SlideShare a Scribd company logo
1 of 15
Download to read offline
Presentation
PAF centers his main activity at Construction, focussing on building works but also with experience and qualified to civil
works and a few and small bridges constructions.
Through the combination of a large team of professionals (one hierarchical structure comprising management,
engineers, commercials sales technician, administrative secretarys and a highly skilled professionals affects the works)
with the technical and the high-performance equipment allow us to successfully achieve the realization of many large-
scale and very complexity works, as we distinguish ourselves by the high percentage of use of own means to fulfill
contracts that can be awarded.
The founder of the Group, the PAF CONSTRUÇÕES LDA. was established in 2001 at Amarante a town in northern
Portugal, and benefiting from the know-how and experience in construction of the founders. In a short space of time it
has proven to be at the best level to stand out in the Iberian Peninsula market. Initially it has distinguished himself in the
masonry activities such as plasterwork, masonry settlements, plasters, paints and other coatings on buildings, later in
hydraulic works and civil works, in particular with a high degree of rise and a high turnover in the in situ execution of
reinforced concrete structures progressively to reach the necessary experience and the legitimate path for the
implementation of a general work contracts.
Currently PAF holds the Construction Class 7 nº 57902 (authorizes to build in Portugal up to the limit of € 10.624 million
by the regulatory authority of Construction).
It Portugal it highlights some of the works performed in Portugal and is a true example of subcontracting held at the
Basilica of Fatima, the Casa da Música in OPorto , the Estadio do Dragao and S. João Forte Conversion in the new
buildings of the Municipality Council of Bragança.
In Spain it was possible to conquer some territory, especially in the Basque Country, through the collaboration in
numerous works, including some of the most importants such as the Tecnhiker Center for Research Technology in Eibar,
the Basque Culinary Center in San Sebastian, the construction of Purifying Station in Aduna, to of the Towers of 607
Apartments in Bilbao and other numerous work contracts with much emphasis in the real state market.
Over the years the Group has worked in terms of reach and take root in the Iberian Peninsula market, thus overcoming
the only Portugal land border and by projecting since the year 2005 until the present day. To achieve the solidity and the
trust of the customers and the market taken as aim, it was established in 2010 the NORPAF Construcciones SL. in the
town of Tolosa in the Basque Country, the company that has been a reference by the works such as 96 VPO Apartments
+ 40 VS Apartments in Basauri, the Nuevo Pabellón Buesa Arena in Victoria Gasteiz, the construction of 90 VPO
Apartments + 42 VPT Apartments in Olalde - Oiartzun, the construction of 144 Apartments VPO S. Roque in Durango
and other buildings of major interest.
2
Cementing the commitment to the European market, is was established in the year 2012, a PAF's subsidiary in
Germany, PAF CONSTRUCTION LTD, GMBH, initially based in Neustadtcarrying out since then the market research
and the development of some works as the Neubau AM Westpark in Munich (residential buildings).
The NORINTERIM Empresa de Trabalho temporário Lda. is a Portuguese company of Temporary Work, created in
2013 and with his headquarters in Amarante, in Portugal, it has the authorization Permit nº 713/13 and is positioned
strategically to the market requirements and Customer needs. This company focuses its attention on the customer
satisfaction, improving its human capital, in the search for flexible and cost-effective solutions, by promoting qualitative
improvement of productivity and competitiveness with a special focus on the Construction activity. The use of
temporary workers is an effective response to the companies needs, such as the rapid replacement of employees, the
occasional increases of activity, events and seasonal activities or non lasting projects.
The Vitaleme Imobiliária Lda. is based in the city of Amarante in Portugal and is active in the field of real estate
development, property management and real estate investments.
3
PAF Construções Lda / VITALEME: Rua de S. João nº1052
4600-670 Louredo – Amarante
Portugal
NORINTERIM ETT Lda: Rua da Mó - Edifício Nascente Loja B
Entrada 2
4600 - 595 Fregim - Amarante
Portugal
NORPAF Construcciones SL: Poligono Arzabalza bajo 4
20400 Tolosa – Guipuzcoa
Basque Country
PAF Construções Lda - Gmbh: Brandstattgasse 18
84405 Dorfen - Erding
Germany
LOCATION / CONTACTS / ADDRESSES / EMAIL:
4
General Administration - PAF:
Tlm. +351 966185655 / +34 609291158
Email. norpafjosefrancisco@gmail.com
Construction Works Direction - PAF:
Tlm. +351 962243573 / +34 608787604
Email. ricardopais.grupopaf@gmail.com
Administrative Services - PAF:
Tel. +351 255092433 / Tlm. +351 962243574
Email. paf.amt@gmail.com / smoreira.paf@gmail.com
Norinterim ETT Lda:
Tel. +351 255432622
Tlm. +351 962243572 / 962243574
Email. norinterim@gmail.com
Work designation: Brickwork - bricks and blocks - Coating and sealing of walls and ceilings
Timeline of Construction Works
5
 Renewal of the Arquivo Histórico do Porto - 2001
 Construction of a Comercial Residence at Amarante - 2001
 Renewal of the Cultural Zone in Freixo at Porto - 2001
 Construction of the Health Club Holmes Place at Porto – 2002
 Construction of the Women's Prison of North Santa Cruz do Bispo - 2002
 Construction of the New Stadium of F.C. Porto – Dragon Stadium - 2002
 Construction of the Acess Roads to the Francisco Sá Carneiro Airport - 2002
 Construction of the Complex Multiusos in Arrábida at V. N. Gaia - 2002
 Construction of the Station of Wastewater Treatment Bacia de Cambados – 2003
 Construction of the Station of Wastewater Treatment Bacia do Rio Ferreira – 2003
 Construction of the Interface of Antas – Porto Metropolitan – 2004
 Construction of the Antas Station – Porto – 2004
 Construction of the Bessa Stadium – Porto – 2004
 Construction of a Comercial Residence at Ribeira da Pena - 2004
 Construction of the Aplicação urbana II – Comercial Center at Antas - 2004
 Construction of the Health Club Holmes Place at Porto – 2005
