1. MOHAMED MAHMOUD SALEM
23, El Ansary st, Elarbeen, Suez,
Egypt.
+2-010-69888696.
moh_salem78@yahoo.com
Objective
A position in a result oriented company that seeks an ambitious and enthusiastic person, where acquired skills
and education will be utilized towards continued growth and advancement.
Academic Qualifications
• [Electronics & Communication Engineering]: June 2006 [General Grade: Good]
• Helwan University. [Project Grade: Excellent]
Work Experience (8 Years)
• Work in PETROJET (PETROLEUM PROJECTS & TECHNICAL CONSULTATIONS CO ) –
EGYPT : [ APRIL-2008 until Now]
- Electrical & Instrument Site Engineer.
Upgrade OF Zubair Compression Station Project, IRAQ with SCOPE CO.
• Installation of the construction work for E&I activities inside building and at the field
such as earthing, lighting, lightning, switchgear panel board, Bus duct, UPS system,
DCS system, HAVC system, laying and termination of power and control cables,
fabrication and installing of cable tray supports, installation of cable trays & cables
ladders, installation of fire detection system.
• Installation & Calibration of all type of instruments such as
(Valves,Pressure/Flow/LevelTransmitters,Temperature/Pressure/Flow/Level
Switches, Speed/Temperature Sensors, O2 Analyzer).
• Installation of S.S Tubing for all Instruments.
• Loop check for instrumentation systems include Six gas turbine, Junction Box,
substation, control room DCS, generators, workstation area.
• Commissioning & Pre-Commissioning for DCS system.
• Commission and start up of electrical equipment such as motors, fire water pump,
transformers.
• Testing of electrical & instruments equipment and all electrical & instrument panels.
• All test for electrical works such as meggering test for cables, phase sequence and
rotation and insulation resistance for MV 11, 22, 33KVA and LV, DC high potential test
for power cables.
-Electrical & Instrument Site Engineer.
EGAS Sokhna FSRU project. Jetty Unloading Facilities Project, Egypt with COWI & HLNG CO.
• Installation, testing, commissioning and documentation of electrical equipment and
instrumentation.
• Umbilical connections between FSRU and Jetty.
• Jetty power supply and power distribution.
• Jetty instrumentation and Jetty shutdown system.
• Jetty interface system and Gas detection system.
• Supplemenentary Jetty lighting.
• Earthing and potential bonding, including instrument and intrinsic safe earthing.
2. - Electrical & Instrument Site Engineer.
Barik to BVS.8 SOGL Pipeline 20"(157km) Project, Oman with PDO CO (Petroleum
Development Oman).
• Installation and start up and commissioning of the impressed current Cathodic
protection system for the 20'' pipeline and the valves rooms.
• Installation and start up and commissioning of 4 deep well ground bed(150meter
depth)and 115 test station.
• Installation of the construction work for E&I activities such as Earthing, Laying and
termination of power and instrument cables in valve rooms.
• Installation & Calibration of all type of instruments such as (Valves, Pressure/Flow
Transmitters, Temperature/Pressure/Flow Switches).
• Installation of S.S Tubing for all Instruments
• Installation of 4 solar cells power supply.
- Electrical & Instrument Site Engineer.
Expansion of Six Storage Tanks, Egypt with SUMED CO.
• Installing and operate the Cathodic Protection system for the tanks (Impressed
current and Sacrificial Anode systems).
• E&I Site Engineer for activities at the field such as earthing, lighting, lightning,
switchgear panel board, load sharing panel board, laying of power and control cables,
termination of power and control cables, laying and termination of HV cables 66KV,
UPS panels board, fabrication and installing of cable tray supports, installation of
cable trays & cables ladders, Cathodic protection system installation and start up,
calibration and loop check for instrumentation, fire detection system, laying of fiber
optic cable.
• All test for electrical works such as meggering test for cables, phase sequence and
rotation and insulation resistance for MV and LV, DC high potential test for power
cables.
• Installation of RTG Wireless Tank Radar
- Electrical & Instrument Site Engineer.
Disi-Water Conveyance Pipeline System 66"(70km) Project, Jordan with GAMA CO.
• Installation and start up and commissioning of the impressed current Cathodic
protection system for the 66'' pipeline and the valves rooms.
• Laying, splicing, and termination of 140km Optical Fiber cable and installing the
SCADA control system in the pipeline including RTUs.
• Installation of the construction work for E&I activities such as Earthing, Laying and
termination of power and instrument cables in valve rooms.
- Electrical & Instrument Site Engineer.
Upgrade OF Aqaba Compression Station Project, Jordan with MANTURBO CO.
