SlideShare a Scribd company logo
1 of 4
Shehzada Muhammad Naveed Nawaz
Email: naveednawaz252@gmail.com Skype id: faisal_0312
Contact: 00971 554371497/ 0092 333 4116437
PERSONAL INFORMATION:
Date of Birth 11-10-1982
Religion Islam
Marital Status Married
N.I.C 35101-5128260-1
Nationality Pakistani
PP No BB 9612601 / BB 9612602
VISA STATUS TOURIST
VISA EXPIRY 28-05-2015
CareerObjectives:
Fully motivated, energetic & equipped with essentials to work in an organization using my
organization skills for its progress and prosperity.
Experience In Saudi Arabia & Pakistan (11 Years):
(from Nov 2011 to June 2014)
1 Samsung Engineering jubail Saudi Arabia.
Working as Building Electrical Supervisor
Responsibilities:
 Supervise and coordinates activities of Electrician engaged in construction,
maintenance repair of electric power, lighting, and communication systems of
buildings, factories, and transportation equipment
 Plan wiring and installation of equipment fixtures, like motors, switches, circuit
breakers and fuse boxes, according to blueprints, schematic drawings and
sketches
 Inspect wiring & fixtures for conformance to company specifications or local
electrical codes, using test equipment, like voltmeter ohmmeter
 Electrical systems, equipment, and components to identify hazards, defects, and
the need for adjustment or repair, and to ensure compliance with codes.
 Advise management on whether continued operation of equipment could be
hazardous.
 Test electrical systems and continuity of circuits in electrical wiring, equipment,
and fixtures, using testing devices such as ohmmeters, voltmeters, and
oscilloscopes, to ensure compatibility and safety of system.
 Plan layout and installation of electrical wiring, equipment and fixtures, based on
job specifications and local codes.
 Prepare sketches or follow blueprints to determine the location of wiring and
equipment and to ensure conformance to building and safety codes.
 Use a variety of tools and equipment such as power construction equipment,
measuring devices, power tools, and testing equipment including oscilloscopes,
ammeters, and test lamps.
(From May 2009 to April 2011)
2 AL-FANAR CERAMICS Riyadh Saudi Arabia .
Working as an ElectricalForeman ( Installation ,Testing, Commissioning).
Responsibilities:
 Responsible for installation, testing and commissioning of M.V & L.V switchgears.
 Responsible for installation, testing and commissioning of Motor Control Center.
 Responsible for installation, testing and commissioning of power and Distribution
transformer.
 Responsible for installation of Cable tray.
 Ensure safety and quality policy of the project is being implemented. Prepare
reports for submission to the senior engineer attention.
 Inspection of cable pulling and related work.
 Power supply to new potable container /office and fluorescent lamp, outlet and
others install as per required.
 Testing and commissioning of HT and LT Cable transformers and high voltage
 Renovation of electrical wiring, DB panel, lighting fixture, and related works.
 Terminating all the LT cables in all DB, s and two points.
 Underground cable pulling from main panel to distribution panel and cable.
 Electrical equipment and tools repair and maintain.
 Specially checking grounding cable for SWB, SMDB,MDB and package sub-
station.
 Making snagging list of all electro-mechanical work.
(From Sep 2006 to Oct 2008)
3 Dost Steel Mills(PVT) LTD Pakistan.
Worked as an ElectricalForeman (Testing, Commissioning & maintenance)
Responsibilities:
 My major job responsibilities were Testing , Commissioning of Substation, Utility
and Plan start up for Dost mills after i join maintenance department.
 Testing and commissioning of low voltage and medium voltage switchgears, Motor
control Center (MCCs),Bus Ducts and Transformers.
 Testing & Commissioning of UPS, Battery Chargers & batteries.
 Solo run test of LV/MV motors.
 Functional Testing of LV/MV motors.
 Commissioning & Configuration of Variable Speed Drives (VSD) .
 Polarization Index (PI) Test of M.V Transformers and Motors.
 Hi-potential (HI-POT) Test of MV/HV cables, Motors , Circuit Breakers ,
transformers, Bus ducts & Bus bars.
 Testing of Current Transformers (CTs) & Potential Transformer (PTs).
 Follow PTW system (Permit to work system).
 Testing & Commissioning of Crane for Hoisting.
 Testing & commissioning of lighting system including Transformer Panels.
( From Dec 2002 to Aug2006)
4 Hussain Construction Company Limited.
Working as a Building Electrician.
Responsibilities
 Diagnose malfunctioning systems, apparatus, and components, using test
equipment and hand tools, to locate the cause of a breakdown and correct the
problem.
 Install ground leads and connect power cables to equipment, such as motors.
Perform business management duties such as maintaining records and files,
preparing reports and ordering supplies and equipment.
 Connect wires to circuit breakers, trans Direct and train workers to install,
maintain, or repair electrical wiring, equipment, and fixtures. formers, or other
components. )
 Repair or replace wiring, equipment, and fixtures, using hand tools and power
tools.
 Work from ladders, scaffolds, and roofs to install, maintain or repair electrical
wiring, equipment, and fixtures. Perform physically demanding tasks, such as
digging trenches to lay conduit and moving and lifting heavy objects.
 Place conduit (pipes or tubing) inside designated partitions, walls, or other
concealed areas, and pull insulated wires or cables through the conduit to
complete circuits between boxes.
 Provide assistance during emergencies by operating floodlights and generators,
placing flares, and driving needed vehicles.
 Assemble, install, test, and maintain electrical or electronic wiring, equipment,
appliances, apparatus, and fixtures, using hand tools and power tools.
ACADEMIC QUALIFICATION:
Degree Institute-university Years
B.Tech (electrical) PIMSAT, Lahore 2008
DAE (electrical) Sharif institute of Technology, Lahore 2002
Matric (science) Give. High School Chunian 1997
COMPUTER SKILL:
 DCS
 DIT