 Construction of a Comercial Residence Portas de Amarante - 2005
 Construction of the Comercial Center Fórum Coimbra - 2005
 Construction of the Church Holy Trindade Santuary at Fátima – 2006
 Construction of 12 Apartments ALFA San Andrés at Zumaia – Basque Country - 2007
Work designation: Brickwork - bricks and blocks - Coating and sealing of walls and ceilings
Timeline of Construction Works
6
 Construction of 30 Apartments at Lugaritz – Donostia - Basque Country – 2007
 Construction of Lot 3 Building Vila Sol Condomínio at Vila Real – 2007
 Construction of 71 Apartments VPO + 35 Apartments at Tolosa - Basque Country – 2007
 Construction of 54 Apartments at Extxebeltz - Basque Country – 2008
 Construction of 54 Apartments VPO "Etxebeltz“ at Azpeitia - Basque Country – 2009
 Construction of Mueble Center Lot 1 – URI at Irun - Basque Country – 2009
 Ampliation of Zaragueta Ikastetxea (School) at Orio - Basque Country – 2012/2013
Work designation - Hydraulic Infrastructure
 Work of excavation, earthworks and access tunnels Shopping Centre Antas at Porto - 2003
 Contract for execution of inlet pipes and pumping systems in sub-systems in Vale of Torno and Peneireiro – Vila Flor - 2004
 Work sanitation systems in the Cities Bacia do Rio Minho PART 1 - Interception Systems and elevation at Paredes de Coura,
Monção and Caminha – 2004
Work designation – General Contract
Timeline of Construction Works
7
 Construction of 124 Apartments venda libre + 24 Apartments Socials at Rentaria – Basque Country – 2006
 Construction of a Single Family Housing building at Amarante – 2008
 Construction of a Single Family Housing building at Amarante – 2008
 Construction of a Single Family Housing building at Amarante – 2008
 Construction of a Single Family Housing building at Amarante – 2008
 Construction of Pavilion Matsaria – Eibar – Basque Country – 2009
 Construction of a Single Family Housing building in Louredo at Amarante – 2011
 Construction of two Villas at Penafiel – 2011
Work designation – Concrete Structures
 Construction of Pavilion Voith Paper at Tolosa – Basque Country – 2005
 Execution of Concrete Structure in the building of Las Terras e Juntas Miramon at Donostia - Basque Country – 2005
 Construction of Santa Teresa Monasterium – Ávila – 2005
 Construction of Pavilion Egiburuberri at Eibar - Basque Country – 2006
 Construction of 100 Apartments at Urnieta - Basque Country – 2006
 Construction of Apartments of Garibay at Donostia - Basque Country – 2006
 Construction of 28 Apartments Lugaritz, Lots 12/13/14/15 at Donostia - Basque Country – 2007
 Construction of Health Center of Zumaia - Basque Country – 2007
 Construction of 15 Apartments at Lugaritz - Lot 6 - Basque Country – 2007
 Construction of 12 Apartments ALFA San Andrés at Zumaia - Basque Country – 2007
Work designation – Concrete Structures
Timeline of Construction Works
8
 Construction of 15 Apartments at Lugaritz – Lot A 300/17 - Basque Country – 2007
 Construction of Pavilion E2 and E3 and Building A1 at Apata, Tolosa – Basque Country – 2007
 Construction of 64 Apartments Locals y Garages – Eibar - Basque Country – 2008
 Construction of 56 Apartments at Etxebeltz - Azpeitia - Basque Country – 2008
 Construction of 146 Apartments at Danobat - Azkoitia - Basque Country – 2008
 Construction of 106 Apartments Larramendi Tolosa - Basque Country – 2008
 Construction of Vaso Central Parcela 4 – Tolosa - Basque Country – 2008
 Construction of 258 Apartments at Tolosa - Basque Country – 2008
 Construction of Promocion Beasain - Basque Country – 2008
 Construction of the Urbanization and Building Parcelas V1,V2 y EC. Poligono Oinartxo(Azkoitia) - Basque Country – 2008
 Construction of 152 Apartments at Larramendi Tolosa - Basque Country – 2008
 Construction of Deusto Lot 2 Bajo rasante - Basque Country – 2008
 Construction of 106 Apartments Larramendi Tolosa - Basque Country – 2008
 Construction of 42 Apartments at Beasain - Basque Country – 2008
 Construction of Gallery Wall at Badiolegi - Azpeitia – Basque Country – 2009
 Construction of 54 Apartments VPO "Etxebeltz" - Azpeitia - Basque Country – 2009
 Construction of 152 Apartments Larramendi Tolosa - Basque Country – 2009
 Construction of Purifier Station in Aduna - Basque Country – 2009
 Construction of148 Apartments at Tolosa - Basque Country – 2009
Work designation – Concrete Structures
Timeline of Construction Works
9
 Construction of Lot 2 Sotanos Gorostidi-Voith at Tolosa - Basque Country – 2009
 Construction of 50 Apartments VPO Etxebeltz R-5 – Azpeitia - Basque Country – 2010
 Construction of 148 Apartments VPO Tolosa - Basque Country – 2010
 Construction of Vaso Central - P2 - Basque Country – 2010
 Construction of 40+40 Apartments at Tolosa - Basque Country – 2010
 Construction of Basque Culinary Center lot 1Y2 at Donostia - Basque Country – 2010
 Construction of 96 Apartments VPO + 40 VS at Basauri - Basque Country – 2010
 Construction of 154 Apartments, Locals y Garages at Zabalgana – Vitoria Gasteiz - Basque Country – 2010
 Construction of the Tecnhiker Technology Research Center at Eibar - Basque Country – 2010
 Construction of 96 Apartments libres + 40 Apartments VPO at Basauri - Basque Country – 2010
 Construction of 14 Apartments Etxebeltz en Azpeitia - Basque Country – 2010
 Construction of 16 Apartments at Tolosa Erretengibel - Basque Country – 2010
 Construction of 48 + 70 Apartments at S. Fausto Durango - Basque Country – 2011
 Construction of Imbiomeden Miramon Center - Basque Country – 2011
 Construction of Puente Peatonal at Tolosa - Basque Country – 2011
 Construction of 111 Apartments at Aretxabaleta - Basque Country – 2011
 Construction of Pavilions Guenes at Bilbao - Basque Country – 2011
 Construction of the New Pavilion Buesa Arena at Victoria Gasteiz - Basque Country – 2011
 Construction of 16 Apartments VPO + 36 Libres Legutiano - Basque Country – 2011
 Requalification of School Center EB1 Costa Cabral 2ª Fase at Porto – 2011
Work designation – Concrete Structures
Timeline of Construction Works
10
 Urban Requalification of Forte São João de Deus – Reconversion in Municipal Buildings in the City of Bragança – 2012
 Construction of 25 Apartments VPO y Bajos Comerciales at San Juan - Ordizia - Basque Country – 2012
 Construction of 2 Villas at Talaimendi – Zarautz - Basque Country – 2012
 Construction of 60 Apartments VPO y Bajos Comerciales San Juan at Ordizia - Basque Country – 2012
 Construction of 57 Apartments at Getaria - Basque Country – 2012
