Key Considerations 
Library Site Location 
a. The center of our City is our Downtown, Courthouse Square 
b. An ideal location maintains the Library as part of the downtown fabric 
c. Promotes a Walkable and Active Civic Center and Downtown Community 
d. Supports the Catalytic Downtown Revitalization Efforts of Jasper 
e. Enhances opportunities for collaboration and partnerships among agencies 
Annex 
a. Bonus space, but not conducive for maximized library use and benefit 
b. Poorly incorporates into the functionality of a library, but could serve as auxiliary space 
c. Provides additional parking space that serve library staff and patrons 
d. Ideally, staff resources should be integrated rather than separated from core building space; 
 If all functions desired by the library can be achieved in the new facility, the Board 
will need to determine how the Annex can best provide value to the library 
Size Recommendations: Key areas of focus for new building nonexistent today^: 
Areas of Expansion Needed 
(Approximate) 
Current 
(Square Feet) 
Future 
(Square Feet) 
Young Adults & Adult Collection 
— Shelving, Aisles, etc. 
5,152 
8,800 
Circulation Desk, Workspace, and Cataloging 1,450 4,500 
Children’s Collection 
1,224 
4,100 
– Shelving, Aisles, etc. 
Program Areas 
– Reading Room, Programs/Projects Space 
768 
1,300 
Public Common Areas 
– Meeting Rooms and Common Areas 
882 
4,500 
Common Library Space 
– Computer Lab, Study Rooms, etc. 
556 
1,800 
Common Collections 
– Periodicals, Music, DVD, etc. 
480 
2,000 
Genealogy 500 1,000 
11,012 
Total Calculated Square Feet 
Square Feet 
28,000 
Square Feet 
 Addresses volume of circulation (260,000+) in 2013 by patrons use of materials, which is 3rd in the State 
per population base, providing this component of the library is vital to sustain and support. 
 Flex meeting and program rooms are designed to promote and support appox. 550 programs and events 
in 2014 (Educational, Entertainment, Training, Presentations), which demonstrates capacity and need. 
 ^These estimates exclude additional basement storage (approximately 2,000 sq. ft)
Key Considerations Cont. 
Collaboration with Arts (or similar agencies) 
a. Identify opportunities to collaborate on services and shared community space 
b. Potential to enhance programming, presentations, and shared talents among agencies 
c. Exemplifies a synergy of public agencies and organizations working together 
d. Brings a cost-savings value and generates unique funding opportunities 
e. Shared staff resources are viable where shared building space is considered 
Projecting Expenses: Limiting Taxpayers Burden, 
Maximizing Charitable Investment 
a. Board needs to identify the maximum costs that should be incurred for overall project 
b. Identify the scope in which it really impacts on an individual basis 
 Can this project be completed for $5 million with 3, 5, or 10 year projects planned as 
part of long-range vision and expansion planning? 
c. Demonstrate clear consensus and public support for the referendum 
 Align key endorsements, charitable investments in the project, and 
a positive understanding of how the tax assessment impact and benefit all 
 Example: A $6.5 million bond costs the average tax payer less than $4/month: 
Less than the average subscription to Netflix (similar services offered by your Library). 
d. Endowment capabilities for future sustainability and Friends of the Library fund raising goals should 
capitalize on fund raising potential to maximize philanthropic interests and limit tax-payers burden 
Site Specific Location Options 
a. Current Location: Build New Library (1116 Main Street) 
 Single Phase: Demo the existing structure and build new on library site 
 Two phase: Build toward Main Street on open land, then demo existing site 
b. Hoosier Desk (Mill Street) 
 As rendered by City Visions, whereas the back becomes retrofitted as the front entrance 
due to location of adequate parking and proper entrance for patrons to enter the building. 
 This provides ample space to configure for library needs, a mix of private/public ventures, 
and shared space concepts 
 Requires collaboration of private/public venture to effectively utilize 130,000 sq. ft. 
c. South Newton 
 Expands downtown area, utilizes donated land, and serves as integral step toward 
development on both sides of our riverfront for commercial and living accommodations. 
 Option may consider collaboration with Arts as an enhancement to its viability
CURRENT LOCATION 
(1116 MAIN ST) 
Site Location 
Benefits 
• Stays in same location in downtown vicinity (0.3 miles to downtown square) 
• Utilizes the Library grounds in most effective manner at no additional cost of land ownership 
• Strong community support for the Library’s current location 
• Contributes to the overall City Redevelopment Plan of an expanding and flourishing downtown 
Obstacles 
• Liability associated with remaining open at current site during construction 
OR costs to relocate if the library moves to a temporary site during construction 
• Unfavorable engineering reports of current building if desired to expand or utilize any existing 
portion of the building as part of the new building 
• Requires thoughtful land acquisition planning if future expansion is considered as part of long-range 
(10-25 years) OR thoughtful planning and consideration of feasibility and practicality of 
building up, not out (second story consideration) 
• Parking must be reconfigured to assure maximum gain for additional programmatic services 
Parking 
Considerations 
• Could incorporate angled parking, a parking lot in place of existing building if new building 
located toward Main Street, or closure of a side street to accommodate more parking 
• Current ordinance requires one spot per 400 sq ft 
• 28,000 sq ft building, requirement would be 70 spots 
• Variance possible from city to remove/change restriction 
• Add parking by purchasing nearby properties 
• Change street configuration to allow angled parking/one way side streets 
• Close down either 11th or 12th street completely 
• Annex provides 15 offsite parking spots 
Current/Future Budget 
 Utilities 
o New building/equipment much more efficient than current equipment 
o Past documentation shows costs would not rise significantly
Current/Future Budget cont. 
 Staffing 
o Believe staffing would not need to increase in main building if built as a one story design 
o Unknown on cost of annex staffing; depends on utilization plan 
 Repairs 
o Significant costs on current building to maintain status quo 
o Annex is costing more than expected to maintain 
Size Recommendations (See Key Considerations sheet) 
SINGLE PHASE VS. TWO PHASE CONSTRUCTION 
Single Phase Construction (Demolish existing library and move operations to temporary location) 
Benefits 
• Liability concerns limited by removing library services from construction site 
• Additional land may not have to be purchased if library is in another location during construction 
• Construction can move much quicker without the vehicle and people traffic that 
• Could result from the library staying open at current location during construction 
• Shift of services to other locations. Focus more on branches during construction 
Obstacles 
• Temporary location could be needed for approximately 18 months 
• Additional cost of moving collection twice 
• Temporary building site must meet Indiana Code and Library Standards 
• Limited amount of collection available 
Two Phase Construction (Library stays open at current site while part of the building is built, then moves into 
new part while the old building is demolished.) 
Benefits 
• Would require only one move for library equipment and books 
• A temporary location would not be needed 
