SlideShare a Scribd company logo
1 of 37
(Dr. M K Manik)
HOD.mechccetb@gmail.com
What is Production structure tree
Or
Bill of materials (BOM)
It is a hierarchical Classification of
a product
A bill of materials (BOM) is a
critical product information record
That lists the
 Raw materials
Assemblies
Components
 Parts and
The quantities of each needed to manufacture
Product structure tree defines the systematic sub
assemblies/Components that requires to assemble a
product
What are the Types of Scheduling?
Forward scheduling is planning the tasks from the
date resources become available to determine the
shipping date or the due date.
Backward scheduling is planning the tasks from the
due date or delivery date to determine the start date
and/or any changes in capacity
What is the function of production, planning and
Control (PPC)?
This functions of PPC are as follows:
Efficient utilization of material resources, people
and facilities in any undertaking through planning
Coordinating and controlling the production
activities that transform the raw material into
finished products or components as a most optimal
Backward schedul
ing
Types of Scheduling
What is the principle of Material-handling?
There are three basic principles of material handling
as given below:
Gravity principle: Utilize gravity to move
a material wherever practicable it will generate low
cost.
Material flow principle: Plan an operation sequence
and equipment arrangement to optimize material flow.
Simplification principle: Reduce combine or
What do you mean by aggregate planning
Aggregate planning: is the process of developing,
analyzing, and maintaining a preliminary,
approximate schedule of the overall operations of an
organization.
The aggregate plan generally contains:
Targeted sales forecasts,
Production levels,
Inventory levels,
And customer backlogs.
Generally speaking, aggregate planning is connected to the
budgeting process.
 Finally, aggregate planning is important because
it can help synchronize flow throughout the supply chain;
It affects costs, equipment utilization, employment levels,
Difference between aggregate planning and Master
scheduling
. So, if I make a pen,
It has a cap,
A barrel,
A spring.
And a refill.
Based on the
definition above,
the pen is an MPS
item. The cap,
barrel, spring and
refill are MRP
items.
Problem1. using Jonson’s sequencing algorithm, solve n-jobs× 2 machine
problem with reference to table below
Job J1 J2 J3 J4 J5
Machine-1(hrs) 7 4 3 5 2
Machine-2 (hrs) 6 2 8 9 1
i)Calculate total elapsed
time
ii)Idle time for machine two
iii)Optimal sequence
J3 J4 J1 J2 J5
Here the processing time are given as 1, 2, 3, 4, 5, 6, 7 and 8 hrs in the different
jobs worked in different machines
As per Jonson's rule lowest possible time is only 1 Hour and highest possible
process time is 8 hrs
To find out the optimal sequence time for processing all the jobs as follows:
As job are scheduled as per follows but now it is the time to find out the
machining time to processJob J3 J4 J1 J2 J5
Machine-1(hrs) 3 5 7 4 2
Machine-2 (hrs) 8 9 6 2 1
Machining will be starting with J3 whose process time is 3 hrs in M1 and 8 hrs in M2
•Workshop open and same time operator of M1 and M2 arrived, the operators of machine
M2
Will be seating idle till 1st job of machine M1 is not processed, They will start the job when M1 complete the
1st job.
•After completing the 1st job M1 will take 2nd job i.e. J4 just after three hours, though they will complete the
job
after 8 hrs but M2 personal till they will be busy with 1st job of J1 ,after completing that job at 11 hrs
they will
catch the 2nd Job J4 and similarly all the job will be processed till the Job J5 is not processed.
Problem2. using Jonson’s sequencing algorithm, solve n-jobs× 2 machine problem
with reference to table below
Job J1 J2 J3 J4 J5
Machine-1(hrs) 3 8 7 5 4
Machine-2 (hrs) 4 5 1 2 3
Machine-3 (hrs) 7 9 5 6 10
Solution: Johnson condition
1)Minimum processing time of extreme row ≥ Max. processing
time of middle row 2)Here
minimum process time of extremes row are 3 or 5
And Max. processing time of middle row 5
Hence 3 or 5 ≥ 5 then the condition is satisfied
3) Then above three machines scheduled to be converted into two
machine scheduled as per process.
i)Calculate total elapsed
time
ii)Idle time for machine
Two, Three
iii)Optimal sequence
As per the rule lowest processing time in M1 will be scheduled first and the lowest
time in M2 will scheduled at the end of the processing.
Hence the above jobs will be scheduled as per
As J4 job is to be processed 1st , Hence processing of all the job will be as per given
below
Jo
b
M1
(In
)
M1(out) M2(In
)
M2(out) M3(In
)
M3(out) Remarks
J4 00 0+5=5 5 5+2 =7 7 7+6=13 M2 idle for initial 5 hrs & M3
idle for initial 7 hrs
J1 5 5+3=8 8 8+4=12 13 13+7=20 M2 idle for initial 8-7=1hrs
J5 8 8+4=12 12 12+3=1
5
20 20+10=3
0
J2 12 12+8=2
0
20 20+5=2
5
30 30+9=39 M2 idle for (20-15= 5 hrs)
J3 20 20+7=2
7
27 27+1=2
8
39 39+5=44 M1 machine idle for(44-27)
17Hrs & M2 for 27-25=2 HrsTotal elapsed time is 44 hrs, M1 for 17 hrs, M2 for 13 hrs and M3 for 7 hrs were idle in
Solution: Four Jobs 1,2,3&4 are to be processed in each
of the four machines such as a, b ,c and d in the order given