 Construction of the New School Center Toki-Alai at Irun - Basque Country – 2012
 Requalification of a Scrap Park at Ermua - Basque Country – 2012
 Requalification of Bodegas Señorio Villarica en Hervías - Basque Country – 2012
 Construction of Villa at Urteta – Zarautz – Basque Country – 2012
 Urban Requalification (Bridge) at Olalde of Oiartzun - Basque Country – 2012
 Construction of 47 Apartments at Zizurkil - Basque Country – 2012
 Construction of 90+42 Apartments VPO + VPT at Olalde – Oiartzun - Basque Country – 2012
 Pavilions at Poligono Atallu de Usurbil - Basque Country – 2012
 Requalification of Bodegas Haro - Basque Country – 2012
 Ampliation of School Center Zaragueta Ikastetxea at Orio - Basque Country – 2012
 Construction of 144 Viviendas Apartments VPO S. Roque at Durango – Basque Country – 2012/2013
 Construction of 115 Apartments Rag. Fase Cimentación at Bilbao – Basque Country – 2012/2013
 Construction of School Center of Silvalde at Espinho – 2012 /2013
 Ampliation of School Center CEP Laiotz – Segura – Basque Country - 2012
 Construction Dorre Barriak 607 Apartments in Garellano – Bilbao 2012/2013
Work designation – Concrete Structures
Timeline of Construction Works
11
 Ampliação de CEP Laiotz – Segura – País Vasco
 Interconexión entre Ramales I y III de Abastecimiento y conducción EBAP Galarreta – Hernani – País Vasco – 2013
 Construction of Neubau AM WestPark in München - Deutschland 2013
 Construction of Concrete Central in Gerediaga, suporte work of the Road - Autovia Gerediaga – Elorrio – Basque Country 2013
 Access Works “ Movimientos de Tierras en Epele – Bergara“ – Basque Country 2013
 Accessibility improvements to the historic city of Vitoria Gasteiz – Basque Country – 2013
 Construction of an Underground Parking Lot , Equipment Building at Calle Balenciaga – Getaria – Basque Country – 2013/2014
 Urbanización of Area RE.7 Gorostidi –Voith – Paso inferior Calle Larramendi – Tolosa – País Vasco – 2013
 Construction of 10 Houses at en Karrika, Oiartzun - Basque Country – 2013
 Urbanization of 47 Apartments at Zizurkil - Basque Country - 2013
 House building on Calle Arsuaga - Urrestilla - Basque Country - 2014
 Earth retaining at the Work Construction of 38 apartments VPO en Peñascal - Basque Country - 2014
 Urbanization at the School Center in Mungia - Basque Country - 2014
 Construction of the New Superior Music Center Musikene in San Sebastian - Basque Country - 2014
 Construction of 21 apartments in Azpeitia - Basque Country - 2014
 House reconstruction - Winery in Gurutzeaga, Getaria - Basque Country - 2014
 Pasarela building on Railroad Madrid-Irun Zabalgana in Vitoria Gasteiz - Basque Country - 2014
 Construction of Store, Supermarket and Parking Mercadona Ali-Gobeo in Vitoria Gasteiz - Basque Country - 2014
 Pit construction to Machine Laminadora, Implementation and support buildings in Euskalforging Factory - Sestao - Basque
Country - 2014
Work designation – Concrete Structures
Timeline of Construction Works
12
 Construction of 117 apartments Alduna Enea, uninvolved Rio Ermua in San Sebastian - Basque Country – 2014
 Construction of 46 apartments VPO in Basauri - Basque Country - 2014
 Construction of two Houses in Atotxa - San Sebastian - Basque Country - 2014
 Buildings in Cantera of Sasiola en Deba - Basque Country - 2014
 Intervention in the Construction of Concrete Plant assembly in Gerediaga - Elorrio - Basque Country - 2014
 Urbanization in Calle Larramendi - Tolosa - País Vasco - 2014/2015
 Urbanization of Poligono Lanbarren at Oiartzun - Basque Country - 2014
 New Urbanization in the interior of Frederick Mayo Group - Basque Country - 2014/2015
 Construction of 7 apartments and garages - IYOLA II "from Donostia - San Sebastian - Basque Country - 2014/2015
 Construction of 29 Apartments and garages in Basauri - País Vasco - 2014/2015
 Construction and Adaptation of a Existent Treatment Center in an Industrial Pavillion Installations of Euskalforging in Sestao -
Basque Country - 2015
 Construction of a Building Cancha de Balonmano and Dressing rooms in the Institute Herramienta - Elgoibar - País Vasco – 2015
 Construction and Performances in Z7 of Zubieta Field in Donostia - San Sebastian - Basque Country – 2015
 Construction and Reform of a Plant of Semisótano in Uvesco to Unialco - Irun - Basque Country - 2015
Temporary Employment Agency
Timeline of Construction Works
13
 Temporary assignment of employees to the Work Construction “Les Terraces de L'Hippodrome” – Marseille – France – 2013
 Temporary assignment of employees to the Work Construction “Villas Domaine Holten, Proprieté Bessot, Villa Neal Manuel” –
Saint Tropez – France – 2013
 Temporary assignment of employees to the Work Construction “340.0P - SIEMP - 10 Rue de Meaux - 75019 “ – Paris – France –
2013
 Temporary assignment of employees to the Work Construction “Minerva Cais” – Gaia - Portugal - 2014
 Temporary assignment of employees to the “Rock in Rio” – Lisboa – Portugal - 2014
 Temporary assignment of employees to the Work Construction “Tour D2 / Tour Athena” - Paris – France - 2014
 Temporary assignment of employees to the Work Construction “Hydroeletric Station of Foz do Tua” – Portugal - 2014
 Temporary assignment of employees to the Work Construction “Supermarket Leclerc – Vallauris“ – France – 2014
 Temporary assignment of employees to the Work Construction “ Residence Camieta – 386 Apartements and Parking Lot in
Urrugne” – France – 2014/2015
 Temporary assignment of employees to the Work Construction ““Ekoetxe – 38 Rue de Maignon - Anglet“ – France – 2014/2015
 Temporary assignment of employees to the Work Construction “Abaritz – 8 Rue de Pontrits - Anglet“ – France – 2014/2015
 Temporary assignment of employees to the Work Construction “Kantaldi – Chemin de Landaboure – 64990 Lahonce“ – France –
2014/2015
 Temporary assignment of employees to the Work Construction “Oree de Milaldi – 88 Avenue de la Milady - Biarritz“ – France –
2014/2015
 Temporary assignment of employees to the Work Construction “Extension du Bâtiment MONOPRIX, 8 rue Orbe, 64100
BAYONNE“ – France – 2015
For more information and updates on the PAF Group, please query our social network - Facebook:
(select one of the links - by clicking on the logo)
Additional Information
14
Thanks for taking the time to know
the services we offer and we hope we can begin
a successful and sustainable collaboration...
15