• Limits the time library would need to be closed during moves 
• Moving across the park is a lot easier than moving across town 
• Shift of services to other locations. Focus more on other branches during construction 
Obstacles 
• Most likely necessary to buy additional property (land adjacent) 
OR shut down streets for construction staging 
• Parking during construction extremely limited 
• Liability concerns with public entering a construction site 
• Collection may be limited during construction
Annex 
• 6,800 sq ft when including all three floors 
• Only 1st floor is handicap accessible 
o If any significant work is done to building, the entire building must become ADA 
compliant 
• Library personnel offices 
o Current staff in Annex includes Director, Bookkeeper and IT Manager 
o Plans to also move Centralized Cataloging to Annex by end of 2014 
• Meeting Rooms 
o Income possibilities 
o Not enough area for a “large meeting room” for special programs over 50 people 
o Look for another property to rent or borrow for large library programs approximately 10 
times a year if new plans do not include large meeting room 
• Tutoring/Quiet Study Space 
o Alleviate some congestion and table space in main library 
o Need to decide on consistent hours for study space 
• Parking 
o Provides 15 additional off street parking spaces to library 
Total Project Cost 
 Considerations 
o Demolition of current building 
o Purchasing additional property (if necessary) 
o Cost from city to buy current land 
o Renting temporary space (if necessary) 
o Tax increases 
o Referendum costs 
o Fundraising 
o Current cash on hand for project 
CURRENT LOCATION 
(1116 MAIN ST)
HOOSIER DESK 
(MILL ST) 
Site Locations 
Benefits 
• Library stays downtown (0.3 miles to downtown square) 
• Up to 130,000 square feet available at the site to accommodate a private and public 
partnership of repurposing this relatively empty warehouse in our downtown community 
• Contributes to the overall City Revitalization Plan to repurpose old and unused buildings 
in the downtown footprint 
• Provides a natural collaboration between the library and arts, which could lead to many 
shared spaces to save on costs for all parties involved 
• City Vision has detailed plans (see Memo) on how the library could fit into 
redevelopment plans and meet civic and community needs (such as Library) 
• Only one move required with very little time of library being closed to public 
• Connects Library with our history and heritage inside a wood manufacturing building 
Obstacles 
• Unknown costs to purchase building (or part of building) and renovate 
- Requires additional private negotiations among all parties 
• Engineering and architectural plans required before any definitive plan is developed 
• Requires an evaluation of what services and programmatic space could be shared, 
which requires defined costs structures and shared costs estimates among agencies 
• Several common areas might require larger footprint if servicing two agencies 
• Requires private investment to accommodate full 130,000 sq ft or lead public agency to 
oversee the project outside the Library’s purpose or scope 
Parking 
Considerations 
• Parking is in rear of building so likely that would become main entrance 
• Large parking area could be accommodated with proper paving and shared costs for 
public-private mix use 
Current/Future Budget 
• Utilities 
o Older building so costs could be significant to repair/replace 
o How are the utilities divided between shared spaces?
Current/Future Budget cont. 
• Staffing 
o Staffing needs would depend on how the library is designed 
o Unknown on cost of annex staffing; depend building utilization 
• Repairs 
o Requires cost-sharing defined protocol for common / shared spaces 
o Building would be remodeled but an older structure remains 
• Income potential 
o Renting out extra space for private investors 
o Meeting room rental 
o Repurposed civic use could lead to additional interests for common space 
Size Recommendations (See Key Considerations sheet) 
Annex (Same considerations for Hoosier Desk and South Newton sites) 
• Cost analysis would be needed to see if building still is feasible for library to own if 
library is no longer located at existing site 
• Could be used to house collections such as genealogy but at added cost due to extra 
staffing needed 
• If staff all move to new building, the current offices could be opened up as a large 
meeting room 
• Possibility of library renting out property to other businesses 
• Renovations are limited due to ADA laws and historical building status 
Total Project Cost 
• Considerations 
o Purchase cost of the Hoosier Desk building 
o Engineering and Architectural designs 
o Possibility of grants due to revitalization project 
o Current building reverts to city if the library leaves 
o Tax increases 
o Referendum costs 
o Fundraising 
o Current cash on hand for project 
HOOSIER DESK 
(MILL ST)
SOUTH NEWTON 
Site Location 
Benefits 
• Library stays downtown (0.4 miles to downtown square) 
• Land would be donated if it meets necessary appraisal value 
• Contributes to the overall City Revitalization Plan of an expanding and flourishing 
downtown to both sides of the river 
• Could serve as another possibility for a library/arts collaboration 
• Only one move required with very little time of library being closed to public 
• Potentially could highlight its proximity to Riverwalk, which is a highly favorable 
community asset that was once viewed as “undesirable territory” or outside the 
visionary scope to be classified as a downtown community asset 
Obstacles 
• Overcoming past failures of the site could be a challenging proposition 
• Need city’s help to improve infrastructure to make the site more accessible by means 
other than motor vehicle 
• Requires an evolved perception that “south of the river” is relevant and viable expansion 
of downtown vision and area of interest 
• If the library built on this site, would other businesses follow and make area flourish? 
• Address the stigma that this site is “too close to the jail” 
• What happens if land does not appraise for necessary amount 
• Could land still be donated to Library even if this option does not proceed? 
o Hence, the library could leverage the gift for resale as part of endowment building 
program or immediate building needs 
Parking 
Considerations 
• Plenty of land available for off-street parking lot 
Current/Future Budget 
• Utilities 
o New building would be much more efficient than current building 
o Cost of adding utilities to build site
Current/Future Budget cont. 
• Staffing 
o Staffing needs would depend on how the library is designed but should be able to 
meet needs with current staff with a one-floor design 
o Unknown on cost of annex staffing; depends on how building would be utilized 
• Repairs 
o Should be minimal due to new construction 
Size Recommendations (See Key Considerations sheet) 
Annex (Same considerations for Hoosier Desk and South Newton sites) 
• Cost analysis would be needed to see if building still is feasible for library to own if 
library is no longer located at existing site 
• Could be used to house collections such as genealogy but at added cost due to extra 
staffing needed 
• If staff all moves to new building, the current offices could be opened up as a large 
meeting room 
• Possibility of library renting out property to other businesses 
• Renovations are limited due to ADA laws and historical building status 
Total Project Cost 
• Considerations 
o Land Donation-appraisal contingency 
o Engineering and Architectural designs 
o Collaborative efforts 
o Current building reverts to city if the library leaves 
o Tax increases 
o Referendum costs 
o Fundraising 
o Current cash on hand for project 
SOUTH NEWTON