below Process time is given in Hrs. Find minimum elapsed
time for processing all the Jobs and idle time for the
machines.JOB Ma Mb Mc Md
1 54 14 14 18
2 30 10 18 32
3 28 12 16 44
4 14 16 12 42
Solution: Johnson condition
1)Minimum processing time of extreme column ≥ Max.
processing
time of middle column.
2) Here minimum process time of extremes column are 14 or18
And Max. processing time of middle column 18
Hence 14 or18 ≥ 18 then the condition is satisfied
3) Then four machine scheduled to be converted into two
machine scheduled as per process.
Flow process Chart
The Flow process Chart is a simple half-text, half-picture
used for showing the steps in a process,
Using symbols to indicate the type of action being taken
and text to give details of the action.
The chart can selectively be used to show what happens to
selected people, materials or equipment.
Flow Process Chart
Bar chart or bar graph
A bar chart or bar graph is a
Chart or graph that presents categorical data with
rectangular bars with heights or lengths proportional to the
values that they represent.
The bars can be plotted vertically or horizontally.
A vertical bar chart is sometimes called a line graph.
Gantt chart
A Gantt chart is a type of bar chart that illustrates a project schedule.
This chart lists the tasks to be performed on the vertical axis, and time intervals
on the horizontal axis.
The width of the horizontal bars in the graph shows the duration of each activity
Material-handling equipment.
 Material handling equipment is
mechanical equipment used for:
 The movement,
Storage,
Control and protection of materials,
Goods and products to be shifted for the process of
manufacturing,
Distribution,
Consumption and disposal.
Vertical screw
Automatic Robotic Palletizing System
Static/ Co robotic operation
4 Types of Materials Handling Equipment
Examples of storage and handling equipment
include:
• Racks: such as pallet racks, drive-through or drive-in racks, push-back racks, and
sliding racks
• Stacking frames: these are interlocking units that enable stacking of a load so crushing
doesn’t occur
• Shelves
• Bins and drawers
• Mezzanines: elevated floor systems that are installed between the production floor and
ceiling in order to provide additional storage space
Engineered Systems
•AS/RS: Automated Storage and Retrieval that involves racks, aisles and
shelves that are accessible by a type of mechanized shuttle system for the quick
retrieval of items.
• Conveyor systems: Automated conveyor systems carry heavy materials to
specified destinations using belts, flexible chain. It is a highly efficient equipment
to move large volumes of material quickly.
• Robotic delivery systems– These automated systems are ideal for moving
products on an assembly line or transporting goods throughout a plant or
Conveyer system motion contro
automatic storage and retrieval systems
Automated guided vehicle
Industrial Trucks
Powered industrial trucks, such as forklifts, are used to move large materials or
large quantities of materials around the manufacturing floor.
• Hand trucks– Also known as a dolly, or box cart. Hand trucks are l-shaped
box-moving handcarts with handles at one end, wheels at the base, and a
ledge to set objects on.
• Pallet jacks– These are tools are the most basic form of a forklift and used to
lift and move pallets within a warehouse.
• Pallet trucks– Manual operated or powered industrial forklifts.
• Walkie stackers– A pedestrian walk-behind stacker with a mast for lifting
pallets to heights.
• Platform trucks– These are similar to a two wheeled dolly, but with an
extended deck.
• Order picker– An electric lift truck specifically designed for filling individual
customer orders. This requires piece-part picking rather than selecting full
pallets or unit loads.
• Side loader– Automated tool similar to a fork lift that loads and unloads from
the side of the machine rather than the front.
• Automatic guided vehicles
Bulk Material Handling Equipment
Equipment that deals with bulk handling aids in the control and transportation of
large volumes of material either in bulk or loose form. In general the equipment
is used to move loose parts from one area of the production floor to another.
Examples of bulk material handling equipment are:
• Conveyor belts
• Stackers– Similar to forklifts, stackers help to lift and stack heavy loads on the
dock or in the warehouse.
• Reclaimers– These are large machines used to recover bulk materials from a
stockpile.
• Bucket elevators– Also known as a grain leg. These elevators haul flow able
bulk materials vertically.
• Grain elevators– This type of equipment is used to store and move grain and
other similar materials throughout a production pathway.
• Hoppers– Hoppers are a container for bulk material such as grain, that tapers
and discharges it’s materials at the bottom.
• Silos– A tower used to store grain and other materials such as coal, sawdust,
woodchips, and food products.
What are the factors are to be taken into
account while selecting the material handling
equipment?
Properties of the Material.
Layout and Characteristic of the building.
Production Flow.
Cost Considerations.
Nature of Operations.
Engineering Factors.
Equipment reliability.
Thank youTo
all