More Related Content

Viewers also liked

Presentación del grupo paf es
Presentación del grupo paf esPresentación del grupo paf es
Presentación del grupo paf esPaf Grupo
 
Popeeeeee presentation
Popeeeeee presentationPopeeeeee presentation
Popeeeeee presentationsuzieq1224
 
Pact for Strengthening Civil Peace
Pact for Strengthening Civil PeacePact for Strengthening Civil Peace
Pact for Strengthening Civil PeaceMahmoud Tarabay
 
Norinterim - Apresentação
Norinterim - ApresentaçãoNorinterim - Apresentação
Norinterim - ApresentaçãoPaf Grupo
 
sistema operativo
sistema operativo sistema operativo
sistema operativo Danny Bello
 
Apresentação - PAF (sem imagens)
Apresentação - PAF (sem imagens)Apresentação - PAF (sem imagens)
Apresentação - PAF (sem imagens)Paf Grupo
 
FUNGSI PERALATAN LABORATORIUM
FUNGSI PERALATAN LABORATORIUMFUNGSI PERALATAN LABORATORIUM
FUNGSI PERALATAN LABORATORIUMNesha Mutiara
 
Methods for recording observation
Methods for recording observationMethods for recording observation
Methods for recording observationRowena Montenegro
 
Generalidades de power point
Generalidades de power pointGeneralidades de power point
Generalidades de power pointlaurapablo
 
Agility of Building "Sawada Mansion"
Agility of Building "Sawada Mansion"Agility of Building "Sawada Mansion"
Agility of Building "Sawada Mansion"Takeshi Kakeda
 
2 u6a powerpoint
2 u6a powerpoint2 u6a powerpoint
2 u6a powerpointMmeBoucher
 

Viewers also liked (18)

Presentación del grupo paf es
Presentación del grupo paf esPresentación del grupo paf es
Presentación del grupo paf es
 
Ben c udemy_linux_command_line
Ben c udemy_linux_command_lineBen c udemy_linux_command_line
Ben c udemy_linux_command_line
 
Popeeeeee presentation
Popeeeeee presentationPopeeeeee presentation
Popeeeeee presentation
 
Pact for Strengthening Civil Peace
Pact for Strengthening Civil PeacePact for Strengthening Civil Peace
Pact for Strengthening Civil Peace
 
Norinterim - Apresentação
Norinterim - ApresentaçãoNorinterim - Apresentação
Norinterim - Apresentação
 
29 11-2011
29 11-201129 11-2011
29 11-2011
 
sistema operativo
sistema operativo sistema operativo
sistema operativo
 
Apresentação - PAF (sem imagens)
Apresentação - PAF (sem imagens)Apresentação - PAF (sem imagens)
Apresentação - PAF (sem imagens)
 
FUNGSI PERALATAN LABORATORIUM
FUNGSI PERALATAN LABORATORIUMFUNGSI PERALATAN LABORATORIUM
FUNGSI PERALATAN LABORATORIUM
 
Carta recomendacion
Carta recomendacionCarta recomendacion
Carta recomendacion
 
Алюминий қосылыстары
Алюминий қосылыстарыАлюминий қосылыстары
Алюминий қосылыстары
 
gats
gatsgats
gats
 
Die Grenzen
Die GrenzenDie Grenzen
Die Grenzen
 
Methods for recording observation
Methods for recording observationMethods for recording observation
Methods for recording observation
 
Generalidades de power point
Generalidades de power pointGeneralidades de power point
Generalidades de power point
 
Agility of Building "Sawada Mansion"
Agility of Building "Sawada Mansion"Agility of Building "Sawada Mansion"
Agility of Building "Sawada Mansion"
 
Growth & development
Growth & developmentGrowth & development
Growth & development
 
2 u6a powerpoint
2 u6a powerpoint2 u6a powerpoint
2 u6a powerpoint
 

Similar to English Presentation - PAF (no pictures)

CV-English_12 jan 2016_joana borges de carvalho GS
CV-English_12 jan 2016_joana borges de carvalho GSCV-English_12 jan 2016_joana borges de carvalho GS
CV-English_12 jan 2016_joana borges de carvalho GSJoana Borges de Carvalho GS
 