More Related Content

What's hot

Oak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor PlanOak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor Planpublicinvolvement
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summarypublicinvolvement
 
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County Judicial (Massey) Complex Master Plan 12/10/20
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County
 
7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummit7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummitNICHI_USA
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open Housepublicinvolvement
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Councilpublicinvolvement
 
Car Park Design- David tittle, Design Review
Car Park Design- David tittle, Design ReviewCar Park Design- David tittle, Design Review
Car Park Design- David tittle, Design ReviewDesign South East
 
Non-Residential Architectural Standards Ordinance Amendment
Non-Residential Architectural StandardsOrdinance AmendmentNon-Residential Architectural StandardsOrdinance Amendment
Non-Residential Architectural Standards Ordinance AmendmentCity of College Station
 
Massey Complex Briefing - ARB Jan. 10, 2019
Massey Complex Briefing - ARB Jan. 10, 2019Massey Complex Briefing - ARB Jan. 10, 2019
Massey Complex Briefing - ARB Jan. 10, 2019Fairfax County
 
Bluebonnet Circle Proposal
Bluebonnet Circle Proposal Bluebonnet Circle Proposal
Bluebonnet Circle Proposal GrantMoore
 
PYP_APA draft Final ZAC
PYP_APA draft Final ZACPYP_APA draft Final ZAC
PYP_APA draft Final ZACZachary Lette
 
Massey Complex Master Plan Briefing Oct. 2017
Massey Complex Master Plan Briefing Oct. 2017Massey Complex Master Plan Briefing Oct. 2017
Massey Complex Master Plan Briefing Oct. 2017Fairfax County
 
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...DC Department of General Services
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forumpublicinvolvement
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open Housejseattle
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationpublicinvolvement
 

What's hot (18)

Oak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor PlanOak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor Plan
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County Judicial (Massey) Complex Master Plan 12/10/20
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20
 
7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummit7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummit
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Car Park Design- David tittle, Design Review
Car Park Design- David tittle, Design ReviewCar Park Design- David tittle, Design Review
Car Park Design- David tittle, Design Review
 
