Interface Manager
Northeastern University, Boston, Massachusetts
M.S in Electrical Engineering, December 1980
Employment
History
04/15 –
Present
Louis Berger (Joint Venture with Hill International)
Interface and Utilities - Manager Riyadh Metro Project
Interface Manager: Reviewed Scope Split Matrices and interface documents;
Coordinate Meetings and follow-up with all concerned; Assist in resolving conflicts;
Coordinate with the ADA and agencies; Coordinate with DB interface team and Inter-
package Interface teams; Follow-up and guide subordinates; Prepare weekly and
monthly reports; Respond to letters from contractor, ADA and agencies; Finalize
Land Agreements. Coach new trainees.
Utility Manager: Review and approve Submittals; Review Procedures; Ensure
Compliance in all aspects; Coordinate and follow up meetings; Coordinate with ADA
and Agencies; Assist in resolving conflicts; Respond to letters from contractor, ADA
and agencies; Follow-up and guide subordinates; Prepare monthly reports; Supervise
sub-ordinates.
07/97 – 03/15 Saudi Oger Ltd.
Quality Assurance Manager
Saudi Arabian National Guard Housing 01/13 – Present
- Represented the project during audits conducted by client, management. Made
contact with project team members in engineering, procurement, and construction,
admin services, operations, and other project personnel, and with client and staff
quality assurance personnel.
- Reviewed quality-related procedures prepared on the project to ensure compliance
with the project quality plan.
- Trained personnel in QMS
- Recommended actions to project personnel to correct observed quality deficiencies.
- Identified quality problems, initiated documented action and verified implementation
of solutions.
Follow-up on 132 KV Grid Substation and OHL
Relocation
QA/QC Manager 01/01 – 12/12
Facility Management Division - Head Office in Riyadh, KSA
Revise, update and implement the Division Quality System; write new procedures;
coordinate and follow up internal auditing programs; and revise/ coordinate
internal training and conduct Quality Management System (QMS) training
programs.
Coordinated Saudi Nationals Training. Took special assignments from Division
Manager. Two long missions as indicated below.
KAUST (Long Mission) 03/09 – 06/10
Policies & Procedures, Tasks Lists, O&M Manuals and Handing Over issues
UAE University Al-Ain (Long Mission) 03/08 -03/09
Led team to Prepare and review O&M Manuals, spare parts, special tools,
2. Maintenance Programs and training
Regional Technical Manager (MEP) 05/99 – 12/00
Eastern Region Office, KSA
Coordinated and followed up all works related to all technical disciplines in the
Region.
Computerized Maintenance and ISO 9001 07/98 – 04/99
Western Region Office, KSA
In charge of checking, reviewing and updating all computerized maintenance data and
records. Coordinated and followed up internal auditing programs.
Unit Technical Superintendent 07/97 – 06/98
Western Region, KSA
Coordinated and followed up works related to all technical disciplines in the Unit.
08/84 – 06/97 Saudi Services For Electro Mechanical Works Co., Ltd.,
Riyadh, Kingdom of Saudi Arabia
Al-Rashid Shopping Mall, Al-Khobar, KSA 07/90 – 06/97
Position: Project Electrical Engineer
Worked on Design, Engineering, Procurement, Commissioning, Operation &
Maintenance of the following electrical system:
Medium voltage (Full), Low Voltage (Full) Lighting (Full), CCTV (Coordination),
PA (Coordination), Fire Alarm (Coordination). My most emphasis had been on the
BMS. Prepared and updated points list based on all electrical drawings and
coordination with the suppliers. Wrote sequences and discussed there implementation
with the BMS supplier; participated in database generation; added control points;
modified and upgraded sequences and processes; and trouble shooting (medium level
sophisticated problems). Checked and upgraded the database of the Computerized
Maintenance Management program.
Makkah-Taif Water Transmission Project, KSA 06/88-06/90
Position: Station-in-Charge O & M Engineer
Automatic operation of plant from station control. Maintenance and trouble shooting
of the following: Surge vessel, cooling tower, motor-pump temperature alarm,
vibration alarm, pressure control valves, flow control valves, pressure transmitters,
medium and low voltage panels.
Riyadh Water Extension Project, KSA 05/86-05/88
Position: Field Electrical Engineer
Worked on start-up of motor-pump sets; testing of transformers, motors, MV and LV
panels; calibration of flow meters and level transmitters; as-built drawings and
manuals.
Government Complex, Hail, KSA 08/84-05/86
Position: Field Electrical Engineer / Asst. Project Manager
Interpreted specifications, developed drawings, implemented specification and
drawings, ordered materials, coordinated with main office, subcontractors &
consultant; participated in training, testing and commissioning; worked on Operation
3. & Maintenance Manuals, spare parts and as-built drawings.
04/82-12/82 GILBERT ASSOCIATES, INC., Reading Pennsylvania, USA
Position: Electrical Engineer
Pennsylvania Electric Projects. Wrote or revised equipment specification on the
following: Two speed motors, transformers (230 kV to 13.8 kV), and medium voltage
switchgear. Developed balanced Draft Conversion Electrical System Descriptions;
studied fault current, voltage drop and voltage regulation systems; made, reviewed,
and checked several systems, including elementaries, wiring diagrams and control
panel development.
01/81-01/82 UNITED ENGINEERS AND CONSTRUCTORS, INC
Philadelphia, Pennsylvania, USA
Position: Electrical Engineer
Brunswick Steam Electrical Plant Project 04/81-03/81 wrote or revised equipment
specifications for a variety of nuclear related equipment. Reviewed miscellaneous
electrical drawings.
Seabrook Project 01/81-03/81
Revised several System Descriptions; Worked on cable pulling calculations, lighting
calculations, battery and charger sizing; supported construction and start-up groups in
conducting review of system wiring diagrams, loops and termination.
04/80-09/80 CONCORD MUNICIPAL LIGHT PLANT,
Concord, Massachusetts, USA
Position: Electrical Engineer in Training
Investigation and balancing primary circuit loads, power factor correction,
underground distribution; analysis of system demand kW, KVAR, KVA and power
factor; updating primary distribution circuit maps; drafting for small construction
projects.
Skills: Took several courses in the Technical Field, Project Management, Quality
Management & Processes, Maintenance Management,
Good communication, took several courses in soft skills and MS Office