BYSTEEL presentation_EN
BYSTEEL presentation_ENBYSTEEL presentation_EN
BYSTEEL presentation_ENdstpedreiras
 
Lisbon south-bay-presentation
Lisbon south-bay-presentationLisbon south-bay-presentation
Lisbon south-bay-presentationAlberto Silva
 
Altavista Estructuras
Altavista EstructurasAltavista Estructuras
Altavista Estructurasjrubengago
 
AEP Empresas Feira BIG 5 SHOW 2018
AEP Empresas Feira BIG 5 SHOW 2018AEP Empresas Feira BIG 5 SHOW 2018
AEP Empresas Feira BIG 5 SHOW 2018AEP | INTERNACIONAL
 
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, Belgrade
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, BelgradeGabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, Belgrade
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, BelgradeNALED Serbia
 
Focus on Zinc n° 9 -VMZINC - 2005
Focus on Zinc n° 9 -VMZINC - 2005Focus on Zinc n° 9 -VMZINC - 2005
Focus on Zinc n° 9 -VMZINC - 2005VMZINC
 
Cv Interim English
Cv Interim EnglishCv Interim English
Cv Interim Englishmroseeu
 
Architectural Portfolio Silvia Peluso
Architectural Portfolio Silvia PelusoArchitectural Portfolio Silvia Peluso
Architectural Portfolio Silvia PelusoSilvia Peluso
 

Similar to English Presentation - PAF (no pictures) (20)

CV-English_12 jan 2016_joana borges de carvalho GS
CV-English_12 jan 2016_joana borges de carvalho GSCV-English_12 jan 2016_joana borges de carvalho GS
CV-English_12 jan 2016_joana borges de carvalho GS
 
BYSTEEL presentation_EN
BYSTEEL presentation_ENBYSTEEL presentation_EN
BYSTEEL presentation_EN
 
PauloCosta_CV
PauloCosta_CVPauloCosta_CV
PauloCosta_CV
 
ICT ISTROCONTI
ICT ISTROCONTIICT ISTROCONTI
ICT ISTROCONTI
 
ICT_brochure_mail
ICT_brochure_mailICT_brochure_mail
ICT_brochure_mail
 
Major Achievements List
Major Achievements ListMajor Achievements List
Major Achievements List
 
Lisbon south-bay-presentation
Lisbon south-bay-presentationLisbon south-bay-presentation
Lisbon south-bay-presentation
 
Industry 4.0. and SMEs – S3 Platform for Industrial Modernization
Industry 4.0. and SMEs – S3 Platform for Industrial ModernizationIndustry 4.0. and SMEs – S3 Platform for Industrial Modernization
Industry 4.0. and SMEs – S3 Platform for Industrial Modernization
 
Saudi Build 2019
Saudi Build 2019Saudi Build 2019
Saudi Build 2019
 
My Professional Inventory
My Professional InventoryMy Professional Inventory
My Professional Inventory
 
Altavista Estructuras
Altavista EstructurasAltavista Estructuras
Altavista Estructuras
 
AEP Empresas Feira BIG 5 SHOW 2018
AEP Empresas Feira BIG 5 SHOW 2018AEP Empresas Feira BIG 5 SHOW 2018
AEP Empresas Feira BIG 5 SHOW 2018
 
Some Works
Some WorksSome Works
Some Works
 
EU Residence (Portugal) Golden Visa Office Tower for sale
EU Residence (Portugal)  Golden Visa Office Tower for saleEU Residence (Portugal)  Golden Visa Office Tower for sale
EU Residence (Portugal) Golden Visa Office Tower for sale
 
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, Belgrade
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, BelgradeGabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, Belgrade
Gabriel Raul Pena - redevelopment of brownfields, LED Experts Forum, Belgrade
 
Focus on Zinc n° 9 -VMZINC - 2005
Focus on Zinc n° 9 -VMZINC - 2005Focus on Zinc n° 9 -VMZINC - 2005
Focus on Zinc n° 9 -VMZINC - 2005
 
Cv Interim English
Cv Interim EnglishCv Interim English
Cv Interim English
 
Portfolio12 2014 ricardo
Portfolio12 2014 ricardoPortfolio12 2014 ricardo
Portfolio12 2014 ricardo
 
jbc RESUMEE _English_jan 2016
jbc RESUMEE _English_jan 2016jbc RESUMEE _English_jan 2016
jbc RESUMEE _English_jan 2016
 
Architectural Portfolio Silvia Peluso
Architectural Portfolio Silvia PelusoArchitectural Portfolio Silvia Peluso
Architectural Portfolio Silvia Peluso
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

English Presentation - PAF (no pictures)