Non-Residential Architectural Standards Ordinance Amendment
Non-Residential Architectural StandardsOrdinance AmendmentNon-Residential Architectural StandardsOrdinance Amendment
Non-Residential Architectural Standards Ordinance Amendment
 
Massey Complex Briefing - ARB Jan. 10, 2019
Massey Complex Briefing - ARB Jan. 10, 2019Massey Complex Briefing - ARB Jan. 10, 2019
Massey Complex Briefing - ARB Jan. 10, 2019
 
Bluebonnet Circle Proposal
Bluebonnet Circle Proposal Bluebonnet Circle Proposal
Bluebonnet Circle Proposal
 
PYP_APA draft Final ZAC
PYP_APA draft Final ZACPYP_APA draft Final ZAC
PYP_APA draft Final ZAC
 
Massey Complex Master Plan Briefing Oct. 2017
Massey Complex Master Plan Briefing Oct. 2017Massey Complex Master Plan Briefing Oct. 2017
Massey Complex Master Plan Briefing Oct. 2017
 
Oh workshop02 full_final
Oh workshop02 full_finalOh workshop02 full_final
Oh workshop02 full_final
 
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
successful applications of project visualization
successful applications of project visualizationsuccessful applications of project visualization
successful applications of project visualization
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 

Viewers also liked

AADDDDVVVCCC
AADDDDVVVCCCAADDDDVVVCCC
AADDDDVVVCCCst6
 
Chinese tax calculator presentation
Chinese tax calculator presentationChinese tax calculator presentation
Chinese tax calculator presentationFrederic Normand
 
Jasper public meeting 2 final aug_20_2013
Jasper public meeting 2 final aug_20_2013Jasper public meeting 2 final aug_20_2013
Jasper public meeting 2 final aug_20_2013Matthew Crane
 
Jasper Economic Development Plan draft
Jasper Economic Development Plan draftJasper Economic Development Plan draft
Jasper Economic Development Plan draftMatthew Crane
 
Glv 2012 Volunteering Legacy Get, Set Go! Legacy Timeline
Glv 2012 Volunteering Legacy Get, Set Go! Legacy TimelineGlv 2012 Volunteering Legacy Get, Set Go! Legacy Timeline
Glv 2012 Volunteering Legacy Get, Set Go! Legacy Timelineglv2012
 
Jasper High School Business Professionals of America state results
Jasper High School Business Professionals of America state resultsJasper High School Business Professionals of America state results
Jasper High School Business Professionals of America state resultsMatthew Crane
 
Item performance calculator presentation
Item performance calculator   presentationItem performance calculator   presentation
Item performance calculator presentationFrederic Normand
 
161 clearchanne
161  clearchanne161  clearchanne
161 clearchannefinance31
 
Structural assessments of Hoosier Desk
Structural assessments of Hoosier DeskStructural assessments of Hoosier Desk
Structural assessments of Hoosier DeskMatthew Crane
 
Jpl site recommendations (2).pptx 3
Jpl site recommendations (2).pptx 3Jpl site recommendations (2).pptx 3
Jpl site recommendations (2).pptx 3Matthew Crane
 
CÔNG TY LUẬT UY TÍN
CÔNG TY LUẬT UY TÍNCÔNG TY LUẬT UY TÍN
CÔNG TY LUẬT UY TÍNSBLAW
 
Power point for vote centers
Power point for vote centersPower point for vote centers
Power point for vote centersMatthew Crane
 
189 clearchanne
189  clearchanne189  clearchanne
189 clearchannefinance31
 

Viewers also liked (16)

AADDDDVVVCCC
AADDDDVVVCCCAADDDDVVVCCC
AADDDDVVVCCC
 
Βάπτιση
ΒάπτισηΒάπτιση
Βάπτιση
 
Chinese tax calculator presentation
Chinese tax calculator presentationChinese tax calculator presentation
Chinese tax calculator presentation
 
Jasper public meeting 2 final aug_20_2013
Jasper public meeting 2 final aug_20_2013Jasper public meeting 2 final aug_20_2013
Jasper public meeting 2 final aug_20_2013
 
Jasper Economic Development Plan draft
Jasper Economic Development Plan draftJasper Economic Development Plan draft
Jasper Economic Development Plan draft
 
Glv 2012 Volunteering Legacy Get, Set Go! Legacy Timeline
Glv 2012 Volunteering Legacy Get, Set Go! Legacy TimelineGlv 2012 Volunteering Legacy Get, Set Go! Legacy Timeline
Glv 2012 Volunteering Legacy Get, Set Go! Legacy Timeline
 
Jasper High School Business Professionals of America state results
Jasper High School Business Professionals of America state resultsJasper High School Business Professionals of America state results
Jasper High School Business Professionals of America state results
 
Item performance calculator presentation
Item performance calculator   presentationItem performance calculator   presentation
Item performance calculator presentation
 
161 clearchanne
161  clearchanne161  clearchanne
161 clearchanne
 
Gz
GzGz
Gz
 
Structural assessments of Hoosier Desk
Structural assessments of Hoosier DeskStructural assessments of Hoosier Desk
Structural assessments of Hoosier Desk
 