More Related Content

What's hot

Job Shop Scheduling with Setup Times Release times and Deadlines
Job Shop Scheduling with Setup Times  Release times and DeadlinesJob Shop Scheduling with Setup Times  Release times and Deadlines
Job Shop Scheduling with Setup Times Release times and Deadlines
Alkis Vazacopoulos
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
senthil.G
 

What's hot (20)

Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Project crashing and job sequencing
Project crashing and job sequencingProject crashing and job sequencing
Project crashing and job sequencing
 
Scheduling production
Scheduling   productionScheduling   production
Scheduling production
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Mpc sequencing
Mpc   sequencingMpc   sequencing
Mpc sequencing
 
Scheduling
SchedulingScheduling
Scheduling
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Production scheduling(draft agenda)
Production scheduling(draft agenda)Production scheduling(draft agenda)
Production scheduling(draft agenda)
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Ch17
Ch17Ch17
Ch17
 
Sequencing
SequencingSequencing
Sequencing
 
Job Shop Scheduling with Setup Times Release times and Deadlines
Job Shop Scheduling with Setup Times  Release times and DeadlinesJob Shop Scheduling with Setup Times  Release times and Deadlines
Job Shop Scheduling with Setup Times Release times and Deadlines
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
Job scheduling
Job schedulingJob scheduling
Job scheduling
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
 
Flowshop scheduling
Flowshop schedulingFlowshop scheduling
Flowshop scheduling
 

Similar to Scheduling

Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 

Similar to Scheduling (20)

production scheduling
production schedulingproduction scheduling
production scheduling
 