  • 2. PAF centers his main activity at Construction, focussing on building works but also with experience and qualified to civil works and a few and small bridges constructions. Through the combination of a large team of professionals (one hierarchical structure comprising management, engineers, commercials sales technician, administrative secretarys and a highly skilled professionals affects the works) with the technical and the high-performance equipment allow us to successfully achieve the realization of many large- scale and very complexity works, as we distinguish ourselves by the high percentage of use of own means to fulfill contracts that can be awarded. The founder of the Group, the PAF CONSTRUÇÕES LDA. was established in 2001 at Amarante a town in northern Portugal, and benefiting from the know-how and experience in construction of the founders. In a short space of time it has proven to be at the best level to stand out in the Iberian Peninsula market. Initially it has distinguished himself in the masonry activities such as plasterwork, masonry settlements, plasters, paints and other coatings on buildings, later in hydraulic works and civil works, in particular with a high degree of rise and a high turnover in the in situ execution of reinforced concrete structures progressively to reach the necessary experience and the legitimate path for the implementation of a general work contracts. Currently PAF holds the Construction Class 7 nº 57902 (authorizes to build in Portugal up to the limit of € 10.624 million by the regulatory authority of Construction). It Portugal it highlights some of the works performed in Portugal and is a true example of subcontracting held at the Basilica of Fatima, the Casa da Música in OPorto , the Estadio do Dragao and S. João Forte Conversion in the new buildings of the Municipality Council of Bragança. In Spain it was possible to conquer some territory, especially in the Basque Country, through the collaboration in numerous works, including some of the most importants such as the Tecnhiker Center for Research Technology in Eibar, the Basque Culinary Center in San Sebastian, the construction of Purifying Station in Aduna, to of the Towers of 607 Apartments in Bilbao and other numerous work contracts with much emphasis in the real state market. Over the years the Group has worked in terms of reach and take root in the Iberian Peninsula market, thus overcoming the only Portugal land border and by projecting since the year 2005 until the present day. To achieve the solidity and the trust of the customers and the market taken as aim, it was established in 2010 the NORPAF Construcciones SL. in the town of Tolosa in the Basque Country, the company that has been a reference by the works such as 96 VPO Apartments + 40 VS Apartments in Basauri, the Nuevo Pabellón Buesa Arena in Victoria Gasteiz, the construction of 90 VPO Apartments + 42 VPT Apartments in Olalde - Oiartzun, the construction of 144 Apartments VPO S. Roque in Durango and other buildings of major interest. 2
  • 3. Cementing the commitment to the European market, is was established in the year 2012, a PAF's subsidiary in Germany, PAF CONSTRUCTION LTD, GMBH, initially based in Neustadtcarrying out since then the market research and the development of some works as the Neubau AM Westpark in Munich (residential buildings). The NORINTERIM Empresa de Trabalho temporário Lda. is a Portuguese company of Temporary Work, created in 2013 and with his headquarters in Amarante, in Portugal, it has the authorization Permit nº 713/13 and is positioned strategically to the market requirements and Customer needs. This company focuses its attention on the customer satisfaction, improving its human capital, in the search for flexible and cost-effective solutions, by promoting qualitative improvement of productivity and competitiveness with a special focus on the Construction activity. The use of temporary workers is an effective response to the companies needs, such as the rapid replacement of employees, the occasional increases of activity, events and seasonal activities or non lasting projects. The Vitaleme Imobiliária Lda. is based in the city of Amarante in Portugal and is active in the field of real estate development, property management and real estate investments. 3
  • 4. PAF Construções Lda / VITALEME: Rua de S. João nº1052 4600-670 Louredo – Amarante Portugal NORINTERIM ETT Lda: Rua da Mó - Edifício Nascente Loja B Entrada 2 4600 - 595 Fregim - Amarante Portugal NORPAF Construcciones SL: Poligono Arzabalza bajo 4 20400 Tolosa – Guipuzcoa Basque Country PAF Construções Lda - Gmbh: Brandstattgasse 18 84405 Dorfen - Erding Germany LOCATION / CONTACTS / ADDRESSES / EMAIL: 4 General Administration - PAF: Tlm. +351 966185655 / +34 609291158 Email. norpafjosefrancisco@gmail.com Construction Works Direction - PAF: Tlm. +351 962243573 / +34 608787604 Email. ricardopais.grupopaf@gmail.com Administrative Services - PAF: Tel. +351 255092433 / Tlm. +351 962243574 Email. paf.amt@gmail.com / smoreira.paf@gmail.com Norinterim ETT Lda: Tel. +351 255432622 Tlm. +351 962243572 / 962243574 Email. norinterim@gmail.com
  • 5. Work designation: Brickwork - bricks and blocks - Coating and sealing of walls and ceilings Timeline of Construction Works 5  Renewal of the Arquivo Histórico do Porto - 2001  Construction of a Comercial Residence at Amarante - 2001  Renewal of the Cultural Zone in Freixo at Porto - 2001  Construction of the Health Club Holmes Place at Porto – 2002  Construction of the Women's Prison of North Santa Cruz do Bispo - 2002  Construction of the New Stadium of F.C. Porto – Dragon Stadium - 2002  Construction of the Acess Roads to the Francisco Sá Carneiro Airport - 2002  Construction of the Complex Multiusos in Arrábida at V. N. Gaia - 2002  Construction of the Station of Wastewater Treatment Bacia de Cambados – 2003  Construction of the Station of Wastewater Treatment Bacia do Rio Ferreira – 2003  Construction of the Interface of Antas – Porto Metropolitan – 2004  Construction of the Antas Station – Porto – 2004  Construction of the Bessa Stadium – Porto – 2004  Construction of a Comercial Residence at Ribeira da Pena - 2004  Construction of the Aplicação urbana II – Comercial Center at Antas - 2004  Construction of the Health Club Holmes Place at Porto – 2005  Construction of a Comercial Residence Portas de Amarante - 2005  Construction of the Comercial Center Fórum Coimbra - 2005  Construction of the Church Holy Trindade Santuary at Fátima – 2006  Construction of 12 Apartments ALFA San Andrés at Zumaia – Basque Country - 2007