Jpl site recommendations (2).pptx 3
Jpl site recommendations (2).pptx 3Jpl site recommendations (2).pptx 3
Jpl site recommendations (2).pptx 3
 
CÔNG TY LUẬT UY TÍN
CÔNG TY LUẬT UY TÍNCÔNG TY LUẬT UY TÍN
CÔNG TY LUẬT UY TÍN
 
Power point for vote centers
Power point for vote centersPower point for vote centers
Power point for vote centers
 
189 clearchanne
189  clearchanne189  clearchanne
189 clearchanne
 
Boost TS/TX
Boost TS/TXBoost TS/TX
Boost TS/TX
 

Similar to Jasper Library Site Recommendations Handouts update 091114

Delmont Gardens Branch Renovation Project
Delmont Gardens Branch Renovation ProjectDelmont Gardens Branch Renovation Project
Delmont Gardens Branch Renovation ProjectAndrew Tadman
 
West district library presentation
West district library presentationWest district library presentation
West district library presentationottawapubliclibrary
 
Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010librarygrl3
 
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Fairfax County
 
Capital Facilities Committee 100201rev
Capital Facilities Committee 100201revCapital Facilities Committee 100201rev
Capital Facilities Committee 100201revguest160db3
 
SCONUL Library Design Award
SCONUL Library Design AwardSCONUL Library Design Award
SCONUL Library Design AwardStephen Town
 
Fairfax County Building Repositioning Presentation
Fairfax County Building Repositioning PresentationFairfax County Building Repositioning Presentation
Fairfax County Building Repositioning PresentationFairfax County
 
Sb4all Ord Cmt Letter
Sb4all Ord Cmt LetterSb4all Ord Cmt Letter
Sb4all Ord Cmt Lettersteveyates
 
ULI Atlanta, Constitution Building TAP Report 3.10.16
ULI Atlanta, Constitution Building TAP Report 3.10.16ULI Atlanta, Constitution Building TAP Report 3.10.16
ULI Atlanta, Constitution Building TAP Report 3.10.16Ellen Ray
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Fairfax County
 
High Density and Large Scale Mixed Use
High Density and Large Scale Mixed UseHigh Density and Large Scale Mixed Use
High Density and Large Scale Mixed UseRajesh Kolli
 
portfolio.compressed
portfolio.compressedportfolio.compressed
portfolio.compressedDonald Olsen
 
Soe community meeting 10-30-18
Soe community meeting   10-30-18Soe community meeting   10-30-18
Soe community meeting 10-30-18DCPublicLibrary
 
Confronting the-future
Confronting the-futureConfronting the-future
Confronting the-futureLinda Eckersen
 

Similar to Jasper Library Site Recommendations Handouts update 091114 (20)

Delmont Gardens Branch Renovation Project
Delmont Gardens Branch Renovation ProjectDelmont Gardens Branch Renovation Project
Delmont Gardens Branch Renovation Project
 
Award-Winning Libraries
Award-Winning LibrariesAward-Winning Libraries
Award-Winning Libraries
 
West district library presentation
West district library presentationWest district library presentation
West district library presentation
 
Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010
 
Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
A5 Form Based Codes
 
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)
 
Capital Facilities Committee 100201rev
Capital Facilities Committee 100201revCapital Facilities Committee 100201rev
Capital Facilities Committee 100201rev
 
SCONUL Library Design Award
SCONUL Library Design AwardSCONUL Library Design Award
SCONUL Library Design Award
 
Wadleigh Memorial Library Building Project
Wadleigh Memorial Library Building ProjectWadleigh Memorial Library Building Project
Wadleigh Memorial Library Building Project
 
Fairfax County Building Repositioning Presentation
Fairfax County Building Repositioning PresentationFairfax County Building Repositioning Presentation
Fairfax County Building Repositioning Presentation
 
Sb4all Ord Cmt Letter
Sb4all Ord Cmt LetterSb4all Ord Cmt Letter
Sb4all Ord Cmt Letter
 
ULI Atlanta, Constitution Building TAP Report 3.10.16
ULI Atlanta, Constitution Building TAP Report 3.10.16ULI Atlanta, Constitution Building TAP Report 3.10.16
ULI Atlanta, Constitution Building TAP Report 3.10.16
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
 
Project Name
 Project Name                                       Project Name
Project Name
 
High Density and Large Scale Mixed Use
High Density and Large Scale Mixed UseHigh Density and Large Scale Mixed Use
High Density and Large Scale Mixed Use
 
portfolio.compressed
portfolio.compressedportfolio.compressed
portfolio.compressed
 
Soe community meeting 10-30-18
Soe community meeting   10-30-18Soe community meeting   10-30-18
Soe community meeting 10-30-18
 
Confronting the-future
Confronting the-futureConfronting the-future
Confronting the-future
 

More from Matthew Crane

Dubois county justice project discussion
Dubois county justice project discussionDubois county justice project discussion
Dubois county justice project discussionMatthew Crane
 
Dubois County School Reopening framework
Dubois County School Reopening frameworkDubois County School Reopening framework
Dubois County School Reopening frameworkMatthew Crane
 
Together We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening CampaignTogether We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening CampaignMatthew Crane
 