Method study
Method studyMethod study
Method study
 
ROBOT CYCLE TIME ANALYSIS
ROBOT CYCLE TIME ANALYSISROBOT CYCLE TIME ANALYSIS
ROBOT CYCLE TIME ANALYSIS
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Textile plant layout.pptx
Textile plant layout.pptxTextile plant layout.pptx
Textile plant layout.pptx
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Parallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic AlgorithmParallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic Algorithm
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Process chart due to help to very politely understand
Process chart due to help to very politely understandProcess chart due to help to very politely understand
Process chart due to help to very politely understand
 
Work study
Work studyWork study
Work study
 
Approximation Algorithms Part Two: More Constant factor approximations
Approximation Algorithms Part Two: More Constant factor approximationsApproximation Algorithms Part Two: More Constant factor approximations
Approximation Algorithms Part Two: More Constant factor approximations
 
FMS.pdf
FMS.pdfFMS.pdf
FMS.pdf
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)
 
Lotstreaming
LotstreamingLotstreaming
Lotstreaming
 
Construction Equipment Fleet Management
Construction Equipment Fleet ManagementConstruction Equipment Fleet Management
Construction Equipment Fleet Management
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristics
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristics
 
Work study
Work studyWork study
Work study
 

More from mrinalmanik64 (10)

Nba & pre qualifier for accreditation
Nba & pre qualifier for accreditationNba & pre qualifier for accreditation
Nba & pre qualifier for accreditation
 
IC Engine PPT
IC Engine PPTIC Engine PPT
IC Engine PPT
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Cement morter
Cement morterCement morter
Cement morter
 
Quality control control charts
Quality control control chartsQuality control control charts
Quality control control charts
 
Scheduling
SchedulingScheduling
Scheduling
 
Forecasting
ForecastingForecasting
Forecasting
 
Crystal structure
Crystal structure Crystal structure
Crystal structure
 
Heat treatment of Ferrous and Nonferrous metals
Heat treatment of Ferrous and Nonferrous metalsHeat treatment of Ferrous and Nonferrous metals
Heat treatment of Ferrous and Nonferrous metals
 
Basic of Production management
Basic of Production managementBasic of Production management
Basic of Production management
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 

