Nick Vasiliu Resume Electrical Design Engineer 2017
Eng Samer Ali CV
1. Electrical Engineer CV
Curriculum Vitae of Electrical Engineer
Personal Details:
• Name: Samer Saber Ahmad Ali.
• Place & Date of Birth: Jordan 12th
June 1986.
• Marital Status: Married.
• Nationality: Jordanian.
Contact Information:
• Address: Riyadh, Saudi Arabia.
• Cell Phone: +966-538296971.
• Email: barri86@yahoo.com; (sameralibarri@gmail.com)
Educational Background:
• B.Sc. Degree in Electric Engineering (Power), from Al- Balqa'a Applied University (BAU)-
Engineering College, Average Good (2.71 out of 4), graduation year July, 2009.
• General Secondary certificate for scientific stream, from Al-Rusaifah school, Average
(83%).
Experience:
• February, 2015 to Date
• Employer: Al-ASAS UNITED COMPANY FOR CONSTRUCTION http://www.alasasco.com/
• Position: Electrical Site Engineer.
Description of Duties
• Site Engineer for Testing And Commissioning for QADISIYAH PRIMARY CLINIC Project in
NGHA Ministry.
• Administration of team of qualified technicians to do tests according specifications of the
National Guard Ministry, for the following Electrical Systems:
A. Testing For Electrical Power Panels (MDB, SMDB, DB, ATS, etc..), as the following:
1. Short Circuit Test.
2. Insulation Test.
3. Over Load Current Test.
4. Earth Leakage Test.
5. Labelling.
B. Testing For Electrical Power Socket Outlet Circuits, as the Following:
1. Voltage Drop Test.
2. Resistivity Test.
3. Earth Loop Impedance Test.
4. Continuity Test.
5. Insulation Test.
6. Short Circuit Test.
7. Installation of the Wires and Socket Outlet.
8. Labelling.
Page 1 of 6
2. Electrical Engineer CV
C. Testing For Electrical Power Cables, as the Following:
1. Voltage Drop Test.
2. Resistivity Test.
3. Earth Loop Impedance Test.
4. Continuity Test.
5. Insulation Test.
6. Type Installation of the cables according NEC, which were selected on the
basis of which.
7. Labelling.
D. Testing for Lighting System, and its Circuits, as the Following:
1. Voltage Drop Test.
2. Resistivity Test.
3. Earth Loop Impedance Test.
4. Continuity Test.
5. Insulation Test.
6. Short Circuit Test.
7. Installation of Lighting Fixture and Wires.
8. Labelling.
E. Testing for Data & IP Telephone System, as Following:
1. Fluke Test.
2. Installation.
3. Labelling.
4. Signal and Disinformation Test.
F. Testing for Public Address System, as the Following:
1. Sound Level Test.
2. Fire Alarm Evacuation Test (Evacuation Massage).
3. Microphone Test.
4. Tuner Signal.
5. Labelling and Installation.
G. Testing for CCTV System:
1. Resolution Test.
2. Zoom Test.
3. Disinformation Test.
4. Labelling and Installation.
H. Testing for Access Doors System, as the following:
1. Connection With Fire Alarm System.
2. Card Reader.
3. PC Order.
4. Labelling and Installation.
I. Testing for Fire Alarm System (Addressable), as the Following:
1. Smock Test for Each Smock Detector.
2. Manual Alarm Test for Each Manual Call Device.
3. Heat Test For Each Heat Detector Device.
4. CM I/O Test for Each Device.
5. Connection With F.F.P.
6. Connection With HVAC System.
7. Connection With FM200.
8. Connection With Public Address System.
9. Connection With Access Doors, and Magnetic Doors Lock.
10. Labelling And Installation.
11. Sounder (Sound Level Test).
Page 2 of 6
3. Electrical Engineer CV
• August , 2013 to February, 2015
• Employer: Al-ASAS UNITED COMPANY FOR CONSTRUCTION
http://www.alasasco.com/
• Position: Electrical Site Engineer.
Description of Duties
• Site Engineer in New Central Laundry Project For King Abdul-Aziz Hospital in NGHA
Ministry.
• Administration of team of qualified technicians to do Electrical Devotion According (NEC
and NGHA) Specifications, And Schedule Time.
• Coordination with Mechanical, Civil, Arch Departments.
• Preparing Submittal for the project According (Prices, Technical Spec, Project Spec, etc,,)
• Preparing Shop Drawing according Design Drawing, Project Spec , BOQ Prices, and
Coordination with other Departments.
• Preparing As Built Drawings.
• Following the Suppliers.
• Following the Consultant for Inspections, Approving for the materials, and discussion with
him to Solve Any Problem may will be faced.
• Testing And Commissioning.
Project Details:
The New Laundry Project Have Many Electrical and Mechanical Systems, also have External
Suppliers for Laundry Equipments, That Requested us to Coordinate with them To Know What Are
The Equipments Requirements.
What are the electrical systems in the project?