Dccf report to the public 2019
Dccf report to the public 2019Dccf report to the public 2019
Dccf report to the public 2019Matthew Crane
 
Jasper by the numbers 2019
Jasper by the numbers 2019Jasper by the numbers 2019
Jasper by the numbers 2019Matthew Crane
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan finalMatthew Crane
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan finalMatthew Crane
 
2018 Jasper State of the City
2018 Jasper State of the City2018 Jasper State of the City
2018 Jasper State of the CityMatthew Crane
 
2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costs2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costsMatthew Crane
 
Complete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility studyComplete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility studyMatthew Crane
 
Northeast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibilityNortheast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibilityMatthew Crane
 
Jasper Cabinet River Centre project
Jasper Cabinet River Centre projectJasper Cabinet River Centre project
Jasper Cabinet River Centre projectMatthew Crane
 
2015 Huntingburg State of the City
2015 Huntingburg State of the City2015 Huntingburg State of the City
2015 Huntingburg State of the CityMatthew Crane
 
Hoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimatesHoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimatesMatthew Crane
 
Final Dubois County housing strategies
Final Dubois County housing strategiesFinal Dubois County housing strategies
Final Dubois County housing strategiesMatthew Crane
 
Structural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversionStructural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversionMatthew Crane
 
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth StreetHuntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth StreetMatthew Crane
 
Hoosier desk landscape concepts
Hoosier desk landscape conceptsHoosier desk landscape concepts
Hoosier desk landscape conceptsMatthew Crane
 
Hoosier desk landscape concepts
Hoosier desk landscape conceptsHoosier desk landscape concepts
Hoosier desk landscape conceptsMatthew Crane
 

More from Matthew Crane (20)

Dubois county justice project discussion
Dubois county justice project discussionDubois county justice project discussion
Dubois county justice project discussion
 
Dubois County School Reopening framework
Dubois County School Reopening frameworkDubois County School Reopening framework
Dubois County School Reopening framework
 
Together We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening CampaignTogether We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening Campaign
 
Dccf report to the public 2019
Dccf report to the public 2019Dccf report to the public 2019
Dccf report to the public 2019
 
Jasper by the numbers 2019
Jasper by the numbers 2019Jasper by the numbers 2019
Jasper by the numbers 2019
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
2018 Jasper State of the City
2018 Jasper State of the City2018 Jasper State of the City
2018 Jasper State of the City
 
Dubois
DuboisDubois
Dubois
 
2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costs2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costs
 
Complete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility studyComplete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility study
 
Northeast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibilityNortheast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibility
 
Jasper Cabinet River Centre project
Jasper Cabinet River Centre projectJasper Cabinet River Centre project
Jasper Cabinet River Centre project
 
2015 Huntingburg State of the City
2015 Huntingburg State of the City2015 Huntingburg State of the City
2015 Huntingburg State of the City
 
Hoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimatesHoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimates
 
Final Dubois County housing strategies
Final Dubois County housing strategiesFinal Dubois County housing strategies
Final Dubois County housing strategies
 
Structural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversionStructural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversion
 
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth StreetHuntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
 
Hoosier desk landscape concepts
Hoosier desk landscape conceptsHoosier desk landscape concepts
Hoosier desk landscape concepts
 
Hoosier desk landscape concepts
Hoosier desk landscape conceptsHoosier desk landscape concepts
Hoosier desk landscape concepts
 

Recently uploaded

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 

Recently uploaded (13)