Scheduling

  • 1. (Dr. M K Manik) HOD.mechccetb@gmail.com
  • 2. What is Production structure tree Or Bill of materials (BOM) It is a hierarchical Classification of a product A bill of materials (BOM) is a critical product information record That lists the  Raw materials Assemblies Components  Parts and The quantities of each needed to manufacture
  • 3. Product structure tree defines the systematic sub assemblies/Components that requires to assemble a product
  • 4.
  • 5. What are the Types of Scheduling? Forward scheduling is planning the tasks from the date resources become available to determine the shipping date or the due date. Backward scheduling is planning the tasks from the due date or delivery date to determine the start date and/or any changes in capacity What is the function of production, planning and Control (PPC)? This functions of PPC are as follows: Efficient utilization of material resources, people and facilities in any undertaking through planning Coordinating and controlling the production activities that transform the raw material into finished products or components as a most optimal
  • 8. What is the principle of Material-handling? There are three basic principles of material handling as given below: Gravity principle: Utilize gravity to move a material wherever practicable it will generate low cost. Material flow principle: Plan an operation sequence and equipment arrangement to optimize material flow. Simplification principle: Reduce combine or
  • 9. What do you mean by aggregate planning Aggregate planning: is the process of developing, analyzing, and maintaining a preliminary, approximate schedule of the overall operations of an organization. The aggregate plan generally contains: Targeted sales forecasts, Production levels, Inventory levels, And customer backlogs. Generally speaking, aggregate planning is connected to the budgeting process.  Finally, aggregate planning is important because it can help synchronize flow throughout the supply chain; It affects costs, equipment utilization, employment levels,
  • 10. Difference between aggregate planning and Master scheduling
  • 11.
  • 12. . So, if I make a pen, It has a cap, A barrel, A spring. And a refill. Based on the definition above, the pen is an MPS item. The cap, barrel, spring and refill are MRP items.
  • 13.
  • 14. Problem1. using Jonson’s sequencing algorithm, solve n-jobs× 2 machine problem with reference to table below Job J1 J2 J3 J4 J5 Machine-1(hrs) 7 4 3 5 2 Machine-2 (hrs) 6 2 8 9 1 i)Calculate total elapsed time ii)Idle time for machine two iii)Optimal sequence J3 J4 J1 J2 J5 Here the processing time are given as 1, 2, 3, 4, 5, 6, 7 and 8 hrs in the different jobs worked in different machines As per Jonson's rule lowest possible time is only 1 Hour and highest possible process time is 8 hrs To find out the optimal sequence time for processing all the jobs as follows:
  • 15.
  • 16. As job are scheduled as per follows but now it is the time to find out the machining time to processJob J3 J4 J1 J2 J5 Machine-1(hrs) 3 5 7 4 2 Machine-2 (hrs) 8 9 6 2 1 Machining will be starting with J3 whose process time is 3 hrs in M1 and 8 hrs in M2 •Workshop open and same time operator of M1 and M2 arrived, the operators of machine M2 Will be seating idle till 1st job of machine M1 is not processed, They will start the job when M1 complete the 1st job. •After completing the 1st job M1 will take 2nd job i.e. J4 just after three hours, though they will complete the job after 8 hrs but M2 personal till they will be busy with 1st job of J1 ,after completing that job at 11 hrs they will catch the 2nd Job J4 and similarly all the job will be processed till the Job J5 is not processed.
  • 17. Problem2. using Jonson’s sequencing algorithm, solve n-jobs× 2 machine problem with reference to table below Job J1 J2 J3 J4 J5 Machine-1(hrs) 3 8 7 5 4 Machine-2 (hrs) 4 5 1 2 3 Machine-3 (hrs) 7 9 5 6 10 Solution: Johnson condition 1)Minimum processing time of extreme row ≥ Max. processing time of middle row 2)Here minimum process time of extremes row are 3 or 5 And Max. processing time of middle row 5 Hence 3 or 5 ≥ 5 then the condition is satisfied 3) Then above three machines scheduled to be converted into two machine scheduled as per process. i)Calculate total elapsed time ii)Idle time for machine Two, Three iii)Optimal sequence
  • 18. As per the rule lowest processing time in M1 will be scheduled first and the lowest time in M2 will scheduled at the end of the processing. Hence the above jobs will be scheduled as per As J4 job is to be processed 1st , Hence processing of all the job will be as per given below Jo b M1 (In ) M1(out) M2(In ) M2(out) M3(In ) M3(out) Remarks J4 00 0+5=5 5 5+2 =7 7 7+6=13 M2 idle for initial 5 hrs & M3 idle for initial 7 hrs J1 5 5+3=8 8 8+4=12 13 13+7=20 M2 idle for initial 8-7=1hrs J5 8 8+4=12 12 12+3=1 5 20 20+10=3 0 J2 12 12+8=2 0 20 20+5=2 5 30 30+9=39 M2 idle for (20-15= 5 hrs) J3 20 20+7=2 7 27 27+1=2 8 39 39+5=44 M1 machine idle for(44-27) 17Hrs & M2 for 27-25=2 HrsTotal elapsed time is 44 hrs, M1 for 17 hrs, M2 for 13 hrs and M3 for 7 hrs were idle in
  • 19.