1. Three transformers each one (1000 KVA), and the Fourth one (2000 KVA).
2. Four Main Distribution Boards.
3. Seven Sub Main Distribution Boards.
4. Three Distribution Boards.
5. Generator (630 KVA) with Monthly, and Daily Diesel Tank.
6. Tow ATS, That Connected with the Generator And (2) MDB.
7. Isolation Switches (Safety Switches) For Mechanical Devices.
8. Electrical Power Cables (MV, LV) SWA/XLPE/PVC/CU.
9. Electrical Power Socket Outlets.
10. Lighting systems.
11. Grounding System, And Lightning Protection Systems.
12. Communications Systems (DATA & IP TELEPHONE).
13. Public Address System.
14. Fire Alarm System (Addressable).
15. Gas Leakage detectors.
16. BMS System.
17. Access Doors.
I have the ability to do all the calculations (manual, by programs) for Transformer, Electrical
Cables, Electrical Panels (Selectivity For CB.s), Lighting, Power Socket Outlets, Grounding, etc,,,.
Page 3 of 6
4. Electrical Engineer CV
What are the mechanical systems in the project?
1. HVAC systems (supplying by electrical power, connected with BMS system,
connected with Fire Alarm System).
2. Electrical Pumps (water, F.F.P) (Supplying by electrical power, connected
with BMS, Connected with F.A.C.P.).
3. RO System (Supplying By Electrical Power, connected with BMS system).
4. Softener System (Supplying By Electrical Power, connected with BMS
system).
5. Steam Generator System by (Electrical Boiler 1250KW, 2 LPG Boilers)
(Supplying by Electrical Power, and connected with BMS systems.)
6. LPG station (Liquid Petroleum Gas) (Supplying the Evaporators and air
compressor by electrical power, connected with BMS system, separately
grounding system, gas leakage detectors) according GASCO Spec.
7. Central Electrical Water Heater (105KW, 55KW).
8. Air Compressors .
We encountered in the project are many problems, where there was not good coordination from
the beginning (design and a leading supplier of washing machines and other devices, which the
project built for it).
But the efforts of the project team (project manager, mechanical engineer and me.) by did good
coordination and preparation of intensive meetings with the machines supplier, to solve
problems, and to completely knowledge of requirements for the equipments, The project was
completed successfully.
• May , 2010 to June , 2013
• Employer: Al-Mohandes Construction Company.
• Position: Electrical Site Engineer.
Description of Duties
• Electrical Site Engineer in Al-RAI Press Printing Project.
• Administration of team of qualified technicians to do Electrical Devotion According (BSI
code, Client Spec), And Schedule Time.
• Coordination with Mechanical, Civil, Arch Departments.
• Preparing Submittal for the project According (Prices, Technical Spec, Project Spec, etc,,)
• Preparing Shop Drawing according Design Drawing, Project Spec , BOQ Prices, and
Coordination with other Departments.
• Preparing As Built Drawings.
• Following the Suppliers.
• Following the Consultant for Inspections, Approving for the materials, and discussion with
him to Solve Any Problem may will be faced.
• Testing And Commissioning.
Page 4 of 6
5. Electrical Engineer CV
Project Details:
Al-RAI Press Printing Project, is the largest printing building in the middle east for journalist,
books, magazines, etc ,,
32000 m2
is area of the building, and its total cost was 20000 US$, this project have many electrical
and mechanical systems, Except the client equipments (Printing Machines from KBA company).
The biggest challenge in the project was how to coordinate with printing machines supplier, and
ensure all the requirements to run the machines, as its purpose.
What are the electrical systems in the project?
1. Four transformers each one (2000 KVA).
2. Four Main Distribution Boards.
3. Fifteen Sub Main Distribution Boards.
4. Ten Distribution Boards.
5. Four Backup Generator Each one (2000 KVA) with Monthly, and Daily Diesel
Tank.
6. Synchronization panel.
7. Four ATS, That Connected with the Generator And (4) MDB.
8. Isolation Switches (Safety Switches) For Mechanical Devices.
9. Electrical Power Cables (MV, LV) SWA/XLPE/PVC/CU.
10. Electrical Power Socket Outlets.
11. Lighting systems.
12. Grounding System, And Lightning Protection Systems.
13. Communications Systems (DATA & IP TELEPHONE).
14. Public Address System.
15. Fire Alarm System (Addressable).
16. Gas Leakage detectors.
17. BMS System.
18. Access Doors.
19. UPS System.
Professional Skills:
• Very Good in ABB DOCWIN Program for Electrical power Cables and CB selectivity.
• Very Good in AutoCAD.
• Very Good in Dialux Program.
• Proficient in computer skills and Microsoft Office.
Personal Qualities:
• Excellent presentation & communication skills.
• Reliable and able to work under pressure & work with colleagues for multi culture.
• Ability for fast learning.
• Internet skills: browsing, research & Communication.
• Strong interpersonal skills, resourceful & committed team player.
• A Jordanian/ Saudi Arabian drive licenses are available.
Page 5 of 6