  • 6. Work designation: Brickwork - bricks and blocks - Coating and sealing of walls and ceilings Timeline of Construction Works 6  Construction of 30 Apartments at Lugaritz – Donostia - Basque Country – 2007  Construction of Lot 3 Building Vila Sol Condomínio at Vila Real – 2007  Construction of 71 Apartments VPO + 35 Apartments at Tolosa - Basque Country – 2007  Construction of 54 Apartments at Extxebeltz - Basque Country – 2008  Construction of 54 Apartments VPO "Etxebeltz“ at Azpeitia - Basque Country – 2009  Construction of Mueble Center Lot 1 – URI at Irun - Basque Country – 2009  Ampliation of Zaragueta Ikastetxea (School) at Orio - Basque Country – 2012/2013 Work designation - Hydraulic Infrastructure  Work of excavation, earthworks and access tunnels Shopping Centre Antas at Porto - 2003  Contract for execution of inlet pipes and pumping systems in sub-systems in Vale of Torno and Peneireiro – Vila Flor - 2004  Work sanitation systems in the Cities Bacia do Rio Minho PART 1 - Interception Systems and elevation at Paredes de Coura, Monção and Caminha – 2004
  • 7. Work designation – General Contract Timeline of Construction Works 7  Construction of 124 Apartments venda libre + 24 Apartments Socials at Rentaria – Basque Country – 2006  Construction of a Single Family Housing building at Amarante – 2008  Construction of a Single Family Housing building at Amarante – 2008  Construction of a Single Family Housing building at Amarante – 2008  Construction of a Single Family Housing building at Amarante – 2008  Construction of Pavilion Matsaria – Eibar – Basque Country – 2009  Construction of a Single Family Housing building in Louredo at Amarante – 2011  Construction of two Villas at Penafiel – 2011 Work designation – Concrete Structures  Construction of Pavilion Voith Paper at Tolosa – Basque Country – 2005  Execution of Concrete Structure in the building of Las Terras e Juntas Miramon at Donostia - Basque Country – 2005  Construction of Santa Teresa Monasterium – Ávila – 2005  Construction of Pavilion Egiburuberri at Eibar - Basque Country – 2006  Construction of 100 Apartments at Urnieta - Basque Country – 2006  Construction of Apartments of Garibay at Donostia - Basque Country – 2006  Construction of 28 Apartments Lugaritz, Lots 12/13/14/15 at Donostia - Basque Country – 2007  Construction of Health Center of Zumaia - Basque Country – 2007  Construction of 15 Apartments at Lugaritz - Lot 6 - Basque Country – 2007  Construction of 12 Apartments ALFA San Andrés at Zumaia - Basque Country – 2007
  • 8. Work designation – Concrete Structures Timeline of Construction Works 8  Construction of 15 Apartments at Lugaritz – Lot A 300/17 - Basque Country – 2007  Construction of Pavilion E2 and E3 and Building A1 at Apata, Tolosa – Basque Country – 2007  Construction of 64 Apartments Locals y Garages – Eibar - Basque Country – 2008  Construction of 56 Apartments at Etxebeltz - Azpeitia - Basque Country – 2008  Construction of 146 Apartments at Danobat - Azkoitia - Basque Country – 2008  Construction of 106 Apartments Larramendi Tolosa - Basque Country – 2008  Construction of Vaso Central Parcela 4 – Tolosa - Basque Country – 2008  Construction of 258 Apartments at Tolosa - Basque Country – 2008  Construction of Promocion Beasain - Basque Country – 2008  Construction of the Urbanization and Building Parcelas V1,V2 y EC. Poligono Oinartxo(Azkoitia) - Basque Country – 2008  Construction of 152 Apartments at Larramendi Tolosa - Basque Country – 2008  Construction of Deusto Lot 2 Bajo rasante - Basque Country – 2008  Construction of 106 Apartments Larramendi Tolosa - Basque Country – 2008  Construction of 42 Apartments at Beasain - Basque Country – 2008  Construction of Gallery Wall at Badiolegi - Azpeitia – Basque Country – 2009  Construction of 54 Apartments VPO "Etxebeltz" - Azpeitia - Basque Country – 2009  Construction of 152 Apartments Larramendi Tolosa - Basque Country – 2009  Construction of Purifier Station in Aduna - Basque Country – 2009  Construction of148 Apartments at Tolosa - Basque Country – 2009
  • 9. Work designation – Concrete Structures Timeline of Construction Works 9  Construction of Lot 2 Sotanos Gorostidi-Voith at Tolosa - Basque Country – 2009  Construction of 50 Apartments VPO Etxebeltz R-5 – Azpeitia - Basque Country – 2010  Construction of 148 Apartments VPO Tolosa - Basque Country – 2010  Construction of Vaso Central - P2 - Basque Country – 2010  Construction of 40+40 Apartments at Tolosa - Basque Country – 2010  Construction of Basque Culinary Center lot 1Y2 at Donostia - Basque Country – 2010  Construction of 96 Apartments VPO + 40 VS at Basauri - Basque Country – 2010  Construction of 154 Apartments, Locals y Garages at Zabalgana – Vitoria Gasteiz - Basque Country – 2010  Construction of the Tecnhiker Technology Research Center at Eibar - Basque Country – 2010  Construction of 96 Apartments libres + 40 Apartments VPO at Basauri - Basque Country – 2010  Construction of 14 Apartments Etxebeltz en Azpeitia - Basque Country – 2010  Construction of 16 Apartments at Tolosa Erretengibel - Basque Country – 2010  Construction of 48 + 70 Apartments at S. Fausto Durango - Basque Country – 2011  Construction of Imbiomeden Miramon Center - Basque Country – 2011  Construction of Puente Peatonal at Tolosa - Basque Country – 2011  Construction of 111 Apartments at Aretxabaleta - Basque Country – 2011  Construction of Pavilions Guenes at Bilbao - Basque Country – 2011  Construction of the New Pavilion Buesa Arena at Victoria Gasteiz - Basque Country – 2011  Construction of 16 Apartments VPO + 36 Libres Legutiano - Basque Country – 2011  Requalification of School Center EB1 Costa Cabral 2ª Fase at Porto – 2011