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 

Jasper Library Site Recommendations Handouts update 091114

  • 1. Key Considerations Library Site Location a. The center of our City is our Downtown, Courthouse Square b. An ideal location maintains the Library as part of the downtown fabric c. Promotes a Walkable and Active Civic Center and Downtown Community d. Supports the Catalytic Downtown Revitalization Efforts of Jasper e. Enhances opportunities for collaboration and partnerships among agencies Annex a. Bonus space, but not conducive for maximized library use and benefit b. Poorly incorporates into the functionality of a library, but could serve as auxiliary space c. Provides additional parking space that serve library staff and patrons d. Ideally, staff resources should be integrated rather than separated from core building space;  If all functions desired by the library can be achieved in the new facility, the Board will need to determine how the Annex can best provide value to the library Size Recommendations: Key areas of focus for new building nonexistent today^: Areas of Expansion Needed (Approximate) Current (Square Feet) Future (Square Feet) Young Adults & Adult Collection — Shelving, Aisles, etc. 5,152 8,800 Circulation Desk, Workspace, and Cataloging 1,450 4,500 Children’s Collection 1,224 4,100 – Shelving, Aisles, etc. Program Areas – Reading Room, Programs/Projects Space 768 1,300 Public Common Areas – Meeting Rooms and Common Areas 882 4,500 Common Library Space – Computer Lab, Study Rooms, etc. 556 1,800 Common Collections – Periodicals, Music, DVD, etc. 480 2,000 Genealogy 500 1,000 11,012 Total Calculated Square Feet Square Feet 28,000 Square Feet  Addresses volume of circulation (260,000+) in 2013 by patrons use of materials, which is 3rd in the State per population base, providing this component of the library is vital to sustain and support.  Flex meeting and program rooms are designed to promote and support appox. 550 programs and events in 2014 (Educational, Entertainment, Training, Presentations), which demonstrates capacity and need.  ^These estimates exclude additional basement storage (approximately 2,000 sq. ft)
  • 2. Key Considerations Cont. Collaboration with Arts (or similar agencies) a. Identify opportunities to collaborate on services and shared community space b. Potential to enhance programming, presentations, and shared talents among agencies c. Exemplifies a synergy of public agencies and organizations working together d. Brings a cost-savings value and generates unique funding opportunities e. Shared staff resources are viable where shared building space is considered Projecting Expenses: Limiting Taxpayers Burden, Maximizing Charitable Investment a. Board needs to identify the maximum costs that should be incurred for overall project b. Identify the scope in which it really impacts on an individual basis  Can this project be completed for $5 million with 3, 5, or 10 year projects planned as part of long-range vision and expansion planning? c. Demonstrate clear consensus and public support for the referendum  Align key endorsements, charitable investments in the project, and a positive understanding of how the tax assessment impact and benefit all  Example: A $6.5 million bond costs the average tax payer less than $4/month: Less than the average subscription to Netflix (similar services offered by your Library). d. Endowment capabilities for future sustainability and Friends of the Library fund raising goals should capitalize on fund raising potential to maximize philanthropic interests and limit tax-payers burden Site Specific Location Options a. Current Location: Build New Library (1116 Main Street)  Single Phase: Demo the existing structure and build new on library site  Two phase: Build toward Main Street on open land, then demo existing site b. Hoosier Desk (Mill Street)  As rendered by City Visions, whereas the back becomes retrofitted as the front entrance due to location of adequate parking and proper entrance for patrons to enter the building.  This provides ample space to configure for library needs, a mix of private/public ventures, and shared space concepts  Requires collaboration of private/public venture to effectively utilize 130,000 sq. ft. c. South Newton  Expands downtown area, utilizes donated land, and serves as integral step toward development on both sides of our riverfront for commercial and living accommodations.  Option may consider collaboration with Arts as an enhancement to its viability
  • 3. CURRENT LOCATION (1116 MAIN ST) Site Location Benefits • Stays in same location in downtown vicinity (0.3 miles to downtown square) • Utilizes the Library grounds in most effective manner at no additional cost of land ownership • Strong community support for the Library’s current location • Contributes to the overall City Redevelopment Plan of an expanding and flourishing downtown Obstacles • Liability associated with remaining open at current site during construction OR costs to relocate if the library moves to a temporary site during construction • Unfavorable engineering reports of current building if desired to expand or utilize any existing portion of the building as part of the new building • Requires thoughtful land acquisition planning if future expansion is considered as part of long-range (10-25 years) OR thoughtful planning and consideration of feasibility and practicality of building up, not out (second story consideration) • Parking must be reconfigured to assure maximum gain for additional programmatic services Parking Considerations • Could incorporate angled parking, a parking lot in place of existing building if new building located toward Main Street, or closure of a side street to accommodate more parking • Current ordinance requires one spot per 400 sq ft • 28,000 sq ft building, requirement would be 70 spots • Variance possible from city to remove/change restriction • Add parking by purchasing nearby properties • Change street configuration to allow angled parking/one way side streets • Close down either 11th or 12th street completely • Annex provides 15 offsite parking spots Current/Future Budget  Utilities o New building/equipment much more efficient than current equipment o Past documentation shows costs would not rise significantly
  • 4. Current/Future Budget cont.  Staffing o Believe staffing would not need to increase in main building if built as a one story design o Unknown on cost of annex staffing; depends on utilization plan  Repairs o Significant costs on current building to maintain status quo o Annex is costing more than expected to maintain Size Recommendations (See Key Considerations sheet) SINGLE PHASE VS. TWO PHASE CONSTRUCTION Single Phase Construction (Demolish existing library and move operations to temporary location) Benefits • Liability concerns limited by removing library services from construction site • Additional land may not have to be purchased if library is in another location during construction • Construction can move much quicker without the vehicle and people traffic that • Could result from the library staying open at current location during construction • Shift of services to other locations. Focus more on branches during construction Obstacles • Temporary location could be needed for approximately 18 months • Additional cost of moving collection twice • Temporary building site must meet Indiana Code and Library Standards • Limited amount of collection available Two Phase Construction (Library stays open at current site while part of the building is built, then moves into new part while the old building is demolished.) Benefits • Would require only one move for library equipment and books • A temporary location would not be needed • Limits the time library would need to be closed during moves • Moving across the park is a lot easier than moving across town • Shift of services to other locations. Focus more on other branches during construction Obstacles • Most likely necessary to buy additional property (land adjacent) OR shut down streets for construction staging • Parking during construction extremely limited • Liability concerns with public entering a construction site • Collection may be limited during construction