More Related Content

What's hot (20)

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur Rahman
 
MUHAMMAD IQBAL
MUHAMMAD IQBALMUHAMMAD IQBAL
MUHAMMAD IQBAL
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
DEEPU CV O&G_2
DEEPU CV O&G_2DEEPU CV O&G_2
DEEPU CV O&G_2
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
abhishek service engineer
abhishek service engineerabhishek service engineer
abhishek service engineer
 
Samar khan resume (1)
Samar khan resume (1)Samar khan resume (1)
Samar khan resume (1)
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
My resume
My resumeMy resume
My resume
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
Asad Ali Shah cv
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
JOEL ELECTRICIAN CV
JOEL ELECTRICIAN CVJOEL ELECTRICIAN CV
JOEL ELECTRICIAN CV
 
attach (1)
attach (1)attach (1)
attach (1)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 

Viewers also liked

Viewers also liked (11)

RTI Connext 5.2.0
RTI Connext 5.2.0RTI Connext 5.2.0
RTI Connext 5.2.0
 
Enzima
EnzimaEnzima
Enzima
 
Stephanie Bellinger Landscape Design
Stephanie Bellinger Landscape DesignStephanie Bellinger Landscape Design
Stephanie Bellinger Landscape Design
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word document
 
2016 GMekong Forum - S10 - playing games for sustainable fisheries
2016 GMekong Forum - S10 - playing games for sustainable fisheries2016 GMekong Forum - S10 - playing games for sustainable fisheries
2016 GMekong Forum - S10 - playing games for sustainable fisheries
 
Kemahiran berfikir kritis
Kemahiran berfikir kritisKemahiran berfikir kritis
Kemahiran berfikir kritis
 
Fisier.txt
Fisier.txtFisier.txt
Fisier.txt
 
Seminar Wro 25 03 10 Chojnacki Zmiany Jakosciowe
Seminar Wro 25 03 10 Chojnacki Zmiany JakoscioweSeminar Wro 25 03 10 Chojnacki Zmiany Jakosciowe
Seminar Wro 25 03 10 Chojnacki Zmiany Jakosciowe
 
Cree en el evangelio
Cree en el evangelioCree en el evangelio
Cree en el evangelio
 
Aula08 Sc
Aula08 ScAula08 Sc
Aula08 Sc
 
Violencia familiar - Conceptos - Tpos de Maltrato
Violencia familiar - Conceptos  - Tpos de MaltratoViolencia familiar - Conceptos  - Tpos de Maltrato
Violencia familiar - Conceptos - Tpos de Maltrato
 

Similar to supervisor

Similar to supervisor (20)

ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
zahid anwar
zahid anwarzahid anwar
zahid anwar
 
Update CV
Update CVUpdate CV
Update CV
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Ali-Ahmad Resume
Ali-Ahmad ResumeAli-Ahmad Resume
Ali-Ahmad Resume
 
roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015
 
Praveendas Resume -1
Praveendas Resume -1Praveendas Resume -1
Praveendas Resume -1
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 