  • 10. Work designation – Concrete Structures Timeline of Construction Works 10  Urban Requalification of Forte São João de Deus – Reconversion in Municipal Buildings in the City of Bragança – 2012  Construction of 25 Apartments VPO y Bajos Comerciales at San Juan - Ordizia - Basque Country – 2012  Construction of 2 Villas at Talaimendi – Zarautz - Basque Country – 2012  Construction of 60 Apartments VPO y Bajos Comerciales San Juan at Ordizia - Basque Country – 2012  Construction of 57 Apartments at Getaria - Basque Country – 2012  Construction of the New School Center Toki-Alai at Irun - Basque Country – 2012  Requalification of a Scrap Park at Ermua - Basque Country – 2012  Requalification of Bodegas Señorio Villarica en Hervías - Basque Country – 2012  Construction of Villa at Urteta – Zarautz – Basque Country – 2012  Urban Requalification (Bridge) at Olalde of Oiartzun - Basque Country – 2012  Construction of 47 Apartments at Zizurkil - Basque Country – 2012  Construction of 90+42 Apartments VPO + VPT at Olalde – Oiartzun - Basque Country – 2012  Pavilions at Poligono Atallu de Usurbil - Basque Country – 2012  Requalification of Bodegas Haro - Basque Country – 2012  Ampliation of School Center Zaragueta Ikastetxea at Orio - Basque Country – 2012  Construction of 144 Viviendas Apartments VPO S. Roque at Durango – Basque Country – 2012/2013  Construction of 115 Apartments Rag. Fase Cimentación at Bilbao – Basque Country – 2012/2013  Construction of School Center of Silvalde at Espinho – 2012 /2013  Ampliation of School Center CEP Laiotz – Segura – Basque Country - 2012  Construction Dorre Barriak 607 Apartments in Garellano – Bilbao 2012/2013
  • 11. Work designation – Concrete Structures Timeline of Construction Works 11  Ampliação de CEP Laiotz – Segura – País Vasco  Interconexión entre Ramales I y III de Abastecimiento y conducción EBAP Galarreta – Hernani – País Vasco – 2013  Construction of Neubau AM WestPark in München - Deutschland 2013  Construction of Concrete Central in Gerediaga, suporte work of the Road - Autovia Gerediaga – Elorrio – Basque Country 2013  Access Works “ Movimientos de Tierras en Epele – Bergara“ – Basque Country 2013  Accessibility improvements to the historic city of Vitoria Gasteiz – Basque Country – 2013  Construction of an Underground Parking Lot , Equipment Building at Calle Balenciaga – Getaria – Basque Country – 2013/2014  Urbanización of Area RE.7 Gorostidi –Voith – Paso inferior Calle Larramendi – Tolosa – País Vasco – 2013  Construction of 10 Houses at en Karrika, Oiartzun - Basque Country – 2013  Urbanization of 47 Apartments at Zizurkil - Basque Country - 2013  House building on Calle Arsuaga - Urrestilla - Basque Country - 2014  Earth retaining at the Work Construction of 38 apartments VPO en Peñascal - Basque Country - 2014  Urbanization at the School Center in Mungia - Basque Country - 2014  Construction of the New Superior Music Center Musikene in San Sebastian - Basque Country - 2014  Construction of 21 apartments in Azpeitia - Basque Country - 2014  House reconstruction - Winery in Gurutzeaga, Getaria - Basque Country - 2014  Pasarela building on Railroad Madrid-Irun Zabalgana in Vitoria Gasteiz - Basque Country - 2014  Construction of Store, Supermarket and Parking Mercadona Ali-Gobeo in Vitoria Gasteiz - Basque Country - 2014  Pit construction to Machine Laminadora, Implementation and support buildings in Euskalforging Factory - Sestao - Basque Country - 2014
  • 12. Work designation – Concrete Structures Timeline of Construction Works 12  Construction of 117 apartments Alduna Enea, uninvolved Rio Ermua in San Sebastian - Basque Country – 2014  Construction of 46 apartments VPO in Basauri - Basque Country - 2014  Construction of two Houses in Atotxa - San Sebastian - Basque Country - 2014  Buildings in Cantera of Sasiola en Deba - Basque Country - 2014  Intervention in the Construction of Concrete Plant assembly in Gerediaga - Elorrio - Basque Country - 2014  Urbanization in Calle Larramendi - Tolosa - País Vasco - 2014/2015  Urbanization of Poligono Lanbarren at Oiartzun - Basque Country - 2014  New Urbanization in the interior of Frederick Mayo Group - Basque Country - 2014/2015  Construction of 7 apartments and garages - IYOLA II "from Donostia - San Sebastian - Basque Country - 2014/2015  Construction of 29 Apartments and garages in Basauri - País Vasco - 2014/2015  Construction and Adaptation of a Existent Treatment Center in an Industrial Pavillion Installations of Euskalforging in Sestao - Basque Country - 2015  Construction of a Building Cancha de Balonmano and Dressing rooms in the Institute Herramienta - Elgoibar - País Vasco – 2015  Construction and Performances in Z7 of Zubieta Field in Donostia - San Sebastian - Basque Country – 2015  Construction and Reform of a Plant of Semisótano in Uvesco to Unialco - Irun - Basque Country - 2015
  • 13. Temporary Employment Agency Timeline of Construction Works 13  Temporary assignment of employees to the Work Construction “Les Terraces de L'Hippodrome” – Marseille – France – 2013  Temporary assignment of employees to the Work Construction “Villas Domaine Holten, Proprieté Bessot, Villa Neal Manuel” – Saint Tropez – France – 2013  Temporary assignment of employees to the Work Construction “340.0P - SIEMP - 10 Rue de Meaux - 75019 “ – Paris – France – 2013  Temporary assignment of employees to the Work Construction “Minerva Cais” – Gaia - Portugal - 2014  Temporary assignment of employees to the “Rock in Rio” – Lisboa – Portugal - 2014  Temporary assignment of employees to the Work Construction “Tour D2 / Tour Athena” - Paris – France - 2014  Temporary assignment of employees to the Work Construction “Hydroeletric Station of Foz do Tua” – Portugal - 2014  Temporary assignment of employees to the Work Construction “Supermarket Leclerc – Vallauris“ – France – 2014  Temporary assignment of employees to the Work Construction “ Residence Camieta – 386 Apartements and Parking Lot in Urrugne” – France – 2014/2015  Temporary assignment of employees to the Work Construction ““Ekoetxe – 38 Rue de Maignon - Anglet“ – France – 2014/2015  Temporary assignment of employees to the Work Construction “Abaritz – 8 Rue de Pontrits - Anglet“ – France – 2014/2015  Temporary assignment of employees to the Work Construction “Kantaldi – Chemin de Landaboure – 64990 Lahonce“ – France – 2014/2015  Temporary assignment of employees to the Work Construction “Oree de Milaldi – 88 Avenue de la Milady - Biarritz“ – France – 2014/2015  Temporary assignment of employees to the Work Construction “Extension du Bâtiment MONOPRIX, 8 rue Orbe, 64100 BAYONNE“ – France – 2015
  • 14. For more information and updates on the PAF Group, please query our social network - Facebook: (select one of the links - by clicking on the logo) Additional Information 14
  • 15. Thanks for taking the time to know the services we offer and we hope we can begin a successful and sustainable collaboration... 15