4.6 7.1 #12 5 6 6 8 2 5 3 1 6 4.7 #13 7 5 8 10 8 10 6 1 8 7.0 #14 #15 8 9 6 6 3 5 9 9 7 5 5 5 4 7 1 10 3 5 5.1 6.8
  • 23. RISK MAPPING IN RISK ASSESSMENT PROCESS Code Risiko Likelihood Impact 1 Bahan baku tidak tersedia dipasar #1 3.56 7.67 2 Penunjukkan langsung rekanan tanpa proses tender #2 5.11 6.22 3 Bahan baku yang diterima tidak sesuai spesifikasi. #3 6.89 7.78 4 Rekanan wanprestasi (tidak mampu memenuhi pesanan) #4 3.33 5.22 5 Pembelian bahan baku tanpa otorisasi #5 4.56 5.33 6 Terjadi gempa bumi yang menghambat pengiriman bahan. #6 2.22 6.89 7 Kapal laut pengangkut bahan baku tenggelam di laut #7 2.67 7.00 8 PO diterbitkan tanpa adanya PR #8 4.56 4.89 9 Terjadi perampokan bahan baku dalam perjalanan. #9 4.00 7.89 10 Tidak ada performance evaluation yang standar terhadap rekanan #10 3.78 4.56 11 Fluktuasi harga bahan baku yang tidak stabil #11 6.11 7.11 12 Otorisasi purchasing dilakukan oleh petugas yang tidak berwenang #12 4.44 4.67 13 Adanya kebijakan pemerintah yang mengatur masalah purchasing #13 3.67 7.00 14 Harga bahan baku di atas patokan harga dasar pembelian #14 3.89 5.11 15 Fluktuasi nilai mata uang asing (kurs mata uang) #15 6.22 6.78 No RISIKO (EVENT)