supervisor

  • 1. Shehzada Muhammad Naveed Nawaz Email: naveednawaz252@gmail.com Skype id: faisal_0312 Contact: 00971 554371497/ 0092 333 4116437 PERSONAL INFORMATION: Date of Birth 11-10-1982 Religion Islam Marital Status Married N.I.C 35101-5128260-1 Nationality Pakistani PP No BB 9612601 / BB 9612602 VISA STATUS TOURIST VISA EXPIRY 28-05-2015 CareerObjectives: Fully motivated, energetic & equipped with essentials to work in an organization using my organization skills for its progress and prosperity. Experience In Saudi Arabia & Pakistan (11 Years): (from Nov 2011 to June 2014) 1 Samsung Engineering jubail Saudi Arabia. Working as Building Electrical Supervisor Responsibilities:  Supervise and coordinates activities of Electrician engaged in construction, maintenance repair of electric power, lighting, and communication systems of buildings, factories, and transportation equipment  Plan wiring and installation of equipment fixtures, like motors, switches, circuit breakers and fuse boxes, according to blueprints, schematic drawings and sketches  Inspect wiring & fixtures for conformance to company specifications or local electrical codes, using test equipment, like voltmeter ohmmeter
  • 2.  Electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes.  Advise management on whether continued operation of equipment could be hazardous.  Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system.  Plan layout and installation of electrical wiring, equipment and fixtures, based on job specifications and local codes.  Prepare sketches or follow blueprints to determine the location of wiring and equipment and to ensure conformance to building and safety codes.  Use a variety of tools and equipment such as power construction equipment, measuring devices, power tools, and testing equipment including oscilloscopes, ammeters, and test lamps. (From May 2009 to April 2011) 2 AL-FANAR CERAMICS Riyadh Saudi Arabia . Working as an ElectricalForeman ( Installation ,Testing, Commissioning). Responsibilities:  Responsible for installation, testing and commissioning of M.V & L.V switchgears.  Responsible for installation, testing and commissioning of Motor Control Center.  Responsible for installation, testing and commissioning of power and Distribution transformer.  Responsible for installation of Cable tray.  Ensure safety and quality policy of the project is being implemented. Prepare reports for submission to the senior engineer attention.  Inspection of cable pulling and related work.  Power supply to new potable container /office and fluorescent lamp, outlet and others install as per required.  Testing and commissioning of HT and LT Cable transformers and high voltage  Renovation of electrical wiring, DB panel, lighting fixture, and related works.  Terminating all the LT cables in all DB, s and two points.  Underground cable pulling from main panel to distribution panel and cable.  Electrical equipment and tools repair and maintain.  Specially checking grounding cable for SWB, SMDB,MDB and package sub- station.  Making snagging list of all electro-mechanical work.
  • 3. (From Sep 2006 to Oct 2008) 3 Dost Steel Mills(PVT) LTD Pakistan. Worked as an ElectricalForeman (Testing, Commissioning & maintenance) Responsibilities:  My major job responsibilities were Testing , Commissioning of Substation, Utility and Plan start up for Dost mills after i join maintenance department.  Testing and commissioning of low voltage and medium voltage switchgears, Motor control Center (MCCs),Bus Ducts and Transformers.  Testing & Commissioning of UPS, Battery Chargers & batteries.  Solo run test of LV/MV motors.  Functional Testing of LV/MV motors.  Commissioning & Configuration of Variable Speed Drives (VSD) .  Polarization Index (PI) Test of M.V Transformers and Motors.  Hi-potential (HI-POT) Test of MV/HV cables, Motors , Circuit Breakers , transformers, Bus ducts & Bus bars.  Testing of Current Transformers (CTs) & Potential Transformer (PTs).  Follow PTW system (Permit to work system).  Testing & Commissioning of Crane for Hoisting.  Testing & commissioning of lighting system including Transformer Panels. ( From Dec 2002 to Aug2006) 4 Hussain Construction Company Limited. Working as a Building Electrician. Responsibilities  Diagnose malfunctioning systems, apparatus, and components, using test equipment and hand tools, to locate the cause of a breakdown and correct the problem.  Install ground leads and connect power cables to equipment, such as motors. Perform business management duties such as maintaining records and files, preparing reports and ordering supplies and equipment.  Connect wires to circuit breakers, trans Direct and train workers to install, maintain, or repair electrical wiring, equipment, and fixtures. formers, or other components. )
  • 4.  Repair or replace wiring, equipment, and fixtures, using hand tools and power tools.  Work from ladders, scaffolds, and roofs to install, maintain or repair electrical wiring, equipment, and fixtures. Perform physically demanding tasks, such as digging trenches to lay conduit and moving and lifting heavy objects.  Place conduit (pipes or tubing) inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.  Provide assistance during emergencies by operating floodlights and generators, placing flares, and driving needed vehicles.  Assemble, install, test, and maintain electrical or electronic wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools. ACADEMIC QUALIFICATION: Degree Institute-university Years B.Tech (electrical) PIMSAT, Lahore 2008 DAE (electrical) Sharif institute of Technology, Lahore 2002 Matric (science) Give. High School Chunian 1997 COMPUTER SKILL:  DCS  DIT