  • 5. Annex • 6,800 sq ft when including all three floors • Only 1st floor is handicap accessible o If any significant work is done to building, the entire building must become ADA compliant • Library personnel offices o Current staff in Annex includes Director, Bookkeeper and IT Manager o Plans to also move Centralized Cataloging to Annex by end of 2014 • Meeting Rooms o Income possibilities o Not enough area for a “large meeting room” for special programs over 50 people o Look for another property to rent or borrow for large library programs approximately 10 times a year if new plans do not include large meeting room • Tutoring/Quiet Study Space o Alleviate some congestion and table space in main library o Need to decide on consistent hours for study space • Parking o Provides 15 additional off street parking spaces to library Total Project Cost  Considerations o Demolition of current building o Purchasing additional property (if necessary) o Cost from city to buy current land o Renting temporary space (if necessary) o Tax increases o Referendum costs o Fundraising o Current cash on hand for project CURRENT LOCATION (1116 MAIN ST)
  • 6. HOOSIER DESK (MILL ST) Site Locations Benefits • Library stays downtown (0.3 miles to downtown square) • Up to 130,000 square feet available at the site to accommodate a private and public partnership of repurposing this relatively empty warehouse in our downtown community • Contributes to the overall City Revitalization Plan to repurpose old and unused buildings in the downtown footprint • Provides a natural collaboration between the library and arts, which could lead to many shared spaces to save on costs for all parties involved • City Vision has detailed plans (see Memo) on how the library could fit into redevelopment plans and meet civic and community needs (such as Library) • Only one move required with very little time of library being closed to public • Connects Library with our history and heritage inside a wood manufacturing building Obstacles • Unknown costs to purchase building (or part of building) and renovate - Requires additional private negotiations among all parties • Engineering and architectural plans required before any definitive plan is developed • Requires an evaluation of what services and programmatic space could be shared, which requires defined costs structures and shared costs estimates among agencies • Several common areas might require larger footprint if servicing two agencies • Requires private investment to accommodate full 130,000 sq ft or lead public agency to oversee the project outside the Library’s purpose or scope Parking Considerations • Parking is in rear of building so likely that would become main entrance • Large parking area could be accommodated with proper paving and shared costs for public-private mix use Current/Future Budget • Utilities o Older building so costs could be significant to repair/replace o How are the utilities divided between shared spaces?
  • 7. Current/Future Budget cont. • Staffing o Staffing needs would depend on how the library is designed o Unknown on cost of annex staffing; depend building utilization • Repairs o Requires cost-sharing defined protocol for common / shared spaces o Building would be remodeled but an older structure remains • Income potential o Renting out extra space for private investors o Meeting room rental o Repurposed civic use could lead to additional interests for common space Size Recommendations (See Key Considerations sheet) Annex (Same considerations for Hoosier Desk and South Newton sites) • Cost analysis would be needed to see if building still is feasible for library to own if library is no longer located at existing site • Could be used to house collections such as genealogy but at added cost due to extra staffing needed • If staff all move to new building, the current offices could be opened up as a large meeting room • Possibility of library renting out property to other businesses • Renovations are limited due to ADA laws and historical building status Total Project Cost • Considerations o Purchase cost of the Hoosier Desk building o Engineering and Architectural designs o Possibility of grants due to revitalization project o Current building reverts to city if the library leaves o Tax increases o Referendum costs o Fundraising o Current cash on hand for project HOOSIER DESK (MILL ST)
  • 8. SOUTH NEWTON Site Location Benefits • Library stays downtown (0.4 miles to downtown square) • Land would be donated if it meets necessary appraisal value • Contributes to the overall City Revitalization Plan of an expanding and flourishing downtown to both sides of the river • Could serve as another possibility for a library/arts collaboration • Only one move required with very little time of library being closed to public • Potentially could highlight its proximity to Riverwalk, which is a highly favorable community asset that was once viewed as “undesirable territory” or outside the visionary scope to be classified as a downtown community asset Obstacles • Overcoming past failures of the site could be a challenging proposition • Need city’s help to improve infrastructure to make the site more accessible by means other than motor vehicle • Requires an evolved perception that “south of the river” is relevant and viable expansion of downtown vision and area of interest • If the library built on this site, would other businesses follow and make area flourish? • Address the stigma that this site is “too close to the jail” • What happens if land does not appraise for necessary amount • Could land still be donated to Library even if this option does not proceed? o Hence, the library could leverage the gift for resale as part of endowment building program or immediate building needs Parking Considerations • Plenty of land available for off-street parking lot Current/Future Budget • Utilities o New building would be much more efficient than current building o Cost of adding utilities to build site
  • 9. Current/Future Budget cont. • Staffing o Staffing needs would depend on how the library is designed but should be able to meet needs with current staff with a one-floor design o Unknown on cost of annex staffing; depends on how building would be utilized • Repairs o Should be minimal due to new construction Size Recommendations (See Key Considerations sheet) Annex (Same considerations for Hoosier Desk and South Newton sites) • Cost analysis would be needed to see if building still is feasible for library to own if library is no longer located at existing site • Could be used to house collections such as genealogy but at added cost due to extra staffing needed • If staff all moves to new building, the current offices could be opened up as a large meeting room • Possibility of library renting out property to other businesses • Renovations are limited due to ADA laws and historical building status Total Project Cost • Considerations o Land Donation-appraisal contingency o Engineering and Architectural designs o Collaborative efforts o Current building reverts to city if the library leaves o Tax increases o Referendum costs o Fundraising o Current cash on hand for project SOUTH NEWTON