  • 20. Solution: Four Jobs 1,2,3&4 are to be processed in each of the four machines such as a, b ,c and d in the order given below Process time is given in Hrs. Find minimum elapsed time for processing all the Jobs and idle time for the machines.JOB Ma Mb Mc Md 1 54 14 14 18 2 30 10 18 32 3 28 12 16 44 4 14 16 12 42 Solution: Johnson condition 1)Minimum processing time of extreme column ≥ Max. processing time of middle column. 2) Here minimum process time of extremes column are 14 or18 And Max. processing time of middle column 18 Hence 14 or18 ≥ 18 then the condition is satisfied 3) Then four machine scheduled to be converted into two machine scheduled as per process.
  • 21.
  • 22. Flow process Chart The Flow process Chart is a simple half-text, half-picture used for showing the steps in a process, Using symbols to indicate the type of action being taken and text to give details of the action. The chart can selectively be used to show what happens to selected people, materials or equipment.
  • 23.
  • 25. Bar chart or bar graph A bar chart or bar graph is a Chart or graph that presents categorical data with rectangular bars with heights or lengths proportional to the values that they represent. The bars can be plotted vertically or horizontally. A vertical bar chart is sometimes called a line graph.
  • 26.
  • 27. Gantt chart A Gantt chart is a type of bar chart that illustrates a project schedule. This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. The width of the horizontal bars in the graph shows the duration of each activity
  • 28.
  • 29. Material-handling equipment.  Material handling equipment is mechanical equipment used for:  The movement, Storage, Control and protection of materials, Goods and products to be shifted for the process of manufacturing, Distribution, Consumption and disposal.
  • 30. Vertical screw Automatic Robotic Palletizing System Static/ Co robotic operation
  • 31. 4 Types of Materials Handling Equipment Examples of storage and handling equipment include: • Racks: such as pallet racks, drive-through or drive-in racks, push-back racks, and sliding racks • Stacking frames: these are interlocking units that enable stacking of a load so crushing doesn’t occur • Shelves • Bins and drawers • Mezzanines: elevated floor systems that are installed between the production floor and ceiling in order to provide additional storage space Engineered Systems •AS/RS: Automated Storage and Retrieval that involves racks, aisles and shelves that are accessible by a type of mechanized shuttle system for the quick retrieval of items. • Conveyor systems: Automated conveyor systems carry heavy materials to specified destinations using belts, flexible chain. It is a highly efficient equipment to move large volumes of material quickly. • Robotic delivery systems– These automated systems are ideal for moving products on an assembly line or transporting goods throughout a plant or
  • 32. Conveyer system motion contro automatic storage and retrieval systems Automated guided vehicle
  • 33. Industrial Trucks Powered industrial trucks, such as forklifts, are used to move large materials or large quantities of materials around the manufacturing floor. • Hand trucks– Also known as a dolly, or box cart. Hand trucks are l-shaped box-moving handcarts with handles at one end, wheels at the base, and a ledge to set objects on. • Pallet jacks– These are tools are the most basic form of a forklift and used to lift and move pallets within a warehouse. • Pallet trucks– Manual operated or powered industrial forklifts. • Walkie stackers– A pedestrian walk-behind stacker with a mast for lifting pallets to heights. • Platform trucks– These are similar to a two wheeled dolly, but with an extended deck. • Order picker– An electric lift truck specifically designed for filling individual customer orders. This requires piece-part picking rather than selecting full pallets or unit loads. • Side loader– Automated tool similar to a fork lift that loads and unloads from the side of the machine rather than the front. • Automatic guided vehicles
  • 34. Bulk Material Handling Equipment Equipment that deals with bulk handling aids in the control and transportation of large volumes of material either in bulk or loose form. In general the equipment is used to move loose parts from one area of the production floor to another. Examples of bulk material handling equipment are: • Conveyor belts • Stackers– Similar to forklifts, stackers help to lift and stack heavy loads on the dock or in the warehouse. • Reclaimers– These are large machines used to recover bulk materials from a stockpile. • Bucket elevators– Also known as a grain leg. These elevators haul flow able bulk materials vertically. • Grain elevators– This type of equipment is used to store and move grain and other similar materials throughout a production pathway. • Hoppers– Hoppers are a container for bulk material such as grain, that tapers and discharges it’s materials at the bottom. • Silos– A tower used to store grain and other materials such as coal, sawdust, woodchips, and food products.
  • 35.
  • 36. What are the factors are to be taken into account while selecting the material handling equipment? Properties of the Material. Layout and Characteristic of the building. Production Flow. Cost Considerations. Nature of Operations. Engineering Factors. Equipment reliability.