• Installation of the construction work for E&I activities inside building and at the field
such as earthing, lighting, lightning, switchgear panel board, UPS system, DCS system,
HAVC system, laying and termination of power and control cables, fabrication and
installing of cable tray supports, installation of cable trays & cables ladders,
installation of fire detection system.
• Attend/check daily tool box talk for safety meeting and observe all electric foremen
wear PPE and visual inspect for scaffolding and work on height.
• Installation & Calibration of all type of instruments such as
(Valves,Pressure/Flow/LevelTransmitters,Temperature/Pressure/Flow/Level
Switches, Speed/Temperature Sensors, O2 Analyzer).
• Loop check for instrumentation systems include 2 gas turbine, Junction Box,
substation, control room DCS, generators, workstation area.
• Commissioning & Pre-Commissioning for DCS system.
3. - Electrical & Instrument Site Engineer.
Basement Processing Unit Project (BPU), Yemen with TOTAL CO.
• Materials take-off, preparing shop drawing/coordination, submittals, purchase order.
• Prepare invoice, budget estimation for electrical system power, lighting, earthing,
fire alarm, telecom, ..etc.
• E&I Site Engineer for activities at the field such as earthing, lighting, lightning,
switchgear panel board, load sharing panel board, laying of power and control cables,
termination of power and control cables, laying and termination of HV cables 33KV,
UPS panels board, fabrication and installing of cable tray supports, installation of
cable trays & cables ladders, Cathodic protection system installation and start up,
calibration and loop check for instrumentation, installation of fire detection system,
laying of fiber optic cable.
• Make and checked all the submitted as built drawings.
• Installation & Calibration of all type of instruments such as
(Valves,Pressure/Flow/LevelTransmitters,Temperature/Pressure/Flow/Level
Switches, Speed/Temperature Sensors, O2 Analyzer).
• Installation of S.S Tubing for all Instruments.
• Loop check for instrumentation systems include Six gas turbine, Junction Box,
substation, control room DCS, generators, workstation area.
• Commissioning & Pre-Commissioning for DCS system.
• Commission and start up of electrical equipment such as motors, fire water pump,
transformers.
• Testing of electrical & instruments equipment and all electrical & instrument panels.
• All test for electrical works such as meggering test for cables, phase sequence and
rotation and insulation resistance for MV and LV,DC high potential test for power
cables.
• Installation of Heat Tracing system.
• Work in ATAKA POWER STATION CO - EGYPT : [ Dec 2007 to March 2008 ]
- Instruments & Control Engineer.
• Planning organization and Supervision of versatile I&C activities.
• Administration and Control in DCS (Distributed Control System).
• Maintain AC Drivers and electronics I/O cards.
• Troubleshooting Of problems within instruments Such as:
(Valves, Pressure/Flow/Level Transmitters, Temperature/Pressure/Flow/Level
Switches, Speed/Temperature Sensors).
• Work in Ewest Egypt (MITEC) CO - EGYPT : [ July 2007 to Dec 2007 ]
- Maintenance & Control Engineer.
• Maintenance & Installation instruments.
• Working to establish best practices for maintenance management system.
• Preparing Daily Weekly and Monthly maintenance reports.
• Calculating & monitoring equipment's performing rates.
4. Computer Skills
• MS-Office (2000,2003,2007,2010) Application: (Excellent)
o MS-Excel, MS-Word, MS-Power Point, MS-Access , MS-Outlook
• IT Skills including Computer hardware & software troubleshooting: (Very Good)
• Visual Basic 6 & Database programming with Access: (Good).
• Platforms: Windows98/NT/2000/XP/SEVEN/VISTA
Courses and Training
• Course COMPEX CERTIFICATE of CORE COMPETENCE " Ex01 : Ex04 " - Cairo[Oct 2015]
[Certificate No: 52419 from Compex Training Center of UK]
info@compex.org.uk
• Attended a training in Project Management Professional PMP - Suez[AUG 2015]
I trained for 36 contact hours from A’lam Mwazy Training Center.
• Attended a training program in Protection Instruments.
In Ataka Power Station co.
• Attended a training program in Instruments & Control.
In Ataka Power Station co.
• Course “Communication skills- Leader ship -Self learning -Time management- Self planning - Mind
mapping ".
[Certificated from ITC Training Center of Human Development]
• Course “programming of Visual basic ".
[Certificated from LCSE Training Center of programming]
Language Skills
• Arabic Degree : Excellent (Mother tongue).
• English Degree : Very Good writing and speaking.
Personal Information
• Marital status: Married
• Military status: Exempted
• Date of birth: 20/10/1984
• Nationality: Egyptian
• Mobile: +2010 69888696
• E-mail: moh_salem78@yahoo.com